Lesner Bridge Replacement

Similar documents
Bonner Bridge Replacement Update:

Ironton Russell Bridge Project

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Ironton Russell Bridge Project

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Elevated Slab Sequence

1. Cast-in-place concrete is specified in Section

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Get In, Get Out, Stay Out!

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

Open-Web Truss Long Span Installation Guidelines

I-91 Viaduct Public Information Briefing

Ingenuity Offers a Solution to an Anomaly in a Bridge Support

Exposition Light Rail Transit Project

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

High School STRUCTURAL DESIGN AND ENGINEERING PROBLEM STATEMENT

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

Jobsite Layout Considerations

ODOT Design & Construction Requirements for MSE Walls

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

Media Release # 4. Melville Bay East Arnhem Land Mud Wharf Community Project Stages 7c & 7d

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development.

Project Address: Name of Person Completing Form:

Overturning Forces. 12 times 300 lbs = 3,600 lbs of shear force along top of wall. Shear Wall

2013 VIRGINIA CONCRETE CONFERENCE LESSONS LEARNED / CHALLENGES NOVA MEGAPROJECTS PROGRAM STRUCTURE AND BRIDGE FIELD PERSPECTIVE. Fawaz K. Saraf, P.E.

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

Boeing North Bridge in Washington State

Construction Formwork Inventory Control Tracking System

ENGINEERING DIRECTIVE

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL

Precast Segmental Bridge Construction Part 4 - Balanced Cantilever Erection Method

SUNSHINE SKYWAY BRIDGE

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example

MOA Project # Golden View Drive Intersection & Safety Upgrades

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority

Precast Segmental Bridge Construction Precast Segment Manufacturing

LANDSCAPE RETAINING WALLS

The Aizhai Suspension Bridge is

Design and Rating of Steel Bridges

From the ADA and ABA Accessibility Guidelines for Buildings and Facilities

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

JULY 2014 LRFD BRIDGE DESIGN 5-1

Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

SELLWOOD BRIDGE REPLACEMENT PROJECT

I-91 Viaduct Public Information Briefing

Bijan Khaleghi, Ph, D. P.E., S.E.

AASHTOWare BrD 6.8 Substructure Tutorial Solid Shaft Pier Example

Table of Contents. List of Drawings

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

CITY OF FARGO SPECIFICATIONS SIGNING

Continuous for Live Load: A Texas Historical Perspective

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

4th International Engineering and Construction Conference - July 28, 2006

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Voigt 1. Russell Voigt Construction Option Advisor Ed Gannon Louis at 14 th Washington, D.C. 16 September 2013 Technical Report #1.

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Fence and Wall Requirements

Reason for Acceptance or Rejection

Planning, Ordering, and Installing FRP Trail Bridges In the Forest Service, the recreation program has the

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

I-495 HOT LANES PROJECT VIRGINIA CONCRETE CONFERENCE CONCRETE: LEADING THE WAY. Dan Staron, P.E. HNTB Corporation MARCH 4, 2010

I-94/I-69 Interchange Bridge Construction

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION

Carpinteria Avenue Bridge Replacement Project Description Introduction

SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS

Smarter. Safer. Leaner.

MEETING DATE: March 22, 2017 PREPARED BY: DEPT. DIRECTOR: Jim Gilliam, Arts Administrator. Jennifer Campbell

JULY 2016 LRFD BRIDGE DESIGN 11-1

A101 S001 1 SUB-BASEMENT 3/16" = 1'-0" SHEET (906) PH (906) FX 2 S101 NEW CONCRETE WALLS TO FORM WAVE TANK 3' - 0" 5' - 5"

Concrete weighs about 150 pounds per cubic foot

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

COMMUNITY BOARD EIGHT

TECHNICAL SESSION 3. Strengthening, Repair & Rehabilitation

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System

Design, fabrication and construction of Railway Bridge over Södertälje canal

Ohio Department of Transportation

The Europe Bridge in Portugal: concept and structural design

Transcription:

Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on the hour. August 13, 2015 Update When are they going to install the first bridge segment? That is the million dollar question that many are asking now that the assembly of the launching gantry is complete. The answer is.... sometime the week of August 17th. The gantry is currently being load tested and certified for lifting the bridge segments and should be ready to pick the first bridge segment next week. All of the bridge segments for the first span have been delivered to the project site and are being stored in the laydown yard behind the Lynnhaven Boat Ramps. You can see some of them from the Construction Camera. They are located on the extreme right of the frame beneath the unloader gantry crane and behind the field offices. McLean will transport these segments from the laydown yard to the beach beneath the launching gantry once load testing and certification is complete. From the Construction Sequence Animation you will see that McLean will first set the segment on the bridge abutment and then set the two pier segments at Pier #1. Once these segments are anchored in place, the launching gantry will lift all the remaining segments for the span into position. One by one, each segment face will get a coating of epoxy and then be pulled together using temporary post-tensioning bars. The span will be complete once all of the permanent post tensioning tendons (10 total; six 27-strand and four 19-strand) for span one of the bridge are installed, post-tensioned, and grouted. The launching gantry will then move to span 2. You can see how this equipment will be used in the Lesner Bridge Construction Sequence Animation.

19-Strand Grouted Tendon Cross Section Foundation work continues ahead of the launching gantry and segment installation preparation. Reinforcing steel is currently being placed for the footing at Pier 4 in preparation for concrete placement this Friday August 14th. The seal slab for Pier #5 has been poured and is currently curing. All of the drilled shaft foundations for Piers 6 and 7 have been installed. Drilled shaft installation at Pier 8 continues this week and is expected to be completed by August 20th. The first of three concrete pours at Abutment B (next to the former Duck Inn property) took place on August 3rd. The second concrete placement at Abutment B will take place this Friday, August 14th. The contractor has also completed the installation of the top coping along the entire length of the MSE retaining wall next to 3556 On The Bay condominiums, and has also begun applying the bridge coating material on the MSE wall panels.

Reinforcing Steel Being Placed in the Footing at Pier 4 For those of you who are curious about what the handrail on the new bridge will look like, a full scale mock-up of a typical rail panel was fabricated and assembled in the laydown area (see photo below). This railing is a custom rail fabricated out of aluminum and is powder coated blue. The rail is 42-inches high and will be installed across the new bridge and on top of the MSE retaining walls.

Pedestrian Handrail Mock-up AMI, Inc. in Portsmouth, continues to build the new bridge segments. A total of 64 of the 177 bridge segments have been cast and is enough to complete 4 of the 10 spans in the westbound bridge. Over the next two weeks, the bridge contractor will: Begin placing bridge segments in span 1 of 10 Install the column for Pier #4 Mobilize the seal slab for Pier #5 Complete the drilled foundation work at Pier #8 Begin drilling the foundations for the last bridge pier, Pier #9 Complete construction of Abutment B Complete the coating of MSE wall #1 Now get ready to see the launching gantry lift some bridge segments... it really IS something! Keep watching and drive safely! -Chris History: This project first appeared in the FY 2002-03 CIP and is included in the Governor s Transportation Plan. Lesner bridge was identified for replacement through the City s bridge condition inventory and the Shore Drive Transportation Study. In VDOT s final FY2014 six-year plan, the State shifted prior VDOT funding to out years, but requested the City maintain the prior schedule. The City Council approved substitution of contractual obligation debt on August 13, 2013 so the project could be bid for construction, with agreement that VDOT would provide $10,453,200 in FY 2014-15, $13,000,000 in FY 2016-17, and $14,220,117 in FY 2017-18 and the local debt would be decreased in those years accordingly. Bid were opened on December 21, 2013 and the construction contract executed with McLean Construction on April 28, 2014. The Notice to Proceed for construction was issued for June 2, 2014.

Work Description: This project will replace the existing Lesner Bridge with a signature facility that is capable of handling six lanes of traffic in the future. The replacement bridge structure will be striped for two lanes of traffic and wide shoulders. The inside lane will be 12 feet wide and the inside shoulder will be 6 feet wide. The outside lane will be 14 feet wide and the outside shoulder will be 8 feet wide. Each bridge will also have a 10 foot wide multi-use path for use by pedestrians and recreational cyclists. The proposed bridge will be designed to provide minimum 45 feet vertical clearance above mean high water and 225 feet minimum horizontal clearance at center navigation channel span. This project also includes upgrades to the intersections of East Stratford Street and Vista Circle (the termini for the project), as well as aesthetic upgrades within the project limits. McLean Construction, Inc. began the project June 2, 2014. As a reminder, the sidewalk on westbound Shore Drive is closed to pedestrians and cyclists between Page Avenue and East Stratford Street. If pedestrians need to cross the bridge, they will need to cross the eastbound bridge where a temporary 4-foot wide pedestrian/cyclist access has been provided. PLEASE DRIVE SAFELY! Pending Activities: The pre-casting of the concrete bridge segments began November 2014 and crews hope to place the first bridge segment into the new bridge in March 2015. Immediately after this is completed, the building of the segmented superstructure for the north span will begin. Construction of the westbound bridge lanes (north span) should be completed by November 2015, and construction of the eastbound bridge and lanes (south span) will begin in April 2016 and is scheduled for completion in May 2017. Demolition of the current bridges will take place beginning in November 2015 and continue into March 2016. Additional information is available on the Lesner Bridge Project Detail Sheet Select Lesner Bridge Replacement Project Archive to view past updates for this project. Contact Information Public Works Engineering Direct: (757) 385-4131