DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-02 Contract: AMCC-02: Part design and construction of elevated viaduct (chainage km 1.338 1.458 to km 6.577 6.546) and five elevated stations viz., City Cancer Hospital, SRR Govt. college, Sri Sathya Sai Mandir, Besant road and Railway Station East including design and construction of PEB roof and entry / exit structures of the stations of Pandit Nehru Bus Stand Nidamanuru Corridor of Vijayawada Metro Project. SUMMARY SHEET (ADDENDUM No.-5) S. No Document Page No. Clause No/ Item No. Addendum / Corrigendum Remarks 1. Volume-1, NIT 1RR Clause 1.1.1 Start Chainage and End Chainage mentioned in the Name of Work are revised. Page 1RR is replaced with page1rrr 2. Volume-1, NIT 1RR Clause 1.1.2 Key Details Approximate cost of work and Amount of tender Security are revised Page 1RR is replaced with page1rrr 3. Volume-1, NIT 1RR Clause 1.1.2 Key Details Sale Period, Last Date of issuing Addendum, Date of submission & opening are revised Page 1RR is replaced with page1rrr 4. Volume-3 Employer s Requirements (Functional) 14R Clause 2.1.2 (xxiii) Clause 2.1.2 (xxiii) is modified. Page 14R is replaced with page14rr 5. Volume-3 Employer s Requirements (Appendices) Page 57R Appendix-1 (Drawing List) Rev. 3 are being issued for Drawing Nos. DMRC/DBD/CORR-2/PNBT- BP/GAD/2015 (Sheet 3 of 19) and DMRC/DBD/CORR-2/PNBT- BP/GAD/2015 (Sheet 10 of 19) Pages 57R is replaced with page 57RR. 6. Volume-5 Drawings Page 1R. List of Drawings Rev. 3 are being issued for Drawing Nos. DMRC/DBD/CORR-2/PNBT- BP/GAD/2015 (Sheet 3 of 19) and DMRC/DBD/CORR-2/PNBT- BP/GAD/2015 (Sheet 10 of 19) Pages 1R of drawing list is replaced with page 1RR. 7. Volume-5, Drawings Rev. 3 are being issued for Drawing Nos. DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 (Sheet 3 of 19) and DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 (Sheet 10 of 19) Latest GADs in pdf as well as Auto Cad format are being issued with Addendum-5
Contract: AMCC-02: Part design and construction of elevated viaduct (chainage km 1.338 1.458 to km 6.577 6.546) and five elevated stations viz., City Cancer Hospital, SRR Govt. college, Sri Sathya Sai Mandir, Besant road and Railway Station East including design and construction of PEB roof and entry / exit structures of the stations of Pandit Nehru Bus Stand Nidamanuru Corridor of Vijayawada Metro Project AMENDED REVISED NOTICE INVITING TENDER (NIT) 1.1 GENERAL (e-) 1.1.1 Name of Work: Delhi Metro Rail Corporation (DMRC) Ltd. Invites online open e-tenders from eligible applicants, who fulfil qualification criteria as stipulated in Clause 1.1.3 of NIT, for the work Contract: AMCC-02: Part design and construction of elevated viaduct (chainage km 1.338 1.458 to km 6.577 6.546) and five elevated stations viz., City Cancer Hospital, SRR Govt. college, Sri Sathya Sai Mandir, Besant road and Railway Station East including design and construction of PEB roof and entry / exit structures of the stations of Pandit Nehru Bus Stand Nidamanuru Corridor of Vijayawada Metro Project. NOTE:- The name of work otherwise mentioned elsewhere in the tender documents shall be deemed to have amended as above The brief scope of the work is provided in Clause A1 of ITT (Volume-1) and Employer s Requirement (Volume-3). 1.1.2 Key details : Approximate cost of work INR 285 crore INR 2.85 crore Security Completion period of the Work Security (in original) as per clause C18 of ITT shall be accepted only up to 1500 hrs on 07.12.2015 14.12.2015 22.12.2015 in the office of Executive Director/Contracts at the address mentioned hereinafter. 24 (twenty four) months From 23.10.2015 to 07.12.2015 14.12.2015 22.12.2015 (up to 1100 hrs) on e-tendering website www.tenderwizard.com/dmrc. documents on sale document can only be obtained online after registration of tenderer on the website www.tenderwizard.com/dmrc. For further information in this regard bidders are advised to contact on 011-49424307, 011-49424365 or 011-23417910. INR 21,000/- (inclusive of 5% DVAT) Non-Refundable Cost of documents Last date of Seeking Clarifications Pre-bid Meeting (Demand Draft /Banker s cheque drawn on a Scheduled Commercial Bank based in India and should be in favour of Delhi Metro Rail Corporation Ltd payable at New Delhi) Cost of tender documents i.e, D.D. / Banker s cheque, in original, shall be accepted only up to 1500 hrs on 07.12.2015 14.12.2015 22.12.2015 in the office of Executive Director/Contracts at the address mentioned hereinafter. 10.11.2015 up to 1730 hrs. Queries/clarifications from bidders after due date and time shall not be acknowledged. 04.11.2015 at 1100 hrs. Last date of issuing addendum 19.11.2015 24.11.2015 02.12.2015 10.12.2015 Date & time of Submission of online Date & time of opening of online 07.12.2015 14.12.2015 22.12.2015 up to 1500 hrs 07.12.2015 14.12.2015 22.12.2015 at 1505 hrs. DMRC/AMCC-02/Vol-1/Amended Revised NIT Page 1RRR
Contract: AMCC-02: Part design and construction of elevated viaduct (chainage km 1.338 1.458 to km 6.577 6.546) and five elevated stations viz., City Cancer Hospital, SRR Govt. college, Sri Sathya Sai Mandir, Besant road and Railway Station East including design and construction of PEB roof and entry / exit structures of the stations of Pandit Nehru Bus Stand Nidamanuru Corridor of Vijayawada Metro Project. (xiv) (xv) (xvi) (xvii) (xviii) (xix) (xx) (xxi) (xxii) (xxiii) (xxiv) (xxv) (xxvi) Providing and fixing GI brackets with suitable covering arrangement on both sides of the parapet walls of viaduct as per tender drawing for electrical cables & signalling cables. Crash Barrier as per drawing. Inserts for track plinth (track plinth is not in the Scope of this work). Expansion joint, sealant in the expansion joints as per concept plan as per specification. Man holes with manhole covers made of Cast Iron on the deck with locking arrangement. Earthing arrangement, drainage system and inserts for signalling masts in the parapets and other systems as may be required. Location of these inserts shall be as directed by the Engineer. Designing and construction of ground water recharging/rain water harvesting systems in alternate spans to cater all the piers. Piers including cantilever piers, portal piers and portal beams. The work also includes the construction of piers and pier caps at the start and end of station area. Design and construction of foundation systems, piers, and pier caps and pedestal at the start end i.e., at Chainage km 1.458 and end of this contract package. The foundation systems, pier(s), pier cap(s) and pedestal at this end shall be used for resting of superstructure of the adjacent package. For this purpose the load / forces, shape and size of pier cap at the start end of this package will be provided by DMRC / Contractor of the adjacent package. At the end chainage of this contract i.e. Chanage km 6.546, foundation systems, piers, pier caps and pedestal shall be constructed by the Contractor of adjacent package which will be used for resting of the superstructure of this package. However, Contractor of this package shall provide Loads/forces of superstructure of this contract package to the Contractor of adjacent package to enable them to design and construct foundation systems, piers, pier caps and pedestal in the scope of adjacent package. be considered from adjacent spans in the design of these structures shall be provided by the Engineer. Provision for cut-outs in the viaducts required for services in coordination with various system contractors. Grooves on the parapets. Provision for MS/ RCC ladders / staircases along with railing for approaching the viaduct track bed from station platform at both ends for up & down lines shall be inclusive. (xxvii) At some locations tenderer may have to do cast-in-situ construction for the viaduct depending on the site constraints. (xxviii) Demolition/dismantling of RCC framed /steel structures/buildings, masonry buildings including basement, ground and above floors as existing at site on the alignment of viaduct and station locations as indicated in GAD without making damages to the adjacent structures, utilities, etc. including disposing off retrieved materials out of site of work. Demolition/dismantling of road, footpath, kerbstone, central verge, boundary wall, etc. er must visit the site and ascertain actual magnitude of quantum of work involved for footpaths, kerbstone, central verge, boundary wall, etc. and nothing shall be payable on this account. Retrieved materials obtained from demolition/dismantling shall be property of the contractor. However in case of Foot Over Bridge, the contractor has to hand over the serviceable material at location as directed by DMRC/FOB owning department. Acquisition and evacuation of the properties will be done by concerned Authority. (xxix) The contractor has to get necessary permission/ NOC from the railway, road and other concerned regulatory authorities for block and working in such locations. DMRC will facilitate for getting them permission from concerned regulatory authorities for working in such locations. (xxx) The alignment is passing over canals between chainage 1500.000 & 1700.000 and 2100.000 & 2200.000 as indicated in General Alignment Drawing No. DMRC/DBDCPRR-2/PNBT- BP/GAD/2015 Sheet No. 4 of 19. Permission from the concerned agencies shall be taken prior to commencing of work in those locations. Care should be taken so that the flow in the canals is maintained with minimum of obstruction. The tenderer shall propose a detailed construction methodology of working in these locations and the methodology shall be got approved by the contractor from the concerned agency. DMRC will facilitate for getting them permission from concerned agency for working in such locations. DMRC/AMCC-02/Volume-3/ Employer's Requirements/Section B/Functional 14RR
Contract: AMCC-02: Part design and construction of elevated viaduct (chainage km 1.338 1.458 to km 6.577 6.546) and five elevated stations viz., City Cancer Hospital, SRR Govt. college, Sri Sathya Sai Mandir, Besant road and Railway Station East including design and construction of PEB roof and entry / exit structures of the stations of Pandit Nehru Bus Stand Nidamanuru Corridor of Vijayawada Metro Project. EMPLOYER'S REQUIREMENTS APPENDIX 1 LIST The Documents contains a set of reference/ drawings that are applicable to the Contract Works. The er shall incorporate into the only those drawings from that set which amplify aspects of the Contractor's Technical Proposals. General information drawings will not be included in the Contract. The List of Drawings issued with the tender drawings is as under:- S.No. DESCRIPTION NO. 1 GENERAL ARRANGEMENT ALIGNMENT 2 GENERAL ARRANGEMENT ALIGNMENT 3 GENERAL ARRANGEMENT ALIGNMENT 4 GENERAL ARRANGEMENT ALIGNMENT 5 GENERAL ARRANGEMENT ALIGNMENT 6 GENERAL ARRANGEMENT ALIGNMENT 7 GENERAL ARRANGEMENT ALIGNMENT 8 GENERAL ARRANGEMENT ALIGNMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 3 OF 19 Rev. R2 R3 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 4 OF 19 Rev. R2 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 5 OF 19 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 6 OF 19 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 7 OF 19 Rev. R1 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 8 OF 19 Rev. R1 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 9 OF 19 Rev. R1 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 10 OF 19 Rev. R2 R3 9 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 11 OF 19 10 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 12 OF 19 11 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 13 OF 19 12 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 14 OF 19 13 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 15 OF 19 14 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 16 OF 19 15 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 17 OF 19 16 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 18 OF 19 17 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 19 OF 19 CITY CANCER HOSPITAL 18 LIST AMCC-TEN-CCH-LST 19 INSERTION PLAN AMCC-TEN-CCH-001 Rev. R2 20 GROUND LEVEL PLAN AMCC-TEN-CCH-002 Rev. R2 21 CONCOURSE LEVEL PLAN AMCC-TEN-CCH-003 Rev. R1 22 PLATFORM LEVEL PLAN AMCC-TEN-CCH-004 Rev. R1 23 SECTIONS AMCC-TEN-CCH-005 Rev. R1 24 ROOF LEVEL PLAN AMCC-TEN-CCH-006 Rev. R1 SRR GOVERNMENT COLLEGE 25 LIST AMCC-TEN-SGC-LST DMRC/AMCC-02/Volume-3/ Employer s Requirement/Appendices Page 57RR
Contract: AMCC-02: Part design and construction of elevated viaduct (chainage km 1.338 1.458 to km 6.577 6.546) and five elevated stations viz., City Cancer Hospital, SRR Govt. college, Sri Sathya Sai Mandir, Besant road and Railway Station East including design and construction of PEB roof and entry / exit structures of the stations of Pandit Nehru Bus Stand Nidamanuru Corridor of Vijayawada Metro Project AMCC-02 LIST The List of Drawings issued with the tender drawings is as under:- S.No. DESCRIPTION NO. 1 GENERAL ARRANGEMENT ALIGNMENT 2 GENERAL ARRANGEMENT ALIGNMENT 3 GENERAL ARRANGEMENT ALIGNMENT 4 GENERAL ARRANGEMENT ALIGNMENT 5 GENERAL ARRANGEMENT ALIGNMENT 6 GENERAL ARRANGEMENT ALIGNMENT 7 GENERAL ARRANGEMENT ALIGNMENT 8 GENERAL ARRANGEMENT ALIGNMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 3 OF 19 Rev. R2 R3 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 4 OF 19 Rev. R2 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 5 OF 19 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 6 OF 19 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 7 OF 19 Rev. R1 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 8 OF 19 Rev. R1 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 9 OF 19 Rev. R1 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 10 OF 19 Rev. R2 R3 9 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 11 OF 19 10 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 12 OF 19 11 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 13 OF 19 12 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 14 OF 19 13 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 15 OF 19 14 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 16 OF 19 15 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 17 OF 19 16 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 18 OF 19 17 GENERAL ARRANGEMENT DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET 19 OF 19 CITY CANCER HOSPITAL 18 LIST AMCC-TEN-CCH-LST DMRC/AMCC-02/Vol-5/ Drawings Page 1RR
PANDIT NEHRU BUS TERMINAL BEST PRICE L E G E N D DETAILS SHOWN IN TENDER ARE TENTATIVE AND MAY CHANGE DURING DETAILED DESIGN. REVISIONS DELHI METRO RAIL CORPORATION LTD. Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-110001 TITLE:- GENERAL ALIGNMENT FOR VIJAYAWADA METRO PROJECT ( PANDIT NEHRU BUS TERMINAL TO NIDAMANURU ) APPROVED BY :- DESIGNED BY:- 3. 07/12/2015 R3 Contract package boundary changed from Ch: km 6.577 to Ch: m 6546.26 S.D.SHARMA Sd/- G.P.Rangarao R.K.KURUVARTI SUNIL DUTT 2. - R2 Location of Gundala Station changed from Ch: m 6655.70 to Ch: m 6616.26 1. - R1 Contract package boundary marked at Ch:-km 6.577 NO. DATE REV.NO. DESCRIPTION APP. NO.:- SHEET NO. SHEET SIZE DATE:- REV:- SCALE:- 10m 00m 10m 20m 30m 40m 50m 23.03.2015 R3 DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 10 OF 19 A2
LIFT PANDIT NEHRU BUS TERMINAL BEST PRICE L E G E N D DETAILS SHOWN IN TENDER ARE TENTATIVE AND MAY CHANGE DURING DETAILED DESIGN. REVISIONS DELHI METRO RAIL CORPORATION LTD. Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-110001 TITLE:- GENERAL ALIGNMENT FOR VIJAYAWADA METRO PROJECT ( PANDIT NEHRU BUS TERMINAL TO NIDAMANURU ) APPROVED BY :- DESIGNED BY:- 3. 07/12/2015 R3 Contract package boundary of AMCC-02 changed from Ch:-km 1.338 to Ch: m 1458.300 S.D.SHARMA Sd/- G.P.Rangarao R.K.KURUVARTI SUNIL DUTT 2. - R2 Right side (facing towards increasing chainage) entry/exit shifted slightly. DATE:- 23.03.2015 REV:- R3 SCALE:- 10m 00m 10m 20m 30m 40m 50m 1. - R1 Contract package boundary of AMCC-02 marked at Ch:-km 1.388 NO. DATE REV.NO. DESCRIPTION APP. NO.:- DMRC/DBD/CORR-2/PNBT-BP/GAD/2015 SHEET NO. 3 OF 19 SHEET SIZE A2