Division: Planning & Regulation Job Grade: JG7

CHAS Assessment Standards

Environmental and Social Management Plan

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

Murra Warra Wind Farm Project Environmental Management Plan

version 1 / 96 R Green Stars Hotel Environmental Management System

APPLICATION for ISO Certification (All Standards) Contents

Health and Safety Management Standards

9.0 Environmental Protection Program

H&S007 Level 2 and 3 Risk Health and Safety Contractor Approval Request

Division: Planning and Regulation Job Grade: JG4A

ISMS AUDIT CHECKLIST

Permit to Work Manual

Health and Safety Manual

Works, services and infrastructure code

6 Risk assessment methodology

Risk Assessment Policy

Report for Agenda Item: 2

Occupational Health and Safety Management Manual v2.2

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

Work Health and Safety Management Systems and Auditing Guidelines

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

9.3.9 Industry uses code

Electricity Safety (Electric Line Clearance) Regulations 2010

Attachment C Management of the Installation

1 Determine the legal framework of OHS in the workplace

Environmental Aspects & Impacts Procedure EMS 01 Internal Procedures Issue 1, Revision 1

ISO14001 Training. ALPS Electric (Ireland) Ltd.. Rev 08 Updated August Consent of copyright owner required for any other use.

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

THE COMPLETE GUIDE TO ISO14001

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

The Horse Rangers Association Health & Safety Policy

Norman Road Haulage (Wimbledon) Ltd Health & Safety Policy

Identification and evaluation of environmental aspects

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

CS ENERGY PROCEDURE FOR SITE CONDITIONS. Key Changes Prepared By Checked By Approved By Date Initial Release G Oduko July 2011

Railway Interface Planning Scheme Rules (RIPS Rules)

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E

HAZARD IDENTIFICATION AND RISK ASSESSMENT Revision Date: 04/2017

Child Protection Compliance

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

Technical Guidance Document for Operational Environmental Management Plan (OEMP)

HEALTH, SAFETY & ENVIRONMENT MANAGEMENT SYSTEM MANUAL AJM-HSEMS-MAN NOVEMBER 2016

Hazardous. Scheme. the power behind your business

OPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME

Asbestos in Grounds, Asbestos Management Plan, Sydney Secondary College Balmain Campus, Balmain, NSW 2041

Managing Contractors (Scotland)

ENVIRONMENT, HEALTH & SAFETY POLICY Up date

Central NSW Regional Contaminated Land Policy Template

Procedure: Safety Management System Procedure - My Safety

Health & Safety Officer. Donegal County Council

Role Description Facilities Maintenance Coordinator

Verify Category A Audit Content

Work Health and Safety Toolkit for Congregations

Section 75J of the Environmental Planning & Assessment Act 1979

Honorary Contracts Procedure

ENVIRONMENTAL DEFENDER S OFFICE (ACT)

Work Health and Safety

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

General Counsel Manager, Governance, Risk and Compliance

Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Contractor Management and Purchasing

Minimum Standard- Work Health and Safety (WHS) Management Review. October, 2014

Pollution & Environmental Harm

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Tasman Extension Project Environmental Impact Statement APPENDIX N PRELIMINARY HAZARD ANALYSIS

Lone Working Policy Reference DP113

Operating Requirements Manual 11 October 2015 Version 1

DATA QUALITY POLICY. Version: 1.2. Management and Caldicott Committee. Date approved: 02 February Governance Lead

ST AUGUSTINE S PARISH SCHOOL

See revision section. Resources, Roles, Responsibility, Accountability, and Authority. Section in OHSAS 18001:2007

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007

Opportunities for Improvements in Safety and Health Management Systems for Coal Mines - An Auditor's Perspective

THE 5Cs WATER HYGIENE TRAINING

HSE Integrated Risk Management Policy. Part 3. Managing and Monitoring Risk Registers Guidance for Managers

Registered as a Scottish Charity - No. SC Job Description. Grade 8, Salary commences 25,339 per annum

Loy Yang B Environment Improvement Plan

Register of Contaminated Land Consent Conditions

HEALTH AND SAFETY STRATEGY

Audit report VET Quality Framework

Work Experience Placement Vetting Policy

Compliance standard & framework

21311 PROCEDURE - HEALTH AND SAFETY - RISK ASSESSMENT. 2. Risk Assessments/Health and Safety Considerations

Health, Safety and Environment (HSE) Policy

THIS IS THE HEALTH AND SAFETY POLICY STATEMENT OF GLASGOW KELVIN COLLEGE

Community & Client Services. Health & Regulatory Services

Occupational Health and Safety. Improvement Standard

GUIDE FOR APPLICANTS

Quality, Health, Safety & Environment Manual

City Infrastructure and Traffic Operations. Titles of Positions which report to Public Domain Team Leader are:

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

Transcription:

CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date Key Changes Author Approver 12/02/2002 Original 06/06/2005 Owner title; site H&S officer title; minor editing. 19/04/2006 Inclusion of new Sections 5 - Review and 6 - Auditable Outcomes; minor editing. 06/07/2009 Update organisational titles. 06/06/2011 Re-write to remove reference to Health and Safety Management Plans and focus on the requirements for Environmental Management Plans. 17/11/2011 Document transferred to new CS Energy template, J. Lafferty R. Hartigan minor editing. 27/04/2012 Update Risk Management Framework J. Lafferty R. Hartigan Page 1

CONTENTS DOCUMENT HISTORY... 1 1 INTRODUCTION... 3 2 PURPOSE AND SCOPE... 3 3 EMP PREPARATION... 3 3.1 Assess Potential Environmental Impacts... 3 3.2 Assess Need for Additional Environmental Approvals... 4 3.3 Determine Scope of EMP... 4 3.4 Implementation... 5 3.5 Revision and Update... 5 4 EMP EVALUATION AND APPROVAL... 5 5 RESPONSIBILITIES... 6 5.1 Principal s Representative... 6 5.2 Contractor... 6 6 AUDITABLE OUTCOMES... 6 7 DEFINITIONS... 7 8 REFERENCES... 8 9 ATTACHMENT / APPENDIX... 9 9.1 Environmental Risk Assessment... 9 9.2 Environmental Management Plan Template... 11 ENVIRONMENTAL MANAGEMENT PLAN TEMPLATE... 11 Page 2

1 INTRODUCTION An Environmental Management Plan (EMP) is a project-specific plan developed to ensure that appropriate environmental management practices are followed to minimise the risk of environmental harm or nuisance, and to ensure compliance with environmental legislation and CS Energy s commitment to environmental management. It is a requirement of the CS Energy Power Station Site Conditions (CS-SCP-609) that an EMP be prepared and approved before undertaking contracted works at sites owned, operated and maintained by CS Energy. 2 PURPOSE AND SCOPE The purpose of this procedure is two-fold: To provide guidance for the preparation of an EMP for contractors undertaking works at CS Energy sites, in order to meet the requirements of Site Condition 7.21 of CS-SCP-609. To provide guidance for the evaluation and management of an EMP by the Site Environmental Coordinator and the Contract s Principal s Representative, generally a CS Energy Contract Administrator or Supervisor. This procedure is applicable to all Contractors and CS Energy personnel responsible for evaluating environmental documentation associated with contracts taking place at sites owned, operated or maintained by CS Energy. 3 EMP PREPARATION 3.1 Assess Potential Environmental Impacts For each step of the work task, consider the potential risks to the environment by assessing factors including: Types and quantities of chemicals, equipment and other materials being brought to site; Types and quantities of wastes likely to be produced; Likely receptors if chemicals or wastes are spilled; Possible impacts on air quality, noise generation, water quality (including stormwater), weed control, nearby residents and road users; If earthworks are involved, the susceptibility of soils to erosion, the likelihood of exposing contaminated soils and/or items of Cultural Heritage significance; Possible non-conformances with respect to existing site Environmental Approvals; and Possible breaches of environmental legislation including but not limited to: - Environmental Protection Act 1994 and Regulations. - Environmental Protection Policies (Air, Water, Noise). - Sustainable Planning Act 2009. - Aboriginal Cultural Heritage Act 2003. - Local Council planning and environmental laws. Page 3

3.2 Assess Need for Additional Environmental Approvals Assess the need for any additional environmental approvals, licenses and permits from local Council and/or State Government Departments such as the Department of Environment and Resource Management (DERM). Such approvals may be necessary for the handling of regulated wastes, vegetation removal, contaminated land, operational works and/or Cultural Heritage. If uncertain, it is recommended to seek advice from the Site Environmental Coordinator via your CS Energy Contract Administrator. If necessary, the Site Environmental Coordinator will seek legal advice on particular legislative matters to assist the environmental approval process. 3.3 Determine Scope of EMP The scope of an EMP will vary depending on the scale and nature of a project. It is recommended to evaluate each potential environmental impact using the likelihood and consequence matrix within Attachment A. This assessment should be conducted in consultation with your CS Energy Contract Administrator. If all potential environmental impacts are assessed as low risk, then the completion and successful implementation of a Job Safety Environmental Analysis (JSEA) is sufficient to meet the contractor s environmental management requirements, sufficient to the conditions of contract. If there are one or more environmental impacts assessed as moderate, significant or high risk, then an Environmental Management Plan is to be formulated in addition to task-specific JSEAs. A template is provided in Attachment B, however, a contractor is not necessarily obliged to use the template, provided their EMP content includes, as a minimum: Project description; Environmental management structure and responsibility; Risk assessment for applicable environmental factors (air, noise, water, dust, waste, flora, fauna, contaminated soils, sediment and erosion control and Cultural Heritage); Environmental management activities and controls; Approval and licensing requirements; Schedule of environmentally significant works; Environmental monitoring requirements; Incident management and corrective action procedures; Reporting process; Environmental training; Complaint handling procedure; and Emergency contacts and response. Page 4

3.4 Implementation Works cannot commence until the EMP is approved by the CS Energy Contract Administrator. All staff members working under the given contract are expected to be aware of the EMP and its requirements. EMP implementation will be subject to audits and inspections by the CS Energy Contract Administrator, Site Environmental Coordinator or other representatives of CS Energy as authorised by the Contract Administrator. 3.5 Revision and Update The EMP is a living document that focuses on continual improvement and as such may need to be revised and updated. The timing of review and possible update will depend on the nature and scale of the project or task. It is generally advised that a review take place when: There is a change in project scope; An environmental incident has occurred; There is a need to improve performance in an area of likely environmental impact; and/or At the request of a CS Energy Representative. If changes are made, it is recommended that reasons for making the changes are documented and copies of the previous version kept for reference. 4 EMP EVALUATION AND APPROVAL It is the role of the Contract Administrator to evaluate, approve and audit the implementation of the EMP, ensuring that it: Applies best practice environmental management to a project/task; Complies with the site Environmental Authority and relevant environmental legislation, and is consistent with the CS Energy Environmental Management System (ISO14001 certified); and Achieves an overall reduction in the risk of environmental harm and incident occurrence to a level considered acceptable under the CS Energy Risk Management Procedure. EMP evaluation and approval occurs initially before the onset of works and also periodically throughout the project in order to ensure compliance and identify opportunities for continual improvement. It is strongly recommended that the Contract Administrator liaise with the Site Environmental Coordinator when evaluating the EMP. Copies of all EMPs (including originals and updates) should be forwarded to the Site Environmental Coordinator and maintained onsite for reference with other contractual documents. Page 5

5 RESPONSIBILITIES 5.1 Principal s Representative Assess the hazards / risks associated with the work at the planning and scoping stage of the work / contract, in conjunction with the Contractor and Site Environmental Coordinator. Ensure the Environmental Management Plan is approved prior to work commencing on site. Audit EMP compliance and identify opportunities for improvement. 5.2 Contractor Provide the Environmental Management Plan as requested by the Principal s Representative prior to work commencing on site. Continually identify opportunities for improvement. 6 AUDITABLE OUTCOMES The following items are outputs of this procedure: Environmental risk assessment; Job Safety and Environmental Analysis (JSEA); Environmental Management Plan (EMP); and Evidence of EMP implementation. Page 6

7 DEFINITIONS Contractor Term Environmental Harm: Environmental Management Plan (EMP): Environmental Management Systems (EMS): Environmental Nuisance: Environmental Policy: Environmental Value: Principal s Representative: Definition Any service provider subject to the CS Energy Power Station Site Conditions (CS- SCP-609). Examples include trade service providers (plumber, fitter, scaffolder), cleaners, and building and construction contractors. Any adverse, or potential adverse effect (whether temporary, permanent and of whatever magnitude, duration or frequency) on an environmental value, and includes environmental nuisance. A project-specific plan developed to ensure that appropriate environmental management practices are followed while undertaking contract works to minimise the risk of environmental harm and to ensure compliance to the CS Energy Environmental Management System and legislative obligations. The part of an organisation s overall management system that includes organisational structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the Environmental Policy. Unreasonable interference or likely interference with an environmental value caused by: noise, dust, odour, light; an unhealthy, offensive or unsightly condition because of contamination; or another way prescribed by regulation. Statement by an organisation of its intentions and principles for environmental performance. A quality or physical characteristic of the environment that is conducive to ecological health or public amenity or safety; or another quality of the environment identified and declared to be an environmental value under an Environmental Protection Policy or Regulation. Also known as the CS Energy Representative; is the person appointed by CS Energy to supervise the operation of a contract. Page 7

8 REFERENCES Reference No Reference Title Author AS/NZS ISO 14001: Environmental management systems Requirements with guidance for use. Australian Standard 1055.1: Acoustics - Description and Measurement of Environmental Noise - Part 1-3. "B/D/12/15254" CS-ENV-09 - Environmental Legal Compliance Manual CS Energy Environmental Protection Act 1994 and Regulations. Environmental Protection Policies (Air, Water, Noise). Sustainable Planning Act 2009. Aboriginal Cultural Heritage Act 2003 Local council planning and environmental laws. (accessed 20/04/2011) (accessed 20/04/2011) Aboriginal Cultural Heritage Act 2003 Duty of Care Guidelines (2004) Guideline for the Preparation of Environmental Management Plans (2004) Soil Erosion and Sediment Control: Engineering Guidelines for Queensland Construction Sites Dept of Environment and Resource Management Dept of Infrastructure Planning and Natural Resources NSW Queensland Division, Institution of Engineers, Australia. Page 8

9 ATTACHMENT / APPENDIX 9.1 Environmental Risk Assessment Risk is assessed in accordance with the CS Energy Risk Management Procedure, as follows: LIKELIHOOD A 1 Minor 2 Low CONSEQUENCE 3 Medium 4 Major 5 Severe 6 Catastrophic Almost Certain L M S H H H B Likely L M M S H H C Possible L L M S S H D Unlikely L L L M M S E Rare L L L L L M The evaluation made determines the actions and timelines to be met, according to the determined level of risk as follows: H S M L LEVEL OF RISK Mandatory Risk Register entry; implement control to eliminate or reduce risk within a maximum of 3 months; report progress; seek authorisation to proceed without risk reduction from your Executive General Manager Mandatory Risk Register entry; implement control to eliminate or reduce risk within a maximum of 6 months; report progress; seek authorisation to proceed from your Site Manager Optional Risk Register entry; seek advice from your supervisor or other internal subject matter expert; implement control to eliminate or reduce risk. Seek authorisation to proceed from your Manager or Supervisor. Proceed and manage using routine procedures (e.g. PTW System, Isolations, JSEA or Task Risk Analysis, monitor job, use correct PPE) Page 9

Whereby consequence is defined as follows: Consequence Level Catastrophic Severe Major Medium Low Minor Environment Very large contaminant release; Extensive off-site area affected; Complex long-term remediation (Category 4 Incident equivalent) Very large contaminant release; Extensive off-site or on-site area affected; Complex long-term remediation (Category 4 Incident equivalent) Large contaminant release; Localised off-site or on-site area affected; Straightforward medium-term remediation (Category 3 Incident equivalent) Large contaminant release; Localised off-site or on-site area affected; Straightforward short-term remediation (Category 3 Incident equivalent) Moderate contaminant release; Localised on-site area affected; Routine short-term clean-up (Category 2 Incident equivalent) Small contaminant release; Localised on-site area affected; Routine short-term clean-up (Category 1 Incident equivalent) Whereby likelihood is defined as follows: Page 10

9.2 Environmental Management Plan Template ENVIRONMENTAL MANAGEMENT PLAN TEMPLATE Front Page: Title Environmental Management Plan for Works at Site Second Page: Company Name Address and Contacts Sub-Contractor Details Company Environmental Policy Statement (if applicable) Strategic Environmental Objectives (if applicable) Following pages: Company Structure and Environmental Contacts Company organisational chart - Showing the responsible positions for Environmental decision making and emergency contacts. Description of Proposed Works A description of proposed works including: A list of any plant or potentially contaminating substances likely to be brought on to the site and/or any potentially contaminating waste substances resulting from the work; Details of any environmental approvals relevant to the proposed works, their current status and/or expected timeframe for issue (see Section 3.2 for more information); and Schedule of environmentally significant works. Environmental Risk Assessment, Management Measures and Controls Conduct a risk assessment for potential impacts on environmental factors (air, noise, water, dust, waste, flora, fauna, contaminated soils, sediment and erosion control and Cultural Heritage) in accordance with Section 3.1 and the CS Energy Risk Assessment Matrix outlined in Attachment A. Evaluate environmental risk before and after the application of management measures and comment on any residual risk. Environmental Monitoring Specify details of any environmental monitoring to be undertaken throughout the duration of the proposed works and the conditions that will trigger corrective action. Environmental Training Provide details regarding what environmental training staff have or will be undertaking in order to ensure the works are carried out to minimise the risk of environmental harm or nuisance, and to ensure compliance with environmental legislation and CS Energy s commitment to environmental management. This is to include detail regarding staff inductions to the work site and communication of the EM Plan to the site workforce. Page 11

Incident Management and Corrective Action Procedures Specify details of your company s incident management and corrective action procedures; this is to include details of the handling of complaints. Attach any applicable documentation. Reporting Process Specify any environmental reporting commitments that have been agreed upon between CS Energy and the Contractor, including a process for revising, updating and re-issuing the EM Plan to all involved parties. Page 12