Fast quench problems and how they damage coke drums

Similar documents
Fatigue Life & Reliability Consideration During Field Repair of Coke Drum & Piping

HÉZIO Rosa da Silva (PETROBRAS/REGAP)

Bulging Assessment and Long- Term Repair of Coke Drums

Marcio I Haraguchi. Mahmod Samman. Ediberto B. Tinoco Fábio C. Marangone Hezio R. Silva Gustavo C. Barcelos

Repair and Retrofit of a Coke Drum Skirt Attachment Weld

USE OF ANALYTICAL AND EXPERIMENTAL MONITORING TECHNIQUES IN ASSESSING THE PERFORMANCE OF A COLD REHEAT STEAM LINE

Post Weld Heat Treatments for New and In Service Coke Drums Paul Kovach - Stress Engineering Services Richard Boswell - Stress Engineering Services

Structural Vessel Repairs Using Automated Weld Overlays

Stress Evaluation of a Typical Vessel Nozzle Using PVRC 3D Stress Criteria: Guidelines for Application

Weld Distortion Control Methods and Applications of Weld Modeling

Sample Report: ½ Tri-Clamp Flange Connection

Finite Element Stress Analysis and Vibration Analysis for a Geothermal Separator

Evaluation of the CompsiSleeve TM Pipeline Repair System

Stress Corrosion Cracking in a Dissimilar Metal Butt Weld in a 2 inch Nozzle. Master of Engineering in Mechanical Engineering

Design and Operation of Large Fossil-Fueled Steam Turbines in Cyclic Duty

Proceedings of the ASME nd International Conference on Ocean, Offshore and Arctic Engineering OMAE2013 June 9-14, 2013, Nantes, France

Downsizing a Claus Sulfur Recovery Unit

ABSTRACT. KEY WORDS: Tubular piles; composite behavior; offshore structures; push-out strength; bond strength; slip.

Effect of Spray Quenching Rate on Distortion and Residual Stresses during Induction Hardening of a Full-Float Truck Axle

A Review of Suitability for PWHT Exemption Requirements in the Aspect of Residual Stresses and Microstructures

FCCURegenerator Vessel Structural Repair Utilizing Automated Weld Metal Overlay

Contact Pressure Analysis of Steam Turbine Casing

MAE 322 Machine Design Lecture 5 Fatigue. Dr. Hodge Jenkins Mercer University

Modeling Welded. ANSYS e-learning. June CAE Associates

Technical Specifications

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

Updated Design Methods for HPHT Equipment Kenneth Young, Chris Alexander, Richard Biel, Stress Engineering Services; Earl Shanks, DTC International

Lens barrel optomechanical design principles

APPLICATIONS OF LIMIT LOAD ANALYSES TO ASSESS THE STRUCTURAL INTEGRITY OF PRESSURE VESSELS

MACHINES DESIGN SSC-JE STAFF SELECTION COMMISSION MECHANICAL ENGINEERING STUDY MATERIAL MACHINES DESIGN

Fatigue Analysis of a Welded Structure in a Random Vibration Environment

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

9. VACUUM TANK 9. VACUUM TANK

Methodology for design of earthquake resistant steel liquid storage tanks

DIN EN : (E)

The strength of a material depends on its ability to sustain a load without undue deformation or failure.

Introduction to Joining Processes

3. Residual Stresses

ESECMASE - SHEAR TEST METHOD FOR MASONRY WALLS WITH REALISTIC BOUNDARY CONDITIONS

DCU Process Control. Protecting Critical Investments & Optimizing Process Control with Advanced Temperature Measurement Systems

SANICRO 30 TUBE AND PIPE, SEAMLESS

FINITE ELEMENT ANALYSIS OF COMPOSITE REPAIRS WITH FULL-SCALE VALIDATION TESTING

POWER TURBINE STEAM CHEST LIFE ASSESSMENT. Proceedings of the ASME Power Conference POWER2010 July 13-15, 2010, Chicago, Illinois, USA

Fabrication of Components. Fabrication of Components. at Dillinger Hütte Heavy Fabrication Division

Welding Processes. Consumable Electrode. Non-Consumable Electrode. High Energy Beam. Fusion Welding Processes. SMAW Shielded Metal Arc Welding

Simulating Pellet and Clad Mechanical Interactions of Nuclear Fuel Rod for Pressure Water Reactors

Analysis of High-Collapse Grade P110 Coupling Failures

Design and Analysis of a Process Plant Piping System

Cold Spray Developments at UTRC

Finding the Root Cause is Critical

FEM STRESS CONCENTRATION FACTORS FOR FILLET WELDED CHS-PLATE T-JOINT

Recent Developments in Stay Cable Systems

Objectives. This chapter provides fundamental background on processes of drawing of rods, wires and tubes.

TECHNICAL JUSTIFICATION FOR ASME CODE SECTION XI CRACK DETECTION BY VISUAL EXAMINATION

Storage Tank Piping (79720-PS-002) Stress Analysis

PROCESS GAS WASTE HEAT BOILERS WITH THIN FLEXIBLE TUBESHEET DESIGN

REINFORCING LARGE DIAMETER ELBOWS USING COMPOSITE MATERIALS SUBJECTED TO EXTREME BENDING AND INTERNAL PRESSURE LOADING

FABRICATION OF HEAVY WALL Cr-Mo / Cr-Mo-V REACTORS CHALLENGES AND TECHNOLOGY UPGRADATION AT LARSEN & TOUBRO LIMITED INDIA

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

ctbuh.org/papers CTBUH Recommendations for the Seismic Design of High-Rise Buildings

Prediction of Residual Stresses after Local Post-Weld Heat Treatment

LOW-CYCLE FATIGUE FAILURE MECHANISM OF WIND TURBINE FOUNDATION DUE TO VIBRATION OF UPPER STRUCTURE

TROUBLE SHOOTING IN DELAYED COKER UNIT- INSPECTION EXPERIENCE

DETERMINATION OF FAILURE STRENGTH OF CURVED PLATE WELD JOINT USING FINITE ELEMENT ANALYSIS

Failures of High Alloy Expansion Bellows in Refinery Catalytic Cracking Units

Available online at Procedia Engineering 55 (2013 )

THE EFFECTS OF RESIDUAL TENSILE STRESSES INDUCED BY COLD- WORKING A FASTENER HOLE

PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS

Quiz 1 - Mechanical Properties and Testing Chapters 6 and 8 Callister

ISO 9001:2008 certified

Alloy C194 vs. Alloy C122 for Air Conditioning and Refrigeration Applications

Analytical support to experiment QUENCH-17 and first post-test calculations with ATHLET-CD

CROSBY H-SERIES DIRECT SPRING SAFETY VALVES

W. Mark McGinley March 3, 2016 ISEA MEETINGS 1

Turbine Tip Clearance Issues and Optimization for Increased Power and Efficiency. Lloyd Cooke Liburdi Turbine Services Inc

API-582. a practical approach for industrial welding practices. All rights reserved to thepetrostreet team

Editorial Manager(tm) for Ironmaking and Steelmaking: Processes, Products and

severe accident progression in the BWR lower plenum and the modes of vessel failure

Deepwater Landing String Design

SECT. VIII CHANGES

Stress and Distortion Evolution During Induction Case Hardening of Tube

Application instruction

SEAU 5 th Annual Education Conference 1. ASCE Concrete Provisions. Concrete Provisions. Concrete Strengths. Robert Pekelnicky, PE, SE

THINK. Filter Technology SIKA-B

GREEN THREAD Piping Systems

STAINLESS STEEL SHEETS

3. MECHANICAL PROPERTIES OF STRUCTURAL MATERIALS

Life Assessment of a Jet Engine Component

Nonlinear Finite Element Modeling & Simulation

Impact 7 Steel. A Durable, Dependable Steel Solution For Harsh Environments. Technical Data. Alloy Description. Alloy Type. Typical Applications

Stress Analysis of Reactor with composite material by FEA

Chapter 2 The Structural Hot-Spot Stress Approach to Fatigue Analysis

Finite Element Analysis Based Optimization of Expansion Joint with Fatigue Analysis

Technowrap composite repairs for the maintenance of piping, pipelines, vessel or structural integrity Simon R. Frost, Walker Technical Resources

NON-LINEAR STRUCTURAL INTEGRITY ANALYSIS

STRATCO Alkylation Technology Improvements

Cracking of a Closing Weld in a Secondary Autothermal Reformer in a Mega Methanol Plant

Material for a pressure vessel Short term thermal insulation Energy efficient kilns

INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK

Transcription:

Fast quench problems and how they damage coke drums Coke Drum Reliability Workshop Galveston, Texas March 24, 2009 Richard Boswell, P.E. Stress Engineering Services, Inc Principal richard.boswell@stress.com Classic Drum Deformation For Low Alloy Drums Weil and Murphy (Kellogg 1960, ASME) Permanent deformation pattern of vessels in cyclic service Skirt is attached to the cylinder by welding 1

Welds fail from Low Cycle Fatigue Crack initiates often at edges of weld cap interface to clad Crack grows through h base metal to leak hot oil in Circ crack Typical* Butt Weld Detail * Joint detail may vary Some Key Points of the Coking Cycle The drum grows larger and taller when it is hot It is filled with a lot of hard material as the hydrocarbon cracks and releases vapor Some cokes will bond to the wall, and flow channels develop within the coke bed Hot oil is stopped (diverted to other drum) Steam is used to remove volatile vapor Water enters from bottom to cool the coke bed, becomes steam and flows up the center or outside along the walls The coke drum shrinks in diameter and height as it cools Eventually water can form and fills the drum Which way does the water go?? 2

Discussion of the Flows during the Coking Cycle Traditional Analysis methods assume a uniform average flow of water upwards to remove heat from coke bed and shell at same time Coke bed formation determines path of least resistance for water flow Flow channel area and friction Plugging and channel collapse Permeability Porosity Collapse strength of coke matrix Temperature measurements suggest fast quench with flow near wall is? common This creates greater stress in shell/cladding bond and skirt weld This increases likelihood that hot zones remain in coke after quench Problem Circ Weld Seam* Cracking Is Common * Joint detail may vary 3

Cracking from ID at Weld Cap to Clad Junction Drum Cracking Examples Coke Drum Failed During Quench After Repair Cracked Skirt to Shell weld - 5 Years 4

A NOTABLE QUENCH STRESS MEASURED ON SHELL O.D. A Measured Cycle For In-Line Skirt Stress Response (OD) Temperature Axial Stress Hoop Stress 5

Some Key points to describe the transient 1. Switch-In after Prewarm 2. Max temperature during Filling 3. Begin to cool from Coke Insulation Buildup Skirt FE Analysis based on Measured Transients FILL 1 2 3 What is the rate of Heating and Cooling? 4 QUENCH 4. Begin Quench after Switch-Out and Steam Purge 5. Open drum, remove water and begin drilling 5 Cone Skirt Cone Peak Thermal Rate 6

Cone Skirt Skirt Peak Thermal Rate During Quench - Skirt is Pushed and then gets Pulled by Knuckle DISPLACED SHAPE AT THE END OF FILL DISPLACED SHAPE 1 HOUR INTO QUENCH ( MAXIMUM STRESS DURING QUENCH OCCURS HERE) 7

Example Temperature Distribution During Quench Skirt is still hot in hot box zone Example Bending Stress Distribution ib ti 8

Example In-Line Skirt Axial Stress During the Fill Transient Axial Bending Stress Gap Radiation Note high bending stresses as hotter cone PUSHES Skirt Outward Example Tangent Mount Axial Stress During the Quench Transient Axial Bending Stress Gap Radiation, Gap Conductance active when in contact Note high bending stresses as cooler cone PULLS Skirt Inward 9

Quench Switch and Fill FEA : Axial Stress transient at the top of the skirt ID is function of SCF at inside radius FATIGUE LIFE CALCULATION FOR A SKIRT IS MORE ACCURATE USING MEASURED THERMAL TRANSIENT Design (by others) predicted 152 years SES Transient analysis performed prior to T/A Maximum stress intensity range during transient = 143,430 psi Using ASME code Section VIII Division i i 2 fatigue design Table 5-110.1, UTS < 80 ksi, a fatigue life of 1228 cycles was obtained. Finite Element Model vs Reality After 5 years (~1369 cycles) cracks were discovered in all 4 drum skirts (no slots) prior to T/A 10

Thermal Cycles and Rates for Cone Thermal Cycles and Rates for Skirt and Shell 11

Thermal Cycles and Rates for Skirt and Shell Thermal Quench and Rates for Skirt and Shell Skirt Shell 12

Thermal Rate Histogram for Shell 2003 2004 Does Fast Quench Shorten Cyclic Life? Where Does Fast Quench Hurt? Skirt Attachment Weld Shell Circ Seams Cone Circ Seams Why Does Fast Quench Hurt? Constraint created by components at different temperatures t (i.e. thermal expansions) Different Material Properties (Yield, Expansion, Conductivity, Diffusivity) 13

FEA Transient Analysis for ID Circ Seam Base Metal Cladding Weld Overlay Stress Distribution Across Weld During Quench for Linear Elastic Fracture Mechanics Evaluation Stress Distribution Below the Weld Just Below Weld Cap 50000 High Stress At Interface of Cl ddi Cladding 40000 Stress (psi) 30000 Radial Axial Hoop Shear 20000 10000 0 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6-10000 -20000 Distance from ID (inches) 14

Example of Measured Cone Temperatures Skin Temperatures approaching Inlet Temperature Tem p F 900 tc11 tc12 tc13 tc14 800 700 MIDDLE CONE TC's 600 500 Fast 400 Quench 300 200 100 0 5/18/06 0:00 5/18/06 6:00 5/18/06 12:00 5/18/06 18:00 5/19/06 0:00 5/19/06 6:00 5/19/06 12:00 Fast Quench Issues Traditional Analysis methods assume a uniform average flow of water upwards to remove heat from coke bed and shell at same time, or up thru central primary flow channel. Coke bed formation determines path of least resistance for water flow Flow channel area and friction Plugging and channel collapse creates new flow paths Permeability Porosity Collapse strength of coke matrix Temperature measurements suggest fast quench with flow near wall is common Generally random and not necessarily aligned with Inlet Nozzle This creates greater stress in shell/cladding bond and skirt weld Creates greater stress at circ seams tri-metal junction This increases likelihood that hot zones remain in coke bed after quench 15

What to do about Fast Quench? Change the way you do it Use Sensor Measurements (TC and HTSG) to guide you Use your Process Technology experts to address the possible procedures and maintain production Change the way drums are made Or, be prepared for continued problems. 16