INSTALLATION INSTRUCTIONS. MODEL Version W SUBMERSIBLE SUMP PUMP

Similar documents
300828TWP INSTALLATION INSTRUCTIONS MODEL SUBMERSIBLE SUMP PUMP

MODELS PH PH PH

INSTALLATION INSTRUCTIONS

MODEL SJ10. Installation Manual. SumpJet TM - Water Powered Backup System C IMPORTANT: MODEL SERIAL

Series Sump and Sewage Systems

TYPICAL INSTALLATION INSTRUCTIONS

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

YOUR SPLASH PAD RESOURCE

HYDRAULIC DOCK LEVELER OWNERS MANUAL

INSTALLATION INSTRUCTIONS CMP SERIES

EASY INSTALLATION INSTRUCTIONS FOR BASEMENTSAVER WP-SERIES WATER POWERED BACKUP SUMP PUMPS - MODELS WP1, WP2, & WP3

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SC Series Modular Reverse Osmosis System. January 2012 Version

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version

SECTION SLUDGE HOLDING TANK DECANTER PUMP

Residential Sewer Backup Prevention Program

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

HYDROMATIC W/D/V-A1 SUBMERSIBLE SUMP/EFFLUENT

PRESQU ILE. A. Ordering Information. B. Required Electrical Service. C. Product Information T01-F INSTALLATION INSTRUCTIONS

PRESQU ILE. A. Ordering Information. B. Required Electrical Service. C. Product Information T01-B INSTALLATION INSTRUCTIONS

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual

SECTION MOTORS AND PUMPS FOR PLUMBING SYSTEMS

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

FAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS.

Liner Replacement Instructions:

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

Pulsar Whirlpool Bath with Surround INSTALLATION INSTRUCTIONS

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

SpeedTrace Roof & Gutter Pre-Assembled Self-Regulating Heating Cable

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

Gerber M Series Site Requirements

Quick-Start Operating Guide Document No Process Gas Cooler Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1" Solids: 1/8" GPM: TDH:

Fiberglass Cooling Towers

SK75/100. Performance Data TOTAL HEAD IN FEET HEAD-METERS 6 SK100 SK Liters/Second Capacity-U.S. G.P.M.

SEPTIC TANK CONSTRUCTION GUIDELINES

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION COOLING TOWER

B-500 / B-600 SERIES

olor Match POOL FITTINGS, INC. Blending Beauty & Function

SECTION PACKAGE BOOSTER PUMP STATIONS

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09008

Installation Instructions EQ-400 Whole House Water Filter

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

Flygt 2700 series. Corrosion resistant dewatering pumps. 50 Hz

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

Thank you for purchasing the SC-CONVERSION System 500/600 Conversion Kit. This Kit is available in two different versions:

WHOLE HOUSE FILTER &

EMERALD ROUGHING-IN. A. Summary Of Key Requirements. B. Product Inspection. A.Ordering Information: A. : T01-B 1 INSTALLATION INSTRUCTIONS

Switch-Tek. LV41 & LV42 Series Manual. Sump Float Level Switches

Legacy Environmental Process, LLC 1445 Ashville Road, Suite 103 Leeds, Alabama In USA Fax:

HSES Evaporative Cooling System Installation Manual

Ecologix Environmental Systems, LLC

Village of Arlington Heights. Sewer Back-up Rebate Program

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps...

78-RK VARIABLE SPEED HEAVY DUTY VIBRATOR OPERATING MANUAL

Daytona Beach Pier Building Renovation Jun 2010

FERTILIZER IRRIGATION EQUIPMENT LTD. SERIES 6000 APPLICATIONS

Pioneer Forced Draft Cooling Tower Specifications

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

Training Certification Categories

Drag Chain Conveyor Installation and Operation Manual

Simplex Fiberglass Lift Station: Hard Piped

Introduction. Disclaimer. Table of contents

SHCM SHOWER COLUMN INSTALLATION INSTRUCTIONS

Reverse Osmosis User s Manual

Fiberstars Lighted Laminar Flow Fountains

AQUAROBIC MINI-PLANT TM

Radon Vent Pipe System. Labeling Performance Indicators

Pump Company. Simsite Structural Composite Pumps. The only Pump that is Impervious to Salt Water Corrosion. Since 1919 VERTICAL PIT

Verona Whirlpool Bath

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

Typical Finished Basement Details

Blender. Instruction Manual

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

Assembly Instruction wedi Fundo Floor element

SECTION PLUMBING PIPING SYSTEMS

Fairfax County, Virginia

B. System Design and Performance Requirements

This policy will generally explain the following in regards to the City sewerage collection systems:

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

BEST ONE SUBMERSIBLE SUMP PUMPS EPA. Page Features & Applications 100 Exploded View 101 Pump & Motor Specifications 102 Selection Chart / Type key 103

Troubleshooting Guide 9702 Series

Global Water globalw.com

Chapter 3: General Regulations

Owners Manual Models: 200-RODI4-XXX. US Water Systems 4 Stage RO/DI System Installation and Maintenance Manual.

ATT-42/95 SAMPLING, Asphalt

PSP Series Water Purification Systems

ROOF MOUNT KIT OWNERS MANUAL

Annex A STATEMENT OF WORK Radon Mitigation

MASTER. Installation and Operation Manual. Water Conditioning Corp. DECHLOR Series Flow-Through Residential Carbon Filters.

ELVORON LU/LA ELEVATOR

- CONSTRUCTIONS 300 SECTIONAL VIEW 300 SECTIONAL TABLE 301 QUANTITY FOR MODEL 302 MECHANICAL SEAL 303 BEARINGS 304

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

SECTION 5 E-Treat Water Conditioning Systems

Transcription:

www.burcam.com 2190 Dagenais Blvd. West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping. However, occasional damage may occur due to rough handling. Carefully inspect your pump for damages that could cause failures. Report any damage to your carrier or your point of purchase. INSTALLATION INSTRUCTIONS MODEL 300527 Version W SUBMERSIBLE SUMP PUMP Please read these instructions carefully. Failure to comply to instructions and designed operation of this system, may void the warranty. 2014 BURCAM Printed in Canada 310261

SAFETY INSTRUCTIONS: This fine pump that you have just purchased is designed from the latest in material and workmanship. Before installation and operation, we recommend the following procedures: A B C D E Check with your local electrical and plumbing codes to ensure you comply with the regulations. These codes have been designed with your safety in mind. Be sure you comply with them. We recommend that a separate circuit be lead from the home electrical distribution panel properly protected with a fuse or a circuit breaker. We also recommend that a ground fault circuit be used. Consult a licensed electrician for all wiring. The ground terminal on the three prong plugs should never be removed. They are supplied and designed for your protection. Never make adjustments to any electrical appliance or product with the power connected. Do not only unscrew the fuse or trip the breaker, remove the power plug from the receptacle. Assuming that you have a sump pit located in your basement floor... Your sump pit must be constructed from concrete, brick, tile or more recently a sump basin made from plastic and/or fiberglass. The minimum size of your sump pit MUST be 18 in diameter and no less than 25 deep. When pit is ready, proceed to next step. MONTHLY MANDATORY CHECK-UP: 1. Inspect the pump and the sump for any obvious condition that necessitates cleaning, correction, adjustement or repair. 2. Clear the sump and the surroundings of any paper, leaves or other debris that might clog the input openings. Remove anything that might float into the sump. 3. Assure that the pump is secure and vertical for proper operation. 4. Assure that there is adequate clearance from any combustible materials or structure. Stored materials must be kept away from the pump. Shelves or cabinet structures must not be in close proximity over the pump. 5. Assure that the motor is securely plugged into a proper GFCI electrical outlet. 6. Test the GFCI outlet by pressing its test switch. This should prove that the outlet is energized and will trip off to protect against a ground fault. Be sure to reset the GFCI by pressing its reset switch. 7. Lift the float to prove that the pump will start when required. (Step 8 below will test submersible pumps with enclosed floats). 8. Put a pail of water (8 liters) in the sump to prove that any check valve present will permit effluent to flow. 9. Observe that the plumbing can carry the effluent safely out of the residence. Material required for submersible sump pump installation: Desired length of 1 1/2 or 1 1/4 of ABS/DWV pipe to link up the pump to the drain line. 1 only 1 1/4 check valve (350353) (Note that this 1 1/4 check valve may also be use with a 1 1/2 pipe). 18 x 25 sump basin. 1 1/4-1 1/2 stainless steel clamps (750886). ABS cement. Tools: NOTICE This unit is not designed for applications involving salt water or brine. Use with salt water or brine will void warranty. Screwdrivers, hacksaw to cut pipe, knife to assist in pipe cutting, round file to smooth pipe ends, pipe wrench, adjustable wrench to tighten fittings. 2

APPLICATION: This submersible sump pump is designed for a permanent sump installation To be used in a residential cottage and farm application. Capacity: US GPH LPH 5 4000 16600 Friction loss not included. 10 3200 13600 15 2300 10200 20 1300 7550 25 300 2250 FEATURES: Non corrosive material. Stainless steel motor body. Stainless steel mechanical rotary seal. Thermal and overload protection. Piggyback grounded cables. 3/4HP, 115VAC, 60Hz, 5.5A (10A at start). INSTALLATION STEPS: IMPORTANT NOTICE : Please note before you proceed with the installation of this product that the manufacturer s guideline has to be respected. Failure to comply may void your warranty. The following are minimum requirements in order to protect your residence from flooding. It is a small investment but it is your personal responsibility to protect your home, family and valuables. Failure to comply with the following requirements may also void your warranty: - Two (2) pumps have to be installed in the sump pit. The first pump as a primary pump and the second pump as the backup unit. - Burcam alarm system model 450454 has to be installed to advise you of any malfunctions. - As sump pumps are electrically powered and activated so to prevent flooding, a Burcam battery powered back up pump model 300403 has to be installed to evacuate the water. Pump selection, proper and adequate installation are a must to comply with local by-laws and need to be adhered to. STEP 1 We recommand that you install your pump in a clean location where there is adequate room for servicing at a later date. Protection from freezing temperatures and good ventilation should be considered as well, to provide the pump an environment for long life. Do not use to pump gas or toxic fuels. This submersible sump pump is designed to pump water only. Friction losses in the discharge pipe must be taken into consideration when the horizontal offset is greater than 50 feet. The discharge pipe should be increased from 1 1/2 to 2. This will reduce friction losses and allow the pump to give maximum performance. More friction losses must also be taken into consideration when many elbows and fittings are installed in the discharge line. Each elbows and fittings must be considered as 1 feet of head. The float switch of your pump has been pre-set at the factory and does not need any adjustment. Never run the pump dry. Damage to the seal may occur. Fill pump pit or sump basin with water before turning on the power. STEP 2 Assuming that you have a sump pit located in your basement floor... Your sump pit may be constructed from concrete, brick, tile or more recently a sump basin made from plastic and/or fiberglass. The minimum size of your sump pit should be 18 in diameter and no less than 5 deep. When pit is ready, proceed to next step. 3

SUMP PUMP APPLICATION (See diagram on page 5) STEP 3 At this step, you have the opportunity to install a 1 1/2 or a 1 1/4 discharge. We recommend a 1 1/2 ABS/DWV discharge. Install a check valve (350362 in-line 1 1/2 or 350353 1 1/4 MNPT inlet and 1 1/4 or 1 1/2 outlet) over discharge pipe of your pump and secure it with stainless steel clamps or glued nipple for ABS/DWV pipe. This check valve will allow easy access to pump, should service be required. STEP 4 Install and position your submersible sump pump in the centre of your sump pit or basin and ensure that there is clearance to allow the mechanical float switch a free working area without obstructions (pipe, pit s wall, power cord). The float cord length is factory set and should not need adjustment. If adjustment is required, the switch cord can be shorted or lengthed. STEP 5 Install your discharge pipe from check valve to the point of discharge or drain. For installation over 50 feet of horizontal position discharge pipe, use a 2 pipe to reduce friction loss. STEP 6 The mechanical switch provided with your pump is supplied with a serial electrical male plug. Fix the power cord of the pump into the piggy-back receptacle of the switch and plug this one into electrical grounded outlet. We recommend that a licensed electrician be employed to do wiring. Permanently ground the motor in accordance to the electrical codes for your area. Do not use an extension cord to connect your pump to the power source. From your distribution panel to the receptacle, we recommend a wire gauge not smaller than 14 gauge. Use tape or tie wrap to fix power cords to discharge pipe. STEP 7 Fill the sump pit or basin with water to test the operation of your submersible sump pump. The motor should start when the water level reaches approximately 3 over your pump. Allow the pump to go through several on-off cycle to assure satisfactory operation. If needed, see trouble shooting guide in this manual. STEP 8 Review your installation with typical diagram. Check all connections for leaks. MAINTENANCE: Unplug the switch and pump motor power cord. Remove the pump from pit or basin. Remove trash accumulation and dirt from the pump and float switch. Be sure the float switch operates freely after cleaning. If tar or paint has been received in the pit or basin, use kerosene to remove residue from float switch or pump. Do not use strong paint solvents. Remove the screws that hold the strainer or the base to the bottom of the pump body. Pry the base off the pump body carefully. Clean the impeller and volute passage way from any debris wich may have become in contact with these parts. Again, If tar or paint has entered pump, clean with kerosene. Do not use strong paint solvents. Be sure impeller turns freely after cleaning. Check and clean away any debris wich may be clogging the suction inlet, pump discharge, check valve and discharge line. screws and return sump pump to sump pit or basin and reconnect to piping. 4

SUMP PUMP APPLICATION STEP 3 Prepare your choice of discharge pipe size and check valve. STEP 6 Connect float and motor power cable. STEP 2 Sump pit 18 diameter X 25 depth. STEP 7 Fill the basin and test the operation. STEP 8 Review and check connections for leaks. STEP 5 Install discharge pipe. STEP 4 Install your pump in center of pit. REPAIR PARTS REF. PARTS DESCRIPTION 1 310246 Base 2 310247 Housing cover 3 310248 O-Ring 4 310249 Hydraulic housing 5 310250 Lower seal 6 310251 Nut 7 310252 Impeller 8 310253 Flat washer 9 310254 Rubber ring 10 310255 Mechanical seal 11 310256 Plastic washer 12 310257 Oil seal 13 310263 Motor 14 310258 Screw (6) 15 310259 Plug 16 310260 Screw (3) 17 450468A Switch 18 52285 PVC Elbow (none shown) 17 4 3 2 1 16 15 13 12 10 8 6 14 11 9 7 5 Repair parts may be ordered from your authorized point of sale or from BURCAM PUMPS 5

TROUBLE SHOOTING GUIDE CHECKLIST NEVER MAKE ADJUSTMENTS TO ANY ELECTRICAL APPLIANCE OR PRODUCT WITH THE POWER CONNECTED. DON T JUST UNSCREW THE FUSE OR TRIP THE BREAKER, REMOVE THE POWER FROM THE RECEPTACLE. TROUBLE PROBABLE CAUSE ACTION Motor does not run. Switch is off position Blown fuse Tripped breaker Plug disconnected Corroded plug Low water level Thermal overcharge Defective switch/float Defective motor Improper float position Turn switch to on position Reset Re-install Clean prongs Add water and verify Cool the motor /repair Check movement Pump does not deliver to full capacity. Jammed impeller Plugged check valve Blocked suction/inlet Discharge leak Blocked line/pipe Worn impeller Defective motor Clean Clean/replace Check for debris in pit and clean Repair Check for debris or ice Repair/replace Pump does not shut off. Defective switch Float obstruction Blocked suction/inlet Adjust/check Check for debris in pit and clean TO THE END CONSUMER If you have any problems with the product, before advising the store, where you ve purchased the pump, please contact us at 514 337-4415, and ask for our sales department, and they will be pleased to help you with any questions you might have, concerning your installation. 6