Annual CCR Fugitive Dust Report. TS Power Plant. Eureka County, Nevada

Similar documents
FUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK. PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York

40 CFR Part 257. Rollin M. Schahfer Generating Station

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

I. Site Name and Location

I. Site Name and Location

CCR RULE FUGITIVE DUST CONTROL PLAN

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

Alma Offsite Landfill Phase IV S2180 State Hwy 35 Alma, Wisconsin

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

Good Neighbor Agreement, Section Annual Report ESCO Corporation, Portland, Oregon Calendar Year 2013

David Miller, P.E.- Atlanta. The New Coal Ash Regulations Wednesday, May 6, 2015

A Guide to Navigating EPA s Final CCR Rule

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Concrete Waste Management

APPENDIXG FUGITIVE DUST CONTROL PLAN

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

Written Post-Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado

INITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc.

August 6, James McClung, Owner JM Oilfield Services 4 Melody Lane Quitman, AR RE: Complaint. Dear Mr. McClung:

(1) Adequately wet asbestos-containing waste material as follows by doing all of the following:

Annual Inspection Report

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION REGION 1 50 CIRCLE ROAD STONY BROOK, NY 11790

Particulate Matter Rules Update BAAQMD BACWA Meeting

DUST CONTROL AND LOADING SYSTEMS INC. LOADING SYSTEMS

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc.

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO

Lansing Generating Station Project No Closure Plan for Existing CCR Revision: 1 TABLE OF CONTENTS

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

Whiting Metals, LLC 2230 Indianapolis Boulevard Hammond, Indiana 46394

Closure Plan Brame Fly Ash Pond

ENERGY SOURCE ESI. A Newsletter published by. The Steam and Power SPECIAL FORCES

SUBPART OOO Check-OFF FORM July 11, 2005

Refuse-to-Energy Facility

Department of Public Health Proposed Rules and Regulations for the Handling and Storage of Bulk Material Piles (Proposed December 19, 2013)

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY

August 18, Mr. Randy Woolard General Manager IE Furniture, Inc Ball Park Road Thomasville, NC 27360

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

VIRIDOR WASTE MANAGEMENT LIMITED. Lostock Waste Treatment Plant. Airborne Pollutant Management Plan. November 2009

Proposed EPA Regulations Changing the Coal Power Generation Industry

FUGITIVE DUST CONTROL GUIDELINES BEST MANAGEMENT PRACTICES CONFINED BEEF CATTLE FEEDING OPERATIONS

Current Regulatory Issues Impacting the Appalachian Basin. Gary E. Slagel Steptoe & Johnson PLLC October, 2014

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN:

TECHNICAL SUPPORT DOCUMENT (TSD) August, Mailing Address P.O. Box 35130, Tucson, AZ

Niagara Falls Storage Site Safety Measures During Remediation

Dust Recovery Collector Systems. University of Iowa Iowa City, IA. Considerations for NAAQS & NFPA Compliance

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C (E)(10)} Yearly Cover Sheet (Form 1)

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Initial Closure Plan Slag Pond. Nelson Dewey Generating Station. Wisconsin Power and Light Company. Prepared for:

Construction Environment Management Plan

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

6.1 Introduction to Wastewater Issues

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT

Proposed EPA Regulations Changing the Coal Power Generation Industry

IAC/MHC EPC CORE COMPETENCIES PRESENTATION. Innovation. Service. Product Excellence.

STATEMENT OF BASIS. NAICS Description: All Other Miscellaneous Chemical Product and Preparation Manufacturing NAICS Code:

Powered Industrial Trucks Safety Checklist

Comments on Draft Permit #12-POY-079. FTS International Proppants, LLC. Acadia, Trempealeau, Wisconsin. March 15, 2013

Executive Summary. Consistent with Schedule 3 of the Environmental Assessment Act, IWM is submitting for evaluation this registration document.

Vehicle Service Facilities

Bulk Bag Unloader Installation, Operation and Maintenance Manual

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Groundwater Monitoring Requirements of the CCR Rule What s Next?

Environmental Management Plan Checklist and Format

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

Final Transportation and Consolidation Plan Non-Public Properties Newhall Street Neighborhood Site Hamden, Connecticut

Environmental Standard Operating Procedure Originating Office: Natural Resources and Environmental Affairs Office

Parking Area Maintenance

MODULE 14: Off-site Transport and Storage of Healthcare Waste

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

The Future of Coal Ash

Safe Handling of Pesticides. Presented by Dr. H. B. Singh

NORTH AMERICAN Precast Concrete Sustainable Plant Program

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT

On-Line Carbon in Ash System at PPL Montour for Increasing Ash Sales

Statement of Basis. for Ash Grove Cement Company, Inc.

MAJOR SOURCE OPERATING PERMIT

CITY OF DURHAM, NORTH CAROLINA MEMORANDUM. October 16, Cecil Brown, Senior Assistant City Manager Fred Ravin, Director of Solid Waste Management

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Managing Solid Waste Facilities to Prevent Odor Connecticut Avenue, NW Suite 300 Washington, DC

OMT Asphalt Plant Inspection Checklist

SSPC. QP2 Audit Evaluation Checklist. Contractor: Location: Date: Type of Audit: Auditor:

NSPS OOOOa Fugitive Emissions Requirements

COAL COMBUSTION PRODUCTS (CCPs): OPPORTUNITIES FOR EXPANDED USE IN THE MINING INDUSTRY

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760)

Environmental Management Programme (EMP)

PRIMARY OR ALTERNATIVE OPERATING SCENARIO

Eurobitume UK. Site Inspection for Delivery of Bitumen

2017 Annual Inspection Report

Fumigation Management Plan

Fumigation Management Plan Methyl Bromide

Annual Inspection Report Lawrence Energy Center

Transcription:

Annual CCR Fugitive Dust Report TS Power Plant Eureka County, Nevada November 16, 2016 Prepared by: Dennis Laybourn Senior Environmental Manager Newmont Nevada Energy Investment - TS Power Plant 450 TS Power Plant Road Battle Mountain, NV 89820 1.0 Introduction Newmont Nevada Energy owns and operates the TS Power Plant (TSPP), a coal-fired electrical generating facility located in Eureka County, Nevada. The TS Power Plant facility includes an ash landfill to accommodate the dry disposal of coal combustion residue (CCR). As such, TSPP is subject to the provisions of the 2015 Coal Combustion Residuals Rule (40CFR 257.8). The CCR Rule established national minimum criteria for CCR landfills, including: location restrictions, design and operating criteria, groundwater monitoring and corrective action, closure requirements and post-closure care, and recordkeeping, notification, and internet posting requirements. One of the requirements of the CCR Rule is for facilities to develop a Fugitive Dust Control Plan (Plan) to document procedures that are undertaken at the facility to minimize CCR from becoming airborne ( 257.80). TSPP completed the Plan, obtained certification from a Professional Engineer that the plan met the requirement of the CCR Rule and uploaded the Plan Annual CCR Fugitive Dust Control Report Page 1

to the TSPP publically available website in October 2015. The Plan included procedures related to: Management of CCR from the combustion process to temporary storage in silo s or impoundments near the TSPP boiler building. Management of CCR during transfer from fly ash storage silo to dry bulk tractor trailer for transport off- site Management of CCR during transfer from the fly ash storage silo to haul truck for transport to TSPP ash landfill. Management of CCR during transport to TSPP ash landfill Management of CCR during and after disposal at TSPP at TS Power Plant Documentation of any citizen complaints, corrective action, and follow-up engagement The CCR Rule requires that the owner or operator of a CCR unit prepare an annual CCR Fugitive Dust Control Report the will (1) describe actions taken by the facility to control CCR fugitive dust, (2) document citizen complaints during the previous 12 months with associated corrective actions, and (3) evaluate procedures to control CCR fugitive dust at the facility. This document represents the initial Fugitive Dust Control Report for TSPP. 2.0 Operations Summary Operations at TSPP during the previous 12 months period (Nov. 1, 2015 Oct. 31, 2016) was characterized by low to mid load operation, that resulted in the reduced generation of CCR. During the period, approximately 30,000 tons of fly ash was generated from coal combustion. Of this total, approximately 90% was shipped off-site for reuse. The overall potential for fugitive dust during the period was significantly decreased by the low volume of fly ash that was managed on site. The following describes the actions being undertaken to control CCR fugitive dust at TSPP and an evaluation of effectiveness of these actions. Annual CCR Fugitive Dust Control Report Page 2

2.1 Management of CCR from the Combustion Process to Temporary Storage Ash is transported to the CCR landfill, located approximately 0.5 miles north of the plant in open haul trucks with tailgates to minimize spillage. TSPP facility roads, including the landfill haul road, are paved to control fugitive dust. The speed limit along the road is posted and enforced at 10 mph. The road is periodically washed with an on-site water truck to remove incidental spillage from the road surface that could contribute to the generation of fugitive dust. Fly ash collects in bins in the bottom of the bag house compartments and is transported pneumatically to the fly ash silo, an 800-ton capacity silo adjacent to the baghouse. The silo is equipped with a dust collector to prevent the fugitive release of particulates during ash transfer. A vacuum producer located adjacent to the silo drives the pneumatic system for the transport of ash from the baghouse to the storage silo. Procedures that are in place to monitor these activities include: Weekly Inspections of the Fly Ash Silo Bin Vent Filter in accordance with manufacturer s recommendations. Documentation of the inspections is maintained in the TSPP scheduled maintenance records. Monthly visible emission inspection of the Fly Ash silo bin vent filter. If visible emissions are observed, a Method 9 visible emission test is to be conducted. Records are maintained in the TSPP environmental files. Weekly inspections of the vacuum blower filtration system for visible emissions. Quarterly preventive of the vacuum producer and associated dust filters. The procedures that are in place are effective at preventing the generation of airborne emissions of fly ash. No modification of procedures are warranted. Annual CCR Fugitive Dust Control Report Page 3

2.2 Management of CCR during Transfer from Fly Ash Storage Silo to Bulk Tractor Trailer for Transport Off- Site During loading, the trailers are pulled into the truck loading bay, and an extendible dry unloading chute is fitted to one of the hatches of the trailer. A return airline in the chute creates a negative pressure in the trailer and forms a vacuum seal between the unloading chute and the trailer. This permits the loading of bulk trailers with virtually no fugitive particulate emissions. Trained site personnel make the connections of the unloading chute to the truck, initiate the truck loading operation and retract the chute when loading has been completed. A checklist has been developed that guides the process in a step-by-step format and ensures the truck loading operation is conducted in a safe manner without the release of fugitive emissions. The checklist requires a documented visible emission observation during the loading process and instructs the operator to stop loading operations and contact plant maintenance personnel if visible emissions are present. The checklist is completed for every load and kept on file in the plant operations files. TSPP policy is that all hatches on the trailers are closed and latched prior to loads of ash leaving the site. The bulk trailers are equipped for pneumatic unloading, so there is no potential for release of ash from leaking bottom hatches. The procedures that are in place are effective at preventing the generation of airborne emissions of fly ash from the transfer activities. No modification of procedures are warranted. 2.3 Management of CCR during Transfer from Fly ash Storage Silo to Haul Truck for Transport to CCR Landfill. Ash is removed from the bottom of the silo to a 20-ton articulated dump truck pulled into the truck loading bay. All ash unloaded in this manner passes through a mixing device, called a pug mill, that mixes the ash with water before it is discharged to the truck. The addition of water in the pug mill conditions the ash, producing an agglomerated, wetted ash for transport. The conditioned ash drops from the pug mill through a shroud to the haul truck. The shroud acts as a wind barrier to prevent exposure of the fly ash to wind Annual CCR Fugitive Dust Control Report Page 4

during silo unloading to trucks. When properly operated, the silo unloading process is free of fugitive dust. All operators are trained in the operation of pug mill to properly condition the fly ash to minimize the potential for fugitive dust during transport. This is done largely by observation and making adjustments to ash unloading rates or water addition rates to ensure the proper consistency of the conditioned fly ash. A Fly Ash Storage Silo Wet Unloading Operating Procedure has been developed and is posted in the pug mill area to guide operations. The monitoring of ash during unloading includes monthly visible emission observations to ensure the process is working properly and fugitive dust is not being generated. Records are maintained in the TSPP environmental files. The procedures that are in place are effective at preventing the generation of fugitive emissions of fly ash from the transfer activities. No modification of procedures are warranted. 2.4 Management of CCR during Transport to TS Power Plant CCR landfill Ash is transported to the landfill, located approximately 0.5 miles north of the plant in open haul trucks with tailgates to minimize spillage. The conditioned fly ash is in a damp, agglomerated state that does not contribute to fugitive dust during transport. TS Power Plant facility roads, including the landfill haul road, are paved to control fugitive dust. The speed limit along the road is posted and enforced at 10 mph. The road is periodically washed with an on-site water truck to remove incidental spillage from the road surface that could contribute to the generation of fugitive dust. The procedures that are in place are effective at preventing the generation of fugitive emissions of fly ash from the transport activities. No modification of the existing procedures are warranted. Annual CCR Fugitive Dust Control Report Page 5

2.5 Management of CCR During and After Disposal at TS Power Plant at TS Power Plant Fly Ash is end dumped from the haul truck in an active area of the landfill and periodically dozed into position. As a result of conditioning, the ash maintains a damp consistency and does not generate fugitive dust during disposal. Due to the self-cementing character of the conditioned ash, a surface crust forms on the ash which stabilizes the material and reduces the potential for fugitive dust generation. Following disposal, the crust continues to form as a result of periodic rain fall events. To prevent the disruption of the crust, vehicle activities are limited to active areas of the landfill that are designated by boundary markers. This is an effective method for maintaining the integrity of the crust. If fugitive dust becomes an issue at the landfill, operations personnel apply water from an on-site water truck as a dust control measure. The procedures that are in place are effective at preventing the generation of fugitive emissions of fly ash from the transfer activities. No modification of procedures are warranted. 3.0 Citizen Complaints During Previous Twelve Months Any citizen complaints regarding fugitive dust at TSPP are handled in accordance to with an Issues and Concerns Management, and Resolution Procedure developed and implemented by Newmont s External Relations Department. The procedure is applicable to all Newmont Nevada sites, including TSPP. Complaints and concerns may be received in verbal or written format directed to: the TS Power Plant, Newmont External Relations representatives or other personnel in nearby communities, and the Newmont North American Regional Offices. In order to ensure any complaints are properly documented and addressed, recipients fill out and submit an External Relations Opportunity/Issues form which is submitted electronically to the assigned External Relations Representative (ERR) for the site. The ERR enters the information into StakeTracker stakeholder management software; a tracking system to document community concerns, followup activities and corrective actions. Annual CCR Fugitive Dust Control Report Page 6

Once entered into the system, procedures include: ERR acknowledges receipt of the concern with the complainant with three (3) business days and describes the process to be undertaken to resolve the complaint. Appropriate corrective actions will be determined and undertaken at TS Power Plant to modify procedures as appropriate to resolve fugitive dust issues. ERR will discuss corrective actions with complainant to close the issue. During the previous 12 month period, no citizen complaints were received regarding fugitive dust from the TSPP CCR landfill. Therefore, a program of corrective actions was not required. 4.0 Summary TSPP has prepared a CCR Fugitive Dust Control Plan (Oct. 2016) that documents procedures to control fugitive dust during the generation, transport and landfill disposal of CCR. These procedures have proven effective at controlling fugitive dust at TSPP. During the previous 12 month period, there were no issues regarding fugitive dust generation from CCR related activities. There were no corrective actions and no modifications to the existing plan are warranted. During the period, there were no documented citizen complaints regarding fugitive dust from the CCR landfill. Annual CCR Fugitive Dust Control Report Page 7