PUMP STATION CHECK LIST

Similar documents
Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

SEWER SYSTEM DESIGN GUIDELINES

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

City of Wentzville. Standard Specifications and Construction Details Amendment List

South West Water s amendments & requirements for Sewers For Adoption 6 th Edition

ENBRIDGE GAS DISTRIBUTION METER BOX. Builders Installation Guidelines September 2011

SECTION COOLING TOWER

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter X X X Adopt Entire Chapter as amended (amended sections listed below) X X X X X X

BUILDING CODES & DESIGN CRITERIA

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

Module 9 : Sewage And Storm water Pumping Stations. Lecture 11 : Sewage And Storm water Pumping Stations

Village of Arlington Heights. Sewer Back-up Rebate Program

WASTEWATER PUMPING STATION INVENTORY

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

JACKSON COUNTY WATER AND SEWERAGE AUTHORITY. Cross-Connection Control Program

Element Z General Design Requirements Existing Facilities Information

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

B. System Design and Performance Requirements

Flood Mitigation Solutions

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

16. Design of Pipeline Structures.

Landscaping and Fencing

Telecommunication Spaces

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

RESIDENTIAL BUILDING REQUIREMENTS

SECTION UTILITY MANHOLES AND STRUCTURES

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

DESIGN CRITERIA MANUAL

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

SPILL ESTIMATION. Not Just A Guess Anymore

Engineering Standards

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

CHAPTER 6. Sanitary Sewer

GRAY WATER RECYCLING SYSTEMS

Training Certification Categories

ELVORON LU/LA ELEVATOR

Division II Contractors

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

Introduction. Disclaimer. Table of contents

SUGGESTED SPECIFICATION SECTION ENTRANCE FLOOR MATS AND FRAMES

For more information, visit our web site at: h2o.enr.state.nc.us/ndpu/

December Illinois American Water Cross Connection Control Program

CITY OF SELMA, TEXAS Inspection Guidelines: Residential

Why Do I Need a Permit? D ID Y OU K N OW? Protects property values. Makes Selling Property Easier. Site Plan Page 2. Plan Requirements Page 2

CURRENT NORTH LAS VEGAS ADDENDA

Delivering Reliability. Electrical Vaults. Power & Energy-Underground Structures

The following is required for a complete permit submittal for each unit.

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

PART VII - WATER SYSTEM DESIGN CRITERIA

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPECIFICATIONS - DETAILED PROVISIONS Section Welded Steel Tanks for Water Storage C O N T E N T S

CISTERN & DRY-HYDRANTS

PRECAST RECTANGULAR CHAMBERS

Developer Services. Design Specification for the Adoption of Small Submersible Foul and Surface Water Pumping Stations. June 2017

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

Walking-Working Surfaces

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

CODE COMPLIANCE PLAN REVIEW PROCEDURES

GENERAL PLAN REVIEW REQUIREMENTS

BUREAU Joe Iuviene, AIA January 20, 2017

Underground Piping for Private Hydrants & Sprinkler Supply Line

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

The following definitions apply with regard to requirements specified in this document:

MINIMUM SPECIFICATIONS

Simplex Fiberglass Lift Station: Hard Piped

SEPTIC TANK CONSTRUCTION GUIDELINES

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FIVE SANITARY SEWER COLLECTION SYSTEM

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

CITY OF SOUTH GATE SCHEDULE OF FEES APPROVED

MSC Guidelines for Review of Ventilation System Plans

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

Walking-Working Working Surfaces. OSHA Office of Training and Education 1

Glossary Irrigation Terminology

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

RESIDENTIAL BUILDING PLAN REQUIREMENTS

NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION

level control gates Waterman Industries of Egypt WATERMAN

Continuing Certificate of Occupancy Pre-Inspection Checklist

Natural Gas Service Installation and Meter Clearance Requirements

Transcription:

PUMP STATION CHECK LIST I. SITE LOCATION D. E. Location of pump station site has to be reviewed and approved by Planning Department and Department of Public Utilities. (II-V-F-1-J-i) The pump station has to be located in accordance with the sanitary sewer MASTER PLAN. (II-V-F-1-j-ii) The site plans should show all metes and bounds. The site has to be purchased and plat deeded to the City. (II-V-F-1-j-iii) Lot size 40' x 55' (typical). (II-V-F-1-j-iii) Adjacent to City maintained right-of-way. (II-V-F-1-j-iii) II. TYPE OF PUMP STATION D. City standard pump station is a suction lift or wet well/drywell pump station with a brick building, emergency forcemain connector, emergency electrical connection and concrete driveway. (II-V-F-1-b) A submersible pump station is permitted ONLY IF this station meets all of the criteria for selection of submersible sewerage pump station. See policy on this subject. (II-V-F-2-c) If pump station discharges into an existing gravity system, then check with the Public Utilities Engineering Division regarding downstream capacities and need for upgrading the system (i.e. gravity line and/or P.S. etc.). Note: This must be approved by Public Utilities prior to submittal. (II-V-F-1-g) If HRSD forcemain line is accessible, then the pump station will have to be designed to connect to the HRSD forcemain line. The pump station should be designed to HRSD entrance head requirement. (Contact HRSD for specific requirements). (II-V-F-1-e) III. DESIGN REVIEW OF PUMP STATION Pump station shall be located to take advantage of topography so as to maximize the reach of the proposed system. (II-V-F-1-j-i) Each pump station will be designed to serve approximately a 3000' radius. (II-V-F-1-j-i) A service area map of the pump station must be submitted on Real Estate Tax Map. This service area must be in accordance with the master plan and approved by Public Utilities.(II-V-F-1-j-i)

D. Design calculations shall be included with the pump station plans. (See Pump Station Design Calculations Check List) (II-V-F-1-i) Calculations 1. Design flow = 3.1 persons/residence x 100 GPD/Capita x 2.5 (peak factor). (II-V-F-1-i-i) 2. Average flow=design/2.5.(v-f-1-i-ii) 3. Retention volume = 10 min. retention time x average flow/7.48 gal./ft. 3 (II-V-F-1-i-iii) 4. Determine wet well volume based on geometric shape. (II-V-F-1- iv) 5. Head calculations. (suction piping in station)(ii-v-f-1-i-v) 6. Head calculations. (discharge piping in station) (II-V-F-1-i-v) 7. Forcemain outside of station. (II-V-F-1-i-v) 8. T.D.H. @ design flow.(ii-v-f-1-i-vi) 9. Pump selection. (min. & max. conditions at initial and ultimate development, HRSD Interceptor Policy) Expected operating condition should fall within envelope and ensure conditions fall within operating range. (II-V-F-1-i-vii) 10. NPSH (Net Positive Suction Head) A factory certified reprime test is required. Should not be less than.5 feet. (II-V-F-1-i-vii) 11. Priming lift. (II-V-F-2-b-iii) 12. Minimum submergence. (II-V-C-4-g) 13. Minimum velocities per Health Department. (II-V-C-1-i-viii) 14. Hydraulic analysis to determine effect on existing City pump stations. (II-V-C-1-e) 15. Check siphon head if applicable. (II-V-F-1-i-ix) 16. Pumps must alternate and where 3 pumps are provided, two must meet 2.5 of average flow. (II-V-F-1-i-x)

E. Pump Station Building Design 1. Aesthetic review. (IIV-F-1-d) 2. Electrical service riser adequate. (II-V-F-3-b) 3. All electrical items shall be placed inside the pump house except the emergency electrical connection and VEPCO meter. (II-V-F- 1-h) 4. Interior layout per City Standard. 5. Air release valve is to be located at high point of discharge pipe, upstream of check valve. In the wet well the air release lines are run along the wall and extend just below (3") the low water level. Inverted check valve required for wet well/dry well application. (II-V-F-4-d) 6. Heater and exhaust vent with calculations to ensure 12 complete air changes per hour if continuous and 30 air changes per hour if not continuous. (II-V-F-5-b) 7. Ensure wet well ventilation duct is extended to platform and relief duct terminates just below slab. Ducts shall be PVC in wet well and vent pipe above slab shall be D.I. (II-V-F-5-i) 8. Pressure and vacuum gauges are provided. (II-V-F-5-e) 9. Check valves and gate valves provided with a gate valve between EPC and wall. (II-V-F-4-b) 10. Back flow preventer provided. (II-V-F-4-h) 11. Bubbler pipe and high water alarm placed along wall and located as close to ladder/platform as possible. (II-V-F-5-a&j) 12. Check that all minimum separations are provided and that pump removal is facilitated. (PS-1) (a) 2' between pumps and between pumps and walls. (b) 18" joint of pipe behind pump.

(c) 2' minimum between outside wall and first joint of pipe for both effluent and influent. (d) Dimensions of door frame (varies with size of pumps). (e) Hooks and chains for pump removal. 13. Ensure design is in conformance with OSHA standards. Consult with ECR Management for any information. (II-V-F-1) (a) 7' shaft guarding. (2 pit only) (b) 42" railing height. (c) 4" toe guards. (d) 16" stair rungs. 14. 100-Yr. and 25-Yr. flood identified and protection provided in accordance with Section 22.01.01 of the Sewerage Regulations. (I-I-A-26) 15. Bar screen (removable). (II-V-F-5-k) 16. Permanent emergency suction pipe. (optional) 17. All miscellaneous metal in wet well to be stainless steel or aluminum. (II-V-F-5-f) 18. Alarm control points are correct on the power riser diagram.(ii- V- F-3-b) 19. Soil borings provided foundation design adequate.(i-i-a-8) 20. Review specifications for conformance with City Specifications. (II-V-C-1) 21. Eight copies of Shop Drawings on all systems needed. (See Shop Drawings Checklist) (I-I-A-18) F. Site Plan Review 1. Driveway to be 7" Class A3 concrete with 6" x 6" wire mesh. (II- V-F-1-c) 2. Landscaping required. See typical layout or consult City Arborist.

3. Lot grading provided. (.5% min.) (II-I-Q-5) G. Request to Public Utilities for HRSD Certificate must be submitted to Utility Engineer, Department of Public Utilities with copy to Department of Public Works. (II-V-H-8) H. Portable equipment data required. Minimum overflow time is atleast 95 minutes depending on pump station location. (II-V-F-1-h) IV. APPROVAL Dedication required for all off-site pump station sites prior to approval. Notification of portable pump and telemetry depository requirements in approval letter. Copies of design calculations and service area map to the Utility Engineer, Public Utilities with approval letter. Has State Health Department/Water Control Board approval been granted.