Green Procurement Standard

Similar documents
NEC GREEN PROCUREMENT GUIDELINES (FOR SUPPLIERS) Ver. 5

GREEN PROCUREMENT GUIDELINES

GREEN PROCUREMENT GUIDELINE

KANSUI (Ver. 2)

COMMISSION DELEGATED DIRECTIVE (EU).../ of XXX

Green Procurement Guidelines

YANMAR GROUP Green Procurement Guideline Septemnber 2016 (5th Edition)

Nitto Group. Green Procurement Standards

Fuji Electric. (Edition 5.0) Green Procurement Guideline. April Fuji Electric Co., Ltd.

Omron Group Green Procurement Standards

Revised : June 1, 2016 Revised : August 24, 2006 First edition : September 21,2000 DENSO GROUPE. June 2016 DENSO CORPORATION

Green Accreditation Guideline

Aluminum Electrolytic Capacitors

Subject: China RoHS Presented By: Homi Ahmadi Venue: IEEE- PSES-Orange County, CA Date: January 2008

Normative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products

Unfolding our Environmental Promise. Everywhere You Live and Work

Nikon Green Procurement Standards

NTT DOCOMO Guidelines for Green Procurement

-Toward realization of sustainable development of society -

NSK Group Green Procurement Standard

The Green Procurement Guideline

Intel Non-CPU Component Products IEEE (EPEAT) Declaration

Guidelines for the Management of Chemical Substances in Products

Dell s Chemical Use Policy

Certificate of non-use of The Controlled Substances

YKK BANGLADESH PTE. LTD.

Green Procurement Guidelines

China RoHS an overview. Version 7 August zdeclaration. zrestriction. zdifferences to EU RoHS. zpackaging. Web:

Valmet guidance on restricted materials in products 1/8

European Packaging Legislation and Packaging Waste Recovery

Policy on CSR Activities

China RoHS Overview. inemi Life after EU RoHS Forum Chicago, IL Sept. 28, Tom Valliere, Sr. Vice President Design Chain Associates, LLC

Green Procurement Guidelines

COMMISSION DELEGATED DIRECTIVE../ /EU. of XXX

Green Label Product Fluorescent lamps (TGL 2- R4 15)

GUIDE FOR PROCUREMENT OF ENVIRONMENTALLY PREFERRED PRODUCTS/SERVICES

Semiconductor Operations. TI Customer Material Specification (Controlled Chemicals and Materials)

Pioneer Group Environmental Substance Report Manual

IECQ PUBLICATION QC IEC Quality Assessment System for Electronic Components (IECQ System)

Maruti Suzuki Green Policy Maruti Suzuki Green Procurement Guideline

PFU Group Green Procurement Direction

Green Label Product Products made from rubberwood

REACH and RoHS updates for EU and Asia Pacific countries Mike McNally Antea Group

FrelTec GmbH. Shielded SMD Power Inductors

HONG KONG GREEN BUILDING COUNCIL

FrelTec GmbH. Multi-Layer Power Inductor SMD

COMPLEMENT. RoHS PRODUCTS. Prepared by: Karin Medeiros Verified by: Natália Silva. Approved by: Mariano Mercado Approval Date: 15/01/2016

UL 110 Standard for Sustainability for Mobile Phones Verification Requirements

Welcome to ChaseWarner Waste Management

1. General regulations

European Machinery Directive 2006/42/EC & Related Directives

Green Procurement Guideline

Omron Green Procurement Standards

NARROW PITCH (0.4mm) CONNECTORS P4S SERIES

NTT Guidelines for Green Procurement

Report by the Committee on the Regulation of Food Utensils, Containers and Packaging

The challenge: Videojet advantage:

HONG KONG GREEN BUILDING COUNCIL

Statement of RoHS Exemption. In the Directive 2002/95/EC of the European Parliament and of the Council of 27 January 2003, Article 5 (b) states:

TOYOTA. Green Purchasing Guidelines. Toyota Motor Corporation. January 2016

RoHS & Related Initiatives

FrelTec GmbH. SMD Shielded Power Inductors

NS Green Procurement Guidelines NIPPON SEIKI CO., LTD.

EPEAT CONFORMITY ASSESSMENT PROTOCOLS 4.8 Packaging

The Ericsson lists of banned and restricted substances

EcoLeaf Environmental Label Product Category Rules (PCR)

3M Pin Strip Header 2 mm and 2 mm x 2 mm Straight, Surface Mount 951 Series

Measures for Administration of the Pollution Control of Electronic Information Products

PRODUCT HSE: Clauses HSE Technological purchase

Understanding RoHS What it Means to U.S. Manufacturers

3M Card Connector SD Normal Polarization, Push-Push, Surfacemount SD Series

FURUKAWA ELECTRIC TAPE FOR ELECTRICAL USES

Green Product Certification A boon for global green building movement

SUPPLIER QUALITY CODES

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods

Eastman AdapT technical services sample kit procedure

The List of Environment-Related Substances

M{zd{ Green Purchasing Guideline

Please understand that poor results from green procurement assessment may lead to shrinkage or termination of business with the subject suppliers.

Recommendation for Handling and Assembly of Infineon Hallsensor PG-SSO Packages

Border Control Activities for Enforcement of the Basel Convention

Supplier Quality Requirements Q Clauses

Environmental criteria for sustainable public procurement of. Workwear. Version March 2017

End of Life Plan. for Kodak i5000 Series. Scanners

Implementing a RoHS Compliance Assurance System (CAS) Utilizing IPC 1752

SMT Green Procurement Guideline

Lead-Free Inspection Methods. Tom Perrett Marketing Manager Soldertec & Keith Bryant European Sales Manager Dage Precision Industries

Supplier Quality Agreement

Appendix W: Solid and Hazardous Waste

UPPLIER ANUAL. Issued: 01 Aug 13

End of Life Plan for. Kodak i4200 and i4600 Scanners

Revision of the European Ecolabel Criteria for: WOOD-, CORK-, AND BAMBOO-BASED FLOOR COVERINGS

Contributing to society, industry and people s livelihoods through leading-edge technologies and superior services

TWG 2016 in Rosslyn, VA

Green Procurement Guideline

Quality System Document DOC #

01 For more information, please contact your local UL field representative. UL Traceability Requirements

Plastic Products Version 2.9 Certification Criteria

NATIONAL REGULATION AND BORDER CONTROL ACTIVITIES IN THAILAND

UL Traceability Requirements

Transcription:

azbil Group Green Procurement Standard For Suppliers Third Edition: March, 2015 AGS-541A-006 Attachment 1 Rev. 3

Table of Contents 1. The azbil Group s Position on Green Procurement 2. Terms and Definitions 3. Procedural Flow Chart 4. Requirements for all Suppliers (Green Procurement Evaluation) 5. Requirements for Packaging Materials 6. Requirements for CMS Materials 7. Related Documents AGS-541A-006 Attachment 1 Rev. 3

1. The azbil Group s Position on Green Procurement The azbil Group considers the environment as an important management issue. The Group Philosophy states that one of the Group s basic goals is to contribute to global environmental preservation, as well as to realize safety, comfort and fulfillment in people s lives by means of human-centered automation. Environmental policy is also stated in the Group s conduct guidelines. Accordingly, the Group views contributing to global environmental conservation and establishing a sustainable society by providing customers with environmentally aware products and services to be a pillar of its business activities. Moreover, some chemical substances are regulated by laws and regulations in Japan or overseas. It is the company s duty to provide customers with products that are in compliance with the laws and regulations for chemical substances. In order to achieve the aims outlined above, the azbil Group has defined in the azbil Group Environmental Charter that We prefer to purchase materials and equipment that contribute to reduction of the burden on the environment. In keeping with the Charter, the Group has decided to procure its products from suppliers that give priority to addressing global environmental conservation. Furthermore, the Group has decided to procure materials from suppliers who manage chemical substances so that no substances that are harmful to the environment are contained in the materials. For the purpose of green procurement, the Group has established procedures for evaluation and selection of materials, as well as establishing the items and steps that are necessary in order to maintain environmentally friendly procurement. We therefore ask for your understanding and cooperation. 2. Terms and Definitions This section explains the terms and definitions that are important for green procurement. (1) Material, auxiliary material, and subsidiary material These items are required for manufacturing products. They could also be called parts or raw materials, but as a cover term we use materials. Material Accompanying material Packaging material Material Subsidiary material A generic term that includes accompanying materials and auxiliary materials. Auxiliary material Accompanying material Accompanying materials include the following subsidiary materials : [1] Parts and raw materials: exterior parts, packing materials (cardboard, wood, adhesive tape, cable ties, plastic bags, packing sheets, buffer material, indicator labels, ink, paint, etc.), packaging parts (magazine-stick, reels, trays, carrier tape, bulk cases, etc.), electric components, mechanical parts, semiconductor components, PCBs, etc. Note: packaging materials includes those that are used for procurement of materials and that reach the azbil Group s customers. Example: packaging for AC adapters and communication cables, packaging for products manufactured by sub-contractors, packaging and wooden crates for items purchased by factories, etc. [2] Assembly parts: functional units, module units, PCB assembly units, etc. [3] Accessories: accessory parts for using equipment (AC adapters, remote controllers, power supply cables, etc.) [4] Subsidiary materials: adhesive agent, soldering material, adhesive tape, caulking agent, welding material, filler and other materials used for assembling products. [5] Instruction and installation manuals [6] Repair service kit AGS-541A-006 Attachment 1, Rev. 3 3

Auxiliary material Materials that are used in the manufacturing process and do not normally remain in products, such as cleaning agents, mold release agents, cutting fluid, lubricating oil for press work, etc. In our chemical-substances management system these are subject to restriction. Make sure that these are not confused with the subsidiary materials listed in [4] above. (2) Chemical-substances management system (CMS) This term reflects the azbil Group s stance with regard to managing and restricting chemical substances related to products. CMS is an abbreviation for Chemical-substances Management System. This is the system for managing the entire supply chain of materials used for products, order to prevent admixture and contamination of hazardous chemical substances. Chemical substances subject to this management system are not only those that are to be contained in materials but also those that are to be contained in auxiliary materials to be used for production of materials. The system runs the plan-do-check-act (PDCA) cycle of policy-making, planning, implementation and operation, auditing, management review, and policy-making again, aiming at improvements in a planned manner. Materials that are recognized by the azbil Group as subject to management under the CMS are called CMS materials and the suppliers who deliver those materials to the azbil Group are called CMS suppliers. Methods of certification involved in auditing, etc., are defined in azbil Group Guidelines for the Establishment of a Chemical Substances Management System. Materials other than the above CMS certified materials are called general materials, and suppliers other than the above CMS suppliers are called general suppliers. (3) Contained, impurity Contained: this refers to the inclusion of any chemical substance as a component part or ingredient in a material. Chemical substances may be contained in residue from the manufacturing process (solvent, mold release agent, cutting fluid, etc.) and in residual impurities. In other words, this refers to any chemical substance added to, contained in, or attached to the parts and units comprising the products or raw materials used therein, whether intentionally or otherwise. It includes cases where those substances are unintentionally contained or attached to products somewhere in the manufacturing process. Therefore, this refers to a condition in which such a substance remains with the product at the end of the manufacturing process. Impurity: a naturally-derived substance that is contained in a material and cannot be technically removed by a material manufacturer in its purification process for its material production process. Also, a substance that is produced in a synthetic reaction and that cannot be removed completely for technological reasons. (4) RoHS compliance These specifications ensure that the amount of 6 substances (mercury, lead, cadmium, hexavalent chromium, PBB and PBDE) restricted by the EU s RoHS Directive 1 should not exceed the defined limits. Items that comply with the specifications are used as RoHS-compliant materials and products. (5) Designated chemical substances Chemical substances that are subject to restriction and management other than RoHS compliance are designated upon 1 Directive 2011/65/EU of the European Parliament and of the Council of 8 June 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment AGS-541A-006 Attachment 1, Rev. 3 4

request by the corporate units procuring them. (6) Content limit For designated substances, this is the maximum allowable amount of the substance that a product can contain. 3. Procedural Flow Chart The flow chart below summarizes the green procurement procedure for our suppliers. This procedure is implemented based on the category of material purchased from the supplier: CMS certified suppliers: suppliers who deliver CMS certified materials Packaging materials suppliers: suppliers who deliver packaging materials. General suppliers These categories may overlap. Figure 1.1. Summary of green procurement procedure for suppliers For more information on the following, refer to the specified section. Green procurement evaluation: Section 4 Requirements for packaging materials: Section 5 Requirements for CMS materials: Section 6 AGS-541A-006 Attachment 1, Rev. 3 5

4. Requirements for all Suppliers (Green Procurement Evaluation) As shown in Figure 1.1, all suppliers are required to submit a Green Procurement Evaluation Sheet concerning their environmental conservation activities and results. Suppliers are evaluated for their environmental activities to check whether they meet specific requirements for their activities. If the evaluation determines that a supplier does not satisfy the requirements, the supplier is required to improve its environmental conservation efforts or to receive assistance from us. 4.1 Evaluation procedure Suppliers are evaluated by an azbil Group procurement department using the azbil Group Green Procurement Evaluation Sheet (Form 1). (1) Request We send the azbil Group Green Procurement Evaluation Sheet to suppliers and ask for self-evaluation. Any new supplier is given an explanation regarding the evaluation procedure beforehand. (2) Evaluation and judgment Table 4.1. Evaluation and score Efforts to obtain ISO 14001, etc. Evaluation (Any one item on the right, criteria max. points: 70) (max. points: 100) Evaluation on materials (Max. points: 30) Score ISO 14001 certification Points: 70 Current action to obtain ISO 14001 Points: 65 Other EMS-related certification Points: 65 Other EMS-related system in progress Points: 60 Voluntary actions for environmental conservation (12 items: 5 points each) Points: Up to 60 Environmentally friendly product design Points: 10 Resource saving for products and packaging, chemical substances management Points: Up to 20 (4 items, 5 points each) 70 points or more A 50 69 points B 50 points or less C Note: A new business requires a B or higher score as a condition for business. (3) Evaluation results and following actions If the evaluation is successful, the supplier must observe the following requirements for materials delivered. Requirements for packaging materials: Refer to Section 5. Supplier delivering general materials: There are no further requirements. Requirements for CMS certified materials: Refer to Section 6. (Suppliers of packaging materials may be CMS suppliers.) AGS-541A-006 Attachment 1, Rev. 3 6

If the evaluation is not successful, the supplier is requested to do one of the following. Environmental conservation activities Obtain an externally certified management system as described in 4.2, or receive Azbil Eco Program (AEP) support provided by the azbil Group. Action determined by the individual business unit (termination of business, restriction of business, or setting of a grace period) If the supplier cannot do either of the above, or cannot do them successfully, the procedure defined by the individual business unit will be followed. 4.2 Evaluation For suppliers environmental preservation activities, the following evaluation procedure is used. The evaluation has two parts. (1) Survey of efforts to implement an environmental management system (EMS) If the supplier is targeting a management system equivalent to ISO, the supplier should provide information on the certified management system. Environmental management systems based on ISO 14001 - Environmental Activities Evaluation Program (Eco Action 21) promoted by Ministry of the Environment - Kyoto Environmental Management System Standard (KES) - Azbil Eco Program (AEP), etc. Suppliers making voluntary efforts will be surveyed on the following. - 3R actions (reduce, reuse, recycle), waste reduction, energy efficiency, etc. (2) Survey of environmental concern in product development Products will be surveyed for environmental awareness in the following. Conservation of resources and energy, management of chemical substances, conservation of materials in product packaging, management of chemical substances in packaging materials 4.3 Evaluation updates Green procurement evaluation is done once every 3 years in principle to check for any changes in suppliers environmental activities. However, evaluation is also performed every time suppliers obtain another certification or update such facilities as may have significant impact on the environment, as well as on other occasions. 4.4 Azbil Eco-Program (AEP) AEP is the azbil Group s own program, which is equivalent to the Environmental Activities Evaluation Program (Eco Action 21) promoted by Ministry of the Environment (with modifications), aimed at smoothing the path of environmental action as a preliminary step before ISO 14001 certification or Eco Action efforts. This program is for suppliers that were not able to meet the requirements of the evaluation described in 4.1, and is implemented upon their request. Nevertheless, suppliers that have been implementing AEP for a certain period are advised to take further action to implement Eco Action 21 or obtain ISO 14001 certification or other third-party certification. For details, refer to Azbil Eco Program Guidelines. Contact a procurement department for the guidelines. AGS-541A-006 Attachment 1, Rev. 3 7

5. Requirements for Packaging Materials Suppliers who deliver materials to be used for packaging azbil Group products must agree to the Agreement on Chemical Substances Contained in Procured Products (Form 3). For details, refer to the attached Requirements for managing packaging materials for the azbil Group. 6. Requirements for CMS Materials (For CMS, refer to section 2 above, Terms and definitions, (2).) Suppliers who supply CMS items must first sign the Agreement on Chemical Substances Contained in Procured Products (Form 3). For details, refer to The azbil Group s Guidelines for Establishment of Chemical Substances Management System. The Memorandum of understanding regarding chemical substances contained in materials to be delivered to the azbil Group is the same document for packaging materials, and therefore is not needed again if it has already been signed for packaging materials. 6.1 Survey on chemical substances contained in products We sometimes may ask suppliers to submit data on the content of chemical substances that are restricted by the azbil Group. 7. Related Documents Attachment No. Attachment 2 Attachment 3 Related document name azbil Group Guidelines for the Establishment of a Chemical Substances Management System azbil Group Requirements for Managing Packaging Materials Form No. Form 1 Form 3 Form name azbil Group Green Procurement Evaluation Sheet Agreement on Chemical Substances Contained in Procured Products End AGS-541A-006 Attachment 1, Rev. 3 8

Contact: For inquiries, contact Azbil Corporation or an azbil Group procurement department. 2008 2015 Azbil Corporation All RIGHTS RESERVED. AGS-541A-006 Attachment 1, Rev. 3 9

Azbil Corporation / The azbil Group Third Edition: March, 2015 AGS-541A-006 Attachment 1, Rev. 3