ETHIOPIAN ELECTRIC POWER CORPORATION NOW & IN THE FOLLOWING YEARS

KEY WATER ISSUES IN AFRICAN AND ETHIOPIAN PERSPECTIVES AMID WATER RELATED SUSTAINABLE DEVELOPMENT CHALLENGES. Water Catalyst Award Lecture

USAID/NARUC/ EKT- East Africa Regional Regulatory. 1 st Partnership Exchange: ETHIOPIA POWER SECTOR OVERVIEW

Eastern Nile Basin Water System Simulation Using Hec-ResSim Model

NBI Role in Facing Energy Security Challenges in the Nile Basin

Mapping of Energy Institutions and Initiatives in Ethiopia

AFRICA CLEAN ENERGY CORRIDOR Infrastructure for Renewable Power. Kudakwashe Ndhlukula Programme Officer, IRENA

Developing an Integrated Energy Model for the Eastern African Power Pool (EAPP)

Energy Policy of Ethiopia. Ministry of Water and Energy. Country Report. Japan International Cooperation Agency. Tokyo International Center

Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers)

Investment Opportunities in the Energy Sector of Eritrea.

Application of the Water Evaluation And Planning (WEAP) Model to Simulate Current and Future Water Demand in the Blue Nile

Presented by Philippe NIYONGABO Head of Energy Division Department of Infrastructure and Energy, AUC

ENTRO Capacity Building and Internship Program

Updated Rapid Assessment and Gap Analysis on Sustainable Energy for All (SE4All): The UN Secretary General Initiative

OVERVIEW OF GEOTHERMAL RESOURCE EXPLORATION AND DEVELOPMENT IN THE EAST AFRICAN RIFT SYSTEM

Expand Win-Win Cooperation; Promote Sino-African Mutual Development

Assessment of the Impact of the Grand Ethiopian Renaissance Dam on the Performance of the High Aswan Dam

National Energy Policy of Ethiopia

Powering the Nile Basin

NELSAP AT A GLANCE. Overview of NELSAP

SREP Ethiopia Project Approval Request Public Document International Finance Corporation (IFC)

NBI strategic water resources analysis Phase I findings

Renewable Energy Development in Sri Lanka Opportunities and Challenges. Ministry of Power and Energy Sri Lanka 01/12/2014 1

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

Brief Overview of Renewable Energy Regulation in Tanzania

SCALING-UP RENEWABLE ENERGY PROGRAM IN ETHIOPIA. Final Draft External Independent Review

Ethiopia s Water Security and the State of Water Resource Management

AfDB s Activities in the Water and Sanitation Sector: Strategies and Pipeline of Projects. Water Development and Sanitation Dept.

Renewable energy: Investing in Africa

Hydropower. Social, environmental & economical concerns. Caroline Sundin

ETHIOPIA. Investment Opportunities G20 Compact with Africa. ETHIOPIA Compact with Africa

Irrigation Investment. The case of Ethiopia

ETHIOPIA. Aspiring to Become the Leading Manufacturing Hub in Africa by 2025

sustainable Energy Deployment in Egypt

POLICY BRIEF FOR DECISION MAKERS. Ethiopia: The Climate Change and Energy Debate

HYDRO-QUÉBEC ELECTRICITY: CLEAN, RENEWABLE AND RELIABLE. November 2015

Development of Alternative Scenario for Ethiopias Electricity Sector by LEAP Software

HYDROPOWER GENERATION, THE GOOD, THE BAD AND THE UGLY

Basline Servey of Irrigation and Rainfed Agriculture in Blue Nile Basin

SECTOR ASSESSMENT (SUMMARY): ENERGY

Address at the opening ceremony of Workshop

The Story of the Nile River

Climate Change Policy for Punjab

Ethiopia s Climate-Resilient Green Economy

Presentation on current status of or plan for nuclear HRD programs Country: Lao PDR

Title: Modelling of Cascade Dams & Reservoir Operation for Optimal Water Use: Application to the Omo River Basin, Ethiopia

Electricity interconnection projects between North Africa and Europe: challenges and opportunities

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis

ENERGY BALANCE OF VIETNAM BY 2020

The New England Clean Power Link A powerful wind and hydro partnership for Massachusetts

CH2356 Energy Engineering Hydro Power. Dr. M. Subramanian

Profiles of 12 proposed Mainstream developments in the LMB

Renewable energy (RE) is any energy source that naturally replenishes and cannot be exhausted. Renewable energies include:

GEOTHERMAL PROJECT TIMELINES

2.ENERGY AND OIL #INVESTINGUATEMALA. Industry in Guatemala

Climate Change: The spotlight on renewables. Renewable Energy Development

Q3 FY Analyst Meet Mumbai February 10, 2017

The term Water Resources Development

Regional Water Resources Modeller, Nile Basin Initiative Secretariat, Entebbe, Uganda 3

Power Development and Planning in China

Renewable Energy and Climate Change: The CIF Experience TITLE SLIDE

INTERNATIONAL WATERS IN AFRICA COOPERATION AND GROWTH

ESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group

New power bridges between Germany and Scandinavia

Developing Albania s Hydroelectric Potential

Thailand Power Development Plan (PDP 2007)

Global Geothermal Development Plan Roundtable

Hydropower & Dams Services

Section 1. Electricity and Your Community. What Do You See? Think About It. Investigate. Learning Outcomes

Clean Line Energy Partners

Case Study: Lokoho Project, Madagascar

The Global Grid. Prof. Damien Ernst University of Liège December 2013

From Manufacturing to the End Consumer How to Meet the Working Capital Needs of the Off-Grid Solar Sector Across the Supply and Distribution Chain?

Nile Basin Development Forum

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Country Action Plan-Proposed Outline

Woldemariam Wolde-Ghiorgis* and Timnit Wolde-Ghiorgis**, Co-Founders and Co- Directors, IDRI, Insight Development Research Institute, August 18, 2016

Data, tables, statistics and maps ENERGY STATISTICS

ESTIMATING THE EFFECT OF CLIMATE CHANGE ON THE HYDROLOGY OF THE NILE RIVER IN THE 21 ST CENTURY

RUZIZI HYDROPOWER CASCADE COORDINATION OPTIMIZATION: A CASE STUDY

HVDC Transmission and the Future of Clean Energy

Nuclear energy development in the Republic of Armenia. IAEA, Amsterdam June

Global Energy Interconnection and Northeast Asia Grid. Dr. Chen Gesong State Grid Corporation of China 17/12/2015

INNOVATIVE FINANCING OF GRID CONNECTIONS BY ETHIOPIAN ELECTRIC POWER CORPORATION

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No. PIDA Ethiopia Electrification Program (ELEAP) Region

Promoting Renewable Energy Development: An Introductory Workshop for Energy Regulators. Kenyan Country Report

Investment Opportunities in Energy Sector of Montenegro

The Potential Contribution of Renewables in Ethiopia s Energy Sector: An Analysis of Geothermal and Cogeneration Technologies

Experiences with Grid Integration of Wind Power in the Philippines

THEME Country profile Current state of energy sector Outlook of energy demand and supply The energy policy Documents and its implementation. Short ter

LONG-TERM SOLUTIONS FOR NEW YORK S CLEAN ENERGY FUTURE

By Bot Sosani HAPUA Secretarat. Sustainable Energy Training, Bangkok 25 th November 2013

Electricity supply options for Latvia to ensure security, sustainability and efficiency

RENEWABLE ENERGY AND ENERGY EFFICIENCY FINANCING AND POLICY NETWORK FORUM

Power & Energy. Solutions for a better world

Name: Wayne Peppard Organization: Allied Hydro Council Date: October 10, Subject: AHC Site C Technical Presentation

Position paper: Norway s role as a flexibility provider in a renewable Europe

Connecting New Generation in New Zealand. Len Gould Customer Services Manager Transpower New Zealand Ltd

Transcription:

ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st 2015 LONDON, UK Azeb Asnake, CEO, Ethiopian Electric Power

1. INSTITUTIONAL & REGULATORY FRAMEWORK Ministry of Water Irrigation & Energy (MoWIE) is the lead institution for the Energy Sector. It supervises Three Institutions: Ethiopian Electric Power (EEP): Generation & Transmission Construction and Operation, Universal Electric Access Program, Power Export Ethiopian Electric Utility (EEU): Distribution, Sales Ethiopian Energy Authority: Regulatory body for electricity and energy efficiency Its responsibilities fall into Three Broad Categories: Resource assessment and development, Policy and regulatory, and R&D Energy study and Dev. Follow-up Hydropower and Dams Administration Bio-fuel Development Ethiopian Electric Power (EEP) Ministry of Water, Irrigation & Energy Ethiopian Electric Utility (EEU) Petroleum Downstream operation Regulator Alternative Energy Technology Promotion & Dissemination Ethiopian Energy Authority (EEA)

2. ENERGY SECTOR POLICY The Energy policy envisages to meet the following broad objectives: Giving high priority to RE Development and follows climate resilient green economy strategy Considers Hydropower as the backbone of the country s energy generation and maximize its utilization ; Promoting and enhance other renewable energy sources development such as solar, wind, geothermal and bio-mass to increase RE mix there by Improving security and reliability of energy supply and be a regional hub for renewable energy. Enhancing regional and global cooperation in the energy sector to ensure exchange of know-how, information and transfer of technologies Strengthening cross boarder energy trade. Increasing access to affordable and adequate modern energy. Promoting efficient, clean, and appropriate energy technologies and conservation measure. Improving the energy efficiency of systems and operations. Strengthening energy sector governance and build strong energy institution (EEPCo s Transformation) Ensuring environmental and social safety and sustainability of energy supply and utilization, and gender mainstreaming. Ensuring Capacity building and technology transfer Strengthening Energy Sector Financing. Exploring for natural gas and other hydrocarbon fuels Encourages Public-Private Partnership in energy generation 3

3. PRIVATE SECTOR PARTICIPATION Based on the Energy policy, enabling environment is created for both Public and Private investors. In any RE generation projects, private sector can participate either in partnership with Public or independently without any limitation of generation capacity. The public sector plays significant role in power sector development. On the basis of the enabling environment for investment, many private developers showed keen interest to participate as an IPP for generation from hydro, wind, solar, and Geothermal. Accordingly, PPA is signed for the first Geothermal IPP for 1000 MW generation at Corbetti with Icelandic- Reykjavik Geothermal Company. Aluto Geothermal Powerhouse 4

4. INDIGENOUS ENERGY RESOURCES Resource Unit Exploitable Reserve Exploited Percent Hydropower MW 45,000 <5% Solar/day kwh/m 2 Avg. 5.5 <1% Wind: Power Speed GW m/s 1,350 > 6.5 <1% Geothermal MW 7000 <1% Wood Million tons 1120 50% Agricultural waste Million tons 15-20 30% Natural gas Billion m 3 113 0% Coal Million tons 300 0% Oil shale Million tons 253 0%

5. RENEWABLE ENERGY POTENTIALS AND THEIR GEOGRAPHICAL DISTRIBUTION Hydro Ethiopia s plentiful hydropower resources are distributed in nine major river basins and their innumerable tributaries is estimated to generate an economically affordable energy of about 260 TWH. However, less than 5 % of the potential has been exploited so far. Wind Ethiopia has total wind energy resource reserve of 3,030 Giga Watt and the potential exploitable quantity of is 1,350 Giga Watt. For technical and economic reasons appropriate wind regions for gridbased electricity generation are those with wind density of 300W/m 2 (wind speed 6.5 m/s) and above. Ayisha in the Eastern part of the country has good potential. Solar According to the revised Master Plan, Ethiopia s average solar energy potential is 5.5 KWh/m 2 /day and mainly centralized in the north part of the country in Tigray and Afar regions. Geothermal The best perspective areas are distributed along the Ethiopian Rift valley system which runs for more than 1000 km from the Afar depression, at Red Sea to the Turkana depression southwards (NE-SW to N-S direction). A total of 16 geothermal resource areas have been identified by various studies. These resource zones are all located within the rift valley system. (Aluto Langano, Tullu Moye Tendaho, Danakil Depression.)

6. DEVELOPED HYDRO RESOURCE Ethiopia s Hydro potential (45,000 MW) constitutes 20% of the total technically feasible potential in Africa. With this potential Ethiopia is usually referred as the power house of Africa. However Ethiopia has utilized less than 5% of its potential so far. Currently, Access to electricity in Ethiopia is ~ 55%. Demand Supply Potential 7

Hydro Potential 45,000 MW Developed 2,360 MW (4228 MW) Access to electricity 55% Annual Demand growth 25-30% No. of Customers 2,450,000 7. CURRENT STATUS OF ENERGY DEVELOPMENT IN ETHIOPIA Substati ons 145 Distributi on 189,000 Km 8,000 10,000 MW GTP I Transmiss ion 12,825Km Generati on 2,360 MW (9018 GWh) Gibe III =1,870 MW GERD = 6,000 MW GD3 = 254 MW 10/23/2015 Hydro, Wind, Geothermal, Biomass 8

8. GENERATION PROJECTS UNDER CONSTRUCTION Grand Ethiopian Renaissance Dam Project: 6000 MW installed capacity 48% Completed Fully Public Financed Project RCC & Rock fill Saddle Dam 9

8. GENERATION PROJECTS UNDER CONSTRUCTION ( continued) Gibe III Hydropower Project 1900 MW Installed Capacity 93% Completed RCC Dam 246 m High Dam & Reservoir: General View 10

Gibe III: U/S & D/S Views

8. GENERATION PROJECTS UNDER CONSTRUCTION (.continued) Genale Dawa Hydropower Project 254 MW Installed Capacity 78% Completed Rockfill Dam Upstream Face Spillway Concreting Works 12

8. GENERATION PROJECTS UNDER CONSTRUCTION (.continued) Adama II Wind Power Project: 153 MW Installed Capacity 96% Completed 1.5 MW Turbines 13

8. GENERATION PROJECTS UNDER CONSTRUCTION (.continued) Aluto Geothermal Upgrading of the current Capacity to 70 MW

8. GENERATION PROJECTS UNDER CONSTRUCTION (.continued) Reppi Waste to Energy Project: 50 MW Installed Capacity Municipal Solid waste (Addis Tipping Hall, Waste Bunker Area and Boiler Hall Ababa) Under Construction The first W to E Plant in Africa 68% completed 15

9. TRANSMISSION PROJECTS UNDER CONSTRUCTION (MAJOR) Capacity (KV) Length (KM) 500 1,700 400 900 230 1,100 132 560 Total ~4,260 KM

10. Power System Demand Forecast Major Consumers include: 1. Transport Sector (Railway) 2. Agriculture Sector 3. Industrial Sector 4. Large-scale Housing Programs 5. Universal Electricity Access Program 6. Electricity Export Market Trans 8% Agri. 14% Ind. 36% 2014 Internal Demand Composition Com. 24% Ind. 46% Dom. 18% Serv. 14% Dom. 39% 2037 Internal Demand Composition 17

9000 4000-1000 513 60000 40000 20000 30000 20000 10000 0 Transport Sector 1711 2976 4739 7354 8427 2015 2020 2025 2030 2035 2037 0 Industrial sector 51155 36431 29169 20761 3244 447 7326 1007 2845 3994 4986 7002 2013 2015 2020 2025 2030 2037 Large scale dwelling houses and UEAP 1830 312239665593 8241 12842 20271 Gen. (GWh) Peak (MW) Gen. (GWh) 20000 10000 Peak (MW) 0 Gen. (GWh) Peak (MW) 20000 15000 10000 5000 60000 40000 20000 0 0 623 3438 Agricultral Sector 7178 10913 14580 15996 2015 2020 2025 2030 2035 2037 1758 2209 Service Sector 3403 5568 8784 15392 2013 2015 2020 2025 2030 2037 Power Export Forecast 12075 2759 38469 41754 41754 30585 2015 2020 2025 2030 2035 2037 Gen. (GWh) Peak (MW) Gen. (GWh) Peak (MW) Energy GWh Capacity MW

11. Over View of Existing and Planned Interconnection Ethiopia is already connected to Sudan, Djibouti and the Border towns of Kenya. EGYPT Aswan Cairo Possible Interconnection Lines with Neighboring Countries Ethiopia Kenya 500 KV D.C. line under construction (up to 2000 MW) ; Exports to Egypt 2000 MW and additional 1200 MW to Sudan are planned for implementation soon. MoUs signed to Exports to Tanzania, Rwanda, Burundi, South Sudan and Yemen Merowe Khartoum SUDAN Roseries LEGEND 220 kv 230 kv 230 kv Sub-marine Cable 400 kv 500 kv HVDC Link MALAKAL Gedaref 157 km 37 km JUBA Border Pawie Beles Asmara Humera Shehedi Mandaya Finchaa GG-I GG-II GG-III ELDORET 80 km 120 km Shire Tekeze Gonder B.Dar K.Dobi KENYA ERITREA 500 km 590 km 100 km Mekele Addis Ababa D.Dawa Koka M.Wakena GD-03 225 km Mega 82 km 201 km Djibouti DJIBOUTI 185 km 26 km Berbera Hargessa SOMALILAND GD-06 GD-08 Mogadishu 80 km 465 km Kisimayou 90 km 170 km 370 km SOMALIA YEMEN LEGEND Substation at 230 kv and above Substation with Generation Facility (Switchyard at 230 kv and above) Nairobi Town AC/DC Station (Converter/Inverter) 19

Sept 29, 2015 JUBA

12.GTPII : UPCOMING PROJECTS (2016-2020) Inline with the 25 Years Power Sector Master Plan, the following projects are planned for implementation in the GTP II: Planned Generation Projects Hydro = 11,015 MW Wind = 1,520 MW Geothermal = 1,270 MW Solar = 300 MW Biomass= 420 MW Planned Transmission Projects 500 KV = 1,229 km 400 kv = 2,137 km Total = 14,615 MW 230 kv = 3,343 km 132kv = 3,041 km < 132 kv = 250 km Planned Substation Construction 115 New 63 Rehabilitation/Upgrading Total = 178 Total = 10,000 km No. RE Source Project Installed Capacity (MW) Energy (GWh) Indicative Cost (MUSD) Planned Year of Completion 1 Geba I & II 372 1709 572 2020 2 Genale Dawa VI 256 1532 588 2020 3 Werabesa + Halele 422 1973 886 2020 4 Yeda 1 + Yeda 2 280 1089 540 2020 5 Gibe IV 2000 6200 2000 2020 6 Tams 1700 5760 4214 2020 7 Upper Dabus 326 1460 628 2020 HYDRO 8 Wabi Shebele 88 691 1100 2020 9 Karadobi 1600 7857 2576 2021 10 Beko Abo 935 6632 1260 2022 11 Upper Mendaya 1700 8582 2436 2023 12 Birbir River 467 2724 1231 2023 13 Baro 1 + Baro 2 + Genji 859 3524 1794 2024 14 Genale V 100 575 298 2025 Total 11,105 50,308 20,123 1 Iteya I 200 613 380 2016 2 Iteya II 200 312 420 2016 3 Dila 100 306 210 2018 4 Iteya II 200 613 380 2017 5 Wind Assela 100 307 190 2018 6 Debire Birihan 100 613 380 2017 7 Ayisha I & II 420 1577 760 2017 8 Sululta 100 306 210 2019 9 Mega Maji 100 306 210 2019 Total 1520 4955 3140 1 100 175 180 2016 2 Solar Different Sites 100 175 180 2016 3 100 175 180 2016 Total 300 525 540 1 Corbetti 1000 7096 4000 2017-2022 2 Aluto Langano II 70 552 280 2018 Geothermal 3 Aluto Langano III 100 788 364 2017 4 Tendaho 100 788 364 2016 Total 1270 9224 5008 1 Biomass Any Resourceful site 420 2940 525 2009 Grand Total 14,615 67,427 23,624

13. Profile of GTP II Generation Projects Intended for IPP/PPP Modality 1.UPPER MENDAYA and BEKO ABO Hydropower Project Installed Capacity: 2635 MW Reconnaissance Study Indicative Cost Estimate: USD 3.3 Billion Located Third Cascade of Abay/Nile River, Western Ethiopia 2. TAMS Hydropower Project Installed Capacity: 1700 MW Prefeasibility Study Completed Indicative Cost Estimate: USD 3.2 Billion Located on Baro River, Western Ethiopia 3. KARADOBI Hydropower Project Installed Capacity: 1600 MW Prefeasibility Study Completed Indicative Cost Estimate: USD 3.5 Billion First Cascade of Abay/Nile River 4.Baro I & II and Genji Hydropower Project Installed Capacity: 859 MW Prefeasibility Study Indicative Cost Estimate: USD 1.8 Billion Located Baro River, Western Ethiopia 22

13. Profile of GTP II Generation Projects Intended for IPP/PPP Modality ( Continued) 4.Birbir Hydropower Project Installed Capacity: 467 MW Reconnaissance Study Indicative Cost Estimate: USD 1.6 Billion Located on Birbir River South-West Ethiopia 5.HALELE WERABESSA Hydropower Project Installed Capacity: 436 MW Feasibility Study Completed Indicative Cost Estimate: USD 1.1 Billion 6. UPPER DABUS Hydropower Project Installed Capacity: 326 MW Prefeasibility Study Completed Indicative Cost Estimate: USD 848 Million Located in Dabus River, Western Ethiopia 7. CHEMOGA YEDA Hydropower Project Installed Capacity: 280 MW Prefeasibility Study Completed Indicative Cost Estimate: USD 729 Million 8. GENALE DAWA VI Hydropower Project Installed Capacity: 256 MW Prefeasibility Study Completed Indicative Cost Estimate: USD 794 Million Located in the Genale Dawa River Basin, Southern Ethiopia 23