Mekong Region Waste Refinery-International Partnership towards Achieving Zero Waste, Zero Landfill and Reduce Greenhouse Gas Emission Project

Similar documents
Japan s support to realize Leapfrog Low Carbon Development in Asian Cities

EXPERIENCE ON IMPLEMENTATION PROJECT: Pro-poor and sustainable solid waste management in secondary cities and small towns

Japan s efforts of country-country cooperation and CCAC as a new framework of international cooperation

Launch of CCAC MSWI Asian Component

JOB DESCRIPTION. Conservation Manager, Finance and Administration Manager, HR Manager, Marketing Manager, Communications Manager

Problem Statements. Past and on Going Efforts

3. Future Assistance to the Mekong Region in the Infrastructure Sector

Case Study: Biogas generation from

initiative Nordic Partnership New Nordic Climate Solutions CLIMATE SOLUTIONS #NNCS NEW NORDIC

Chapter 4. Cambodia Country Report. September 2016

Introduction of solid waste management and climate change

UNICEF/EAPRO, Bangkok

Embassy of Ireland. VACANCY ANNOUNCEMENT Commercial Attaché

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline

Intended Nationally Determined Contribution (INDC) Development in Laos

COVENANT OF MAYORS WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS WHEREAS WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS WHEREAS,

JICA s Cooperation for the 3Rs JICA. 30/10/2006 Global Environment Department. Implementation of 3R s program in a school, Malaysia

Vietnam - Waste Sector NAMA: Waste to Resources for Cities

Proposal for Improving the Business Environment in Lao PDR - Based on a JETRO survey on business needs -

Report of the Mekong River Commission **

TERMS OF REFERENCE. Coordinator, Monitoring and Evaluation, WWF Greater Mekong Programme. Representative, WWF Greater Mekong Programme

UN DESA/DSD Transport Assessment Methodology Meeting

Example 2. Development of Waste Management Strategy and Action Plan of Phnom Penh City, Cambodia. Key Challenges and Policy Responses

Public Participation and Municipal Solid Waste Management in Selected Asian Cities

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia

Nationally Appropriate Mitigation Action (NAMA) programme in the Waste Sector: Waste to Resources for Cities in Vietnam

Discharge and Sediment Monitoring Project Regional meeting 14 January 2009 Presented by Ms. Iwona Conlan

WORK PLAN. A. Background

2.3 CBTI Development. 1) Asian Highway History of Asian Highway 7)

25th commission meeting, 16 October 2014 WORKING DOCUMENT. Commission for the Environment, Climate Change and Energy

WASTE MANAGEMENT AND ACTIVITIES OF CAMBODIA IN THE APPLICATION OF BASEL CONVENTION

WIND training programme in Cambodia, Mongolia and Thailand

Solid Waste Management Services recommended 2015 Operating and Capital Budgets and Rates Divisional overview:

WAC Programme Key Areas

What is cogeneration and why cogeneration

RIVER HEALTH, ENVIRONMENTAL FLOWS AND CASCADE MANAGEMENT IN LAO PDR

Preliminary Description of Composting Potential Action Research Pilot

Public Perspective toward Waste-to-energy Applications in Thailand: An Opportunity on Biogas Production from Organic Waste

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station:

Waste Management System City of Copenhagen

Volunteer Job Pack (Draft)

FIATA Diploma in International Freight Forwarding. Validation for MIFFA (Myanmar International Freight Forwarders Association)

Waste Management in Jharkhand. Swati Singh Sambyal Programme Manager Centre for Science and Environment

Outcome of COP20 and Outlook for COP21

Rural Electrification by Renewable Energy in Cambodia

A ROADMAP TO REDUCE U.S. FOOD WASTE BY 20 PERCENT. Key insights

San Paolo Albanese, Italy

Improving the quality of life of building inhabitants and construction workers in China

Intelligent Energy Europe (IEE) programme

MRV Capacity Building in Asia for the development of New Market Mechanisms

Japan s Urbanization and Growth Processes. Hiroto Arakawa Senior Special Advisor, JICA

politics & global warming, october 2017

Shifting consumer spending patterns in urban China by engaging retailers, suppliers and consumer associations

Vaglio di Basilicata, Italy

Innovation and good practice in DRR Governance in Asia: Lessons Learnt

Japan s International Cooperation for Resource Efficiency and the 3Rs

Do s & Dont s in EPR. Case study analysis: leassons learnt. Steve Claus Vigorous inspriring EPR consultant

Country profile. More from less material resource efficiency in Europe overview of policies, instruments and targets in 32 countries.

SOLID WASTE PROMOTION AND EDUCATION UPDATE

Co-Benefit Approach in JICA

Bangkok, Thailand December 2016

Better Work Vietnam. Newsletter. No. 4, Sep-Dec 2011

Gap analysis of DG implementation in CLMV and T

Thailand. Mr. President, Mr. Director General, Excellencies, Distinguished Representatives, Ladies and Gentlemen,

Contemporary Issues on the Mekong River

Company Introduction

INVENTORY AND MANAGEMENT OF CAMBODIA WETLANDS PROJECT

RE-energizing Cities event in Quito

Sustainable Development and Eco-friendly Waste Disposal Technology for the Local Community

(and the scope of the public sector)

San Martino d'agri, Italy

This is a draft revision of the briefing, and any comments are welcome please them to Becky Slater on

Capacity building project for E waste management. Mushtaq Ahmed MEMON, Ph.D. Programme Officer International Environmental Technology Centre (IETC)

Policymaker training course on SME productivity and working conditions. The SME Policy Index for ASEAN

WASTE MANAGEMENT Concrete actions taken and specific progress made in implementation

NAMA in the Waste Sector: Waste to Resources for Cities in Vietnam

Background. Environment and Climate Change. Waste management is a sector where local govern- Country municipalities

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Global Alliance for Clean Cookstoves: ACEF Gender Deep Dive 1 CLEAN COOKSTOVES AND FUELS

London Green Fund. Waste Urban Development Fund Procurement Information Event. 20 May 2010

Equitable and Low-Carbon Society: Aspiration and Strategies for Southeast Asia

, Municipal waste management in Slovakia

STRATEGY 1 Increase composting by county employees to achieve 85% waste diversion; continue education about including soiled paper in compost stream

Location: Thailand, Bangkok, Samut Prakan, Trat. Job Title: Country Director and Project Manager. Starting date: 8th of January 2018

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia

LOW EMISSION DEVELOPMENT STRATEGIES: LINKING TO SUB- NATIONAL PLANS

City Report. < Sylhet City Corporation, Bangladesh>

3R Implementation in Indonesia. Asia 3R Conference Tokyo,, 30 Oct 1 Nov, presented in. Ministry of Environment - Republic of Indonesia

Opportunity of Co-benefits of Climate Change Mitigation Actions from Waste: Experience of Waste Concern in Bangladesh

British Columbia s Carbon Tax Strengths and Opportunities

Biological recycling in Sweden Britta Moutakis

Best Practice Guide Collection & Recycling Lamps. 13 December 2012

3Rs PROMOTION IN HO CHI MINH CITY

Climate Change and Power Supply Solutions: LFGE / MSWE Project development in Nigeria

with Electronic Data Interchange (EDI)

PART IV Benefits for Cities in Climate Change Action

Japan s support to realize Leapfrog Low Carbon Development in Asian Cities

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Transcription:

Mekong Region Waste Refinery-International Partnership towards Achieving Zero Waste, Zero Landfill and Reduce Greenhouse Gas Emission Project 3 rd High Level Seminar on Environmentally Sustainable Cities Angkor Era Hotel, Siem Reap, Cambodia, 28 February 2012 Dr. Muhammad Abu Yusuf Project Director Mekong Region Waste Refinery-International Partnership Project Asian Institute of Technology, Thailand 1

Background, Rationale, Objective and Purposes Project Background and Rationale: Rapid Development in the region, rapid urbanization, Waste volume doubled in 10 years, find place for dumpsite is difficult- land price increase and no one want dumpsite in their back yard (NIMBY), huge amount of waste is unmanageable by the cities, thus zero waste, zero landfill and reduce greenhouse gas emission advocating by this project Overall Objective: Improved knowledge on Technology and Technological knowhow to reduce solid waste origin greenhouse gas emission in the Mekong region and motivated to transfer of technology in the region Project Purposes: To improve understanding on the importance of zero waste, zero landfill and reduction of waste origin green house gas emission and leading role in its implementation in the Mekong Slide No. 2 Region

Outputs Output 1: Feasibility Study Report, identified dumpsites to install anaerobic digester to convert waste/biomass to biogas or trap the gas from the dumpsite and gas micro-turbine to convert biogas to electricity or provision of pour gases in cylinder to use for cooking. Output 2: Relevant stakeholder s capacity developed Output 3: Developed/strengthened partnership among different stakeholders in the region and Sweden. Output 4: Cities in the region lead in the waste origin greenhouse gas reduction initiatives (through introduction of 3R, zero waste and zero dumpsite concept) Slide No. 3

Main Activities Conduct feasibility study to identify the dumpsites to install an aerobic digester to convert biodegradable waste to biogas or trap gas from the dumpsites and gas micro-turbine to convert biogas to electricity in Phnom Penh, Cambodia and Vientiane Capital, Lao PDR Arrange study visit for City Mayor, senior city officials and relevant stakeholders to visit waste refinery in Boras City, Sweden to learn how Boras city is managing waste through practicing zero landfill concept Conduct Technical Training on waste to biogas and biogas to electricity Technology and Technological know-how for technical staff of city offices from the 4 cities 4 Mekong region countries Slide No. 4

Main Activities (Cont d) Organize training courses/workshops on sustainable management of solid (3R initiatives), waste refinery, waste to biogas and biogas to electricity for relevant stakeholders of Mekong region Implement demonstration project on waste to Biogas generation and uses it for cooking/energy generation in Phnom Penh, Cambodia and Vientiane Capital, Lao PDR Organise Project Launching meeting at the beginning of project Conduct dissemination seminar/meeting Slide No. 5

Cross-Cutting Issue Gender equality environment Slide No. 6

Risk Analysis RISK Cultural variation and language barrier MITIGATION MEASURES Local partners will be involved in the project; participants of events interact in local language, and translation provision in meeting/workshop Project implementation and organizing event delay due to natural calamities, outbreak of pandemic and political problem Project implementation plan will be prepared in such a way that time leverage will be kept, thus project can be completed on time and shift the event if needed. Lack of political commitment after change of city politician/mayor Resignation of trained technical staff from the job The officials from city will be included in the training/study tour, thus after change of political regime, the city official will continue to pursue the activity The technical staff can train 1/2 local staff about the technology and technological know-how, & draft a manual, thus trained staff can take over the responsibility if the technical staff resigned. Slide No. 7

Sustainability and Up-scaling The capacity of the different stakeholders in the region will be developed by improving knowledge, technology & technological know-how exposure, city mayor and officials will support to zero waste, zero landfill & reduce greenhouse gas emission initiatives, & motivate other to initiate such programme. In the next phase, plant can be installed/tested in selected sites, city officials those attend technical training will be able to manage plants by themselves. Mayor, officials and relevant stakeholders those capacities developed through involvement of this project will advocate promoting this technology throughout the region. Slide No. 8

INNOVATION, LEARNING AND DISSEMINATION Mekong region and Swedish solid waste management exposure of Swedish expert and Mekong region city officials will understand to adapt the technology in the local context. The new lesson learned can be disseminated in both regions through dissemination meetings and dissemination of achieved results through implementation of the project. By implementing this project, strengthened & developed partnership in between region and learn how to work and adapt technology in a different socio-cultural setting. The expected and unexpected results and lessons learned will be recorded and disseminated through dissemination meeting, media and distribution of hard copy of final report with results and lessons learned to the partners and relevant stakeholders in the Mekong Region. Slide No. 9

Partners of the Project Nordic Partners: University of Boras, Sweden Boras City, Sweden Mekong Region Partners: VUDAA, Lao PDR DONRE, Ho Chi Minh City DoE, Phnom Penh Municipality Detudom Municipality, Ubon Ratchathani Province, Thailand Slide No. 10

Partners Major Responsibilities (cont d) Phnom Penh Municipality, Cambodia: Nominate Mayor/senior officials to attend study visit in Boars City, Sweden Nominate staff to attend one month technical training at the University of Boras, Sweden Support in conducting feasibility study in dumpsite managed by Phnom Penh Municipality. Nominate staff to attend regional training and arrange local training. Implement biogas plant installation demonstration project in an urban poor community in Phnom Penh Municipality and supply of biogas to poor families for cooking. Submit progress and completion report to AIT, Thailand. Prepare project progress report and final report and send to AIT Submit progress and final financial report to AIT with necessary receipts as per financial guidelines. Organize launching and dissemination meeting and distribute dissemination materials/report with results and lessons learned.

Partners Major Responsibilities (cont d) VUDAA, Lao PDR: Nominate Mayor/senior officials to attend study visit in Boars City, Sweden Nominate staff to attend one month technical training at the University of Boras, Sweden S Support in conducting feasibility study in dumpsite managed by VIUDAA. Nominate staff to attend regional training and arrange local training. Implement biogas plant installation demonstration project in an urban poor community in Vientiane Capital and supply of biogas to poor families for cooking. Prepare project progress report and final report and send to AIT Submit progress and final financial report to AIT with necessary receipts as per financial guidelines. Organize launching and dissemination meeting and distribute dissemination materials/report Slide No. 12 with results and lessons learned.

Partners Major Responsibilities (cont d) Boras City, Sweden and University of Boras: Arrange and conduct one month technical training at the University of Boras for Technical staff of 4 city offices from 4 countries of Mekong region organize training courses Arrange study visit of Mayor and senior city officials to Boras city in collaboration with University of Boras. Prepare project progress report and final report and send to AIT Submit progress and final financial report to AIT with necessary receipts as per financial guidelines. Slide No. 13

Partners Major Responsibilities (cont d) Detudom Municipality, Thailand: Nominate Mayor/senior officials to attend study visit in Boars City, Sweden Nominate staff to attend one month technical training at the University of Boras, Sweden Nominate staff to attend regional training. Organize dissemination meeting and distribute dissemination materials report with results and lessons learned. Prepare project progress report and final report and send to AIT Submit progress and final financial report to AIT with necessary receipts as per financial guidelines. Slide No. 14

Partners Major Responsibilities (cont d) Ho Chi Minh City, Vietnam: Nominate Mayor/senior officials to attend study visit in Boars City, Sweden Nominate staff to attend one month technical training at the University of Boras, Sweden Nominate staff to attend regional training * organize dissemination meeting and distribute dissemination materials report with results and lessons learned. *Prepare project progress report and final report and send to AIT * Submit progress and final financial report to AIT with necessary receipts as per financial guidelines. Slide No. 15

Study Visit to Boras City, Sweden Study Visit Participant in a meeting with Mayor of Boras City in Boras City Hall

Study Visit to Boras City, Sweden Bus and waste collection vehicles plying in Boras uses biogas generated from waste and it is written on the bus and truck in Swedish language ("Vi kör på biogas")

Study Visit to Boras City, Sweden Participants in a community in Boras City, Sweden to observe the waste management services provided by city to the community-waste bin provided by city office in community (left), participants observing waste bin (right)

Study Visit to Boras City, Sweden Community members drop waste at community level recycle centre (left) and toxic and hazardous waste storage site (right) in Boras City, Sweden

Study Visit to Boras City, Sweden 1. Waste Vending in ICA Maxi Shopping Mall in Boras City, Sweden to buy recyclable and pay money machine and machine count the price and pay money automatically (left). 2. A citizen bring recyclable bottles and plastic to drop in the machine and collect money (right)

Study Visit to Boras City, Sweden Waste Collection Vehicles dropping waste at the sorting station in Sobacken (left) and study tour participants observing the waste is carrying by the conveyer belt to separate in Sobacken (right)

Study Visit to Boras City, Sweden Sorted biodegradable waste in Sobacken (left) and devices where biodegradable waste pressed to extract liquid from the solid part and liquid send to a container through pipes (right)

Study Visit to Boras, Sweden Storage of extracted liquid from the biodegradable in Sobacken (left) and biogas generation chamber in Sobacken (right)

Study Visit to Boras City, Sweden Combustible wastes are carried by automatic machine to drop in a designated place to carry by the conveyer belt in Incineration Site in Boras City (left) and designated area to drop the waste by the automated machine (right)

Technical Training in the University of Boras, Sweden

Technical Training in the University of Boras

Technical Training in the University of Boras

Technical Training in the University of Boras

Technical Training in the University of Boras

Launching meeting in Lao PDR

MONITORING AND EVALUATION Project Coordination Unit will do regular Monitoring and evaluation: i)through review progress report submitted by the partners ii) PD will visit project sites and have meeting with partner organizations to monitor the project progress iii) Regular monitoring by e-mail and telephone Conduct Mid-term Monitoring and Evaluation Slide No. 31

Challenges and Strategy to overcome the challenges Flooding and Inundation of AIT under 2 to 3 m water Thai Government Declaration and Apprehension of Flooding in Bangkok City Centre Suspended Travels to have meeting with partners in Oct and Nov 11 due to flooding Staff hiring delayed due to flooding and AIT Inundation. Steps were taken, soon the staff will join. Delayed Inception meeting and plan to organise after Study Tour and Technical Training, thus local participants can actively involved and promote it whatever they have seen and learnt from the study visit and technical training. Study Tour and Technical Training participants will act as spoke person of the waste refinery and zero waste concept. Last moment decline of attendance to study tour by 2 partner institutions. Project Coordination unit negotiating with University of Boras and Boras City regarding organizing study visit for 2 cities during technical training in between Jan-Feb 11. Slide No. 32

Way Forward Successful Completion of project through overcoming challenges Explore fund to conduct feasibility study and implement demonstration project Explore fund to extend the project activities in more cities of Mekong region for their capacity development and also conduct feasibility study and implement demonstration project (school children can be involved) Support countries of Mekong region to draft climate friendly, zero waste and zero dumpsite concept related energy policy and waste management policy; as well as support its implementation and monitor implementation. Policy Advocacy campaign engaging different stakeholders and Dissemination events essentials for wide spreading the results and Slide No. 33

Strategy of Ultimate Achievement Arrangement of Fund to construct Waste to Energy infrastructure: 3 ways can be done: a)100% Grant to construct infrastructure and support in construction through transfer of technology and transfer technical know-how. b) Soft Loan to cities to construct waste refinery infrastructure and and support in construction through transfer of technology and transfer technical know-how. c) Find Company to fund to construct and manage infrastructure and collect management fees to recover the investment Slide No. 34

Looking forward Climate sensitive energy and waste management policy in place in countries in Mekong region by 2020 Countries in Mekong Region adopted zero waste and zero landfill concept by 2021-2025 No more landfill site in the Mekong region countries by 2030 Waste refinery practiced in all countries in the Mekong region Continuous support needed to make sure the zero waste concept introduction and its implementation by providing infrastructural support. Slide No. 35

Countries Expectation Continuous support until achieving goal instead of piece meal and un-interrupted support or support like fire fighting is not worth. Support in continuous monitoring and evaluation in adopting and implementation of policies and infrastructure development and kept in operation Continuous Technical and technological support until achieve the target goal. Slide No. 36

By 2030 Zero waste and zero waste in place in the Mekong Region Countries in Mekong Region take leading role to disseminate and implement zero waste and zero land fill concept in other Asian countries? Climate friendly energy and waste management policy in place in all countries in the Mekong region, and take leading role in its implementation in other Asian countries? Slide No. 37

Lessons for City Managers/city citizens Consider Waste as Resource- Mind set towards waste needs to change Teach the School Children about separation of waste at source, 3Rs, waste to energy and zero waste, zero landfill and reduce greenhouse gas emission Showcase the results through demonstration instead of saying in words to make city citizens believe, convince and understand, as people don t like to accept without seeing in their eyes or prove Start with a pilot project in a small scale project in different communities instead of start with large scale project and move forward with lessons learned to install large project manage centrally.

THANK YOU Project Blog URL : http://eep3r091.wordpress.com. Slide No. 39