SCHOOL BASED ASSESSMENT RESULTS - QUESTION RESPONSES

Similar documents
Facility Improvements

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOVEJOY Independent School District

PLUMMER ELEMENTARY SCHOOL

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

Operational Services Facility Innovation & Readiness Stakeholder Team

LASALLE - BACKUS EDUCATION CAMPUS

LECKIE ELEMENTARY SCHOOL

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Facility Assessment Report, Montgomery Independent School District

Scripps Ranch High School

Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi

Cheldelin Middle School

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

LEWIS ELEMENTARY SCHOOL

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

Madison School District. Strategic Five-Year Facility Maintenance Plan

Completed projects. Projects in progress. Program developments

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM

BOWIE LEARNING CENTER

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G REST AREA/WELCOME CENTER AND TRUCK PARKING FACILITY PERFORMANCE MEASURES

School Without Walls

A/E Design Deliverable Checklist

Crockett Elementary School Renovations

CENTENNIAL SCHOOL DISTRICT

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

CARL E. SCHLUTER ELEMENTARY SCHOOL

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

CODE COMPLIANCE PLAN REVIEW PROCEDURES

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS

Penns Valley Area School District

Perimeter Site Improvements

Division 09 FINISHES TABLE OF CONTENTS

FACILITY NEEDS ASSESSMENT CURRENT PRIORITY ONE PROJECTS

SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Sustainable Facilities Master Plan

A/E Design Deliverable Checklist

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX

SECTION ALTERNATES

INSPIRE each student to develop a strong

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken.

Auburn University Facilities Management Policy :

CITY OF NOVI. Police Department

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Priority 2 Access to Goods & Services

Mount Vernon Elementary School Grades PK 5

Davis Frame Co., Inc. Construction Budget Considerations

Creative Performing Media Arts Middle School

U.S. Department of Housing and Urban Development Community Planning and Development

Design Advisory Committee Meeting #1. December 6, 2016

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken.

DIVISION PARKING STRUCTURES

AED Design Requirements: Site Layout Guidance

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken.

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

Section 1 OBC FADS /13 Access to Parking Areas

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

MADISON HIGH SCHOOL // Executive Summary

Budget Estimate Basic Tenant Improvement

Velma F Thomas Early Childhood Center

BLIND BROOK-RYE PUBLIC SCHOOLS

Facilities Systems Upgrades

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

MIAMI-DADE COUNTY PUBLIC SCHOOLS OFFICE OF ECONOMIC OPPORTUNITY PREQUALIFICATION FORUM

BLDG Rm Number FM. FIU Florida International University. Facilities Planning and Construction PM STATUS REMARKS. from to

Highland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features

Construction Summary

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Facilities Condition Assessment Qualcomm Stadium

QUAIL CROSSING TOWNHOMES ASSOCIATION, INC.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT BOND PROGRAM REPORT NOVEMBER 4, 2003 BALLOT

2012 TAS. Did you sign-in? Atelier. the first year. Course Description. Latest with TDLR. Learning Objectives TAS The First Year April 2013

Excellence in. Modular Building Design

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Appendix A. Facilities Condition Assessment

3D Home Improvement and Inspection Services, Inc

Qualifying Process for Handyman Online Qualifying Questions. Name: Street Address: City: State: Zip Code. Home Phone: Cell Phone: Address:

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene

CHAPTER R-6,000 Single-Family Residential. 6,000 Square Foot Minimum Lots

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

USER INSTRUCTIONS The FIT is comprised of three parts as follows:

Exhibit D Construction Budget Template

Jane Addams Elementary School S Avenue H Chicago, IL 60617

Expedited Local Partnership Program (ELPP)

Fairfax Elementary School 3150 Fairfax Rd, Cleveland Heights, Ohio

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.

Pueblo Estrella Homeowners Association Architectural Guidelines

Arbor Heights Elementary School. Concrete for South Building Foundation Stem Walls

Back to School Preparation Report. Staffing/Hiring Status, Facilities, Technology, Enrollment and Instructional Materials

New Homes Forestbrook Road. Yes, it s INCLUDED!

Transcription:

SCHOOL BASED ASSESSMENT RESULTS QUESTION RESPONSES ANDREW JACKSON MIDDLE APOLLO ASTRONAUT SENIOR HIGH ATLANTIS AUDUBON BAYSIDE SENIOR HIGH CAMBRIDGE CAPE VIEW CENTRAL MIDDLE CHALLENGER 7 CHRISTA MCAULIFFE COCOA BEACH JR/SR HIGH COCOA SENIOR HIGH COLUMBIA Evaluation of car loop Additional bike racks with paved bike ; Fire Lane in front of school and highly visible "No Parking" signage New Bike racks; View restriction in parking New signage at vehicle and bus loop; Additional Visitor parking; Evaluate bikers and walkers access to campus Additional bike racks; Additional sidewalks from school's ROW onto campus Ingress/egress/routing modifications at bus and car pickup ; Routing of walkers and bike riders to be Additional Visitor parking Additional signage at car loop; painting of crosswalks Fencing at bike racks Additional parking ; Larger bike rack and Emergency vehicle access to relocation; Speed bumps at be student dropoff Additional bike rack ; Walker access needs to be Resurfacing of all pavement Campus Paving, Sidewalks and ; Upgrade of parking Covered Walkways Systems signage; Restriping of parking Guttering & downspouts at roof edge Upgrade drainage practice Paving South parking ; Additional staff parking Sidewalk finish and elevation fields/baseball; Covered Correct flooding at sidewalks; ; Canopy to s; Canopy columns walkways Bldgs. 700 to 800; Additional covered walkways Walkway canopies at all ; Securing d to address rusting Sidewalk at baseball & tennis walkways & courtyard of fence gates courts Storm drainage to be Upgrade of drainage at front ; Evaluation of of school & car loop walkway cover at front office Repair of sidewalks Repair/Replacement of sidewalks; Covered walkway at ESE bus loop ; Exterior signage Security cameras; Upgrade of Fire Alarm ; Evaluation Alarm Systems of security Fencing improvements; Interior and exterior security Additional exterior security s desired; including parking Fencing; Front door access control; Fire Alarm not audible from exterior Additional security cameras Perimeter fencing; Fencing at baseball/softball Security cameras and intrusion detection Evaluation of parking lot ; Upgrade of ground floor security gates Perimeter fencing single point of access on campus Upgrade of walkway ; Security cameras; Additional/ exterior Security evaluation to limit access points; Additional security cameras Line of sight/security issues to be Upgrade irrigation Covered play /pavilion; New well for irrigation Irrigation needs new Additional gates at desired @ front and west side time clock; Provide mulch in playground of school lieu of sand at play Painting of exterior walls Additional & existing playground Deterioration of existing playground Upgrade of PreK playground Evaluation of playground ; bordering of playground mulch Repair of irrigation Playground condition and location assessment Evaluate pool house; Resurface and restripe track, basketball and tennis courts; Additional PE Storage; Paint Gymnasium; Covered play /pavilion New PE Storage Building; correct flooding at baseball field; Covered pavilion at New PE Storage Building Evaluation of surface cracks and lines at track; Gymnasium Basketball courts need bleachers to be ; resurfacing and painting of Additional visitors bleachers lines at stadium Additional PE Storage Building Additional storage for Fencing/dugouts at Painting of lines at basketball PE/athletic ; Track softball field ; Track court resurfacing; Replace existing resurfacing stadium concession stand Evaluate asphalt condition; Campus Accessibility and ADA Restriping parking stalls; Signage Additional ADA parking spaces; Signage at front office; Automatic door openers at front office ADA Parking location at bus loop and causes traffic conflicts; Additional ADA parking ; ADA signage assessment ADA ramp and access door ; Upgrade of exterior signage Additional ADA door closers; Additional ADA drinking Power at Media Center; Additional accessible water HVAC ; Electrical ; Air Plumbing needs to be Plumbing fixtures should be (MEP) and Technology conditioning in the for d gymnasium Rooms vary in temperature HVAC ; Mechanical Address 21st Century needed classroom technology needs Replacement of Mechanical Bell/intercom/PA ; evaluation in select Technology infrastructure in Classrooms and Media Center classes Technology Evaluation of Mechanical and Electrical s; Additional student stations and HVAC ; Upgrade corridor ; Bell/clock to be ; Technology Evaluate electrical service; Evaluate plumbing service; HVAC s to be Replace carpet with ceramic Building Finishes and Systems tile at select spaces Tile flooring in Classrooms and Administration Provide cover in courtyard; Flooring replacement needed Tile flooring in Exterior painting ; Exterior painting; Critical Upgrade of exterior finishes in some Classrooms; Doors gymnasium, cafeteria and Tile replacement in specific finish deterioration at North at courtyard; New blinds and warped and paint finish classrooms; Interior painting; rooms (3151); Interior paint side of building window treatments failing Windows leaking failure Exterior painting is ; Floor tile missing in select rooms Repair of building cracks; Exterior painting; Flooring s campus wide Exterior painting needs to be refreshed; Repaint interior high traffic (gymnasium, locker room, cafeteria) Interior in poor Replacement of Media Center condition; interior painting carpeting Remove lockers & paint New furnishings and flooring walls; Replace carpet in in Media Center; Interior classrooms with ceramic tile; painting at Cafeteria; Select to be painted Additional food service Inadequate office space for staff and storage space Storage Bldg for Athletics, Administration, and Gymnasium. Classrooms sizes to be Additional classroom restrooms; Additional storage space Additional storage needed Ticket booth for Gym Security cameras at restroom Music classroom ; ; Additional serving ESE Classroom enhancement ; Additional restrooms Media Center lines in Cafeteria; Additional ; Additional serving at select spaces storage ; Addition lines at kitchen Kitchen prep HVAC ; Air conditioning in the gymnasium; Exterior wood door replacement; Evaluation of pool house Fire lane addition; Security fencing campus wide Bus loop too small for Evaluate electrical service number of buses; Bus loop Track stadium Press Box throughout campus; Correct shared with parking creating needs to be replaced; flooding between 500 & 600, vehicle conflicts; Auditorium facility needs to 300 & 400 and at back bike Configuration of bike rack be updated including path; Evaluate functioning of location and student s/equip. grease trap: Technology and circulation should be safety s Issues relating to Baseball and Softball Area Additional storage; Plumbing Security Cameras campus issues in 900 wing; Exterior wide and intrusion detection including painting, & canopies for walkways Security is ; Upgrade classrooms without 21st Century ; Completion of exterior painting work Mechanical ; Sidewalk repair/replacement Ability to monitor present Improvements to site New playground ; Evaluate campus layout to a priority; Surfacing and gate locations to be drainage ; Security Outside covered play ; limit access points; Additional repair of track ; ; Use of cameras; Limitation of points Additional parking; Additional permanent Classrooms to Whiteboard replacement; gates/fencing to limit access of campus access sidewalks; Electronic allow enrollment increase Interior door replacement to Buildings marquee FACILITY SERVICES 1 JULY 22, 2014

SCHOOL BASED ASSESSMENT RESULTS QUESTION RESPONSES COQUINA CROTON DELAURA MIDDLE DISCOVERY EAU GALLIE SENIOR HIGH EDGEWOOD JR/ SR HIGH ENDEAVOUR ENTERPRISE FAIRGLEN FREEDOM 7 SCHOOL OF INTERNATIONAL STUDIES GEMINI GOLFVIEW HANS CHRISTIAN ANDERSEN HARBOR CITY Additional parking for Staff & Visitors; Modifications to bus loop to Evaluation of vehicular prevent overflow to street circulation on campus and through parking Enlarge Bus Loop; Signage Add to North parking Additional parking; Evaluation Evaluate vehicular circulation ; Restripe parking lots; of vehicular circulation at dropoff/pickup Provide additional signage Provide access control to main entry Upgrade site signage; Additional parking; New bike Additional parking at former racks security portable location; Restriping at front of school Additional parking; Routing modifications to vehicle and bus traffic. Provide Fire Lane designation; Traffic signage including speed limit Sidewalk repairs ; Campus Paving, Sidewalks and of covered walkways Covered Walkways Systems Resurfacing/sealing at front Resurface Bus Loop; Restripe parking and car loop; and additional signage Covered walkways to pavilion parking and ; Traffic signage Stormwater issues at select sidewalk/crosswalk paved Covered walkways to portable classrooms Covered walkways between Building 3 & 4 (both ends); Additional traffic signage; Improved gutter Covered walkways at Concrete at bike paths cracking; Back play field floods; Signage at busloop and carloop Resurface car loop; Seal all other paving on site Painting of bus loop striping Covered walkways for ; Sidewalk resurfacing at select Car loop improvements; Sidewalk repairs Sidewalk repairs Security cameras Alarm Systems Additional security Single point of access; ; Security cameras Security cameras; Single point Additional exterior at ; Evaluate campus of access; Upgrade of exterior building perimeter and to develop single point of parking access Single point of access Additional in north parking ; Additional security cameras Repair bus loop fence Provide access control to Add panic hardware to access main entry ; Additional gates; Provide security exterior ; cameras; Upgrade fire alarm Secure/Gates at all entry/exit Upgrade of campus fencing Access gate modifications; Additional exterior security Fencing; Limit points of access Irrigation Upgrade of irrigation Irrigation needs to be d Provide irrigation Additional mulch at playground Provide irrigation ; Additional playground ; Irrigation at front ; Additional mulch at playground Sprinkler ; Playground Irrigation repairs Resurfacing of courts; Replace existing storage units Resurfacing of play courts Resurface ; Replace basketball goals; New softball field backstop Track resurfaced and Additional PE Storage; restriped; Remove lights Upgrade sewer at Provide athletic track; Small from Baseball; Remove football concessions; Address Provide additional PE Storage bleachers for PE class; PE Storage shed replacement Provide additional PE Storage dugouts from Baseball; Lights turf issues at football field Striping of basketball court; at tennis courts; Relocate Flooding at basketball court bleachers Restripe ; New basketball goal assemblies Additional PE Storage; Evaluate root damage at hard court ADA s at classroom Campus Accessibility and ADA restrooms; ADA water campus wide Evaluation of accessible on campus; Stage access to be Provide elevator; provide ADA compliant drinking ; Replace signage; Upgrade door hardware Lack of cold water at drinking Evaluate ADA accessible entrance; Evaluate ADA compliant restrooms Upgrade exterior building signage; New digital marquee; Therapy pool for new program Upgrade water ; Upgrade/Repair school marquee Restriping of traffic/parking lines; Evaluation of exterior signage Signage improvements Mechanical (MEP) and Technology ; Pipe leaks HVAC ; Plumbing and electrical Evaluate electrical service; s; HVAC ; Sanitary evaluation; Electrical service for Bell, Audio, Intercom s technology; Evaluate corridor evaluation Upgrade of Electrical ; HVAC issues at building addition Evaluate HVAC units; Desire waterless urinals at group restrooms New HVAC at Media Center; Replace toilets at media Center; 21st Century Technology s Evaluate HVAC at Upgrade telephone ; Additional PA speakers at car loop; Additional 21st Century ; Add Computer Labs Additional 21st Century student stations Evaluation of HVAC ; Additional outlets for Plumbing issues; Electrical technology; Some classrooms to accommodate need 21st Century technology. Upgrade of 21st Century ; Upgrading of cables, infrastructure & Roof leaks at Administration; Roof leaks; Interior/Exterior Painting throughout campus; Exterior to be painting; Replacement of Upgrade of exterior ; Building Finishes and Systems ; Flooring needs to exterior ; Skylights Carpet replacement at be failing; Flooring band/chorus room Replacement of all carpet with tile Number of roof leaks; Lockers need to be painted Paint school exterior; Roof leaks Building 08; Paint interior; Replace Carpet at Band and Media Center Repair Bldg. 13 windows; Replace Computer Lab and Music Room carpet; Evaluate flooring at Portable 3 Exterior painting; Replace carpet in Music Room Interior school painting; Window replacement at Exterior painting; Interior Replace Media Center carpet; Door replacement needed: Replace all carpet/vinyl with Administration; Exterior painting at cafeteria; Evaluate Paint interior and exterior Flooring in Bldg. 1 & Cafeteria ceramic tile; Custodial Clo. painting; Upgrade bathroom carpet in select needing replacement. floors need painting finishes Exterior painting at select locations Staff restrooms needed on Replace cabinets in NW side of campus; classrooms; additional Evaluation of classroom electrical outlets: Kitchen too config. ; Additional small; Restrooms line of sight staff dining & conference to be Upgrade of wall at Gymnasium; of grease trap at Kitchen Renovation/Addition to Administration Building Additional PE Storage; Enlarge space for Music Provide Building numbers Additional storage Some Classrooms too small; Limited storage; Upgrade of Replace Media Center carpet; Limited storage; Additional or Administration location Media Center circulation desk Limited storage expansion of serving line should be and shelves Limit points of access on Existing walkway canopies in campus; Cabinetry in main poor condition; Additional building not adequate; walkway canopies ; Additional Storage desired; Admin. Area needs resource new Kitchen Cafetorium room, guidance office & desired; Reconfigure conference room classroom spaces Air conditioning in Gymnasium and Locker Rooms; Bus loop improvements; Entrance for late arriving students; Additional parking for Visitors and Parents Single point of access to campus Address roof leaks; Address gymnasium appearance; Address security access on campus; Upgrade restrooms and lockerrooms Address lack of covered walkways; Renovation/Addition to Administration Building Address single point of access; Provide security cameras/intrusion detection New irrigation ; Site drainage improvements around hard courts and playground ; Additional pavilion New school marquee; HVAC for classrooms; Access control at main entry Small cafeteria size; Limited classroom space No office space for counselors; Limited storage space; Increase amount of parking; Perimeter fencing Additional parking; Trash compactor Building with open classroom plan should be for renovation Fencing; Limit points of access; Evaluate Administration layout; Upgrade Media Center circulation desk & shelves FACILITY SERVICES 2 JULY 22, 2014

SCHOOL BASED ASSESSMENT RESULTS QUESTION RESPONSES HERBERT C HOOVER MIDDLE HERITAGE HIGH IMPERIAL ESTATES INDIALANTIC JAMES MADISON MIDDLE JOHN F KENNEDY MIDDLE JOHN F TURNER SR JUPITER LEWIS CARROLL LOCKMAR LONGLEAF LYNDON B JOHNSON MIDDLE MANATEE MEADOWLANE INTERMEDIATE Evaluation of sidewalk to campus entry Additional visitor parking; Striping painted; Additional exterior Evaluate car loop capacity Painting of striping and resealing of parking lots Additional bike rack Campus Paving, Sidewalks and Correct Drainage at East Covered Walkways Systems parking and Gymnasium Additional sidewalks at east side; Canopy leaks Painting of striping at parking Evaluation of front entrance No covered walkways; Evaluation of parking lot lots; Leaking covered dropoff and flagpole ; Sidewalks uneven; Flooding paving; Evaluation of center walkways; Canopy covers to Drainage evaluation; Bus loop of stormwater at North walkway ; Signage at car & traffic signage and paving bus loop Replacement of curbs at front of school Evaluate cracking sidewalks Replacement of speed bumps Covered walkway Alarm Systems Replace perimeter gates Evaluation of security camera Evaluation of perimeter ; Additional at Upgrade of at canopy fencing; Single point of access softball, baseball field ; covers fencing reconfiguration Evaluation of Fire Alarm Evaluation of Fire Alarm ; Exterior ; Fencing at Gymnasium Lighting in parking ; Additional exterior at Locks and gate latch s rear of campus Fencing and access gate s at front of school Evaluate playground location and type of fencing Provide security cameras; Evaluate line of sight from Administration Additional primary playground Additional playground Upgrade of playground ; Repair of fencing at K playground Irrigation Add irrigation Resurface track; Resurface Evaluation of electrical at concessions; Upgrade of athletic fields Striping on ; grading at play fields and softball Lines repainted; Upgrade of nets and backboards Additional PE Storage Resurfacing of basketball court Upgrade of fitness course ; Evaluation of basketball court and Campus Accessibility and ADA Evaluation of marquee Sidewalks at East Side; Covered walkways leaking Sidewalk access to water Additional ADA parking; Upgrade of drinking Upgrade electrical ; HVAC ; Plumbing of (MEP) and Technology galvanized pipe; 21st century technology s Replace walkway lights Remove old science lab tables & s; Remove old HVAC Upgrade of HVAC ; s in classroom; Upgrade of plumbing Evaluation of HVAC balancing HVAC evaluation of balancing; Additional in corridor PA not functioning in select HVAC at select Upgrade of phone Upgrade of technology infrastructure; 21st century Evaluation of HVAC balancing technology s Replacement of VCT and Building Finishes and Systems carpet campus wide; Evaluation of exterior Exterior door finishes; Evaluate glue issues Upgrade Primary playground Tile s in bathrooms; Roofing leaks; Painting in select ; Remove lockers and paint Repainting and door touchup painting of interior ; in select ; Roof leaks in Replace wallpaper with paint select Exterior door replacement; Additional Bldg. 1; Ceiling replacement Bldg. 1 classrooms Replacement of carpet in select ; Replacement of tiles in select Painting of exterior of building; Replacement of carpets Evaluate cracks in tile at select Additional storage Provide electrical service; Stripe basketball court; Upgrade play fields Modifications to Administration layout Additional storage; Cafeteria evaluation of serving lines & restrooms Evaluation of group restrooms at cafeteria; Administration evaluation of layout/circulation Evaluation of acoustics at Multipurpose Additional storage Correction of HVAC and plumbing issues Corrections to security camera and Fire Alarm Playground ; striping at basketball court; Safe room Upgrade of plumbing ; for ESE/EDB; New stage Classrooms with HVAC issues; curtains; Larger cafeteria; Evaluation of center sidewalk Upgrade of entrance driveway and sidewalk access Correct leaks in plumbing s, roofs & HVAC ; Cafeteria door configuration and Covered walkways to ; Air Conditioning in gymnasium; Flooding at North of gymnasium Additional parking; Administration layout/circulation; Exterior ; Security cameras; Additional serving line in cafeteria Evaluation of campus security; Evaluation of car Additional parking spaces for Address playground visibility; loop at dismissal; Upgrade of Additional parking; Perimeter staff and visitors; Security Additional security cameras front door security; security for back of campus with online monitoring evaluation of floors; Upgrade of playground Exterior painting of building; Additional landscaping and top soil Evaluate widths of primary covered walkways FACILITY SERVICES 3 JULY 22, 2014

SCHOOL BASED ASSESSMENT RESULTS QUESTION RESPONSES MEADOWLANE PRIMARY MELBOURNE SENIOR HIGH MERRITT ISLAND SENIOR HIGH MILA MIMS OAK PARK OCEAN BREEZE PALM BAY PALM BAY SENIOR HIGH PINEWOOD PORT MALABAR QUEST RALPH M WILLIAMS JR RIVERVIEW Fencing at car loop ; Evaluate crosswalks and blocking at medians Evaluation of bus loop, Evaluation of security at front student drop off and service parking vehicle physical widths/circulation Restriping lines at parking ; Evaluation of entry gates Upgrade vehicular circulation at parent loop Upgrade of bike storage Additional visitor parking; Evaluate service vehicle access Additional parking; Increased Bike pad and walkway at East bike storage; Additional bike rack; Evaluation of car sidewalks at front of school; Monitoring growth for impact loop/staging; Additional Evaluate lines of sight at play walkway at East side of & side parking. school Upgrade visitor parking Campus Paving, Sidewalks and Replacement of gutters and Covered Walkways Systems downspouts Resurfacing and restriping at Additional covered walkways; parking ; Additional Evaluation of Storm water gates at entrance of front campus wide parking Upgrade paving entire campus; Restripe all parking Evaluation of sidewalk failure and traffic markings; Upgrade drainage at west parking Upgrade sidewalks; Upgrade storm water at stadium Upgrade sidewalks at North side of campus; Additional covered walkway to headstart Bldg. and PE pavilion Asphalt need resurfacing; Covered canopies to ; Upgrading of sidewalks Restriping of parking lot; Covered walkways to Upgrade drainage at West playground ; Evaluate access for overflow parking Covered walkway providing access to roof Provide security cameras; Repair campus fencing at front of school; Replace Alarm Systems walkway at select Additional at center of campus; Upgrade of security camera ; Evaluation of gate campus wide Upgrade of campus fencing and access gates Additional gate near front office to control visitors Additional at back of school Provide perimeter fencing Upgrade Fire Alarm Upgrade fencing; Upgrade gates; Upgrade exterior Additional fencing at school perimeter; Upgrade Fire Alarm Development of single point Evaluate line of sight from of access; Provide security Additional cameras; Upgrade Administration to school cameras; Fence replacement of fencing entrance; Upgrade front gate & repair Evaluate lines of sight; Security cameras Painting of fencing and building trim Upgrade of irrigation ; Upgrade landscaping Irrigation not Upgrade irrigation : functioning; Additional play Difficulty growing grass under space desired oaks Upgrade irrigation ADA access to playground Upgrade landscaping Additional shrubs Upgrade of playground ; ADA access to play Additional mulch and surfacing under swings Replace West playground Upgrade surface at play ; Repair fencing Additional outdoor & indoor Storage; Bleacher grip tape Upgrade of concession and restrooms Restripe all playcourts Upgrade basketball & tennis courts Baseball diamond for elementary use Provide PE/Special Needs additional storage; Campus Accessibility and ADA Evaluate signage and water ADA auto door openers Restripe ADA parking; Evaluate ADA access location Restriping of parking Provide cold water at (MEP) and Technology Upgrade phone HVAC Upgrades at select buildings Upgrade HVAC Upgrade HVAC ; Upgrade 21st century Chiller replacement scheduled Upgrade HVAC ; Upgrade plumbing; Upgrade phone : Provide 21st century technology at all classrooms Upgrade plumbing ; Upgrade, electrical distribution, phone and tech. infrastructure Upgrade HVAC at media Upgrade telephone ; Center & Cafeteria; Upgrade Some HVAC s remain; lift station; Upgrade wireless; Technology infrastructure to Additional screens be d Upgrades of HVAC, clock/bell, telephone, media retrieval, TV's Upgrade sound at stage; Building Finishes and Systems Ceramic tile in cafeteria; painting of interior select rooms Interior and exterior Upgrade of classroom door Roof evaluation Buildings 6 & need painting; Additional Refinishing at select locations hardware 7 window blinds; New carpet at Library/Music Upgrade tile in restrooms; Interior painting Upgrade wood Interior painting Bldg. 1; Upgrade exterior Bldg. 1; Upgrade floor finishes to ceramic tile Replacement of bathroom floor tile Touchup painting throughout campus; Interior walls with cracks Replacement of VCT throughout campus; Replacement of carpet at Administration Evaluate roofing Upgrade security at group Layout of cafeteria difficult to Provide multipurpose room supervise space Upgrade stage curtains Upgrade Cafeteria size restrooms; Upgrade interior finishes & ; Conference room at Administration; Evaluate cafeteria for noise control Adjustments for EBD unit Classroom size is not satisfactory Prefer traditional closed classrooms Storage Additional parking; Additional Need to evaluate openness of fencing at front sidewalk; campus; Upgrade of entrance Evaluate entrance to front to metal door office assemblies Evaluation campus wide of security using CPTED principals; Upgrade of student parking lot entrance/exit Evaluation of storm water flooding throughout campus; Evaluation of front entrance Upgrade of Cafeteria Upgrade HVAC ; Secure campus single point; Upgrade West parking ; Upgrade vehicular circulation Cabinet s; Evaluate drainage grates; Evaluate traffic circulation, parking lot sizes, and security Pad at East bike rack; Upgrade of playground ; Upgrade HVAC at Media Sidewalk from Clubhouse Dr.; Address access points at back Limited storage; Small Center & Cafeteria; Upgrade Upgrade parking; Upgrade Additional Storage; Upgrade of school; Closing of classrooms; No common Upgrade fencing for security wireless; Additional parking; security; Additional fencing and gate ; classrooms; Evaluate campus meeting ; Upgrade of Evaluate at Cafeteria sidewalks; Secured play Upgrade VCT to ceramic security; Address access to tile in Cafeteria and for noise control flooring; PE Pavilion; Exterior roof Classrooms & Interior; Paint; Gutters FACILITY SERVICES 4 JULY 22, 2014

SCHOOL BASED ASSESSMENT RESULTS QUESTION RESPONSES RIVIERA ROBERT LOUIS STEVENSON SCHOOL OF THE ARTS ROCKLEDGE SENIOR HIGH RONALD MCNAIR MIDDLE ROY ALLEN SABAL SATELLITE SENIOR HIGH SATURN SEA PARK SHERWOOD SOUTHWEST MIDDLE SPACE COAST JR/ SR HIGH SPESSARD L HOLLAND STONE MIDDLE Evaluate bus loop for service/delivery vehicles; Overhang at bus loop; Evaluate pedestrian circulation through parking lot Upgrade student dropoff; Upgrade bus loop Fencing at bike racks; Evaluation of street crosswalks Resurface turn lane; Upgrade Provide directional signage at fence at bus loop; Provide bus loop turn lane Removable dividers in car loop Create busloop Evaluate safety of walkers at front of school; Fencing Provide covered bus access; Provide crosswalk at school entrance Resurfacing and restriping of Campus Paving, Sidewalks and parking lots; Covered Covered Walkways Systems walkways at bus loop; Crosswalk signals Storm drainage improvements at Bldg. #8; Covered walkways leaking Additional parking at North Upgrade of sidewalk ; East side of campus; Correct Additional walkways at ADA ramps at front of Cafeteria; Storm water at classrooms; Replace onsite front of building traffic signage Provide speed bumps at student drop off ; Covered walkways leaking Resurface and restripe parking lot; Directional signage at bus loop Upgrade covered walkway at Evaluate sidewalks; Evaluate South to eliminate flooding; width of covered walkways; Resurface and restripe Upgrade stormwater parking and bus loop drainage Repave and restripe throughout campus; Resurface hardcourt Upgrade traffic signage 7 Upgrade sidewalks; Upgrade striping; Resurface & restripe traffic control signage; all pavement ; Campus Upgrade storm water wide storm drainage at Bldg. 11 Upgrade traffic signage Upgrade all paved ; Upgrade covered walkways; Upgrade storm water drainage Evaluate fire alarm at ; provide gates at Alarm Systems wings; Single point of access Upgrade fire alarm ; Multiple access points; Provide camera Upgrade perimeter fencing; Additional at walkways and exterior of campus Provide security cameras; Upgrade exterior Establish single point of access; fire alarm ; Upgrade perimeter fencing Upgrade exterior ; Provide single point of access Campus wide security fencing; Security camera Security cameras Upgrade fencing and gate ; Provide security Upgrade campus access to single point of entry with fencing & gate Upgrade exterior Upgrade (walkway, exterior); Provide security cameras & intrusion detection; Upgrade fencing Upgrade of playground and surfacing Upgrade irrigation Sod at center courtyard Upgrade play Ground cover at playgrounds Provide irrigation ; Mulch at play Upgrade irrigation Upgrade select playground Upgrade landscape; Upgrade playground No allpurpose ; Resurfacing and restriping of courts Restriping of play court Replace bleachers at McLarty Stadium; Resurface track; Concession at mclarty; Upgrade scoreboard at McLarty Stadium Upgrade softball field; Restriping of track Provide covered hardtop with shade Upgrade track and provide concrete curb; Provide outdoor basketball court Upgrade baseball diamonds; Restripe ; Additional PE Storage Resurface hard courts Upgrade baseball/softball Resurfacing of track; Upgrade improvements; Upgrade tennis courts track; Additional PE Storage Resurface and restripe Evaluate condition of all s (renovate, repair, replace) Campus Accessibility and ADA Upgrade building signage; Upgrade ; Electronic sign Upgrade drinking ; ADA signage for access; Upgrade elevator Bldg. #8 Upgrade of entrance ramps; Restriping of ADA parking Upgrade exterior sign Upgrade exterior signage and building numbers Upgrade exterior signage; Upgrade ADA entrance elements Additional signage at front of Evaluate entrance for school; Upgrade of ADA compliance restroom facilities Upgrade elevator, Upgrade exterior building signage Evaluate entrance at Upgrade drinking gymnasium; Upgrade drinking Upgrade Classroom and Corridor ; Upgrades of Upgrade of plumbing (MEP) and Technology 21st Century Evaluation of balancing/condition HVAC; Upgrade water supply and sewer ; Upgrade computers and wiring Upgrade plumbing ; provide A/C at server rooms; Additional student stations; Additional Storage Upgrade intercom Provide surge protection; Upgrade plumbing Evaluate electrical and HVAC ; Plumbing evaluation; Evaluate classroom Upgrade HVAC ; Upgrade plumbing ; Upgrade HVAC Upgrade HVAC at Gymnasium; Upgrade Bard HVAC s; Upgrade plumbing & telephone Upgrade exterior door ; Upgrade flooring to Building Finishes and Systems ceramic tile; Replace carpeting; Interior painting; Rust @ patio Select painting; Upgrade interior and paint Interior & exterior painting Painting; Reroofing; Window throughout campus; Roofing sills cracking leaking painting of ; Interior painting; Cafeteria needs to be replaced Interior painting; Flooring s Exterior painting Seal windows; Upgrade Evaluate ext. veneer ; Upgrade flooring; Upgrade Upgrade hurricane protection Exterior & interior painting; wooden ; Painting Evaluate main entry; Evaluate Upgrade of flooring in select Upgrade roof ; exterior ; Upgrade VCT; to allow cleaning; Repair floor tile interior classrooms; Upgrade exterior ; Evaluate roof locations Evaluate ; Paint exterior Painting of interior Interior painting Classrooms flooring to tile ; Carpet Additional storage Upgrade Gym lockers; Replace weight room Upgrade of Administrative space; Painting at Gymnasium; Additional Storage Security ability of visitors to bypass front office Upgrade plumbing; Upgrade restroom finished; Ceramic tile in corridors; Painting Security cameras; Sound separation at Music Evaluate Media Center layout; Additional Storage Upgrade band instrument Cameras at restroom entries; storage; Upgrade flooring in Additional 700 seat Multi=Purpose rooms; Auditorium; Upgrade Upgrade flooring Gymnasium Additional Storage Upgrade layout at ESE rooms; Upgrade finishes at Gymnasium Upgrade exterior door ; Painting of exterior Upgrade wiring and trim; Rust at campus ; technology; Evaluate traffic entrance, covered patio, plumbing ; Evaluate flow; Upgrade elevator; campus general; Provide parking configuration need sound in gates & fencing at wings; additional hard surfaces; Auditorium and Gym Secure campus with intrusion devices Perimeter fencing; Exterior ; Exterior basketball courts; Front office furniture to accommodate visitors Safety fencing and gates at West side of car loop Repainting of hallways; Single access/fencing; Shade structure Refinishing of wood FFE; Upgrade interior, Upgrade of plumbing ; Upgrade metal exterior door Upgrade HVAC and Electrical Upgrade flooring; Resurfacing ADA s at restrooms; hardware; Upgrade coating s; Replace gutters and of pavement ; Upgrade Repair voids under concrete ; Additional fencing to downspouts; Plumbing cabinetry in restrooms; slab; Evaluate traffic flow facilitate single point of s beginning to fail Provide sound barrier in from Range Rd. access ceiling Upgrade security campus wide address multiple access points; Security camera Upgrade security camera ; Upgrade configuration of bus & car loop; Upgrade roof and gutter ; Upgrade sidewalks; Modernize Gymnasium (HVAC, acoustics; sound ) FACILITY SERVICES 5 JULY 22, 2014

SCHOOL BASED ASSESSMENT RESULTS QUESTION RESPONSES SUNRISE SUNTREE SURFSIDE THEODORE ROOSEVELT THOMAS JEFFERSON MIDDLE TITUSVILLE HIGH TROPICAL UNIVERSITY PARK VIERA HIGH SCHOOL WEST MELBOURNE SCHOOL FOR SCIENCE WEST SHORE JR/SR HIGH WESTSIDE Evaluate side parking security, gate at bus loop, Provide speed bumps; Fence in car loop; Larger gate rusting soffit, fire pull Room Evaluate student access from Canopies at bus loop and car opening to playground for 204; AC damper in 200 Bldg; West side of campus loop emergency vehicles Storm water drainage at eastern fence line Additional bike racks Upgrade entrances and exits; Additional sidewalks bus loop and bike/walker ; Overhand & benches at car loop; Additional gates Upgrade parking Evaluate entrances and exits at parking Upgrade walker access, signage, crosswalks and sidewalks Separate district bus compound entrance from school entrance Sidewalk s at bus Campus Paving, Sidewalks and loop and at front of school; Covered Walkways Systems Provide speed bumps Evaluate parking paving condition; Existing canopies need cleaning and painting Provide additional signage at parent drop off; Evaluate storm water drainage at entry Resurface and restripe paving Additional covered walkways; at bus loop & parking; Storm Additional sidewalks; Additional paving at bus loop water s at select Upgrade existing sidewalks Evaluate covered walkways; Evaluate exit traffic patterns Upgrade gutters; Upgrade drainage Upgrade campus paving and striping; Covered walkways Additional traffic signage; to ; Crosswalks; Evaluate storm water Traffic control signage Provide single point of access on site, security cameras; Alarm Systems Evaluate campus lines of sight Change gate & fence configuration at office; Evaluate fencing condition and function campus wide Evaluate campus fencing; Provide additional perimeter access gates, single point of at Cafeteria access, camera Upgrade security camera ; Evaluate Fire alarm Upgrade perimeter fencing and gates Upgrade walkway Additional walkway at stadium; Provide security cameras Upgrade campus access; Security cameras; Intrusion detection at front Removal of dead stumps; Excessive tree overgrowth at West fence Upgrade irrigation ; ; Upgrade ground covering at playground Provide irrigation ; Landscape s Upgrade irrigation Upgrade irrigation ; Upgrade irrigation ; Upgrade interior fencing ; Upgrade irrigation Basketball courts need resurfacing and restriping Upgrade ; Upgrade track Additional PE storage; Wall at pavilion with electricity Outdoor space/play field limitations Evaluate Repave and restripe Provide concession stand; Resurface & restripe track, Reconfiguration of PE storage ; Provide dugouts, bleachers, pressbox Campus Accessibility and ADA Provide electric door openers Upgrade exterior ADA signage Lower curb at car loop Upgrade ADA signage; Upgrade water Add ADA water ; Building numbers; Additional access Upgrade water Evaluate function and condition of access (MEP) and Technology Evaluate upgrading phone ; Upgrade classroom HVAC s; Upgrade 21st Century classroom Update telephone ; Upgrade HVAC Upgrade HVAC Upgrade plumb; HVAC s at Office; Upgrade telephone ; Upgrade electrical; Upgrade PA; Upgrade 21st Century Evaluate intercom Upgrade corridor ; Evaluate electrical Upgrade HVAC central and classroom; Upgrade sewer Building 4 Upgrade clock ; Evaluate classroom HVAC s; Evaluate technology s Paint exterior and interior; Replace carpet at Media Upgrade vinyl tile; Building Finishes and Systems Center; Evaluate cracked tile; door hardware; Paint exterior and walls window screens Paint interior and exterior of campus; Provide ceramic tile throughout campus Roof leaks Exterior door paint; Evaluate door hardware condition Upgrade exterior /hardware; Upgrade windows; Upgrade restrooms; Paint interior; Repair exterior walls Painting exterior ; Upgrade flooring at Upgrade carpeting; Refinish Exterior paint; Evaluate exit Upgrade carpeting at Media exterior building walkway; door hardware; painting at Center; Upgrade classroom Paint exterior Auditorium & classrooms; Upgrade flooring Admin.; Water intr. walkways to ceramic tile Evaluate layout, restroom lines of sight Painting in Kitchen Evaluate size of chorus room Upgrade 21st Century drops; Expand dining; Expand dining; Additional conference space; Add classroom restrooms; Multipurpose room too small Faucet s Additional storage Provide carpeting; Expand Music spaces; Upgrade science labs & equip.; Additional Storage Resurface and restripe Upgrade HVAC ; Upgrade student access from Provide covered walkways at parking & student drop off; Security camera ; Additional Storage; Upgrade sanitary West side; Evaluate traffic Upgrade fencing for security; bus and car loop; Evaluate Evaluate storm water Upgrade HVAC ; Additional office space Upgrade storm water Building 4; Upgrade Gym size; Upgrade parent parking; Paint interior and exterior of flow at dismissal; Resurfacing Increase size of cafeteria; staff work room and art kiln drainage at parking; Courts Renovate bathrooms Bldg 17; (resource personnel); Upgrade vehicle entrance and to eliminate classroom provide competition track; Reconfigure fencing to campus; Provide fence at car and restriping asphalt at Reconfigure bus and car location. Provide electric resealed and restriped; ADA Exterior painting of ; Additional building space to exit configuration flooding; Upgrade HVAC Upgrade science classrooms provide single point of access loop parking lots & front of school; loops; Add window blinds for marquee; Primary entrance parking & autodoor at Asphalt repair in various accommodate growth; & equip.; Provide pressbox & Evaluate Gym floor surface; security hard to distinguish entrance; Upgrade classroom Additional exterior space concessions; Additional Upgrade Playground equip. HVAC Storage FACILITY SERVICES 6 JULY 22, 2014