NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017

Similar documents
700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION


PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18

PRE-QUALIFICATION OF SUPPLIERS PROVISION OF FUMIGATION, SANITATION AND SANITAL DISPOSAL SERVICES TENDER NO.KPLC1/5BC/9A/PT-ST/113/2010

CITY OF ROSEVILLE ENGINEERING DEPARTMENT GUIDE TO ONLINE BIDDING FOR CITY PROJECTS

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

Addendum No. 1 Page 1 of 2

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS

ADVERTISEMENT FOR BIDS

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

Finance & Technology Administrator (815) ext 223

VANDERBILT UNIVERSITY

Kenya Integrated Water, Sanitation and Hygiene (KIWASH) Project. Invitation for Bid (IFB) DISP-KIWASH

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

CLARIFICATIONS, CHANGES AND ADDITIONS TO THE BID DOCUMENTS

FORT WAYNE-ALLEN COUNTY AIRPORT AUTHORITY REQUEST FOR PROPOSALS LOCATION BASED INSPECTION/WORK ORDER SOFTWARE PROCUREMENT

HORTICULTURE SITE IMPROVEMENTS PROJECT

Statement of Work Tree Planting Services 202 Parkway, Montgomery County

INVITATION TO BID (Request for Proposal)

APPENDIX A STATEMENT OF WORK SCRAP RUBBER/TIRE REMOVAL AND RECYCLING SERVICES

CRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS 2012

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction

SECTION NETWORK ANALYSIS SCHEDULES (NCA)

United Nations Development Programme (UNDP) FOR THE

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 5/29/2015

STANDARD SPECIFICATION SECTIONS. November 2016 Physical Resources Design, Engineering and Construction

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original

Project Manual April 20, 2015

UNAVCO, INC. INVITATION FOR BID/IFB (THIS IS NOT AN ORDER)

KIMBERLY A. KERR. Interim Director of Transportation. Internet Web Site:

SEALED BID. Contract for the Implementation of the State Standard Plan for Electronic Collection and Recycling

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

Pavement Rehabilitation Project

REQUEST FOR PROPOSALS

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement

DEPARTMENT OF NATURAL RESOURCES PROVINCE OF NEWFOUNDLAND & LABRADOR Forest Service Branch PROJECT W-131c INSTRUCTION TO BIDDERS

SPECIFICATIONS FOR SIDEWALK REPLACEMENT PROGRAM

AMENDMENT TO SPECIAL CONDITIONS MBE/WBE UTILIZATION PLAN

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR

TORONTO MUNICIPAL CODE CHAPTER 67, FAIR WAGE SCHEDULE A, FAIR WAGE POLICY SCHEDULE A FAIR WAGE POLICY

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET

DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR

REQUEST FOR PROPOSALS

INVITATION FOR BID. HVAC Equipment Replacement for Nordlof Center Lower Level West. Issued November 8, Name of Bidding Firm:

REGISTRATION FOR SUPPLY, DELIVERY, INSTALLATION, REPAIR AND MAINTENANCE OF AIR CONDITIONERS SERVICE PROVIDERS

REPUBLIC OF KENYA GOVERNMENT OF MAKUENI COUNTY THE COUNTY TREASURY P.O. BOX MAKUENI

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION COLUMBIA, SC PROPOSAL FOR DRAINAGE STRUCTURE BEAUFORT COUNTY

1. Sinopse do Pedido de Cotação

INVITATION FOR BID Bid #872 - Printing Services

TENDER FOR SUPPLY OF OFFICE FURNITURE (RESERVED FOR THE SPECIAL GROUPS)

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION EVERETT MIDDLE SCHOOL ADDENDUM NO.

ADDENDUM ACKNOWLEDGMENT

to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22.

Main Building Auditorium

Altech Machining, Inc. Terms and Conditions

Gila River Indian Community Utility Authority

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS

AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING BRIDGE DECKS ASPHALTIC MEMBRANE 1

REQUEST FOR PROPOSAL (RFP)

42E? flwt?bl5 TEXAS TRANSPORTATION COMMISSION. ALL Counties MINUTE ORDER Page 1 of 1. ALL Districts. Submitted and reviewed by: R Co t

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

REQUEST FOR COUNCIL ACTION

Harvard Avenue Roadway and Streetscape Rehabilitation CIP PROJECT LOCATION BERKELEY AVE VICINITY MAP S NTS ATTACHMENT 1

SPECIFICATION NO. TxDOT * REVISED: AUGUST 2017 CRIMINAL BACKGROUND CHECKS

COUNJ... St. Charles County, Missouri 201 N. Second Street, Suite 429 St. Charles, MO REQUEST FOR BID BID OF FOR

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

Review of Purchasing Guidelines

2016 CONCRETE REPLACEMENT PROJECT

LAKE ARROWHEAD COMMUNITY SERVICES DISTRICT HEADWORKS FINE SCREEN REPLACEMENT AT THE GRASS VALLEY WASTEWATER TREATMENT PLANT PROJECT NO.

Town of Twisp, Washington

NATIONAL INDUSTRIAL TRAINING AUTHORITY TENDER NO.NITA/26/

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

THIRD STREET WATER MAIN REPLACEMENT PROJECT

PROJECT MANUAL VILLAGE OF ADDISON STREETSCAPE IMPROVEMENTS. Contract 1 GENERAL CONSTRUCTION

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CHAPTER 12: LABOR STANDARDS

NO. OF PAGES 6 BIDDERS ARE REQUESTED TO RETAIN THIS SPECIFICATION FOR FUTURE REFERENCE TABLE OF CONTENTS

PEND OREILLE COUNTY PUBLIC WORKS DEPARTMENT P.O. BOX 5040 NEWPORT, WA FAX

Transit Return on Investment (ROI) Study Request for Proposals (RFP)

INVITATION FOR FORMAL BID

Casework Technical Support (Social Welfare - Project Management)

LEVEL I PREQUALIFICATION DOCUMENTS

REPUBLIC OF KENYA COUNTY GOVERNMENT OF TURKANA PROPOSED CONSTRUCTION OF 3 BEDROOMED STAFF HOUSE BLOCKS

RFP # Request for Proposal Branding Services. Date: January 12, Proposals must be submitted by 3:00 PM: February 10, 2017

CH26 - Reward & recognition scheme

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

RIFT VALLEY WATER SERVICES BOARD

Ohio Department of Transportation

REQUEST FOR QUALIFICATIONS

HOBBS MUNICIPAL SCHOOLS P.O. Box 1030 Hobbs, New Mexico INVITATION TO BID. HMS Nutritional Services Milk

Transcription:

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017 Control 6316-00-001 Project RMC - 631600001 Highway US0059 County HARRISON Ladies/Gentlemen: Attached please find an addendum on the above captioned project. Included in the attachment is an adendum notification which details the changes and the respective proposal pages which were added and/ or changed. Except for new bid insert pages, it is unnecessary to return any of the pages attached. Bid insert pages must be returned with the bid proposal submitted to the Department, unless your firm is submitting a bid using a computer print out. The computer print out must be changed to reflect the new bid item information. Contractors and material suppliers, etc. who have previously been furnished informational proposals are not being furnished a copy of the addendum. If you have a subcontractor on the above project, please advise them of this addendum. Acknowledgment of this addendum is not requested if your company has been issued a proposal stamped This Proposal Issued for Informational Purposes. You are required to acknowledge receipt of this addendum on the Addendum Acknowledgement form contained in your bid proposal by placing a mark in the box next to the respective addendum. Failure to Acknowledge receipt of this addendum in your bid proposal will result in your bid not being read. 04/99

SUBJECT: PLANS AND PROPOSAL ADDENDUMS PROJECT: RMC - 631600001 CONTROL: 6316-00-001 COUNTY: HARRISON LETTING: 01/04/2018 REFERENCE NO: 1220 PROPOSAL ADDENDUMS ------------------ _ PROPOSAL COVER _ BID INSERTS (SH. NO.: ) _ GENERAL NOTES (SH. NO.: ) X SPEC LIST (SH. NO.: SHEET 1-2 ) X SPECIAL PROVISIONS: ADDED: 002---011, 008---030 DELETED: _ SPECIAL SPECIFICATIONS: ADDED: _ OTHER: DELETED: DESCRIPTION OF ABOVE CHANGES (INCLUDING PLANS SHEET CHANGES) REVISED SPECIAL PROVISION 2-11 & ADDED 8-30. 1-1

CONTROL : 6316-00-001 PROJECT : RMC - 631600001 HIGHWAY : US0059 COUNTY : HARRISON TEXAS DEPARTMENT OF TRANSPORTATION GOVERNING SPECIFICATIONS AND SPECIAL PROVISIONS ALL SPECIFICATIONS AND SPECIAL PROVISIONS APPLICABLE TO THIS PROJECT ARE IDENTIFIED AS FOLLOWS: STANDARD SPECIFICATIONS: ADOPTED BY THE TEXAS DEPARTMENT OF ------------------------ TRANSPORTATION NOVEMBER 1, 2014. STANDARD SPECIFICATIONS ARE INCORPORATED INTO THE CONTRACT BY REFERENCE. ITEMS 1 TO 9 INCL., GENERAL REQUIREMENTS AND COVENANTS ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (SMALL QUANTITY) (300)(301) (320)(520)(585) ITEM 361 REPAIR OF CONCRETE PAVEMENT (360)(421)(440) ITEM 500 MOBILIZATION ITEM 502 BARRICADES, SIGNS, AND TRAFFIC HANDLING ITEM 720 REPAIR OF SPALLING IN CONCRETE PAVEMENT (429) SPECIAL PROVISIONS: SPECIAL PROVISIONS WILL GOVERN AND TAKE ------------------ PRECEDENCE OVER THE SPECIFICATIONS ENUMERATED HEREON WHEREVER IN CONFLICT THEREWITH. SPECIAL PROVISION "SCHEDULE OF LIQUIDATED DAMAGES" (000---001) SPECIAL PROVISION "NONDISCRIMINATION" (000---002) SPECIAL PROVISION "IMPORTANT NOTICE TO CONTRACTORS" (000---010) SPECIAL PROVISION "CERTIFICATE OF INTERESTED PARTIES (FORM 1295)" (000---384) SPECIAL PROVISION TO ITEM 2 (002---011) SPECIAL PROVISION TO ITEM 4 (004---001) SPECIAL PROVISION TO ITEM 6 (006---001) SPECIAL PROVISIONS TO ITEM 7 (007---001)(007---003)(007---004) (007---010) SPECIAL PROVISIONS TO ITEM 8 (008---023)(008---030) SPECIAL PROVISION TO ITEM 300 (300---009) SPECIAL PROVISION TO ITEM 421 (421---002) SPECIAL SPECIFICATIONS: 1-2

---------------------- ITEM 6001 PORTABLE CHANGEABLE MESSAGE SIGN ITEM 6185 TRUCK MOUNTED ATTENUATOR (TMA) GENERAL: THE ABOVE-LISTED SPECIFICATION ITEMS ARE THOSE UNDER WHICH ------- PAYMENT IS TO BE MADE. THESE, TOGETHER WITH SUCH OTHER PERTINENT ITEMS, IF ANY, AS MAY BE REFERRED TO IN THE ABOVE- LISTED SPECIFICATION ITEMS, AND INCLUDING THE SPECIAL PROVISIONS LISTED ABOVE, CONSTITUTE THE COMPLETE SPECIFI- CATIONS FOR THIS PROJECT. 2-2

002-011 Special Provision to Item 2 Instructions to Bidders Item 2, Instructions to Bidders, of the Standard Specifications is amended with respect to the clauses cited below. No other clauses or requirements of this Item are waived or changed. Article 2.7., Nonresponsive Bid, is supplemented by the following: the Bidder failed to participate in the Department of Homeland Security s (DHS) as specified in Article 2.15., Department of Homeland Security (DHS) E-Verify System. Article 2.15., Department of Homeland Security (DHS) E-Verify System, is added. The Department will not award a Contract to a Contractor that is not registered in the DHS E-Verify system. Remain active in E=Verify throughout the life of the contract. In addition, in accordance with paragraph six of Article 8.2, Subcontracting, include this requirement in all subcontracts and require that subcontractors remain active in E-Verify until their work is completed. If the apparent low Bidder does not appear on the DHS E-Verify system prior to award, the Department will notify the Contractor that they must submit documentation showing that they are compliant within 5-business days after the date the notification was sent. A Contractor who fails to comply or respond within the deadline will be declared non-responsive and the Department will execute the proposal guaranty. The proposal guaranty will become the property of the State, not as a penalty, but as liquidated damages. The Bidder forfeiting the proposal guaranty will not be considered in future proposals for the same work unless there has been a substantial change in the scope of the work. The Department may recommend that the Commission: reject all bids, or award the Contract to the new apparent low Bidder, if the Department is able to verify the Bidder s participation in the DHS E-verify system. For the Bidder who is not registered in E-Verify, the Department will allow for one business day after notification to provide proof of registration. If the Department is unable to verify the new apparent low Bidder s participation in the DHS E-Verify system within one calendar day: the new apparent low Bidder will not be deemed nonresponsive, the new apparent low Bidder s guaranty will not be forfeited, the Department will reject all bids, and the new apparent low Bidder will remain eligible to receive future proposals for the same project. 1-1 12-17 OTU

008-030 Special Provision to Item 8 Prosecution and Progress Item 8, Prosecution and Progress of the Standard Specification is amended with respect to the clauses cited below. No other clauses or requirements of this Item are waived or changed. Article 8.2., Subcontracting, is supplemented by the following paragraph, which is added as paragraph six to this article: The Contractor certifies by signing the Contract that the Contractor will not enter into any subcontract with a subcontractor that is not registered in the Department of Homeland Security s (DHS) E-Verify system. Require that all subcontractors working on the project register and remain active in the DHS E-Verify system until their work is complete on the project. 12-17 OTU