Zurn Z874. Trench Drain System. Installation Instructions

Similar documents
Zurn Z886. 6" Perma-Trench. Installation Instructions

Installation Instructions

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

ZS880 Linear Shower Drain Installation Instructions

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

SMITH/ACO DRAINAGE SYSTEMS

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

BioPrism Solid Surface

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

GroundTrac. Installation Manual

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

ACO DRAIN Site Installation Manual Polymer Concrete Drain Systems

ROLLING RACK. Simple Security

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

Console Table Legs & Console Table Top

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Pre-Sloped Drain System

UNPARALLELED PERFORMANCE

Slab Solutions Section SlabDrain/FG200 ACO DRAIN. Introduction Pgs 1-13 Selecting the right product

Guidelines to installing the ACO Sport range of products

Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to

B R OA DWAY RAC K. High Security

DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS

the P.R. Skate, LLC Pallet Rack Moving System Product Manual

Se incluyen las instrucciones en español

PLATON FOUNDATION WRAP

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

Welcome: What is U-Drain? Drain Materials. Flow

Freedom One-Piece Barrier Free Showers Installation Instructions

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

KS SERIES - VERTICAL INSTALLATION

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block

Zurn Engineered Water Solutions. Spec-Dec. Specified Decorative Systems. Drainage with Style

INSTALLATION INSTRUCTIONS

Trench Duct Class Catalog 5230CT9601R10/08

Assembly Instruction. wedi Fundo Primo Shower System

ECONO 200 INPLANT OFFICE

FORMING THE RETAINING WALL FOUNDATION OUTER WALL

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SIDEWALK REPAIR GUIDE

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Smarter. Safer. Leaner.

One Piece ADA/Barrier Free Showers

POST FRAME BUILDING STANDARDS

A. Product Data shall be provided for each type of product indicated.

Planning and installation instructions

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

Installation Guide and Safety Manual

Installation Procedure of Floating floors

EP Decking Inc. Installation Guide

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

Technical Data Sheet: The Corrugated HC-Omega

Fig. 1 - Standard Clevis Hanger

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SECTION UTILITY MANHOLES AND STRUCTURES

Assembly Instruction wedi Fundo Floor element

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II

SECTION FACILITY SANITARY SEWERS

Chapter 7. Roof Framing

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

Central Snap. Condition Details C SNAPDETAILS

FLOOR AND AREA DRAINS

Infinity Perimeter Trim

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

GARDEN SHEDS 63, 65, 67, 69, 83, 85, 87, 89, 103, 105, 107 & 109 TRECO SHEDS ARE MANUFACTURED TO COMPLY WITH ALL AUSTRALIAN STANDARDS

GB-50. Submittal Special Precautions Specifications Installation Application Specific Details

TYPE "A" CATCH BASIN

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

LATRINE CONSTRUCTION SHELTER. Pour flush latrine 2. Pour flush micro septic tank 3. Initial investment, location, human resources 4.

Container Installation Guide

Installation instructions. MEA Drainage systems

Construction Procedures

SECTION CHAIN LINK FENCES AND GATES

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

SITE WORK II: Footings, Cisterns

Assembly Instruction. wedi Fundo Primo Steam Shower System

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

MERCHANTS METALS. A. ASTM F552 Standard Terminology Relating to Chain Link Fencing

AC50 Silver Adhesive Anchoring System

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.

DIVISION: SPECIALTIES SECTION: DEMOUNTABLE PARTITIONS REPORT HOLDER: TEKNION LIMITED

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

Bonner Bridge Replacement Update:

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Installation Guide. PrivacyShield Outdoor Enclosure

Raised Basement. Mechanical Installation Guide

Liner Replacement Instructions:

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

Weep Valves Stucco Wire Mesh Reinforcement Weather Resistive Barrier Sheathing Insulation Framing

200 / 300 SERIES PANELS COLD STORAGE

Pre-Fabricated Roof Curbs

Transcription:

Zurn Z874 Trench Drain System Installation Instructions

Z874 Accessories Trench Drain System Below are the components of the Z874-X trench drain typical to an installation. Check your order to verify you have all components particular to your job before beginning your installation. Contact customer service at 877-ZURN-NOW (877-987-6669) should additional material be required. Z874 Four-Corner Lockdown (Bag 937) P874-(X)-DGC Ductile Iron Class C Grate P874-(X)-E1 Closed End Cap -RC Rebar Clip (Bag 832) P874-(X)-E No-Hub End Outlet for Channel Z874-(X) Black End Cover (-12" - Bag 933; -18" - Bag 955; -21" - Bag 934) P874-(X)-U No-Hub Bottom Outlet for Channel 2

Z874 Tools Required Tape Measure Phillips Head Screwdriver Hammer Utility Knife Marker Cordless Drill Reciprocating Saw Ear Protection Safety Glasses Gloves Hole Saw Caulk Gun 3

Z874 Encasement Four-inch new concrete encasement is minimum. Guidelines for reinforcing and encasement is recommended to use the same thick ness and reinforcing used in the surrounding concrete slab. Concrete must be vibrated to remove air voids in encasement, especially under the frame rails. Specifying engineer is responsible for concrete encasement and reinforcing based upon application and local codes. Overall Width Grate Width Throat Width Dim. (A) Dim. (B) Dim. (C) System In./[mm] In./[mm] In./[mm] Z874-12 20 [508] 17 [432] 12 [305] Z874-18 26 [660] 23 [584] 18 [457] Z874-21 29-1/4 [743] 26-1/4 [667] 21-1/4 [540] Excavation Trench excavation must include a minimum of 4" concrete encasement or specifying engineer s requirement on both sides and underneath surrounding the trench. Soft and/or shifting soil substrates may cause cracking of the concrete and consequent movement of the trench. It is critical that the concrete be poured on an adequate foundation. Verifying the depth of trench excavation allows for the same thickness of concrete under and beside the trench. 4

Z874 Layout Upon completion of the excavation, the channel should be placed in numeric order alongside the excavation according to the job layout. Each trench section has a trench identifi ca - tion number and flow direction indicating its sequence within the system. It is best to work from the deep or outlet end to the shallow. Grates are not installed at this time. 5

Z874 End Outlet Connection Option Step 1 When installing end cap or end outlet, remove by cutting with saw the 1-1/4" male overlap connection as shown. Step 2 Once overlap is removed, trim end cap/end outlet to desired height. Step 3 Attach end outlet or end cap to the channel with hardware provided. Attach frame end piece to end with hardware provided. 6

Z874 Bottom Outlet Connection Option Step 1 Score both sides of the rib with the utility knife. Step 2 Tap rib with a hammer to remove rib when necessary. Step 3 Attach bottom outlet to channel with hardware provided. Step 4 Cut out hole with hole saw that matches inside diameter of outlet. 7

Z874 Channel Options Male - Male Used for connections at high point transition. Female - Female Used for connections at low point transition. Standard 8

Z874 Channel Connection Step 1 Attach rebar clip with hardware provided. Step 2 Place in trench and set rebar firm in sub soil, working from deep to shallow. Step 3 Slide male end of channel in grooves of female end of set channel. Step 4 Position so frames are flush and in line with each other. Step 5 Attach frame tab to frame tab with hardware provided. Step 6 Using thumbscrew on rebar clip, set the trench to the finished height. Note: Channel should be set so it is 1/8" below finished floor. 9

Z874 Catch Basin Connection Step 1 Slide male end of channel in grooves of female end of set channel. Step 2 Attach frame tab to frame tab with hardware provided. Z874-1B 10

Z874 Retrofit Installation Step 1 Attach 2x4 to span proposed trench opening using wire ties or 3/8-16 bolts threaded into the lockdown holes on the frame. Channel should be held 1/8" below 2x4 so trench is 1/8" below finished floor. Step 2 Place in trench working from deep to shallow. Step 3 Slide male end of channel in grooves of female end of set channel. Step 4 Position so frames are flush and in line with each other. Step 5 Attach frame tab to frame tab with hardware provided. 11

Z874 Internal Bracing Internal sidewall bracing is recommended approximately every 20" for any 874 channel with an invert deeper than 16". Bracing shall be made from standard 2x4 and shall be provided and constructed on site by others. Internal bracing shall be (A) wide (see chart) and the height will be determined to match the invert depth, and horizontal braces shall be placed every 10". System Dim. (A) Z874-12 12 [305] Z874-18 18 [457] Z874-21 21-1/4 [540] 12

Z874 Concrete Pour and Finish Pour the concrete around the three sides of the trench drain. Be certain to adequately vibrate the concrete as it is being placed. Proper vibration will eliminate any unwanted voids within the concrete pour. If sidewalls are used, a first and second pour are recommended. Care shall be taken not to allow concrete into the grate lockdowns. Step 1 Verify layout is correct prior to pouring concrete. Placing Concrete Check that the trench drain is in the location required per the layout drawings prior to pouring concrete. Standard concrete practices with expansion and crack induction joints shall be followed based upon local codes and standards. The trench drain shall not be used as an expansion joint. Step 2 Slurry pour to lock rebar into place. Step 3 Finish troweling should be done to set the top edge of the trench drain 1/8" below the floor grade. Remember to compensate for the concrete shrink that may occur during cure so that the edge of the trench drain does not protrude above the finished floor grade. Step 4 Remove internal bracing. 13

Z874 Installing Grates Step 1 Start bolts by hand 1 to 2 complete revolutions on opposite corners. Do not tighten completely. Step 2 Start bolts on remaining corners 1 to 2 complete revolutions. Do not tighten completely. Step 3 Once all 4 bolts are started, tighten all 4 bolts with a socket in a crisscross method. 14

ZURN INDUSTRIES, LLC FLO-THRU OPERATION 1801 PITTSBURGH AVENUE, ERIE, PA, U.S.A. 16502 PHONE: 814/455-0921 FAX: 814/875-1402 www.zurn.com In Canada: ZURN INDUSTRIES LIMITED 3544 NASHUA DRIVE, MISSISSAUGA, ONTARIO LV4 1L2 PHONE: 905/405-8272 FAX: 905/405-1292 Form No. FT754, Rev. 6/11