Yokogawa generic 416MW Combined Cycle Power Plant Simulator

Similar documents
The DeltaV Virtual Power Plant. Todd Anstine Director of Operations MYNAH Technologies

Innovations for Plant Operations

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013

Combined cycle with detailed calculation of Cp in the HRSG

The Benefits of using Dynamic Simulation and Training Systems for expanding Operator Knowledge and Understanding

Customer Training Overview siemens.com

Combustion Laboratory Unit C492

Simulator for operator training in the Sudurnes Regional Heating Corporation 30 MW el combined heat and power (CHP) plant

Validating a Thermodynamic Model of the Otahuhu B Combined Cycle Gas Turbine Power Station

EFFECT OF AMBIENT TEMPERATURE, GAS TURBINE INLET TEMPERATURE AND COMPRESSOR PRESSURE RATIO ON PERFORMANCE OF COMBINED CYCLE POWER PLANT

Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits

Development of CFBC concepts and problem solution with the aid of simulation programs

Full electrical LNG-plant: Highest availability and energy efficiency trough overall system design

Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future

High efficient peak power on demand. Answers for energy.

SCHNEIDER-KESSEL BERLIN

FLEXI BURN CFB WP4: Boiler design and performance

ADVANCED PROCESS CONTROL FOR YARA UREUM PLANT BRUNSBÜTTEL

Gas turbine power plant. Contacts: Mail: Web:

CO 2 Capture Utilization and Sequestration (CCUS)

Steam balance optimisation strategies

OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

FULL PAPER FP_A.5_CLP_CCGT Upgrade

Ovation GE LM6000 Control System Retrofit

High Efficient Peak Power on Demand

Dynamic Modeling of a Combined-Cycle Plant

Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications

MDC Technology Real Time Optimization - RTO+ John McNally Project Engineer MDC Technology (Houston)

Simulation studies on oxy-cfb boiler

Wärtsilä NACOS VALMATIC Platinum. Integrated Automation System

Electricity Generation from Waste Heat

Power Block Technology for CSP

Top 10 Questions About Aspen Operator Training FAQ

Thermostatic expansion valves for R290 Product type TUB / TUBE and TCBE

A tognum Group Brand COMBINED HEAT AND POWER FROM BIOGAS

TOSHIBA. Steam Turbine

Operational flexibility enhancements of combined cycle power plants

Thermodynamics Optimization of GARRI (1) Combined Cycle Power Plant by Using ASPEN HYSYS Simulation

Drive Workforce Optimization in Oil & Gas

Steam Turbine Solutions

Carrington Power Station

MODELING OF GAS TURBINE ENGINES, HEAT RECOVERY STEAM GENERATORS, AND COMBINED CYCLES USING PEPSE

Grand Composite Curve Module 04 Lecture 12

SGT-8000H gas turbine series proven in commercial operations

Tallinn Powerplant. Andres Taukar Tallinna Elektrijaam

Nuclear Power A Journey of Continuous Improvement

Understand boiler performance characteristics. Use these suggestions when buying, designing or optimizing steam generators

STUDY ON EFFECTIVE PARAMETER OF THE TRIPLE-PRESSURE REHEAT COMBINED CYCLE PERFORMANCE

A Research Reactor Simulator for Operators Training and Teaching. Abstract

COGEN: IS IT WORTH THE CARFARE FOR YOUR OPERATION?

PRIMARY GRADE WATER. PURELAB Prima. Primary Grade Water Purification Systems. The Laboratory Water Specialists

Samcheok Green Power 4 x 550 MW e Supercritical Circulating Fluidized-Bed Steam Generators in South Korea

DEVELOPMENT AND USE OF SIMULATION TRAINERS FOR PIPELINE CONTROLLERS. D.M. Scott Enbridge Pipe Line Company Edmonton, Alberta, Canada

VALMATIC. Integrated Automation System. Exceeding expectations...

Benchmarking of power cycles with CO 2 capture The impact of the chosen framework

Y-HEAT THERMAL MANAGEMENT SYSTEM FOR OVEN, FURNACE, VACUUM FURNACE, AND CRYOGENIC CHAMBER SYSTEMS. Product Overview and Specifications

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW.

Control Systems. Engineering and Technical Services. From conception to completion, we are ready to make your control system project a success.

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

Mobile Nitrogen Vaporizer Skid

FITOCLIMA WALK-IN STABILITY

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

GATE: A Simulation Code for Analysis of Gas-Turbine Power Plants

GE Global Research Rahul Bidkar Doug Hofer Andrew Mann Max Peter Rajkeshar Singh Edip Sevincer Azam Thatte

Industrial Power. SGT-800 Gas Turbine. Power Generation: (ISO) 47.5 MW(e) / 50.5 MW(e) / energy

Gas Turbine Inlet Air Cooling System

Maximising LNG revenue by operating at peak performance

Lecture No.3. The Ideal Reheat Rankine Cycle

Towards New Milestones In CFB Boiler Technology CFB 800MWe

To Study the Steady State Thermal Analysis of Steam Turbine Casing

Thermodynamic and Thermo Economic Optimization of Combined Cycle Power Plant

Geothermal Power Plant

Automation and Drives OSEA Totally Integrated Automation SIMATIC. Process Automation. Exceeding requirements of a DCS

POWER PLANT- BOILER OPERATIONS SIMULATOR

Virtuoso Industry leading engineering simulators, operator training systems and online monitoring systems

Elliott Turbine Generator Sets PRODUCT

2016 BioCleantech Forum TURBODEN ORC TECHNOLOGY: STATE-OF-THE-ART. Ilaria Peretti. Manager, Sales and Business Development North America

COMOS Training Calendar 2017/2018

Raising automation level at a Swiss HPP Rene Neubert, Sales Director Valmet, Automation business line Austria

INDEX. 1 Introduction. 2 Software installation. 3 Open the program. 4 General parameters. 5 Tuning

Steam Sterilizer. SA Series. for hospitals, CSSD and medical centers

DEVELOPMENT OF A TOOL FOR SIMULATING PERFORMANCE OF SUB SYSTEMS OF A COMBINED CYCLE POWER PLANT

Experience with the SIMULEX

COMBINING ADVANCED DATA ANALYSIS METHODS FOR THE CONSTITUTION OF AN INTEGRATED GAS TURBINE CONDITION MONITORING AND DIAGNOSTIC SYSTEM

S-CO 2 Brayton Loop Transient Modeling

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

Heat Load Calculation for the Design of Environmental Control System of a Light Transport Aircraft

360 vision page 13. Air-cooled evolution page 18. 3D testing page 22. Patriot gains page 26

CO-GENERATION PLANT KUSHA INDUSTRY CO.

Natural gas saving opportunities in gas supply system of Iran. 22 April 2014

Conceptual Design of Nuclear CCHP Using Absorption Cycle

At Elliott Group, we are committed to providing each customer with the best possible solution to the challenges they face. Japan

Dynamic Simulation of a 800 MW el Hard Coal One-Through Supercritical Power Plant to Fulfill the Great Britain Grid Code

Auto Bag Drop Application Architecture

Efficiency improvement of steam power plants in Kuwait

Steam Power Station (Thermal Station)

Online Cleaning with Shock Pulse Generators Current Experience

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

energytech.at energytech.at [ energy technology austria ] Cogeneration (CHP) TechnologyPortrait

Transcription:

Yokogaw a Australia Pty Ltd A. B. N. 3 6 0 0 3 8 8 8 3 6 4 Y o k o g a w a S i m u l a t i o n A D i v i s i o n o f Y o k o g a w a A u s t r a l i a P t y L t d T o w e r A, 1 1 2-1 1 8 T a l a v e r a R o a d M a c q u a r i e P a r k N S W 2 1 1 3 L o c k e d B a g 2 0 2 4 N o r t h R yd e P O N SW 1 6 7 0 A u s t r a l i a T e l e p h o n e : + 6 1 2 8 6 6 9 1 3 0 0 F a c s i m i l e : + 6 1 2 8 6 6 9 1 3 3 0 w w w. yo k o g a w a. c o m /a u / Yokogawa generic 416MW Combined Cycle Power Plant Simulator Version 3 Yokogawa Simulation Page 1 of 6

ACTUAL PLANT SPECIFICATION The simulator replicates a 416 MW Siemens CCGT power station consisting of 2 gas turbines, 2 HRSG s and 1 steam turbine controlled by a Teleperm ME control system. The simulator provides large-scale replication of the power station plant control room and plant behaviour. All major systems of the plant are simulated. GAS TURBINE & HRSG The Gas turbines have the following basic characteristics: Single casing Single shaft for Turbine and Compressor Two vertical combustion chambers Outlet temperature control by blade pitch adjustment. Exhaust Gas Flow 469 kg/s Speed 3000 rpm Load CMR 136.7 MW Flue Gas Outlet Temperature 562 o C The HRSGs have the following basic characteristics: Forced circulation Single Pressure Horizontal, convection superheaters economiser temperature control by feed water injection Evaporation Rate 63.29 kg/s (CMR) Superheater Outlet Temperature 530 C Economiser Feed Inlet Temperature 287 C DCS CONTROLS CONFIGURATION Siemens Teleperm XP Coordinated Controls including: o o Local Coordinated Control Mode Remote Coordinated Control mode KEY FEATURES OF SIMULATOR The plant modelling is high fidelity meaning that all dynamic transients are realistic and follow the laws of physics. To the trainee, they appear to be operating a real plant The DCS HMI and logic are fully emulated which allows basic and advanced DCS engineering training to be conducted on the simulator The simulator allows training scenarios to be available at any time and the training program can be tailored to any of the many plant malfunctions and operating conditions which could be anticipated or previously experienced on a power plant. The simulator is supplied with an extensive training exercise system that allows objective trainee competency testing. The training exercise is fully configurable and an automatic scoring calculation is used for evaluating the trainee performance. 14 initial conditions (ICs) and 80 malfunctions are provided All the software runs on standard PC hardware. STEAM TURBINE single casing Single Flow HP Turbine having HP and LP stages Condensing Turbine Two main Stop and Control Valves Static excitation EHC governing Rated Output 142.7 MW Steam Flow 126.6 kg/s (CMR) Condenser Pressure 0.105 Bar (CMR) Circulating Water Throughput 8879 Kg/s Main Steam Pressure 66.5 Bar Version 3 Yokogawa Simulation Page 2 of 6

PLANT OVERVIEW & DCS GRAPHICS Version 3 Yokogawa Simulation Page 3 of 6

SIMULATOR HARDWARE CONFIGURATION Yokogawa Generic 416MW CCPP Simulator The following is the typical hardware configuration. All computers are standard desktop PCs. The hardware configuration is very flexible and can be tailored to suit customer s requirements. Operator Trainee Station 1 with dual monitors Operator Trainee Station 2 with dual monitors Operator Trainee Station 3 with dual monitors HMI HMI HMI Gigabit Ethernet Colour Laser Printer Special Operator Station Instructor Station/ Engineering Station Logic display and Field Device Terminal with dual monitors Instructor and engineering station with dual monitors Typical Hardware Layout INSTRUCTOR FUNCTIONS The Trainer's interface with the simulator is through the graphical user interface in the Instructor Station, the main functions the trainer can do are: Loading an IC (Initial Condition) or Snapshot: Introducing a Condition of plant, ready for a training session; Saving an IC or Snapshot: Saves a particular situation for continued running at a later date for the same trainee, or for use during some other training period; Setting the simulator to Run/freeze mode: Runs the simulator and so permit a trainee to perform operating situations, guided by the various monitoring and alarm systems; Freeze the simulator for detailed analysis of the plant status or pause in the training session; Applying malfunctions: Initiating a single event or pre-program a set of plant or equipment failure situations that a Trainee has to address and to take appropriate actions, so as to rectify poor operating or plant alarm situations; Version 3 Yokogawa Simulation Page 4 of 6

Applying scenario: Introduce a pre-programmed operating exercise that forms the basis for a class training session; Backtracking: Go back in time, to allow a trainee to operate in a different manner from a previous time and to establish an alternative outcome; Develop automatic training exercises; Record trainee details and recall trainee history Instructor Graphical User Interface Malfunction Menus Version 3 Yokogawa Simulation Page 5 of 6

HISTORY OF YOKOGAWA SIMULATION In 1998 Yokogawa Electric Corporation acquired TechComm Simulation of Australia. TechComm Simulation was a simulator manufacturer specialising in high fidelity replica Fossil Fuel Fired Power Plant training simulators. TechComm was established as Costec Pty Ltd in 1983 and had built simulators around the world. The TechComm Simulation business was merged with Yokogawa Australia and operates from offices in Sydney, Australia. The simulator design and development group in Sydney supports all Yokogawa worldwide affiliates in the Power Plant Training Simulator and Services market. Over the past 25 years the Yokogawa Simulator Group in Sydney has built an enviable reputation for the design and delivery of power plant simulators with a wide variety of control systems vendors in diverse locations such as Korea, Australia, Middle East, Singapore, Vietnam, Thailand, Mexico, Zimbabwe and Egypt. For more information please contact Max Barry, Director Yokogawa Simulation Email: max.barry@au.yokogawa.com Telephone: +612 8669 1302 Richard Porter, Simulation Group Manager Email: richard.porter@au.yokogawa.com Telephone: +612 8669 1333 Version 3 Yokogawa Simulation Page 6 of 6