SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT

Similar documents
Limited Asbestos Demolition Survey

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Management Program April 27, 2017

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for

Asbestos-Containing Material and Hazardous Material Survey Summary Report

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

Asbestos Elevator Industry Workshop November 25, 2015

Asbestos & Lead-Based Paint Survey Report Fort Gordon Gate 1 AAFES Station Augusta, Georgia S&ME Project No

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

ASBESTOS AWARENESS. What is Asbestos? Asbestos

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624

Washington University Asbestos Operations and Maintenance Plan

Asbestos/Lead Paint Survey

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN

Asbestos Inspection Cover Letter

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

Asbestos Awareness OSHA Class IV

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4)

Asbestos Survey Report

HERRON Enterprises USA, Inc.

Report of. Asbestos Survey

Final Asbestos Inspection Report and Lead Paint Survey

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414

Asbestos Awareness Program

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction

Common Household Contaminants: The Hazards and the Laws

Pre-Renovation Asbestos Survey

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

Asbestos Containing Building Material Survey

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR INSPECTORS. For

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

Office of Design & Construction State University Plaza Albany, New York

ASBESTOS CEMENT WATER MAIN REPLACEMENT

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125

FACILITY ASBESTOS MANAGEMENT PLAN

Learn Charter School Excel Campus

Asbestos Management Plan

ASBESTOS BUILDING INSPECTION

Explain in writing if the address of the building is different than the address on this form:

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

Asbestos / Lead Paint Management Plan

PREPARED FOR: City of Beverly Hills 345 North Foothill Road Beverly Hills, California 90210

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form:

FINAL REPORT. Asbestos-Containing Building Material Assessment

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number

Asbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016

SUMMARY OF BID ITEMS

ASBESTOS SURVEY & LEAD-BASED PAINT INSPECTION REPORT GARFIELD ELEMENTARY SCHOOL BUILDING "A" & CLASSROOM A "B" STREET SELMA, CALIFORNIA

Explain in writing if the address of the building is different than the address on this form:

ASBESTOS MANAGEMENT PROGRAM

Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite PPT-SM-A 2018

UI Procedures for Asbestos Management

FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario

(1) Adequately wet asbestos-containing waste material as follows by doing all of the following:

Asbestos Survey Report

Asbestos Management Program and Procedures

Lead Risk Assessment Report For the property at: 2933 Del Marr Circle Colorado Springs, CO 80910

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets.

Asbestos and Lead-Based Paint Survey Report

Limited Hazardous Materials Survey Report

LOOSE FILL ASBESTOS INSULATION

HERRON Enterprises USA, Inc.

ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

ASBESTOS MANAGEMENT PLAN PROCEDURE

Transmitted via electronic mail to

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board

Report No: ACM October 29, 2012

If the address on this form is different than the address of the building, submit a written explanation.

Asbestos in the Home

DPS CORP. April 14, 2011

Crothers Environmental Group, LLC

Abatement Scope of Work and Project Requirements for Library Painting Project Bay Shore Library Bret Harte Library Dana Library Long Beach, California

SURVEY FINDINGS Building: 1101

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers

OSHA s Enforcement of Asbestos Standards in the Construction Industry

ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT

ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET

DP ASBESTOS MANAGEMENT

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

Hazardous Building Material Survey of the Former Willamette Industries Mill Site in Sweet Home, Oregon

Asbestos Code of Practice

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board

Lead Based Paint Policy

MANAGEMENT ASBESTOS SURVEY REPORT SITE PHOTO GOES HERE

Health, Safety and Fire Specialists Ltd

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

OAK GROVE SCHOOL DISTRICT ASBESTOS PLAN

Guide for Asbestos Management

Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan. Mount Vernon Apartments II LDHA, LP

If the address on this form is different than the address of the building, submit a written explanation.

Transcription:

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT Prepared For: TALLEY & SMITH ARCHITECTURE, INC. 409 EAST MARION STREET SHELBY, NORTH CAROLINA 28150 Regarding: DELIVERY ORDER NO. 0051 FY 15 DEMOLISH FACILITIES, BASEWIDE CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA Prepared By: ALLIED CONSULTING & ENVIRONMENTAL SERVICES, LLC POST OFFICE BOX 2426 SHELBY, NORTH CAROLINA 28151 PHONE (704) 600-6255 FAX (704) 482-5596 ISSUE DATE: OCTOBER 25, 2013 ACES PROJECT: 2013-08-070

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT Prepared for: TALLEY & SMITH ARCHITECTURE, INC. 409 EAST MARION STREET SHELBY, NORTH CAROLINA 28150 Regarding: DELIVERY ORDER NO. 0051 FY 15 DEMOLISH FACILITIES, BASEWIDE CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA ACES Project No.: 2013-08-051 October 25, 2012 Prepared by: Reviewed by: DeWitt Whitten, CHMM, REM, CES, REPA General Manager NC Licensed Asbestos Inspector #10706 NC Licensed LBP Risk Assessor #120118 Robert L. Smith, AIA, LEED AP Managing Partner

TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 1 2.0 INTRODUCTION... 1 2.1 ASBESTOS... 1 2.2 LEAD-BASED PAINT... 3 2.3 PROJECT SCOPE... 4 3.0 METHODOLOGY... 4 3.1 ASBESTOS... 4 3.2 LEAD-BASED PAINT... 5 4.0 FINDINGS AND RECOMMENDATIONS... 5 4.1 NON-ASBESTOS CONTAINING MATERIALS... 5 4.2 ASBESTOS CONTAINING MATERIALS & PRESUMED ASBESTOS CONTAINING MATERIALS... 6 4.3 LEAD-BASED PAINT... 7 4.4 RECOMMENDATIONS - ACM & PACM... 7 4.5 RECOMMENDATIONS - LEAD-BASED PAINT... 8 5.0 LIMITATIONS... 8 Appendix 1 Figures Appendix 2 Asbestos Analytical Results Chain of Custody Appendix 3 Asbestos Reports by Others Appendix 4 XRF Field Data Sheets

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT FY 15 DEMOLISH FACILITIES, BASEWIDE CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA 1.0 INTRODUCTION As authorized by Talley & Smith Architecture, Inc. on July 30, 2013, personnel of Allied Consulting and Environmental Services, LLC (ACES) performed a non-invasive survey for suspect asbestos containing materials (ACM) and a limited lead-based paint (LBP) survey for various facilities at the Camp Lejeune Marine Corps in Jacksonville, North Carolina between August 19, 2013 and September 11, 2013. The surveys were conducted for the purpose of identifying asbestos containing materials and lead-based painted materials that may be impacted by the proposed demolition of the various facilities. 2.0 GENERAL BACKGROUND INFORMATION 2.1 Asbestos The term asbestos refers to a group of naturally-occurring, fibrous minerals that are commercially mined throughout the world, primarily in Canada, Russia, and South Africa. Asbestos has been used in hundreds of products. Collectively, these products are referred to as asbestos-containing materials (ACMs). Asbestos gained wide use because it is plentiful, readily available, low in cost, and because of its unique properties fire resistance, high tensile strength, resistance, and insulating characteristics. As an insulator, asbestos received wide spread use for thermal insulation and condensation control. Asbestos is added to a variety of building materials to enhance strength. It is found in concrete and concrete-like products. Asbestos cement products are used as siding and roofing shingles, wallboard, as corrugated or flat sheets for roofing and partition walls, and as piping. Asbestos has also been added to asphalt, vinyl, and other materials to make products like roofing cements, felts and shingles, exterior siding materials, floor tiles, joint compounds, and mastics/adhesives. Asbestos also proved valuable as a component of acoustical plaster. This material was troweled on or sprayed on to ceilings or walls. As a decorative product, asbestos was frequently used to texture ceilings, walls, and other painted surfaces. Asbestos is still mined commercially and used in many common products, including brake shoes, roofing materials, and flooring products. It is important to realize that commercially available products containing asbestos can still be purchased. It is a common misconception that asbestos is no longer used. The three most commonly encountered types of asbestos are sometimes referred to by their predominant color. Chrysotile (white) is by far the most frequently used asbestos mineral, constituting approximately 95% of all commercial and industrial applications. Chrysotile fibers FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 1 ACES Project: 2013-08-070

are long and flexible and can be spun or woven into cloth. Amosite (brown) and crocidolite (blue) are used in approximately 4-5% of asbestos-containing products. The U.S. Environmental Protection Agency promulgated the National Emission Standards for Hazardous Air Pollutants (NESHAP) [40 CFR Part 61], which addresses the application, removal, and disposal of asbestos-containing materials (ACM). Under NESHAP, the following categories are defined for asbestos-containing materials: Friable - When dry, can be crumbled, pulverized, or reduced to powder by hand pressure. Nonfriable - When dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Category I Nonfriable ACM - Packings, gaskets, resilient floor coverings, and asphalt roofing products containing more than 1% asbestos. Category II Nonfriable ACM Any material excluding Category I Nonfriable ACM containing more than 1% asbestos. Regulated Asbestos Containing Material (RACM) RACM include one of the following: 1) Friable ACM 2) Category I Nonfriable ACM that has become friable. 3) Category I Nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading. 4) Category II Nonfriable ACM that has a high probability of becoming, or has become, friable by the forces expected to act on the material in the course of demolition or renovation operations. Under NESHAP, the following actions are required: 1) Prior to the commencement of demolition or renovation activities, the building owner must inspect the affected facility or part of the facility where the demolition or renovation activities will occur for the presence of asbestos. 2) Remove all RACM from the facility before any activity begins that would break up, dislodge, or similarly disturb the material or preclude access for subsequent removal. 3) RACM need not be removed if: a) It is Category I nonfriable ACM that is not in poor condition. b) It is on a facility component that is encased in concrete or other similar material and is adequately wet whenever exposed. c) It was not accessible for testing and was therefore not discovered until after demolition began and because of the demolition the material cannot be safely removed. FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 2 ACES Project: 2013-08-070

d) It is Category II Non-friable ACM and the probability is low that the material will become crumbled, pulverized, or reduced to powder during demolition. The Occupational Safety and Health Administration (OSHA) has established three sets of regulatory standards pertaining to asbestos exposure: 29 CFR 1910.1001 General Industry 29 CFR 1926.1101 Construction Industry 29 CFR 1910.134 Respiratory Protection The construction industry standard covers activities involving asbestos demolition, removal, alteration, repair, maintenance, installation, cleanup, transportation, disposal, and storage. The general industry standard covers other activities where asbestos exposure is possible. Addressed under the OSHA standards are building owner / employer responsibilities regarding the identification of identified or presumed asbestos containing materials (PACM), notification to tenants / employees of the presence of asbestos, employee training, and work procedures. 2.2 Lead-based Paint Lead-based paint is paint containing lead, a heavy metal, which is used as pigment. Lead chromate (PbCrO4 - "chrome yellow") and lead carbonate(pbco3 - "white lead") are the most common lead compounds used as pigments. Lead is also added to paint to speed drying, increase durability, retain a fresh appearance, and resist moisture that causes corrosion. Paint with significant lead content is still used in industry and by the military. For example, leaded paint is sometimes used to paint roadway markings and parking lot lines. Although lead improves paint performance, it is a dangerous substance. It is especially damaging to children under age six whose bodies are still developing. Lead causes nervous system damage, hearing loss, stunted growth, and delayed development. It can cause kidney damage and affects every organ system of the body. It also is dangerous to adults, and can cause reproductive problems for both men and women. One myth related to lead-based paint is that the most common cause of poisoning was eating leaded paint chips. In fact, the most common pathway of childhood lead exposure is through ingestion of lead dust through normal hand-to-mouth contact during which children swallow lead dust dislodged from deteriorated paint or lead dust generated during remodeling or painting. Lead dust from remodeling or deteriorated paint lands on the floor near where children play and can ingest it. Paint containing more than 0.06% (600 ppm) lead was banned for residential use in the United States in 1978 by the U.S. Consumer Product Safety Commission (16 Code of Federal Regulations CFR 1303). The U.S. Government defines "lead-based paint" as any "paint, surface coating that contains lead equal to or exceeding one milligram per square centimeter (1.0 mg/cm 2 ) or 0.5% by weight." These definitions are used to enforce regulations that apply to certain activities conducted in housing constructed prior to 1978, such as abatement, or the permanent elimination of a "lead-based paint hazard." Construction activities that involve LBP are addressed OSHA in 29 CFR 1926.62 (Lead in Construction). FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 3 ACES Project: 2013-08-070

2.3 Project Scope The scope of this survey included the proposed demolition of various facilities basewide as designated on drawings furnished by Talley & Smith Architecture, Inc., the proposed scope of services provided to ACES, and as discussed in our conversation on July 30, 2013. It is our understanding that the facilities will be demolished in the near future. A summary of the facilities is presented in the following table. AIR STATION FACILITY ID # TABLE 1 SUMMARY OF FACILITIES TO BE DEMOLISHED CAMP JOHNSON FACILITY ID # MAIN BASE FACILITY ID # RIFLE RANGE FACILITY AS-521 M 102 107 RR 6 AS-528 M 200 S.L. 408 RR 9 AS-530 M 202 414 RR 15 AS-574 M 230 508 AS-3915 M 238 535 AS-4102 M 239 601 AS-4103 M 307 795 AS-4105 M 323 909 AS-4112 M 611 S-944 AS-4133 M 621 PT 4 AS-4134 M 622 PT 4 Shed AS-4137 M 625 PT 4 SBS 1 G-650 SPT 16 TC-1060 SPT 17 TC-1061 SPT 19 TC-1062 SPT 22 TC-1063 SPT 32 TC-1142 SPT 33 NOTES: 1) Small Boat Storage 3.0 METHODOLOGY 3.1 Asbestos SPT 34 BB 231 For this project, a visual, non-invasive survey and sampling for suspect asbestos containing materials (ACM) was conducted at the above referenced buildings. ACES personnel submitted a total of seven hundred and one (701) bulk samples of suspect ACM that may be impacted by ID # FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 4 ACES Project: 2013-08-070

the planned renovation project. Samples were collected by a NC Licensed Asbestos Inspector (DeWitt Whitten - #10706) and submitted to a NVLAP Accredited Asbestos Laboratory (EMSL in Charlotte, NC). Samples were analyzed using Polarized Light Microscopy (PLM) by EPA Method 600/R-93/116. Due to some materials consisting of more than one layer, a total of nine hundred and eighty-one (981) samples were analyzed by the laboratory. Samples included the following materials: paint, flashing, various roofing materials, exterior caulk, exterior door caulk, exterior window caulk, window glazing, interior caulk, interior door caulk, interior window caulk, drywall/spackling (joint compound), floor tile and associated mastic, transite panels, and HVAC expansion joint material. Please refer to the Sample Location Plans (Figure Nos. 1-52) and the Chain of Custody sheets in Appendices 1 and 2, respectively, for the approximate sample locations and the specific materials sampled. During the survey, ACES personnel also reviewed previously prepared reports for various structures provided by personnel of the Camp Lejeune Marine Corps Environmental Protection office. The reports were dated March 28, 2013 and August 21, 2013 (print date). For the purpose of this report, the materials listed in each report are considered presumed asbestos containing materials. These materials are discussed further in Section 4.3 of this report. Copies of the provided reports prepared by others are presented in Appendix 3. Reports for 795 (Main Base), PT-4 Shed (Main Base), PT-4 Single Boat Storage (Main Base), SPT-16 (Main Base), SPT-19 (Main Base), SPT-22 (Main Base), SPT-33 (Main Base), SPT-34 (Main Base), M-102 (Camp Johnson), AS-521 (Air Station), and AS-3915 (Air Station) were not provided. 3.2 Lead-based Paint A North Carolina Lead-based Paint Risk Assessor (Mr. DeWitt Whitten, Risk Assessor #120118) performed a limited lead-based paint (LBP) survey of the interior and exterior painted surfaces (one thousand, five hundred and twelve (1,512) locations) for the various facilities. Please refer to the Sample Location Plans (Figure Nos. 53-103) and the XRF Field Data Sheets in Appendices 1 and 4, respectively, for the approximate test locations and the specific materials sampled. The testing was conducted using a INNOV-X Portable X-ray Fluorescence (XRF) Analyzer to screen surface coatings that may contain lead. The sampling for lead-based paint was not a comprehensive surface by surface testing of the paint (e.g. a HUD level survey), but consisted of testing representative painted surfaces for the presence of LBP. Surfaces tested included exterior and interior walls, exterior and interior doors and door frames, columns and beams, structural frame members, water table, window sills, window lintel plates, piping, handrails, exterior and interior steps, fascias, eves, gables, vents, window guards, door overhangs, curbs, bollards, roof supports, crown molding, baseboards, door casings, tanks, and ceilings. 4.0 FINDINGS AND RECOMMENDATIONS 4.1 Non-asbestos Containing Materials Asbestos containing materials were not identified at the following structures: 601 (Main Base), 795 (Main Base), 909 (Main Base), S-944 (Main Base), PT-4 Shed (Main Base), PT-4 Single Boat Storage (Main Base), SPT-16 (Main Base), SPT-17 (Main Base), SPT-19 (Main Base), SPT-22 FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 5 ACES Project: 2013-08-070

(Main Base), SPT-32 (Main Base), SPT-34 (Main Base), BB-231 (Main Base), M-230 (Camp Johnson), AS-521 (Air Station), AS-530 (Air Station), AS-3915 (Air Station), AS-4103 (Air Station), AS-4133 (Air Station), AS-4134 (Air Station), AS-4137 (Air Station), TC-1061 (Air Station), TC- 1062 (Air Station), and TC-1142. 4.2 Asbestos Containing Materials & Presumed Asbestos Containing Materials Asbestos containing materials (ACM) were detected at fourteen structures surveyed. In addition, asbestos reports prepared by others indicate that presumed asbestos containing materials (PACM) are also present in twenty-six of the structures that are part of this project. The structures are summarized in Table 2. TABLE 2 SUMMARY OF STRUCTURES WITH ACM AND/OR PACM STRUCTURE ID LOCATION ACM PRESENT PACM PRESENT 107 Main Base Yes Yes 408 Main Base Yes 414 Main Base Yes 508 Main Base Yes 535 Main Base Yes Yes Pt-4 Main Base Yes SPT-33 Main Base Yes M-200 S.L. 1 Camp Johnson Yes M-202 Camp Johnson Yes M-238 Camp Johnson Yes Yes M-239 Camp Johnson Yes Yes M-307 Camp Johnson Yes M-323 Camp Johnson Yes Yes M-611 Camp Johnson Yes Yes M-621 Camp Johnson Yes Yes M-622 Camp Johnson Yes Yes M-625 Camp Johnson Yes Yes AS-528 Air Station Yes AS-574 Air Station Yes AS-4102 Air Station Yes AS-4105 Air Station Yes AS-4112 Air Station Yes G-650 Air Station Yes TC-1060 Air Station Yes TC-1063 Air Station Yes NOTE: 1 Steam Lines FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 6 ACES Project: 2013-08-070

TABLE 2 continued SUMMARY OF STRUCTURES WITH ACM AND/OR PACM STRUCTURE ID LOCATION ACM PRESENT PACM PRESENT RR-6 Rifle Range Yes RR-9 Rifle Range Yes Yes RR-15 Rifle Range Yes Yes 4.3 Lead-based Paint The results of the lead paint survey indicated that lead-based paint was present at thirty-three (33) of the structures included in this project as shown in Table 3. The approximate test locations are shown on Figures Nos. 53-103 (Appendix 1) and additional details of the building components having lead-based paint adhered to them are presented in the XRF Field Data Sheets in Appendix 3. TABLE 3 SUMMARY OF STRUCTURES WITH LEAD-BASED PAINT AIR STATION CAMP JOHNSON MAIN BASE RIFLE RANGE AS-521 M-102 107 RR-6 AS-530 M-202 408 RR-9 AS-574 M-230 414 RR-15 AS-4102 M-238 508 AS-4103 M-239 535 AS-4105 M-307 909 AS-4112 M-611 Pt-4 AS-4133 M-621 SPT-32 AS-4134 M-622 SPT-33 G-650 M-625 TC-1142 4.4 Recommendations - ACM & Presumed ACM Asbestos containing materials (ACM) or Presumed ACM (PACM) were identified in twenty-six of the structures included in this survey. Both friable and non-friable ACM and/or PACM was identified. For the purposes of demolition, the identified ACM and/or PACM should be considered Regulated Asbestos Containing Materials (RACM). These materials and any other suspect ACM where present should be removed prior to the demolition of the facilities by accredited personnel in accordance with applicable local, state, and federal regulations and guidelines. Disposal of the removed RACM should be disposed of in accordance with applicable local, state, and federal regulations/guidelines. All ACM waste materials resulting from the renovation activities should be collected and disposed of in accordance with applicable state and federal regulations, the project FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 7 ACES Project: 2013-08-070

specifications, and the Marine Corps Base (MCB) Camp Lejeune Contractor Environmental Guidelines. 4.5 Recommendations - Lead-based Paint Lead-based paint (LBP), i.e. paint that contains lead equal to or exceeding one milligram per square centimeter (1.0 mg/cm2), was identified in thirty-three of the structures surveyed. ACES recommends that the lead paint on the various surfaces not be disturbed as a part of the demolition activities unless necessary as a result of the demolition. If the painted surfaces must be disturbed, removal of the LBP should be performed in accordance with local, state, and federal regulations. In addition, lead was identified on other painted surfaces but the concentration did not meet the definition of LBP. For painted surfaces where LBP was not present but lead was present and would be impacted by the renovation activities, the necessary protection for the potential exposure to lead that may be present should be addressed as outlined in applicable Occupational Safety and Health Administration (OSHA) regulatory standards. All waste materials from the renovations should be collected and disposed of in accordance with applicable state and federal regulations, the project specifications, and the Marine Corps Base (MCB) Camp Lejeune Contractor Environmental Guidelines. 5.0 LIMITATIONS This report has been prepared for the exclusive use of Talley & Smith Architecture, Inc. and their agents. This report has been prepared in accordance with generally accepted environmental practices. No other warranty, expressed or implied, is made. Our observations are based upon conditions readily visible at the time of our site visit. We have not verified the completeness or accuracy of the information provided by others. Materials identified as presumed ACM should be considered to contain asbestos or additional sampling and analysis should be performed to confirm or deny the presence of asbestos. During the site visit, accessible areas were visually surveyed for the presence of suspect asbestos containing materials (ACM) and lead-based paints (LBP). Inaccessible areas, such as above ceilings or behind walls may have not been surveyed; therefore, all ACM and/or LBP may not have been identified. Areas inspected were those designated by the scope of services. As with any similar survey of this nature, actual conditions exist only at the precise locations from which bulk samples were collected and/or LBP samples measured. Certain inferences are based on the results of this sampling and related testing to form a professional opinion of conditions in areas beyond those from which the samples were collected. No other warranty, expressed or implied, is made. Under this scope of services, ACES assumes no responsibility regarding response actions (e.g. O&M Plan, encapsulation, abatement, removal, worker notification, etc.) initiated as a result of these findings. It is important to note that the Building Owner has a number of responsibilities and obligations as found under 40 CFR 745 (also known as Title X) including notification and/or FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 8 ACES Project: 2013-08-070

disclosure of all information concerning LBP to workers and buyers. ACES assumes no liability for the duties and responsibilities of the Building Owner with respect to compliance with these regulations. Compliance with regulations and response actions are the sole responsibility of the Building Owner and should be conducted in accordance with local, state and/or federal requirements, and should be performed by appropriately qualified and licensed personnel, as warranted. ACES, by virtue of providing the services described in this report, does not assume the responsibility of the person(s) in charge of the site, or otherwise undertake responsibility for reporting to any local, state, or federal public agencies any conditions at the site that may present a potential danger to public health, safety, or the environment. It is the client s responsibility to notify the appropriate local, state, or federal public agencies as required by law, or otherwise to disclose, in a timely manner, any information that may be necessary to prevent any danger to public health, safety, or the environment. The contents of this report should not be construed in any way as a recommendation to purchase, sell, or further develop the project site. FY 15 Demolish Facilities, Basewide October 25, 2013 Camp Lejeune Marine Corps Base; Jacksonville, NC 9 ACES Project: 2013-08-070

APPENDIX 1 FIGURES