FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

Similar documents
FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Hind Energy & Coal Beneficiation (India) Ltd.

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

Hind Energy & Coal Beneficiation (India) Ltd.

ZZH/CLAB-KSPCB/04/ Environmental Officer,

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

Paribesh Bhavan, A / 118, Nilakantha Nagar, Unit VIII, Bhubaneswar

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

SINGHAL ENTERPRISES PRIVATE LIMITED

at Sarora Village, Tilda Tehsil, Raipur District, Chhattisgarh in 64 acres of land. Now

Rajasthan State Pollution Control Board

PRE FEASIBILITY REPORT

Himachal Pradesh State Pollution Control Board

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Max. building height (m)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

RAW MATERIALS

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

AMBUJA CEMENTS LIMITED

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

BENEFICIAL USE OF COAL COMBUSTION PRODUCTS AN AMERICAN RECYCLING SUCCESS STORY

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012

Hamm MW Pyrolysis Plant. Integrated Pyrolysis into Power Plant Plant capacity 100,000 t/a Pre-processed Waste Materials

ARC. CEO, Ulla Röttger

Environmental Impact Assessment

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT:

Welcome To Our Exhibition

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA -

The Solution to Pollution is Dilution

RECLAMATION OF COAL MINE VOID

PRE-FEASIBILITY REPORT

Environmental Management Plan

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

PRE FEASIBILITY REPORT

Worldwide Pollution Control Association. August 3-4, 2010

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

EM gravitron rectification sticker installation image on the Smokeless Carbonizer

Performance Analysis of Cement manufacturing Industry

Regulations regarding coal ash utilisation in Europe

Dust Recycling System by the Rotary Hearth Furnace

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

Sustainability for Facilities and Waste Management. Nick Mannie

Presentation on Excellence in Energy Management-2017

API Ispat & Powertech Pvt. Ltd.

N.H. 6 is 50 km away from the proposed plant boundary; in N direction;

Form - IV. (See rule 13) ANNUAL REPORT

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

Excerpt of Thermal Power Guidelines for New Plants

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

KALYANI STEELS LIMITED

Environmental Information Worksheet

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

RATING OF THE STEEL SECTOR. How we did it

KOBELCO Pelletizing System - Contributing to Outstanding Ironmaking Operations

Pelletizing technologies for iron ore

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Green Initiatives at UPL

PROJECT REPORT IRON ORE CRUSHING & SCREENING FACILITIES OF CAPACITY 14,00,000 TPA WITHIN MINING LEASE AREA OF HA AT ARI DONGRI I N D E X

Reducing CO 2 emissions

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

PROJECT FEASIBILITY REPORT

THE AIR QUALITY MANAGEMENT IN WEIHAI

From Wasteland to Green Parkland The West Melbourne Gasworks

Technical Presentation on Spent Pot lining Management & Red Mud

Executive Summary. Ton / day. Iron Ore Barajamda / Banspani area Non coking Coal

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

Waste-2-Energy: Building capacity and gaining public acceptance in Amsterdam

A. INTRODUCTION PREFEASIBILITY REPORT

Managing Iron Ore Fines of Dalli Rajhara For Improvement In Yield

TOTAL WATER MANAGEMENT

STARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY. InCoR Holdings Plc MINING AND METALLURGY. April 2014 REPORT Rev. 00 > Internal ref.

GE 2211 Environmental Science and Engineering Unit I Mineral Resources. M. Subramanian

Circular Pelletizing Technology

Energy Conservation. Work Shop on Knowledge exchange Platform on Best practices in Iron & Steel Industry. By MCJ Energy Engineers Pvt Ltd

2008 New England Kiln Drying Association

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

Refuse-to-Energy Facility

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)

Transcription:

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 i) Name and address of the owner / Occupier ii) Industry category Primary (STC Code) Secondary (SIC Code) PART A : Mr Rahul Mittal Works: Sidiginamola 583138, Ballari tq & dist., Karnataka Correspondence: 17/95, Vishal Nagar Ananthapur Road, Ballari : Large Red iii) Production capacity : Plant: 180,000 tpa Captive Power Plant: 15 MW Iron Ore Beneficiation Plant: 600,000 tpa Pellet Plant: 600,000 tpa iv) Year of establishment : 2004 Production: Product Quantity Produced 2012-13 2013-14 1,72,928.69 T 1,63,985.04 T Captive Power generation 116.50 MU 120.55 MU Iron Ore Beneficiation 1,48,508.00 T Pellet 5,16,870.30 T 3,63,764.00 T

Water consumption in kl / Day: PART B WATER AND RAW MATERIAL CONSUMPTION: Name of the products Plant Pellet Plant Captive Power Plant Iron Ore Beneficiation Plant Process water consumption During the previous financial year Process: 880 klpd Domestic: 10 klpd Gardening: 20 klpd Total: 910 klpd During the current financial year Process: 960 klpd Domestic: 16 klpd Gardening: 30 klpd Total: 1006 klpd Raw Material Consumption: Sl.No Raw material 2012-13 2013-14 1 Iron Ore/fines 7,95,453.390 T 6,90,006.950 T 2 Coal 2,38,226.550 T 2,03,969.500T 3 Bentonite 4,311.700 T 1,579.000T 4 Lime stone 3,499.850T 2,389.170 T 5 HSD & FO (KL) 7,729.84 KL 5,418.19 KL Raw Material Consumption per tonne of product: Name of Unit Captive Power Plant Pellet Name of raw materials* Iron Ore Iron Ore Pellet Coal Limestone Iron Ore fines & beneficiated fines Bentonite Coal Consumption of raw material per unit of Output During the previous financial year (2012-13) During the current financial year (2013-14) 0.98 0.62 0.80 1.13 1.22 1.11 0.02 0.01 Waste gas from Sponge Iron units and two other raw materials i.e coal and dolochar are used. Hence it is not practicable to arrive at consumption of raw material per unit of output. 1.22 0.01 0.038 Waste gas from Sponge Iron units and two other raw materials i.e, coal and dolochar are used. Hence it is not practicable to arrive at consumption of raw material per unit of output. 1.61 0.005 0.044 Iron Ore Beneficiation Iron Ore fines - 1.89

PART C Pollution discharged to environment per unit of output Parameters as specified in the consent issued WATER POLLUTION: Source of pollution Pollutants Quantity of discharged (Kg/day) Concentration of discharges (Mass/volume) Percentage of variation from prescribed standards with reasons Zero Effluent Discharge Unit AIR POLLUTION: PART D Source of pollution Pollutants Quantity of discharged (Kg/day) Concentration of discharges (Mass/volume) Percentage of variation from prescribed standards with reasons Unit Stacks Rotory Kiln I & II Rotory Kiln III & IV Rotory Kiln V & VI 88.59 mg/nm3 79.88 mg/nm3 86.07 mg/nm3 Standard as per CFO 100 mg/nm3 Power Plant Stack connected to FBC Boiler -47 TPH 88.69 mg/nm3 Standard as per CFO 150 mg/nm 3 Pellet plant Stack connected to travelgrate rotory kiln & cooler 37.52 mg/nm3 Standard as per CFO 50 mg/nm 3

SOLID WASTES: PART - E Solid Wastes Total Quantity(Tonne) Total Quantity(Tonne) Ash During previous Financial Year 2012-13 During Current Financial Year 2013-14 From Process 58,320 50,403 From Pollution Control Facility 25,468 29,546 Quantity Recycled or Reused 41,463 50,212 Sold 22,006 4,355 Disposed 15,000 14,000 SOLID WASTES MANAGEMENT: The following tabulation shows the byproducts being generated, their source and use : Name of byproduct Source Use Char As fuel for Power Plant Accretion Production Production To be beneficiated and used as source of Iron Ore for Pellet production and for internal road making. Fly Ash Power generation For Brick manufacturing and as land fill. PART F HAZARDOUS WASTES: (As specified under hazardous wastes/management & handling rules 1989) Hazardous waste Total quantity ( Ltrs ) Waste oil During the previous financial year 2012-13 During the current financial year 2013-14 From process From pollution control facilities DG Sets & Machineries 10,200 Ltrs. PART G 9,700 Ltrs. Please specify the characterization (in terms of composition & quantum) of hazardous as well as solid wastes indicate disposal practice adopted for both these categories of wastes: The waste water generated from the industry is passed through Soak Pit and Septic Tank for reuse in gardening or for sprinkling on the roads. There is a 120 kld Effluent Treatment Plant from which also the processed water is used for gardening and sprinkling on the roads. Waste oil is the only hazardous waste which is generated in the industry from DG Sets and Gear boxes, amounting to about 9,700 LPA and the same is used internally by incineration in Pellet Plant s Travel Grate.

PART H Impact of the pollution abatement measures taken on conservation of natural resources and on the cost of the production. The Industry is producing Flyash bricks. To that extent it avoids excavation of earth by Red Brick manufacturing industry. It conserves environment and ecology. The industry does not adversely impact the environment. The only natural resource consumed is water. The waste water generated from the industry is passed through Soak Pit and Septic Tank for reuse in gardening or sprinkling on the roads. There is a 120 KLD Effluent Treatment Plant from which also the processed water is recycled, reused for gardening and sprinkling on the roads. PART I Additional measures / investment proposal for environmental protection including abatement of pollution, prevention of pollution: Environment protection and pollution controls have been the priority for the industry. Any suggestions or improvements made by the Pollution Control Board would be implemented. PART J Any other particulars for improving the quality of the environment The Industry has taken-up extensive green belt development program in the entire Plant area so that there remains no vacant or un-utilized land without a tree. Till March 2014 1,19,391 saplings have been planted. Area covered under greenbelt is 143.15 acres. As all such land has already been planted, we have started planting small plants in the gaps between the trees also. This program may let us plant another 6000 samplings. Also we are planning to plant fruit bearing plants in the houses of nearby villages Karekal and Bylachintha to generate awareness of environment protection and as a social activity. Dolochar generated from sponge Iron units is completely utilized in FBC boiler thereby reducing use of coal. Constant efforts will be made in making use of the updated technologies.