Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS

Similar documents
Conclusions & Lessons Learned

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

500 Interchange Design

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

LOCATION AND DESIGN DIVISION

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

LOCATION AND DESIGN DIVISION

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

SUBDIVISION SECTION STREET DESIGN MANUAL

Standard Performance Attributes for Transportation Projects

Members of the Board of Directors. Laurena Weinert, Clerk of the Board

CITY OF CLOVIS Traffic Impact Study Guidelines

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

Performance Based Practical Design (PBPD)

Central Phoenix Transportation Framework Study

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Barrington Road. at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study. Community Advisory Group Meeting #1

Woodburn Interchange Project Transportation Technical Report

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

Performance Based Practical Design. An FHWA Perspective

PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Alder Drive / Blair Road Bridge Replacement Projects

Downtown Estes Loop Project Frequently Asked Questions

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRANSPORTATION IMPACT STUDIES

An Introduction to the. Safety Manual

TABLES OF CONTENTS APPENDIX C

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

1.1 Purpose of the Project

Buffalo Niagara Integrated Corridor Management Project. ENTERPRISE Webinar Keir Opie, Cambridge Systematics September 26, 2016

Roundabouts at Interchanges and High Speed Approaches

CE 452 Traffic Impact Assessment

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration

Arizona Association of County Engineers New Rules for Categorical Exclusions for FHWA Projects

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

INSIGHTS INTO THE FIRST THREE DIVERGING DIAMOND INTERCHANGES IN MISSOURI. A Thesis presented to. the Faculty of the Graduate School

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours

APPENDIX C COMMENTS AND RESPONSE TO COMMENTS RECEIVED ON DRAFT NEGATIVE DECLARATION

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

2017 Highway Safety Improvement Program Call

Development of TSP warrants. to-day variability in traffic demand

Geometric Design: Past, Present, and Future

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

ITEM 9 Action October 18, 2017

Chapter 1. FHWA Guidance & Policies Traffic Analysis

The Secrets to HCM Consistency Using Simulation Models

TRANSPORTATION INFRASTRUCTURE FOR CAPE COD

TABLE OF CONTENTS CHAPTER 2D - PLAN DESIGN. SECTION 2D-1 PROJECT REVIEW General... 2D-1

I-91 Viaduct Public Information Briefing

For Public Input Period

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

Carpinteria Avenue Bridge Replacement Project Description Introduction

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION

Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory

TRANSPORTATION TRANSPORTATION 9-1

MONITORING IMPLEMENTATION AND PERFORMANCE

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

AED Design Requirements: Site Layout Guidance

Construction Alternative Screening with Regional Travel Demand Model

FUTURE BUS RAPID TRANSIT PLANS

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Analytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014

Funding for this guidebook was provided through the Genesee Transportation Council s Unified Planning Work Program

200 th Street Interchange Review

TRAFFIC ANALYSES TO SUPPORT NEPA STUDIES

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

Study Area Roadways for Road Diet / Lane Narrowing / Reconfiguration 11/11/2016

Chapter URBAN & RURAL FREEWAY DESIGN

Regional Transportation Studies Regional Council

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA

Interchange Workshop Report (August 2004)

TABLE OF CONTENTS SECTION

National Cooperative Highway Research Program

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING

Concept Development Guideline January, 2018

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

APPENDIX A TIER 1 ANALYSIS

CUY-90-Innerbelt ODOT PID No 77510

Transcription:

DIVERGING DIAMOND INTERCHANGE State Route 120/Union Road Diverging Diamond Retrofit Presented by: Mark Houghton Sam Sherman Matt Brogan Aaron Silva City of Manteca Caltrans, District 10 Mark Thomas Mark Thomas

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS

PROJECT HISTORY

PROJECT HISTORY

PROJECT HISTORY

Existing Interchange Configuration Growth in Manteca Congestion along SR 120 PROJECT HISTORY

Existing Conditions

Partial Cloverleaf (Type L-9) Provided Operational Improvements Required Bridge Replacement Non-Standard Design Features High Construction Costs PREVIOUS DESIGN

PREVIOUS DESIGN Project Study Report/Project Report Approved 2010 Initial Study/Mitigated Negative Declaration Approved 2010 65% Design Plan Development Results: High Construction Costs Adjacent Development Influence

Existing & Planned Development Access Needs Timing Concerns ADJACENT DEVELOPMENT

Existing & Planned Development Access Needs Timing Concerns ADJACENT DEVELOPMENT

Existing & Planned Development Access Needs Timing Concerns ADJACENT DEVELOPMENT

INTERCHANGE INNOVATION 1950 s

INTERCHANGE INNOVATION 1970 s

INTERCHANGE INNOVATION 1980 s

INTERCHANGE INNOVATION 1990 s

INTERCHANGE INNOVATION 2000

INTERCHANGE INNOVATION 2010

INTERCHANGE INNOVATION NOW

REVISED APPROACH Traffic Conditions & Forecasts Cost Savings through Design Improved Development Access Long Term Operational Efficiency

SR120/Union ionion onr Road n Road Interchange nge

SR120/Union ionion onr Road n Road Interchange nge

FHWA SA-14-067

TRAFFIC OPERATIONS 1

TRAFFIC OPERATIONS

TRAFFIC OPERATIONS

CROSS STREET PRIORITY

CROSS STREET PRIORITY

RAMP PRIORITY

RAMP PRIORITY

PEAK HOUR TRAFFIC

PEDESTRIAN CIRCULATION

PEDESTRIAN CIRCULATION

PEDESTRIAN CIRCULATION

PEDESTRIAN CIRCULATION

GEOMETRIC DESIGN CRITERIA DDI BOUNDARY

GEOMETRIC DESIGN CRITERIA HDM 101.2 Highway Design Speed Standards A = 45 mph M = 35 mph ---------------------------------- DIB 90 25-35 mph

GEOMETRIC DESIGN CRITERIA HDM Chapter 200 Super Elevation Runoff & Curvature --------------------------------- DIB 90 - -2% FHWA Guide Exhibit 7-14

GEOMETRIC DESIGN CRITERIA HDM 504.3(3) Intersection Grade 4% or Less --------------------------------- DIB 90 Grade shall be 5% or less (Advisory)

GEOMETRIC DESIGN CRITERIA HDM 301.1 and Table 504.3 Lane widths ---------------------------------- DIB 90 HDM Standard Applies

GEOMETRIC DESIGN CRITERIA HDM 1003.1 (8A) Bike Paths shall not be placed in median of a Local Roadway ------------------------------------------- DIB 90 Sidewalks, Multi-use Paths, Class II Bike Lanes Acceptable

GEOMETRIC DESIGN CRITERIA 40-45

GEOMETRIC DESIGN CRITERIA

LESSONS LEARNED

APPROVALS PROCESS WITH CALTRANS Caltrans is CEQA lead Revalidation Caltrans will own and operate the results Draft DIB 90-DDI Guidelines (FHWA based) Govt. is slow to adopt new concepts Risk Adverse Deeply Ingrained Culture Lengthy processes to create/adopt Non-STD Specs Gray boundaries of responsibilities Caltrans wants to set the proper precedence for future DDI Long Review Times - Multiple Reviews Numerous Reviewers

PROCESS STICKING POINTS Traffic Operations Analysis (new counts, calibration, analysis) Concern over non-typical DDI pedestrian crossing Advisory and Mandatory Design Exceptions Request to install ramp metering, although not likely to be used Air Quality - RTP consistency (SJCOG effort to update RTP) Structure Type Selection Public Acceptance

FINAL DETAILS Class I Bike Path/Pedestrians Ramp Metering Single Lane On-Ramp Stopping Sight Distance

PEDESTRIAN CIRCULATION

PEDESTRIAN CIRCULATION

PEDESTRIAN CIRCULATION

RAMP METER QUEUES

RAMP METER QUEUES

SINGLE LANE ON N-RAMP

STOPPING SIGHT DISTANCE

STOPPING SIGHT DISTANCE

STOPPING SIGHT DISTANCE

OUTREACH

SPRING 2017 SCHEDULE APPROVED TRAFFIC ANALYSIS SUMMER 2017 ENVIRONMENTAL REVALIDATION WINTER 2017 FINAL CONSTRUCTION DOCUMENTS SPRING 2018 AWARD/CONSTRUCTION

QUESTIONS?