GWINNETT COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT

Similar documents
Building/Zoning Permit Fee Structure

SCHEDULE B RESIDENTIAL BUILDING FEES

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Medina County Building Department

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

TOWN OF CHEEKTOWAGA BUILDING PERMIT FEE SCHEDULE

City of Jacksonville Development Guide Building Permits

Construction Application for Permit (CAP) Instructions

RESIDENTIAL CONSTRUCTION PERMIT FEES

37101 Newark Boulevard, Newark, CA Fax Revised 3/2016

The following is required for a complete permit submittal for each unit.

Application Requirements for obtaining a Building Permit

BUILDING INSPECTIONS 215 W HICKORY ST DENTON, TEXAS PHONE FAX. PERMIT AND FEE SCHEDULE (Effective October 1, 2016)

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

Plan Review, Permit & Inspection Fees Schedule

2015 IBC Chapters 1 and 35

The Town of Dennis. Building Department Fee Schedule FY2014

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

b. Nonfixed and movable fixtures, cases, racks, counters and partitions not over five (5) feet nine (9) inches high.

FOR THE SELF-CERTIFICATION PERMIT PROGRAM ISSUED BY THE DEPARTMENT OF BUILDINGS

The following materials and documents are required in order for you to obtain a Building Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

General Commercial Energy Provisions

Permit Fee Schedule from Fee Ordinance

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

CITY OF SOUTH GATE SCHEDULE OF FEES APPROVED

The following is required for a complete permit submittal for each unit.

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

ORDINANCE #16- PROPOSED ORDINANCE #16-14

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

START RIGHT A G U I D E T O L + I S E R V I C E S

RESIDENTIAL FIRE SERVICE METERS Addendum #1

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

SITE DEVELOPMENT PLAN

City of Centerville Building, Zoning & Code Enforcement Department

CITY OF BERKLEY, MICHIGAN FENCE APPLICATION

STATE UNIVERSITY CONSTRUCTION FUND

Residential Building Permit Application

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES

RESIDENTIAL BUILDING PERMIT PROCEDURES

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

BUILDING CODES & DESIGN CRITERIA

Dave Harper, Building Official (509) Susan Davis, Administrative Secretary (509)

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

WARWICK TOWNSHIP Dept. of Planning & Zoning

COMMUNITY DEVELOPMENT

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

RESIDENTIAL BUILDING PERMIT

Chapter 2 ADMINISTRATIVE PROCEDURES

A Guide to Building Permits for Home Owners / Renovators

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

Cass County Soil Erosion & Sedimentation Control Program

PROCEDURE FOR REQUESTING A BUILDING PERMIT

Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

THE CONSTRUCTION SUPERVISOR

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

Short title. This chapter may be cited as the "Kern County Building Code."

City of Donnelly. Permit Application Information and Instructions

ADMINISTRATION CHAPTER 1

Commercial Permit Process

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

Civic Address (Street No. & Name):

City of Altamonte Springs Developer s Guide

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

B U I L D I N G P E R M I T A P P L I C A T I O N

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

Bureau Policy for Tent Permit

WE MUST HAVE 72 HOURS NOTICE. Phone

Last Updated March 15, 2016

TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR DECKS

Adopted Building Codes, Ordinances, and Applicable Regulations

LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

CITY OF COEUR D'ALENE Residential Permit Application

CODE COMPLIANCE PLAN REVIEW PROCEDURES

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

CEQA Categorical Exemption Determination

PIKES PEAK REGIONAL BUILDING DEPARTMENT

COMMERCIAL PLAN REVIEW CHECKLIST

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Westmoreland County, Virginia LAND USE ADMINISTRATION. PO Box 1000 Montross, VA

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

TOWN OF BEDFORD BUILDING DEPARTMENT 55 CONSTITUTION DR. BEDFORD, NH FEES, POLICIES & REQUIREMENTS CURRENT CODES

Property Address: Builder: Phone #: Address:

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

A/E Design Deliverable Checklist

RESIDENTIAL BUILDING PERMIT CHECKLIST FOR THE CITY OF SANTA ROSA

CEQA Categorical Exemption Determination

BUILDING PERMIT BASICS

BUILDING PERMIT APPLICATION

STORMWATER AND EROSION CONTROL PERMIT

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Transcription:

LAND DEVELOPMENT FEE SUMMARY Permit or Plat Review Land Disturbance Permit Clearing Permit Clearing & Grubbing Permit Grading Permit Timber Harvesting Permit Land Disturbance Renewal Land Disturbance Extension Residential/Non-residential Residential/Non-residential Residential/Non-residential Residential/Non-residential $25/Acre (Minimum ) /Acre (Minimum ) /Acre (Minimum ) $5/Acre (Minimum ) (One 3-month extension prior to expiration) Development Permit Concept Plan + $15/Lot Residential Exemption Plat /Lot + $15/Lot Final Plat $10/Lot or (Minimum 0) $150 +$15/Lot Subdivision Development Permit Concept Plan 0-1 Acre $20/Lot or (Minimum 0) $250 +$15/Lot + $15/Lot $250 Non-Residential 1.01-5 Acres 0 /Acre (Minimum $600) 5.01-10 Acres $750 More than 10 Acres $1,000 Specimen Tree Concept Plan Development Permit Renewal $150 Development, Subdivision Permit Extension Fee $150 Development Permit Plan 50% of Total Resubmittal / Re-review (After 3rd review) Plan Review Fee Major Plan Revision (After Permit Issuance OR Plan Authorization) * For plans approved prior to December 15, 2009 the Plan Revision Fee is based on a percentage of the plan authorization fee Minor Plan Revision (After Permit Issuance OR Plan Authorization) Modification Application 50% of Total Plan Review Fee 20% of Total Plan Review Fee Modification Application Sign Location Permit Wall and Ground Sign $150 per Sign (Plus cost of Building Permit if required) Temporary Sign per Sign Oversized Sign 0 per Sign Sign Permit Renewal $125 per Sign Penalty for any construction/installation prior to Sign Permit issuance * * 100% of the Sign Permit Fee Page 1 of 3 Revised 05/23/2014

LAND DEVELOPMENT FEE SUMMARY Permit or Plat Review Miscellaneous Temporary Outdoor Activity Permit Development Certification Letter per tower for first annual registration Annual Registration of Telecommunication Towers per tower per year for each annual registration thereafter per sign for first annual registration Annual Registration of Oversized Signs per sign per year for each annual registration thereafter Tall Structure Permit Application (Greater than 50 feet in height) Communication Tower Noncommunication Structure; Steeple; Silo; Tall Building Amateur Radio Tower Permitted Use Communication Tower Public Notice Sign Deposit $6,000 $600 $600 $2,000 $150 ( refundable; non-refundable) Variance Applications Single-Family Residential $350 Zoning Variance Multi-Family Residential $450 Application Commercial $700 Single-Family Residential $250 Administrative Variance Multi-Family Residential $350 Application Commercial $600 Application for Appeal of Development Administrative Decisions Waiver Applications Unified Development Ordinance $250 Burial Disturbance Permit (Relocation) Burial Disturbance Permit (Preservation) Burial Disturbance Permits 5 Permits or Less 0 0 + for each More than 5 Permits additional relocation greater than 5, not to exceed $2,500 5 Permits or Less 0 0 + $25 for each More than 5 Permits additional relocation greater than 5, not to exceed $750 Chattahoochee River Corridor Development Certificate Application Fee $150 Inspections First Follow-up Inspection $25 Land Development Permit Second Follow-up Inspection Reinspection Fee Third and each Subsequent Follow-up Inspection Page 2 of 3 Revised 05/23/2014

LAND DEVELOPMENT FEE SUMMARY Permit or Plat Penalty Fees Review Penalty for Site Activity prior to issuance of Permit (Land Disturbance, Development, Utility construction, Grease Trap) 100% of the Permit Fee Page 3 of 3 Revised 05/23/2014

STORMWATER MANAGEMENT FEE SUMMARY Grading Plan Review Erosion Control Plan Review Plan Review Preliminary Plans (3 Phases one charge) Residential Commercial Multi-Family/Commercial Subdivision Residential Commercial Multi-Family/Commercial Subdivision RDP (Residential Drainage Plan) Permit $15 per disturbed acre Stormwater Permit for Emergency Repairs Variances Preliminary Plans Administrative Variance Residential Application Commercial Multi-Family/Commercial Subdivision Soil Erosion, Sedimentation and Pollution Control Variance Application Stormwater Redevelopment Variance Application Variance Application Stream Buffer Protection Variance Variance Application Public Notice Sign Deposit $150 ( refundable; nonrefundable) Page 1 of 1 Revised 05/23/2014

WATER AND SEWER FEE SUMMARY Construction Permits On-site/off-site water: A permit is required for installation of on-site and off-site water systems. A single permit may be purchased if plans for both onsite and off-site systems have been approved and are installed at the same time or a permit for each system can be purchased separately. On-site/off-site sewer: A permit is required for installation of on-site and off-site sewer systems. A single permit may be purchased if plans for both onsite and off-site systems have been approved and are installed at the same time or a permit for each system can be purchased separately. DDC/Backflow: A permit is required for each project that requires the installation of a DDC or backflow device for fire protection or meters 3 and larger where the contractor taps the main and installs the device in a vault. All devices are included on one permit. Pump Station: A utility construction permit is not required for privately maintained pump stations. Force Main: A utility construction permit is not required for privately maintained force mains. Each Fire Hydrant: A permit is required for relocation or addition of one or more fire hydrants on an existing county water main if no other water permit is purchased. Fire hydrant relocation or addition can be included in the construction permit for on-site/off-site water system or DDC permit for the same project. Construction Permit Renewal Manhole Core Inspection Permit Grease Trap Permit: A permit is required for each project in incorporated Gwinnett County that requires the installation of a grease trap if no other sewer permit is purchased. Grease trap installation can be included in the construction permit for on-site/off-site sewer for the same project. Penalty to contractor for working without a construction permit Each Each Each 100% of Applicable Permit Fee Page 1 of 2 Revised 06/25/2012

WATER AND SEWER FEE SUMMARY Plan Review Administrative Variance Application Each Exemption Plat + $15 per lot REVIEW OF CITY Concept Plan + $15 per lot RESIDENTIAL PLAN Subdivision Plan $250 + $15 per lot Final Plat $150 + $15 per lot 0-1 Acre $250 REVIEW OF CITY NON-RESIDENTIAL PLAN 1.01-5 Acres 5.01-10 Acres 0 $750 More than 10 Acres $1,000 Page 2 of 2 Revised 06/25/2012

BUILDING PERMIT FEE SUMMARY ONE & TWO FAMILY DWELLINGS, TOWNHOUSES, AND ACCESSORY STRUCTURES Note: 1. A separate building permit is required for each building, structure, and building/structure addition. 2. The minimum building permit fee is $30. USE NEW CONSTRUCTION RENOVATION / ALTERATION Single-family residence Townhouse Two-family residence (Duplex) Model single-family residence Renovation to convert existing unheated space to heated space $0.25 per square foot of heated floor area (plus $25 for Certificate of Occupancy fee) $0.25 per square foot of heated floor area (plus $25 per unit for Certificate of Occupancy fee) $0.25 per square foot of heated floor area (plus $25 for Certificate of Completion fee) Not Applicable (plus $25 for Certificate of Occupancy fee) (plus $25 per unit for Certificate of Occupancy fee) (plus $25 for Certificate of Completion fee) $0.25 per square foot of heated floor area (plus $25 for Certificate of Occupancy fee) Demolition Swimming Pool Combination of electrical, mechanical, and/or plumbing Exterior Deck Detached garage Electrical only Farm Building Gazebo Landscape Irrigation System Mechanical only Plumbing only Retaining Wall Storage Building Unheated Addition $0.005 x Value of Construction Amount (plus $25 for Certificate of Completion fee) (plus $25 for Certificate of Occupancy fee) (plus $25 for Certificate of Completion fee) (plus $25 for Certificate of Occupancy fee) Mobile Home $75 (plus $25 for Certificate of Occupancy fee) (plus $25 for Certificate of Occupancy fee) Vacant Structure Boarding-Up Permit Registration Fee Permit Fee Page 1 of 2 Revised 05/23/2014

BUILDING PERMIT FEE SUMMARY ONE & TWO FAMILY DWELLINGS, TOWNHOUSES, AND ACCESSORY STRUCTURES Inspections First Follow-up Inspection $25 Second Follow-up Inspection Building Permit Reinspection Fee Third and each Subsequent Follow-up Inspection Code Compliance Inspection Assessment Report Application Fee For One and Two-Family Dwellings Penalty Fees Penalty for Construction prior to Issuance 100% of the Permit Fee of Permit Page 2 of 2 Revised 05/23/2014

BUILDING PERMIT FEE SUMMARY COMMERCIAL AND MULTI-FAMILY CONSTRUCTION New Construction - Permit Fee Per Square Foot IBC OCCUPANCY Complete Shell Spec Space Spec Space Interior Finish Building Only Complete Incomplete Assembly $0.38 $0.17 $0.21 $0.21 $0.11 Business $0.37 $0.17 $0.20 $0.20 $0.10 Education $0.40 $0.17 $0.23 $0.23 $0.12 Factory $0.19 $0.16 $0.03 $0.03 $0.01 Hazardous $0.20 $0.16 $0.04 $0.04 $0.02 Institutional $0.54 $0.17 $0.37 $0.37 $0.19 Mercantile $0.35 $0.17 $0.18 $0.18 $0.09 Residential $0.37 $0.17 $0.20 $0.20 $0.10 Storage $0.19 $0.17 $0.02 $0.02 $0.01 Utility $0.13 $0.10 $0.02 $0.02 $0.01 The Permit Fee shall be based on the square footage under roof of the new construction multiplied by the fee listed above. In addition to the permit fee, a fee of fifty () dollars will be assessed for a Certificate of Occupancy for each Complete Building Permit and each Interior Finish Permit and/or a fee of fifty () dollars will be assessed for a Certificate of Completition for each Shell Only Permit and each Spec Space Permit. Complete Building and Shell Only permits - 50% of the permit fee is due at time of plans submittal for code compliance review. The minimum permit fee is $30. Existing Construction - Renovation or Modification Exterior and Interior ALL OCCUPANCIES Renovation and Modification Renovation and Modification of Existing Construction $0.005 x VALUE OF CONSTRUCTION AMOUNT In addition to the permit fee, a fee of fifty () dollars will be assessed for a Certificate of Occupancy for each Complete Building Permit and each Interior Finish Permit and/or fifty () dollars will be assesed for a Certificate of Completion for each Shell Only Permit and each Spec Space Permit. The Value of Construction shall be the construction cost contract amount plus all architectural and engineering fees. Electrical, Mechanical, or Plumbing Only Permits Electrical, Mechanical, or Plumbing Only Permits $0.006 x VALUE OF CONSTRUCTION AMOUNT (or combination thereof) The Value of Construction shall be the construction cost contract amount plus all architectural and engineering fees. Revisions NUMBER OF REVISED DRAWINGS Permit Fee plus $0.005 x any additional 1 to 10 Revised Plan Sheets VALUE OF CONSTRUCTION plus $0.005 x any additional More than 10 Revised Plan Sheets VALUE OF CONSTRUCTION Page 1 of 2 Revised 05/23/2014

BUILDING PERMIT FEE SUMMARY COMMERCIAL AND MULTI-FAMILY CONSTRUCTION Variance Construction and Life Safety Codes Variance Application Tenant Change Permit Re-Review and/or Re-submittal Plans submitted for review which are not authorized for permit after three (3) reviews shall be assessed a re-review fee of 25% of the total building permit fee. Miscellaneous.00 for Certificate of Occupancy Fee plus, $30.00 Permit Fee Vacant Structure Registration Fee Boarding-Up Permit Building Permit Reinspection Fee Permit Fee Inspections First Follow-up Inspection Second Follow-up Inspection Third and each Subsequent Follow-up Inspection Code Compliance Inspection $25 Assessment Report Application Fee For Commercial Construction 0 Penalty Fees Penalty for Construction Prior to Issuance of a Building Permit 100% of the Building Permit Fee Page 2 of 2 Revised 05/23/2014

FIRE FEE SUMMARY Variances Administrative Variance Application Construction and Life Safety Codes Variance Application Revision Fire Permit Plan Revision Certificates Tenant Buildings Certificate of Occupancy (C.O.) Tenant Interior Space Alterations Tenant Change Certificate of Completion Shell Building (C.C.) Spec Space Temporary Certificate of Occupancy (T.C.O.) Burn Permit Burn Permit 0 Site Site Plan Review Shell Fire Permit Shell Building, New Building, 10,001-30,000 sq. ft. and Additions 30,001-100,000 sq. ft. $0.015 per square foot (Sprinklered) Greater than 100,000 sq. ft. $0.020 per square foot Shell Building, New Building, 10,001-30,000 sq. ft. $450 and Additions 30,001-100,000 sq. ft. $0.023 per square foot (NonSprinklered) Greater than 100,000 sq. ft. $0.030 per square foot Interior Finish Fire Permit Assembly Occupancy (Sprinklered Building) Greater than 10,000 sq. ft. $250 Assembly Occupancy (NonSprinklered Building) Greater than 10,000 sq. ft. $375 Business, Mercantile, DayCare 10,001-25,000 sq. ft. $250 & Educational Occupancy 25,001-50,000 sq. ft. (Sprinklered Building) Greater than 50,000 sq. ft. $400 Business, Mercantile, DayCare 10,001-25,000 sq. ft. $375 & Educational Occupancy 25,001-50,000 sq. ft. $450 (NonSprinklered Building) Greater than 50,000 sq. ft. $600 Page 1 of 3 Revised 06/25/2012

FIRE FEE SUMMARY Industrial and Storage Occupancy (Sprinklered Building) Industrial and Storage Occupancy (NonSprinklered Building) Interior Finish Fire Permit (continued) Up to 30,000 square feet (floor area) 30,001-50,000 sq. ft. 50,001-100,000 sq. ft. $350 Greater than 100,000 sq. ft. $400 Up to 30,000 square feet (floor area) 30,001-50,000 sq. ft. $450 50,001-100,000 sq. ft. $525 Greater than 100,000 sq. ft. $600 Residential Occupancy including Hotel, Lodging/Rooming Houses, Multifamily, Group Homes, Personal Care Homes (Sprinklered Building) 10,001-25,000 sq. ft. Greater than 25,000 sq. ft. $250 Residential Occupancy including Hotel, Lodging/Rooming Houses, Multifamily, Group Homes, Personal Care Homes (NonSprinklered Building) 10,001-25,000 sq. ft. Greater than 25,000 sq. ft. $375 $450 Supplemental Fire Permit NonHigh-Rise, Multi-Storied Buildings - All Occupancies Sprinklered Building NonSprinklered Building $32.00 per floor level $48.00 per floor level High-Rise Buildings - All Occupancies $1,280 Specialty Fire Permit Hazardous Materials-quantities below the exempt amounts $64.00 Hazardous Materials-quantities exceeding the exempt amounts $250.00 Commercial Kitchen Hood/Duct.00 per hood Specialized Fire Extinguishing Systems including FM-200, Intergen, Halon, Carbon Dioxide, Dry Chemical, Water- Foam, and Water-Mist 0-10 Devices $128 11-25 Devices $256 26-50 Devices $384 More than 50 Devices $512 Page 2 of 3 Revised 06/25/2012

New Fire Sprinkler System Modifications to Existing Fire Sprinkler System for Tenant Alterations/Additions Fire Reinspection Fee FIRE FEE SUMMARY Specialty Fire Permit (continued) Inspections First Follow-up Inspection Second Follow-up Inspection Third and each Subsequent Follow-up Inspection 10,001-30,000 sq. ft. $224 30,001-75,000 sq. ft. $288 75,001-125,000 sq. ft. $416 125,001-200,000 sq. ft. $576 Greater than 200,000 sq. ft. $768 0-20 Sprinkler Heads $64 21-50 Sprinkler Heads $128 51-100 Sprinkler Heads $192 More than 100 Sprinkler Heads $256 Fire Standpipe System Up to 4 Outlets $64 Each Additional Group of 1-4 Outlets $32 $128 10,001-30,000 sq. ft. $224 New Fire Alarm and Detection 30,001-75,000 sq. ft. $288 System 75,001-125,000 sq. ft. $416 125,001-200,000 sq. ft. $576 Greater than 200,000 sq. ft. $768 Modifications to Existing Fire 0-20 Devices $64 Alarm and Detection System 21-50 Devices $128 for Tenant 51-100 Devices $192 Alterations/Additions More than 100 Devices $256 Fire Sprinkler Pump $250 Fireworks/Pyrotechnics $250 per event Tents and Temporary Structures Up to 500 square feet (floor area) $0 501-12,000 sq. ft. Storage Racks 12,001-20,000 sq. ft. $150 20,001-500,000 sq. ft. Greater than 500,000 sq. ft. 0-20 Sprinkler Heads $64 Storage Racks with In-Rack 21-50 Sprinkler Heads $128 Sprinklers 51-100 Sprinkler Heads $192 More than 100 Sprinkler Heads $256 Penalty Fees $128 $25 Penalty for Construction Prior to Fire Permit Issuance 100% of the Permit Fee Page 3 of 3 Revised 06/25/2012