San Diego Basin Study IRWM RAC Meeting

Similar documents
Developing Metrics & Indicators for the California Water Plan. CA Sustainability Indictors Symposium February 23, 2011

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

Colorado River Basin Water Supply and Demand Study. WRRC 2013 Conference University of Arizona Tucson, AZ March 5, 2013

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Raw Water Supply Master Plan Development

Colorado River Basin Water Supply and Demand Study. Navigating the Future of the Colorado River Natural Resources Law Center June 9, 2011

U.S. Army Corps of Engineers Reservoir Operations Maria Placht, Institute for Water Resources, USACE 49

2 Vision and Objectives

Water Management Representatives

2014 Sustainable Groundwater Management Act

IMPROVING FEDERAL ENERGY DEVELOPMENT DECISIONS: THE USE OF ECOSYSTEM SERVICE VALUATION

Committee on Water. Desalination as a Water Source

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants

Canada-Ontario Domestic Action Plan for Lake Erie Phosphorus Reduction. Agriculture Sector Working Group April 19, 2017

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

Green Infrastructure in the Transportation Sector

IMPACT OF CLIMATE CHANGE ON WATER AVAILABILITY AND EXTREME FLOWS IN ADDIS ABABA

Utility in Transition

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

Climate Adaptation. Introduction

Frequently Asked Questions Updated July 17, 2015

ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Challenges in Seoul Metropolitan for restoring urban water cycle

Walnut Creek Watershed Management Authority. Project Kick Off March 18, 2015

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

Ecosystem Service Tradeoffs in the Implementation of the Bay TMDL

Ecosystem Services: Provision, Value & Policy. Steve Polasky University of Minnesota & Natural Capital Project

Developing Evaluation Criteria

Evaluation of Leaf Collection Programs as a Means to Reduce Nutrient Loads from Urban Basins in Wisconsin

Los Angeles 3 rd Regional

Council of Governments

City of San Diego Pure Water Project October 2014

Cape Town water outlook 2018

Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved.

Water-Energy-Carbon Nexus and Your Membrane Plant

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager

Latest Developments and Trends in Water Reuse Research and Policies

Missouri River Basin Water Management

Implementing Stormwater Management through Split-Flow Drainage Design

Integrated Watershed Management Plan

Key Facts: Metropolitan Responses to Statements from the San Diego County Water Authority

Project Prioritization

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

Green Credits for Water & Wastewater Systems November 4, 2010

GRowing Outcomes in Watersheds (GROW) A home-grown ecological goods and services program for Manitoba

Narragansett Bay and Watershed Restoration Bond Fund

INTEGRATED ECONOMIC-ENGINEERING ANALYSIS OF CALIFORNIA'S FUTURE WATER SUPPLY EXECUTIVE SUMMARY

An investment model for large-scale green

Assessment of the Health of Santa Ana River Watershed

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017

Missouri River Basin Water Management

Models Quantify the Relationship Between Water Flows/Levels and Ecological Endpoints

The Impacts of Climate Change on Portland s Water Supply

El Dorado Water & Power Authority. El Dorado Water Reliability Project

Uncertainty in hydrologic impacts of climate change: A California case study

Riparian Buffer Restoration Fund. Gregg J. Cassidy RI DEM, Sustainable Watersheds Office

Long Term Water Supply Board of Directors Workshop. March 10, 2015

Overview of Truckee Meadows Water Resources

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW HOUSE BILL 609

DECISION. FORTY-SIXTH SESSION OF THE IPCC Montreal, Canada, 6 10 September 2017

Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017

EXECUTIVE SUMMARY STORMWATER CAPTURE MASTER PLAN

Measuring and Valuing Natural Assets: Ecosystem Services. Steve Polasky University of Minnesota & Natural Capital Project

Master Environmental Servicing Plan and Secondary Plan

TMDLs: An Agency s Perspective California Marine Affairs & Navigation Conference Panel Discussion

Recent RiverWare and RiverSMART applications on the Colorado River Basin RiverWare User Group Meeting August 24, 2016

Carbon Creek Channel (OCFCD Facility No. B01) from upstream Intersection of Western/Orange to upstream Beach Boulevard.

Cedar River Watershed Habitat Conservation Plan

2015 Urban Water Management Plan for Mojave Water Agency

Colorado River Challenges Impacts to Southern Arizona

NBI strategic water resources analysis Phase I findings

MODELING AT SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD)

Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project

Climate Adaptation & California Native American Tribes

Climate-Informed Water Resources in the Southeast United States. Rachel M. Gregg June 2015

March 16, The Honorable Donald J. Trump President of the United States The White House 1600 Pennsylvania Ave. N.W. Washington, DC 20500

Lag-Times in the Watershed and their Influence on Chesapeake Bay Restoration. STAC Workshop October 16-17, 2012 Annapolis, MD

Introduction of Chinese Cooperation Initiatives on Scientific Research under CEWP. Sun Yan Research Coordinator, MWR 20 June, 2013 Brussels

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT

Integrated Water Resources Management

IPCC Special Report on Climate Change and Land. Jim Skea Co-Chair, IPCC Working Group III

Water & Environment. Preparing for the future

Minnesota River Basin Interagency Study

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

Opportunities for Improving Water Supply Reliability for Wildlife Habitat on the Tule Lake and Lower Klamath National Wildlife Refuges

Spring Forecast Based Operations, Folsom Dam, California

Managed Groundwater Recharge to Support Sustainable Water Management. A Sacramento Valley Perspective November 8, 2017

Emerging Issues: Adapting To Climate Change

Water Technology and Policy Challenges to Mike Shapiro Deputy Assistant Administrator Office of Water U.S. Environmental Protection Agency

Will be modified map from GIS 6/16 EOD

Achieving Sustainability Goals through TBL Analysis & Culture Change

2014 ENVIRONMENTAL SEMINAR

Gaborone Declaration for Sustainability in Africa Background Document

SPECIAL BOARD OF DIRECTORS MEETING. 1:00 p.m.

Transcription:

San Diego Basin Study IRWM RAC Meeting April 4 th, 2018 Allison Danner U.S. Bureau of Reclamation adanner@usbr.gov Sarah Brower, Ph.D. City of San Diego sbrower@sandiego. gov Agenda Task 2.4 Updates Review of Approach Preliminary Model Results Task 2.5 Updates Review of Approach Present Evaluation Objective scoring methods Timeline and Next Steps 2 1

Study Status & Timeline Water Supply and Water Demand Projections (Task 2.1) Downscaled Climate Change and Hydrologic Modeling (Task 2.2) Existing Structural Response and Operations Guidelines Analysis (Task 2.3) Structural and Operations Concepts (Task 2.4) Trade-Off Analysis and Recommendations (Task 2.5) Task 2.4 Task 2.5 Final Final Final Sept 2018 Sept 2018 Summary Report (Task 2.6) Feb 2019 3 Overview of Task 2.4 Approach Develop Portfolios that can alleviate the impacts Portfoliof increasing demands and climate change Incorporate: Determine how each portfolio will be incorporated into the CWASim model Run the CWASim Model with the portfolios for a range of climate and demand scenarios Analyze the performance of each portfolio for climate change scenarios across 4 impact areas 4 2

Task 2.4 Status & Timeline March August 2017 Developed Adaptation Portfolios and Projects List August December 2017 Revised CWASim model to incorporate projects for adaptation portfolios January April 2018 Ran CWASim model with adaptation portfolios Performing initial analysis Draft Interim Report Outline provided to STAC for review 5 Overview of Task 2.4 Approach Portfolios Baseline Concept Projects Portfolio Concept Concept Baseline + Concept Concept Increase Supplies Concept Enhanced Conservation Optimize Existing Infrastructure Watershed Health/Ecosystem Restoration 6 3

Overview of Task 2.4 Approach 16 Adaptation Concepts Conveyance Improvement Concept Portfolio Projects Concept Concept Seawater Desalination Grey Water Use Concept Concept Recycled Water Concept Etc. 7 Baseline Portfolio (B) Represents the system as it existed in 2015, with some minor modifications to include water supplies that have been or will be implemented (e.g., Carlsbad Desalination Plant and the full QSA annual transfer volume) Concepts Conveyance Improvements Drought Restriction/Allocation Firm Water Supply Agreements Groundwater Imported Water Purchases Local Surface Water Reservoirs Recycled Water Seawater Desalination Urban & Ag. Water Use Efficiency 4

Baseline Plus Portfolio (B+) Includes projects that are being actively pursued or have received funding as of 2017 (e.g. Pure Water San Diego Phase 1) Concepts All Baseline Portfolio Concepts Modified or New Concepts Conveyance Improvements Gray Water Use Groundwater Potable Reuse Recycled Water Stormwater Capture Urban & Ag. Water Use Efficiency Watershed and Ecosystem Management Increase Supplies Portfolio (IS) Projects that focus on increasing regional water supplies Concepts All Baseline Plus Portfolio Concepts Modified or New Concepts Gray Water Use Groundwater Imported Water Purchases Potable Reuse Recycled Water Seawater Desalination 5

Enhanced Conservation Portfolio (EC) Looks at enhanced water conservation beyond currently planned levels. The purpose of this Portfolio is to explore the potential for demand reductions to improve delivery reliability in the future under climate and demand uncertainty. Concepts All Baseline Plus Portfolio Concepts Modified or New Concepts Urban & Ag. Water Use Efficiency Optimize Existing Facilities Portfolio (OEF) Focuses on enhancing the efficiency of existing facilities by replacing, repairing, or maintaining existing infrastructure to maximize its operation Concepts All Baseline Plus Portfolio Concepts Modified or New Concepts Conveyance Improvements 6

Watershed Health/Ecosystem Restoration Portfolio (WE) Seeks to restore or create natural habitats and minimize environmental impacts Concepts All Baseline Plus Portfolio Concepts Modified or New Concepts Stormwater BMPs Stormwater Capture Watershed and Ecosystem Management Impacts examined in the SDBS Flood Control Energy Water Delivery Recreation Environmental Habitat Endangered Species Water Quality Ecological Resiliency 7

SDBS Demand and Climate Scenarios 2015 Demands 2025 Demands + + 2020s 2050s 2050 Demands + PRELIMINARY Water Deliveries Diversification by Scenario Note: Pure Water San Diego is not shown as a separate supply source. 8

Water Deliveries Diversification by Scenario Note: Pure Water San Diego is not shown as a separate supply source. PRELIMINARY Water Deliveries Diversification by Scenario Note: Pure Water San Diego is not shown as a separate supply source. PRELIMINARY 9

Water Deliveries Diversification by Scenario Note: Pure Water San Diego is not shown as a separate supply source. PRELIMINARY Water Deliveries Diversification by Scenario Note: Pure Water San Diego is not shown as a separate supply source. PRELIMINARY 10

Shortage Volume Percentage of Realizations above Threshold B: Four Climate Groups with shortages for 2050 Demands B+: Two Climate Groups with shortages for 2050 Demands PRELIMINARY Shortage Volume Percentage of Realizations above Threshold PRELIMINARY EC: No Climate Groups with shortages 11

Shortage Volume Percentage of Realizations above Threshold PRELIMINARY IS: Some shortages with 2050s demands for the warmer groups Shortage Volume Percentage of Realizations above Threshold PRELIMINARY OEF: Some shortages with 2050s demands for the warmer groups 12

Shortage Volume Percentage of Realizations above Threshold PRELIMINARY WE: No Climate Groups with shortages PRELIMINARY Recreation Boat Ramp Accessibility Lower Otay Boat Ramp Elevation is inaccessible in some climate scenarios for all portfolios Number of realizations with inaccessible boat ramp is lower in all adaptation portfolios compare to Baseline 13

PRELIMINARY Recreation Boat Ramp Accessibility Lower Otay Boat Ramp Elevation is inaccessible in some climate scenarios for all portfolios Number of realizations with inaccessible boat ramp is lower in all adaptation portfolios compare to Baseline PRELIMINARY Recreation Boat Ramp Accessibility Lower Otay Boat Ramp Elevation is inaccessible in some climate scenarios for all portfolios Number of realizations with inaccessible boat ramp is lower in all adaptation portfolios compare to Baseline 14

PRELIMINARY Recreation Boat Ramp Accessibility Lower Otay Boat Ramp Elevation is inaccessible in some climate scenarios for all portfolios Number of realizations with inaccessible boat ramp is lower in all adaptation portfolios compare to Baseline PRELIMINARY Recreation Boat Ramp Accessibility Lower Otay Boat Ramp Elevation is inaccessible in some climate scenarios for all portfolios Number of realizations with inaccessible boat ramp is lower in all adaptation portfolios compare to Baseline 15

Task 2.5 Status & Timeline Oct 4 th RAC Meeting Update Received feedback on Evaluation Objectives November Evaluation Objective Survey Shared with stakeholders Dec 6 th RAC Meeting Update Presented final Evaluation Objectives and survey participation Tradeoff Analysis Approach & Example Shared Adaptation Concept Definitions Jan 31 st STAC Meeting Received feedback on Evaluation Objective scoring March Adaptation Concept surveys sent to RAC and STAC Project surveys sent to Member Agencies April Tradeoff Analysis in progress 31 Tradeoff Analysis Progress 1. Synthesis of survey responses in progress 2. GIS analysis in progress 3. Modeling in progress 4. Performance Measure score calculation 5. Evaluation Objective score calculation 6. Evaluation Objective score weighting 7. Tradeoff Analysis 16

Survey Participation Adaptation Concept Survey Adaptation Concepts evaluated Recipients: STAC, IRWM RAC 12 Submitted Surveys Member Agency Survey Projects evaluated Recipients: Member Agencies 16 Surveys Submitted, representing 35 Projects Expect a total of 70 projects with completed surveys, ~58% THANK YOU FOR YOUR PARTICIPATION!!!! Questions? Overview of Task 2.5 Approach Tradeoff Analysis will compare Adaptation Concepts using 13 Evaluation Objectives (EO) Provide Reliability and Robustness Optimize Local Supplies/Independence Cost Effectiveness Regional Integration and Coordination Provide for Scalability of Implementation Project Complexity Quality of Life/Recreation Environmental Justice Regional Economic Impact Climate Resilience Protect Habitats and Ecosystem Services Water Quality and Watersheds Address Climate Change Through GHG Reduction 17

Overview of Task 2.5 Approach Adaptation Concepts receive a score for each EO Scores Concept EO1 EO2 EO3 EO4 Supplementary Material: Tradeoff Analysis Overview & Example Overview of Task 2.5 Approach Adaptation Concept EO scores will be compared Across a single EO Scores Across all EOs Across a subset of EOs Concept A EO1 vs. Concept B EO1 18

Overview of Task 2.5 Approach Adaptation Concept EO scores will be compared Across a single EO Across all EOs Across a subset of EOs Concept A Scores EO1 EO2 EO3 EO4 Weighted Average vs. Concept B EO1 EO2 EO3 EO4 Weighted Average Overview of Task 2.5 Approach Adaptation Concept EO scores will be compared Across a single EO Across all EOs Across a subset of EOs Concept A Scores EO1 EO3 EO10 Weighted Average Concept B EO1 EO3 EO10 vs. Weighted Average 19

How are Evaluation Objective Scores Calculated? Each EO is measured by one or more Performance Measures EO scores are weighted by their importance SDBS Survey results determine EO weights Survey Results & Evaluation Objective Weights Evaluation Objective Average of all responses Average Score Standard deviation Adaptation Concepts receive a weighted score for each EO. Weighted EO scores will be compared in Trade off analysis Reliability and Robustness 10.0 2.03 Optimize Local Supplies/ 9.4 1.95 Independence Cost Effectiveness 8.5 2.02 Regional Integration and Coordination 8.5 1.97 Provide for Scalability of 7.7 2.20 Implementation Minimize Project Complexity 7.3 2.39 Promote High Quality of 7.4 2.58 Life/Recreation Promote Environmental Justice 8.7 2.37 Support Regional Economy 7.8 2.28 Enhance Climate Resilience 9.6 1.76 Protect Habitats, Wildlife, and Ecosystem Services 9.2 2.10 Protect Water Quality and Watersheds 10.0 1.77 Address Climate Change Through Greenhouse Gas Reduction 8.2 2.60 20

How are Performance Measure (PM) Scores Calculated? PMs are calculated by: Model Metric Results Expert Interviews Adaptation Concept Questionnaire Project Manager Surveys and Interviews Geospatial analyses (GIS) Example: Expert Interviews 21

Example: Expert Interviews Example: GIS Analysis 22

Example: GIS Analysis Example: Expert Interview & GIS Analysis 23

EO: Provide Reliability & Robustness EO: Optimize Local Supplies 24

EO: Cost Effectiveness EO: Regional Integration & Coordination 25

EO: Provide for Scalability of Implementation EO: Project Complexity 26

EO: Quality of Life/Recreation EO: Environmental Justice 27

EO: Regional Economic Impact EO: Climate Resilience 28

EO: Protect Habitats, Wildlife, & Ecosystem Services EO: Water Quality & Watersheds 29

EO: Address Climate Change Through GHG Reduction Timeline and Next Steps Preliminary Model runs Present draft outlines to STAC and RAC Prepare 2 nd Drafts Task 2.4 & 2.5 Reports STAC Meeting STAC review & Peer Review Present results to public stakeholders Final Report Feb April June Jan 2018 March May July Sept Present results to Technical Team Respond to peer review comments Incorporate final edits & respond to public stakeholder comments 60 30

Q & A Allison Danner U.S. Bureau of Reclamation adanner@usbr.gov Sarah Brower, Ph.D. City of San Diego sbrower@sandiego.gov 61 31