REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX

Similar documents
REQUEST FOR PROPOSALS

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

Finance & Technology Administrator (815) ext 223

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET

Coordination of Consultants

Exhibit A Scope of Services and Deliverables

Addendum No. 1 Page 1 of 2

For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan.

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

Janet L. Ravey. Town of Truckee

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient...

Construction Application for Permit (CAP) Instructions

DRAFT TECHNICAL SPECIFICATIONS FOR

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09


Main Building Auditorium

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

Cass County Soil Erosion & Sedimentation Control Program

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

Task Order Authorization

Enclosed is Addendum No. 1 to the above reference contract documents. Please execute and attach this Addendum No. 1 to your Project Manual.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

VANDERBILT UNIVERSITY

BITUMINOUS MIXTURE # 13A BID SHEET

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH

Required Information for Permit Issuance

AGENDA ITEM NO. June 6, 2017

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

PROCEDURE FOR REQUESTING A BUILDING PERMIT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF MODESTO REQUEST FOR PROPOSAL (RFP) CONSTRUCTION MANAGEMENT SERVICES FOR STATE ROUTE 99 AND PELANDALE AVENUE INTERCHANGE RECONSTRUCTION PROJECT

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Project: Multiple Park Demolition Project Bid#P

Property Address: Builder: Phone #: Address:

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

Enterprise Parkway Improvement Project, CIP# E364

Application Requirements for obtaining a Building Permit

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement

UNC Chapel Hill Informal Contracting Guidelines

Forsyth County Procurement

RESIDENTIAL BUILDING PERMIT

The following is required for a complete permit submittal for each unit.

NC State University OESAD GUIDELINES Contract Year

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion

Professional Practice 544

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

REQUEST FOR QUALIFICATIONS (RFQ) For Engineering Services Institute for Marine Mammal Studies (IMMS)

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

PERMITS, ADDRESSES, AND INSPECTIONS

WHITNEY OAKS COMMUNITY ASSOCIATION P.O. Box 1459, Folsom, CA (916) (916)

Scope of Work Bid Package C-4 - West Polished Concrete

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

Facilities Planning Policy & Procedure #20

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

Construction Summary

SECTION BID FORM LICK RUN INTERCEPTOR REHABILITATION

ECONOMICS COURSE. Preconstruction Operations

COMMUNITY DEVELOPMENT

EARLY START PERMITS. Site cleaning, including removal of any existing asphalt, and/or concrete slab, Excavation work under the building footprint,

FOOTING DRAIN DISCONNECTION PROGRAM GUIDELINES

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

KABA DEMOLITION INFORMATION PACKET

ADDENDUM ADDENDUM NUMBER: One DATE: 30 October 2012

Last Updated March 15, 2016

The following materials and documents are required in order for you to obtain a Building Permit:

EXCAVATION PERMIT CHECKLIST

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

2016 CONCRETE REPLACEMENT PROJECT

INVITATION TO BID ON TOWN PAVING PROJECTS

New Outdoor Firing Range Facility Project Manual

PROJECT MANUAL. New Building Addition for Kenworth Sales Company, Inc. Ontario, Oregon. Set No. 01. For the Construction of: October 2017

ARCHITECTURAL / ENGINEERING SERVICES RFQ. North Sound Behavioral Health Organization

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

1.0 ABOUT THE NU GUIDELINES

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN

CITY OF BLUE ASH REQUEST FOR QUALIFICATIONS TO PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES FOR THE DESIGN OF THE

BUILDING PERMIT GUIDELINES - RESIDENTIAL

Construction Family of Documents

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

PROFESSIONAL DESIGN MANUAL INDEX

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

NOTICE TO BIDDERS. May 31, Dorothy E. Maxwell Chair

Document B101 TM. Standard Form of Agreement Between Owner and Architect

BID # UTILITY SERVICE CONTRACT SECTION C SPECIFICATIONS OWNER

Transcription:

REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX The Ottawa County Road Commission is seeking the submittal of written proposals from consulting firms to provide architectural and engineering services for the Preliminary Design, Final Design, Bidding, and Construction phases for the new Coopersville Area Maintenance Complex, located at 475 68 th Avenue, Coopersville, Michigan. The new Coopersville Area Maintenance Complex will include, but not limited to: Maintenance Garage: A commercial/industrial type structure with 3 mechanics bays, fabrication and repair area, 2 blade changing bays, wash bay, supervisor offices, break area, employee locker room, parts and storage rooms, restrooms, and an area with 34 parking spots for trucks and equipment. The building will include all necessary electrical, heating, cooling, lighting, plumbing, venting, and any other utility and construction related items. The building should be designed to accommodate any future expansion of the indoor parking area. Salt Storage Building: A 150 x 80 reinforced concrete wall structure with timber framing, and asphalt roofing and all necessary electrical, lighting, plumbing, venting, and other utility and construction related items. Cold Storage Building: A commercial/industrial type structure with 5 bays that will include all necessary electrical, lighting, venting, and any other utility and construction related items. The building should be designed to accommodate any future expansion. Site Improvements: Driveways, employee and visitor parking areas, site paving, storm water systems, landscaping, site fencing, material storage areas, lighting, utility, and any other related items. To assist with the written proposal development, firms are encouraged to visit (with an appointment) the existing Ottawa County Road Commission Grand Haven and/or North Holland Maintenance Complexes to review the existing layout and operation of the facilities. Written proposals, including qualifications, must be submitted to the Ottawa County Road Commission no later than 10:00am on March 19, 2015. Submit proposals to: Ottawa County Road Commission Rosy Mound Drive at US-31 P.O. Box 739 Grand Haven, Michigan 49417

TIME SCHEDULE: The following is the anticipated project completion time schedule: Site Plan Approval (from all necessary agencies): November 2015 Salt Storage Building (with necessary site Improvements) Final Construction Plan & Specifications: February 2016 Construction Completion Date: October 2016 Maintenance Buildings & Site Improvements: Final Construction Plan & Specifications: November 2018 Construction Completion Date: October 2019 The scope of the services include the following: A) Preliminary Design Phase: SCOPE OF SERVICES: 1) Review with the Ottawa County Road Commission staff the project requirements, scope of services, and overall schedule. 2) Review existing topographical and boundary survey. Identify and perform additional survey needs. 3) Obtain utility information for electric, gas, telephone, cable, water, sanitary sewer, and storm water systems. 4) Perform soil borings and other needed geotechnical investigations for foundation and pavement designs. 5) Prepare a complete site plan that includes a main maintenance (garage) facility, separated storage and salt buildings, parking areas, driveways, storm water facilities, grading, soil erosion, utilities, landscaping, etc. 6) Prepare a detailed cost estimate for construction of the maintenance complex. 7) Meet with the Ottawa County Road Commission staff to review site plan and construction cost estimate. 8) Obtain site plan approval from the City of Coopersville, the Ottawa County Water Resources Commissioner, and any other required agencies. Completion Date: November 2015

B) Final Design Phases: Salt Storage Building & Necessary Site (and Off-Site) Improvements 1) Prepare preliminary construction plans and specifications. 2) Meet with the Ottawa County Road Commission staff to review preliminary construction plans and specifications. 3) Obtain construction plan approval from the City of Coopersville, the Ottawa County Water Resources Commissioner, and any other required agencies. 4) Final plans, specifications, and contract bidding documents must meet the requirements of the current editions of the following codes and standards: a. Michigan Building Code b. Michigan Mechanical Code c. National Electric Code d. MDOT Standard Specifications for Construction 5) Complete final design and prepare final construction plans, specifications, and contract bidding documents in accordance with the Ottawa County Road Commission review and comments. 6) Obtain all necessary permits from the City of Coopersville, the Ottawa County Water Resources Commissioner, and any other required agencies. 7) Submit three (3) sets of final plans and specifications to the Ottawa County Road Commission. Completion Date: February 2016 Maintenance Buildings & Site (and Off-Site) Improvements 1) Prepare preliminary construction plans and specifications. 2) Meet with the Ottawa County Road Commission staff to review preliminary construction plans and specifications. 3) Obtain construction plan approval from the City of Coopersville, the Ottawa County Water Resources Commissioner, and any other required agencies. 4) Complete final design and prepare final construction drawings specifications and contract bidding documents in accordance with the Ottawa County Road Commission review and comments. 5) Obtain all necessary permits from the City of Coopersville, the Ottawa

County Water Resources Commissioner, and any other required agencies. 6) Submit three (3) sets of final plans and specifications to the Ottawa County Road Commission. Completion Date: November 2018 C) Bidding Phases: Salt Storage Building & Necessary Site (and Off-Site) Improvements 1) Submit advertisement on behalf of the Ottawa County Road Commission to various publishers with instructions to publish for two (2) weeks and provide affidavits of publication. The cost of advertising will be paid directly by the Ottawa County Road Commission and does not need to be included in the bidding phase budget. A copy of the bid advertisement will be provided to the Ottawa County Road Commission for submittal to the County Road Association of Michigan. 2) Distribute plans, specifications, and bid documents to plan rooms and prospective bidders. 3) Answer contractor questions and prepare addenda during bid period. No pre-bid meeting will be conducted. 4) Review and tabulate bids after the Ottawa County Road Commission opens the bids. 5) Review qualifications and experience of low bidder and make recommendation of award to the Ottawa County Road Commission. Suggested Completion Date: April 2016 Maintenance Buildings & Site (and Off-Site) Improvements 1) Submit advertisement on behalf of the Ottawa County Road Commission to various publishers with instructions to publish for two (2) weeks and provide affidavits of publication. The cost of advertising will be paid directly by the Ottawa County Road Commission and does not need to be included in the bidding phase budget. A copy of the bid advertisement will be provided to the Ottawa County Road Commission for submittal to the County Road Association of Michigan. 2) Distribute plans, specifications, and bid documents to plan rooms and prospective bidders. 3) Answer contractor questions and prepare addenda during bid period. No

pre-bid meeting will be conducted. 4) Review and tabulate bids after the Ottawa County Road Commission opens the bids. 5) Review qualifications and experience of low bidder and make recommendation of award to the Ottawa County Road Commission. Suggested Completion Date: January 2019 D) Construction Phases: Salt Storage Building & Necessary Site (and Off-Site) Improvements 1) Assemble construction documents, request and review contractor supplied bonds and insurances, distribute documents for signature. 2) Schedule and attend the preconstruction with the contractor and Ottawa County Road Commission. 3) Review contractor submitted shop drawings on behalf of the Ottawa County Road Commission and insure compliance with specifications and local standards. 4) Provide project administration services through the construction period, including: a. Schedule and preside at bi-weekly progress meetings with the contractor and Ottawa County Road Commission staff. Prepare and distribute meeting minutes. b. Review contractor pay requests and submit to the Ottawa County Road Commission for payment. c. Prepare contract change orders, if necessary, and submit recommendation to the Ottawa County Road Commission for authorization. d. Maintain project files on behalf of the Ottawa County Road Commission. e. Prepare and sign all required documents as Project Engineer. 5) Provide project construction engineering services through the construction period, including:

a. All construction staking and surveying. b. Provide a resident project representative to perform on-site inspection during all construction activities of the project. c. Provide record keeping of construction activities; report defective work immediately to the Ottawa County Road Commission. d. Provide and coordinate all on-site and off-site construction materials testing in accordance with MDOT standards and specifications 6) Conduct final review of the contractor s work with the Ottawa County Road Commission present and prepare a final punch list of remaining work items. Provide follow-up inspection to ensure that punch list items have been completed. 7) Prepare record drawings showing dimensions and details as constructed. 8) Submit record drawings and entire project files and records to the Ottawa County Road Commission. Completion Date: October 2016 Maintenance Buildings & Site (and Off-Site) Improvements 1) Assemble construction documents, request and review contractor supplied bonds and insurances, distribute documents for signature. 2) Schedule and attend the preconstruction with the contractor and Ottawa County Road Commission. 3) Review contractor submitted shop drawings on behalf of the Ottawa County Road Commission and insure compliance with specifications and local standards. 4) Provide project administration services through the construction period, including: a. Schedule and preside at bi-weekly progress meetings with the contractor and Ottawa County Road Commission staff. Prepare and distribute meeting minutes. b. Review contractor pay requests and submit to the Ottawa County Road Commission for payment. c. Prepare contract change orders, if necessary, and submit

recommendation to the Ottawa County Road Commission for authorization. d. Maintain project files on behalf of the Ottawa County Road Commission. e. Prepare and sign all required documents as Project Engineer. 5) Provide project construction engineering services through the construction period, including: a. All construction staking and surveying. b. Provide a resident project representative to perform on-site inspection during all construction activities of the project. c. Provide record keeping of construction activities; report defective work immediately to the Ottawa County Road Commission. d. Provide and coordinate all on-site and off-site construction materials testing in accordance with MDOT standards and specifications 6) Conduct final review of the contractor s work with the Ottawa County Road Commission present and prepare a final punch list of remaining work items. Provide follow-up inspection to ensure that punch list items have been completed. 7) Prepare record drawings showing dimensions and details as constructed. 8) Submit record drawings and entire project files and records to the Ottawa County Road Commission. Completion Date: October 2019

PRIOR EXPERIENCE WITH SIMILAR PROJECTS: Firms submitting proposals are requested to provide information on all construction contracts of comparable scope including the following: 1) The location, scope of services, and contract value of similar project. 2) The name of the governmental agency having jurisdiction over the project and the name of the individual at that agency with whom you worked most directly on the project. 3) The name of the contractor who constructed the facility, and the name of the individual at that company with whom you worked most directly on the project. Firms submitting proposals are also encouraged to submit names and biographical data on the architects, engineers, and project managers that would oversee each phase of the project in the event they were selected for this project. All sub-consultants should be listed with detailed information about the firm and personnel who will assist with the project. The Ottawa County Road Commission will evaluate the detailed proposals and select the top rated consultant at the next available Road Commission Board meeting. The selected consultant must submit an approved Equal Employment Opportunity plan to the Ottawa County Road Commission before a contract can be executed.

QUOTATION FOR ARCHITECHTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX The undersigned hereby proposes to provide the architectural and engineering services as outlined in the attached scope of services for the following amounts. A breakdown for the hourly rates and services for the Construction Phase shall be submitted. Amount Preliminary Design Phase Final Design Phase Salt Storage Building Maintenance Building & Site Improvements Bidding Phase Salt Storage Building Maintenance Building & Site Improvements Subtotal (Not to exceed) Construction Phase *(Attach hourly breakdown of services) Salt Storage Building Maintenance Building & Site Improvements Subtotal (Estimated) Total Cost $ Submitted by: Representing (Firm): Signed by: Date: