Design of Geofoam Embankment for the. Steven F. Bartlett, Ph.D., P.E. Research Project Manager, UDOT

Similar documents
EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

LIGHTWEIGHT FILL DESIGN GUIDANCE

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

Performance of Mechanically Stabilized Earth walls over compressible soils

Long-Term Instrumentation Program to Monitor Various Geo-Technologies Used on the I-15 Reconstruction Project, Salt Lake City, Utah

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

ODOT Design & Construction Requirements for MSE Walls

MSE WALLS CASE STUDIES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

INSPECTION GUIDE FOR SEGMENTAL RETAINING WALLS TEK 18-11B

ENGINEERING DIRECTIVE

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

APPENDIX A - SIZING OF BRIDGE AND SUPPORT SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

PE Exam Review - Geotechnical

16. Design of Pipeline Structures.

REPORT STATUS: DATE: Report n :

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

Chapter A-15. CID-MO Structural Analysis

Engineering Properties of Foamed Recycled Glass as a Lightweight Fill

Lecture Retaining Wall Week 12

Geofoam Construction and Application to Industry

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

BLUEPRINTS * Services Insulation for Geotechnical Applications

ICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year.

Table of Contents. July

Tasman Retaining Wall System

Design Data 6. Loads and Supporting Strengths Elliptical and Arch Pipe. Values of B d

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

GEOTECHNICAL RESISTANCE FACTORS

MECHANICALLY STABILIZED EARTH (MSE) WALL SYSTEMS

MODULAR CONCRETE RETAINING WALL

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.

2.1 Backfill - General

Apparent Coefficient of Friction, f* to be Used in the Design of Reinforced Earth Structures. Technical Bulletin: MSE - 6

Bureau of Materials Materials Approval Procedures

LANDSCAPE RETAINING WALLS

Flygt Advanced Low Pressure Sewer System Package

Protecting Existing PCCP Subject to External Transient Loads. 200, Fort Worth, Texas 76109; phone (817) ;

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

MSE Walls Problems and Solutions

Wall Modular Block Mechanically Stabilized Earth, Item S.

PERMEABLE INTERLOCKING PAVERS

SECTION 1. AS MASONRY STRUCTURES CODE

SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS

A-2000 PVC Pipe for Storm Sewers and Drainage

Construction Specification for Concrete Unit Pavers

SPECIFICATION FOR REINFORCED SOIL WALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

SOILS AND FOUNDATIONS

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

A.2.a Random Riprap... Table

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

TensarTech TW1 Wall System Earth Retaining Structures

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

MOA Project # Golden View Drive Intersection & Safety Upgrades

BASE CONSTRUCTION MATERIALS A Aggregate

Technical Bulletin. For Foam Plastic Insulation, Extrusion Matters Performance Equals Resisting Water XPS Performs Better Than EPS.

Design Data 9. Standard Installations and Bedding Factors for the Indirect Design Method

FIRST TIME APPLICATION OF EXPANDED POLYSTYRENE IN HIGHWAY PROJECTS IN GREECE

SECTION UNCLASSIFIED EXCAVATION AND GRADING

VERTI-BLOCK - DESIGN MANUAL

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength psi [45 MPa] min.

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER:

MassBloc Permeable Instant Wall System

SCDOT Geotechnical Manual Updates. Nicholas E. Harman, MS PE

Design Manual: Gravity Wall. Section 1

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

Chapter 2: Foundation

SECTION CAST-IN-PLACE CONCRETE

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

C. Foundation stabilization for pipe and utility structures.

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

AUGUST 2016 LRFD BRIDGE DESIGN 3-1

File No Supplemental November Geotechnical and Environmental Consulting Engineers

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES

Downloaded from Downloaded from /1

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

COVERING THE HIGHWAY E12 IN THE CENTRE OF HÄMEENLINNA INNOVATIVE USE OF FOAMED GLASS AS LIGHT WEIGHT MATERIAL OF APPROACH EMBANKMENT

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Providing proper drainage system

DETERMINATION OF THE LONG-TERM PROPERTIES FOR MIRAGRID XT GEOGRIDS

SECTION SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION

Study of Various Techniques for Improving Weak and Compressible Clay Soil under a High Earth Embankment

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Effects of Polypropylene Fibers on the Shear Strength of Sandy Soil

SECTION AGGREGATES

Reinforced concrete slot channel

Preview of LEAME Computer Software

Immersed Tunnels. Richard Lunniss and Jonathan Baber. CRC Press. Taylor & Francis Group. Taylor & Francis Group, A SPON BOOK

DRAFT - MOCA STANDARD for Fiber-Reinforced Magnesium Cement Board

Transcription:

Design of Geofoam Embankment for the I-15 Reconstruction Steven F. Bartlett, Ph.D., P.E. Research Project Manager, UDOT

I-15 Reconstruction - Quick Facts Single Largest Highway Contract t in U.S. 17 Miles of Urban Interstate $1.5 Billion Design-Build 4 Year Construction Duration (Summer 2001) 144 Bridges/Overpass Structures 160 Retaining Walls (mostly MSE Walls) 3.8 Million m 3 of Embankment Fill 100,000000 m 3 Geofoam Embankment

Primary Uses of Geofoam on the I-15 Project Reduce Settlement to Protect Buried Utilities Improve Slope Stability of Embankments Rapid Construction in Time Critical Areas

Settlement Reduction (continued) Subsurface Profile in Salt Lake Valley CPT Tip Resistance, kpa 0 5 0 5000 10000 15000 20000 25000 30000 35000 40000 Alluvium (m) Depth 10 15 20 25 30 Bonneville Clay Pleistocene Alluvium Cutler Clay Soft Clay (10- mthick) 35 40

Settlement Reduction (continued) Settlement on I-15, Salt Lake City (1964-1968) 11.6 m Fill Height 2.5 year duration Primary Settlement 1.4 m Settlement

Settlement Reduction (continued) Buried Utilities Buried dpipeline NEW FILL Buried Pipeline Ruptured Pipeline

Settlement Reduction (continued) Buried Utilities along Roadway Buried Utilities Geofoam Embankment from State St. to 200 W. Along Interstate I-80, Salt Lake City, Utah

Improve Slope Stability (continued) Diagram a of Potential t Instability ty at Bridges Bridge Deck cracks Failure surface Soft Clay

Improve Slope Stability Details of Geofoam Construction at Bridge Abutments

Rapid Construction (Typical Embankment Construction for I-15) Geotechnical Wick Drains Typical Wick Drain 1/2 SLOPE WIDTH MINIMUM NEW EMBANKMENT SHOULDER C L NEW EMBANKMENT 15 1.5 1.5 SURCHARGE 1 2 1 1 EXISTING EMBANKMENT GEOTEXTILE WICK DRAINS

Rapid Construction (Typical Embankment Construction for I-15) Wick Drain Installation (4 weeks) Grading and Geotextile (4 weeks)) Wall Construction + Settlement Time (6 weeks + 24 weeks) Concrete Panel Placement (2 weeks)

Rapid Construction (Typical Geofoam Construction for I-15) Tilt-up Concrete Fascia Panel Wall 35 cm Concrete Pavement 60 cm Base Material 15 cm Reinforced Concrete Load Distribution Slab Geofoam Block Sloped Embankment (1.5 H to 1 V max.) Wall Footing Bedding Sand (20 cm min.)

Rapid Construction (Typical Geofoam Construction for I-15) Grade Preparation (1 week) Block Placement (3 weeks)) Load Distribution Slab Construction (2 weeks) Panel Wall Construction (1 Week)

Rapid Construction (Comparison of Construction Time) 35 30 Conventional 25 Geofoam 20 15 10 5 0 Construct tion Time (Weeks) Preparation Construction Settlement Finish Work Total

Material Type Dimensions Density Compressive Strengthth Allowable Load & Creep Interface Friction Stability of Internal Slope Bedding Material & Compaction Concentrated Loads Moisture Absorption Buoyancy Thermal Resistance Differential Icing Chemical Attack Flammability Insect Infestation Ultra Violet Degradation Durability

(Material Type) Expanded Polystrene (EPS)* virgin feedstock maximum of 5 percent regrind content t * Extruded Polystrene (XPS) is also available, but was not used on the I-15 project

(EPS Block Dimensions) 81 cm 488 cm 122 cm Dimension tolerance 0.5 percent If tolerance is met, no trimming is necessary If tolerance is not met, shop trimming is necessary

(EPS Density) Property ASTM Test C 578 Type XI Type I Type VIII* Type II Type IX Nominal Density (kg/m 3 ) C303 / D 1622 12 16 20 24 32 Minimum Density (kg/m 3 ) C303 / D 1622 11 15 18 22 29 * Type VIII was used for I-15 Reconstruction

(EPS Minimum Compressive Strength) Property ASTM Test Type XI Type I Type VIII Type II Type IX kpa (10% Strain) C 165 / D 1621 35 69 90* 104 173 * Type VIII was used for I-15 Reconstruction Strain Rate for Testing = 5 mm / minute

(EPS Minimum Compressive Strength Versus Density) (Source: Bartlett et al. 2000) d = 7.3 * D - 47 where D = Density in kpa.

(Allowable Stress and Creep) Source: Negussey (1997) Type VIII EPS d = stress @ 5% strain 0.4 d * Allowable Stress Must Maintained Below 1% Axial Strain to Minimize Long-Term Creep Simplified Formula: Allowable Stress = 0.4 d Allowable Stress = 0.4 x 120 = 48 kpa

(Allowable Stress and Creep) Allowable Stress (Dead Load + Live Load) < 0.4 d Dead Load = Weight of Load Distribution Slab + Weight of Base Material + Weight of Pavement. Dead Load = 30 % of d = 0.3 d Live Load = Traffic Loads Live Load = 10 % of d = 0.1 d

(Creep Data from Norway) Measured Data (3.5 years) Theoretical Model (Source: Aaboe, 2000)

(Creep Data from Norway) Theoretical Model (Source: Aaboe, 2000)

(Interface Friction) n Lateral Force EPS BLOCK Interface Friction Need for Design Against Sliding = n tan = sliding shear resistance n = normal stress tan (Design Value) degrees (Design Value)

(Interface Friction) Design Value = 31 deg. Source: Negussey (1997)

(Stability of Internally Sloped Embankments) Back Slope 1.0 Vertical 1.5 Horizontal Maximum Back kslope = 1.5 15Ht to 1.0 10Vertical for Embankment to Guarantee Internal Slope Stability Force = 0 (Do Not Allow Transfer of Horizontal Force)

(Stability of Internally Sloped Cuts and Hillsides) Reinforced Slope Soil Nails, Soil Anchors, or Other Reinforcement Cut Slope or Cut Slope or Landslide

(Bedding Material and Compaction) Bedding Sand Function free draining sand or fine gravel provides leveling course provides drainage Bedding Sand (20 cm min.)

(Bedding Material and Compaction) Gradation Specification for Bedding Sand Sieve Size 50mm 13mm 6mm 2mm 0.425mm 0.075 mm % Passing 95-100 65-100 50-100 40-70 10-40 0-5 (Percent Passing) * Materials with more than 20 percent of the samples containing between5 and 7 percent minus 0.075 mm material shall not be accepted for use.

(Bedding Material and Compaction) Grade Preparation and Leveling (*Maximum lift thickness = 20 cm) Light-Weight Compaction Equipment

(Concentrated Loads) Uncovered geofoam damages easily from tire loads Do not use heavy equipment atop geofoam until the load distribution slab is placed Use light-weight g construction equipment Protect with plywood sheeting

(Moisture Absorption - Above High Groundwater Elevation) (Source: Aaboe, 2000)

(Moisture Absorption - Below Groundwater) (Source: Aaboe, 2000)

(Moisture Absorption - Design Values) Installation of EPS above high groundwater Design Moisture Content = 1 percent by volume Installation of EPS that is periodically submerged Design Moisture Content = 5 percent by volume Installation of EPS below groundwater Design Moisture Content = 10 percent by volume

(Buoyancy) 100-year design flood event F resisting F uplift groundwater Drainage Sand F resisting = 1.3 x F uplift

(Thermal Resistance) (Negussey, 1997) R-value = heat flow through a unit width of material. R-value for geofoam is about 4 (18 kg/m 3 density). R-value for soil and concrete is less than 1.

(Differential Icing -Cold Regions only) No Icing pavement soil Icing EPS Good Heat Transfer Poor Heat Transfer Base material has heat capacity and prevents pavement from icing as rapidly. No Icing 60 mm base (min.) Proper Design to Prevent Icing

(Chemical Attack) Solvents that Dissolve Geofoam Gasoline Diesel Other Petroleum eu Based Fuels Organic Fluids Protection Against Accidental Spills Concrete Load Distribution Slab Geomembrane Fascia Panel Wall with Coping

(Chemical Attack - Protective Barriers) Concrete Pavement (35 cm) Load Distribution Slab (15 cm - Reinforced) Tilt-up Panel Wall Geomembrane Petroleum Resistant (3 component) for exposed side slope only

(Chemical Attack - Protective Barriers) Tripolymer Geomembrane Polyvinyl Chloride Ethylene Interpolymer Alloy Polyurethane 9 mm thickness minimum (total)

(Flammability) Geofoam is Combustible and Must Be Protect Against Open Flame or Heat Material Specification should include: Flame Retardant Additive and a UL Certification of Classification as to External Fire Exposure and Surface Burning Characteristics.

(Insect Infestation) Chemical (Borate) can be added to stop termite ( ) p or insect infestation.

(UV Degradation) (Bartlett et al., 2000) Prolonged Exposure ( > 90 days) to sunlight can lead to discoloration of geofoam and decrease in the internal angle of friction on the surface of the geofoam.

(UV Degradation) Geofoam should not be left uncovered more than 90 days. UV exposure times greater than 90 days require power-washing to remove degraded geofoam surface where the load distribution slab is placed Side surface where tilt-up panel wall is placed do not require power-washing.

(Durability Data from Norway) Note: No loss of compressive strength with time is evident (Source: Aaboe, 2000).

(Questions???)