Post-Fire BAER Assessment Burned Area Emergency Response (BAER)

Similar documents
Hat Creek Planning Unit. Fish, Plant, and Wildlife Habitat. LCP Volume II Supporting Analysis for Recommendations

Project Goals and Scoping

MONITORING QUESTIONS AND TASKS FOR THE GEORGE WASHINGTON PLAN

CATEGORICAL EXCLUSION WORKSHEET: RESOURCE CONSIDERATIONS

SKIBO PROJECT SCOPING REPORT Laurentian Ranger District, Superior National Forest

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

The status of aquatic ecosystems in the Basin

For the property described as: Property Owner: Name. Phone Number. Mailing Address. City. Report Year:

Wildlife Conservation Strategy

The Galton Project Kootenai National Forest. The Galton Project

CATEGORICAL EXCLUSION REVIEW - NEPA COMPLIANCE RECORD

West Branch LeClerc Creek Watershed Restoration Project Environmental Assessment

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

Lake Britton Planning Unit. Fish, Plant, and Wildlife Habitat LAKE BRITTON PLANNING UNIT

Chehalis Basin Strategy Programmatic SEPA Draft EIS

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

Mechanical Site Preparation

Changed Condition of Unplanned Ignitions Assessment for the View Lake Fire

APPENDIX D: COST ESTIMATES FOR STUDY REACHES

Keefer Pasture Drift Fence Project. Challis-Yankee Fork Ranger District Salmon-Challis National Forest

Temporary Watercourse Crossing: Culverts

Information Request 37

NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007

DECISION MEMO SUGAR CREEK STORM TREATMENT/ FORD REHAB U.S. FOREST SERVICE PAYETTE NATIONAL FOREST KRASSEL RANGER DISTRICT VALLEY COUNTY, IDAHO

Climate Change: Impacts, Monitoring, and Solutions

SAN LUIS VALLEY PUBLIC LANDS CENTER

New Castle County, DE. Floodplain Regulations

Nancy L. Young, Forester USAID/USDA Natural Resources Conservation Service

BURNED-AREA REPORT (Reference FSH ) PART I - TYPE OF REQUEST

Proposed Action Report Big Creek WBP Enhancement Project

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting

719 Griswold, Suite 820 Detroit, MI DANVERS POND DAM REMOVAL AND STREAM RESTORATION PROJECT

DECISION MEMO Divide Creek Barrier Enhancement

Stream Corridor Protection and Adaptive Management Manual. Prepared for the City of Independence, Missouri

Willamette National Forest Sweet Home Ranger District

Draft Decision Notice and Finding of No Significant Impact. Pack II Road Decommissioning Project. United States Department of Agriculture

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B

Good morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa,

Water and Watersheds. Data Maps Action

Prevention and Early Detection

Draft Record of Decision

Economics of Implementing Two-stage Channels

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

Chapter 10 Natural Environment

NetMap Community Digital Watersheds & Shared Analysis Tools

Land, Water and Wildlife Program

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

Lakeview Stewardship CFLRP Work Plan 2012

Payette National Forest

APPENDIX A AQUATIC/RIPARIAN SPECIES AND HABITAT PROJECT DESIGN CRITERIA

WATERSHED. Maitland Valley. Report Card 201

A Summary Guide to the. Rifle River WATERSHED MANAGEMENT PLAN. Know Your Watershed Protect Its Resources

Environmental Assessment

ESTIMATE OF QUANTITIES

Environmental Information Worksheet

Walnut Creek Watershed Management Authority. Project Kick Off March 18, 2015

3-13 Other Required Findings and Regulatory Compliance

Hydrology Specialist Report. ROCK CREEK FUELS AND VEGETATION MANAGEMENT ANALYSIS Minidoka Ranger District

Planning and Combination (Planning and Acquisition) Project Proposal

LEGAL AUTHORITY AND JURISDICTIONS

BLUEJ JAY SPRINGS RESTORATION VEGETATION MANAGEMENT PROJECT RECREATION RESOURCES COMPLETED BY JEREMY SUGDEN NATURAL RESOURCE SPECIALIST RECREATION

Willamette National Forest McKenzie River Ranger District

3.1 Forest Vegetation and Wildlife Habitat

C Fish Lake C Rice Lake C Mud Lake C Weaver Lake C Elm Creek*

SECTION 5.4 LOGJAM REMOVAL AND RIVER RESTORATION

Background. AEM Tier 2 Worksheet Stream & Floodplain Management. Glossary

Proposed Action for Motorized Travel Management on the North Kaibab Ranger District

Sustainable Non-Agriculture Land Management

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact

Urban Hydrology Characteristics and their Influence on Urban Stream Restoration Technology. Presented by:

NORTH FORK FEATHER RIVER PLANNING UNIT Feather River Watershed

Big Hill Insect and Disease Project Proposed Action

Study Justification. Coordinated Resource Management Project Little Snake River Conservation District

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

USDA Forest Service Lake Tahoe Basin Management Unit Forest Plan Revision Topics Need for Change

PROJECT INFORMATION AMEREN POWERLINE RECONSTRUCTION PROJECT April 2014

Dear Interested Party,

Rattlesnake Mountain OHV Trails

Toronto and Region Conservation 2017 Progress & 2018 Budget Peel Council

New Mexico Forest Restoration Principles

Lesson 2-2: Riparian Zones

SECTION 11: REGULATORY FLOODWAYS

Paradise and Watson Creek Headcut Treatment Project (see map on next page)

Travel Management on the Canjilon, El Rito and Tres Piedras Ranger Districts Carson National Forest Soil, Watershed and Air Effects

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

8/5/2011. Lesson Overview. Disturbance/Fragmentation. Shifting Mosaic. Number one cause of biodiversity loss. Types of disturbance. - Scale, frequency

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors

Appendix C. Activity Codes

Fontana Project Scoping Record August 2013

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Municipal Stormwater Management Planning

Transcription:

November 2017 Post-Fire BAER Assessment Burned Area Emergency Response (BAER) Information Brief Diamond Creek Fire Values at Risk Matrix and Treatments CentralWashingtonFireRecovery.info EMERGENCY DETERMINATION The BAER team began assessing the area for post-fire emergencies on September 29, 2017. In that time the team has identified the following values at risk to post-fire threats. Interim reports may be submitted as additional assessments are completed. The risk matrix below, Exhibit 2 of Interim Directive No.: 2520-2014-1 was used to evaluate the Risk Level for each value identified during Assessment. Only values at risk that had a risk of or above are discussed. Probability of Damage or Loss Magnitude of Consequences RISK Very Low Low Low Unlikely Low Very Low The table below describes the values at risk, probability of damage or loss, magnitude of consequences, risk, rationale for emergency treatment or actions and proposed treatments. Emergency Treatments activities (*public health and safety, land, channel, road and trail treatments, protection and safety or public engagement actions).

Public Health Risk to public and employees to exposure to non-controlled human waste at burned vault toilets at Billy Goat TH. Very To avoid potential impacts to public health from exposure to human waste. Treat and cover pit toilet. Road Access Risk to employees to exposure to hazard trees on road access and within the Billy Goat TH area. Very To avoid potential risk to health and safety from hazard trees for employees that complete work at Billy Goat TH area. Create safe access for workers to treat and cover pit toilet. Backcountry Cabin Access Risk to employees and visitors at Stubb cabin from flooding at this administrative site increased post-fire flood risk. To avoid impacts to human health flood waters and debris. Do not use cabin for administrative use until flood risk is reduced. Communicate increased risk of flooding for public safety and property protection. and agency coordination Road Access Damage to FS Roads from loss of water control on FS Roads: Very To mitigate imminent hazards to travel on the road system from flooding risk. Install gate to control access for public and employee safety. 51300 and 5130570 Signage to communicate risks. Drainage improvement treatments to increase stability of road infrastructure will reduce risks of damage on ~4 miles of road. Storm patrol needed to maintain road system integrity by using staged or contracted equipment to maintain functional drainage during storm events

Road Access Risk of flood damage to FS bridges posing risk to human life and safety To reduce impacts of post-fire flow increases to bridge infrastructure from flood waters and debris that impair safe use of bridge. Inspect bridges in 2018, reassess conditions and determine if stabilization work is necessary. Lost River Mazama Risk to downstream private property from flooding in the Lost River and Mazama communities increased post-fire flood risk and to avoid impacts to human health flood waters. Communicate increased risk of flooding for public safety and property protection. and agency coordination Lost River Mazama Risk to downstream private property from flooding in the Lost River and Mazama communities increased post-fire flood risk and to avoid impacts to human health flood waters. Communicate increased risk of flooding for public safety and property protection. and agency coordination Trail Access Risk to employees and visitors at trail crossings below and burn severity areas on Trails with increased risk of flooding (Trail # 514 Diamond Jack, Ashnola, Spotted Creek, 500 Lake Creek, Drake Creek Trails) To avoid impacts to human health flood waters. Signage to communicate increased risk of flooding for public safety for travel within burned areas in the Wilderness. with Trail community, agency coordination Trail Access Risk to hikers along trails along portions of trails in and SBS: FS Trail # 447, 477 Hidden Lakes, 484 Monument/Shellrock, 500 Lake Creek, 502 Larch Creek/ Billy Goat, 504 Andrews Creek, 510 Chewuch, 514 Diamond Jack, 533 Boundary Trail increased post-fire conditions and risks of traveling and camping in burned areas. To reduce risk to hikers and campers from burned area hazards (stump holes, hazard trees, and rock fall hazards, safe campsite location and water quality impacts) in areas within and below areas of moderate and high burn severity. Administrative closure of Trails if hazardous. Further assessment may occur in spring to determine hazard. Signage and public outreach and coordination with local Trails groups to communicate post-fire risks

SUP/Private Access SUP Access Risk to flooding at: Backcountry Outfitter Guide camps Corral (FS 51300580 spur) that sits low in the floodplain Cabin (FS 51300580 spur) increased post-fire flood risk. To avoid impacts to human health flood waters and debris. To notify of increased potential for damage to the corral from increased postfire flows. Notify owners through certified letters of risk to increased risk of flooding. Road Access/Lost River Bridge (County) Increased flood risk to County residents/visitors using Lost River bridge. To avoid impacts to human health flood waters and debris. Public Information/ Outreach, agency coordination. Certified letters Communicate risk of increased flows in the Upper Lost River watershed on NFS lands to local County/ EMS/Engineer, NRCS, NWS managers to best engage with community. Road Infrastructure Damage to FS Roads from loss of water control on roads 51300, 5130570, 5130580, 5130545, 5130565, Low To mitigate imminent hazards to the roads system vary from minor sloughing and culvert blockage to partial or total loss of road template. Install gate to manage access and reduce degradation of road. Drainage improvement treatments to increase stability of road infrastructure will reduce risks of damage on ~4 miles of road. Storm patrol needed to maintain road system integrity by using staged or contracted equipment to maintain functional drainage during storm events Road Access/ Bridges Risk of damage to FS bridges To reduce impacts of post-fire flow increases to bridge infrastructure from flood waters and debris. Inspect bridges in spring 2018, reassess

Trail Infrastructure Damage to FS Trails from loss of water control is expected from risk of increased runoff and erosion from burned areas on Trails # Trail # 447, 477 Hidden Lakes, 484 Monument/ Shellrock, 500 Lake Creek, 502 Larch Creek/ Billy Goat, 504 Andrews Creek, 510 Chewuch, 514 Diamond Jack, 533 Boundary Trail Trail segments with high erosional hazard were susceptible to accelerated erosion pre-fire, therefore trails within high and moderate burn severity, are prone to increased post-fire runoff, concentration of flow, and erosion of the trail surface. Drainage structures will be installed along ~41 miles of trail to control runoff and avoid, minimize and mitigate damage to the trail bed and downslope hillslopes. Soil Productivity Approximately 58% of the fire area is burned at and soil burn severity posing a moderate threat to soil productivity. The extent and degree of changes is unknown. Loss of productivity due to erosion is considered to be long-term but recovery of hill-slope stability is likely to occur within 3-5 years following the fire. due to wilderness, timing and topographic limitations, therefore treatments to control water on road and trail infrastructure in areas of and soil burn severity will help to avoid further degradation to soil productivity into streams. emergency stabilization. Hydrologic Function Risk of impacts to hydrologic function from increased runoff and erosion. Approximately 58% of the fire is burned at and soil burn severity posing a moderate threat to hydrologic function with lasting impacts to hydrologic response. Very infrastructure in areas of and soil burn severity will to hydrologic function. into streams. emergency stabilization.

Riparian Function Increased post-fire flows expected are not likely to degrade riparian function. Channel widening or incision is unlikely to occur in the wilderness portion/majority of the fire resulting in low threat to degradation to riparian areas from increased flows, channel erosion and loss of riparian vegetation. Unlikely Very Low (wilderness) Very (Eightmile at/ below stream crossings) infrastructure in areas of and soil burn severity will to riparian function. into streams emergency stabilization. TES Lost River and Eightmile Creek Risk to Bull Trout and Steelhead populations from the threat of increased postfire flows, erosion and sedimentation of critical habitat. Very infrastructure in areas of and soil burn severity will to riparian function and aquatic habitat. into streams emergency stabilization, fire disturbance is within historical range of variability MIS, R6 Sensitive Species Habitat Threats to the Redband and Westslope cutthroat trout. Very Low infrastructure in areas of and soil burn severity will to riparian function and aquatic habitat. into streams conditions

Native or naturalized plant communities. Risk to forested native or naturalized vegetative communities due to significant tree mortality, where natural regeneration is delayed to the loss of the canopy There are populations of 2 invasive species (Class B noxious weed) along the travel routes in the burn area. Nearby infestations of invasive plant species are likely to move into the burned area, due to the wind-blown dispersal nature of the seed and the inability of the existing native seed bank to offer natural competition. Early Detection Rapid Response treatments for invasive species Native or naturalized plant communities. Risk to Whitebark pine recovery Federal Candidate and Sensitive Very Low Whitebark pine burned within this fire perimeter. The natural seed production of the pine and burn intervals may or may not line up to provide seed production post fire. and vegetative conditions, some restoration planting may occur through restoration effort. TES Wildlife Threats to Twisp wolf pack, lynx and wide ranging carnivore critical habitat from vegetation loss, degraded soil productivity and hydrologic and riparian function. Very Low and vegetative conditions, some restoration planting may occur through restoration effort. and vegetative conditions, some restoration planting may occur through restoration efforts