FINE ORE SURGE CONVEYOR Minnesota

Similar documents
CONSUMERS ENERGY Holland, Michigan

HAVER Mining HAVER & BOECKER HAVER & BOECKER

Proven solutions in ore processing

Quality Handling Systems Pty Ltd. Sampling Solution Specialists. Sampling Systems for Bulk Materials

MINING & QUARRY PROJECT EXPERIENCE

Bulk Raw Materials Storage Selection MR. J. H. ERASMUS KRUPP MINING AND MATERIALS HANDLING

MINING & MINERAL PROCESSING CAPABILITIES

Feed Mill Design. By Fred J. Fairchild, P. E. Department of Grain Science and Industry Kansas State University

Benjamin Brock Astec s CEO Introduces Astec Bulk Handling Solutions

APPENDIXG FUGITIVE DUST CONTROL PLAN

Scraper Reclaimer Technology. Optimal solutions for Bulk Materials Handling

Pelletizing technologies for iron ore

CEMENT INDUSTRY PROJECT EXPERIENCE

We Offer Solutions. Temporary Storage

KOCH Technology, Management and a Passion for Projects. The KOCH Pipe Conveyor. KOCH Transporttechnik GmbH

ABOUT COMMON MATERIALS:

David Lewis. Mechanical Design Engineer. Director Foodstream Pty Ltd

IBAU HAMBURG Custom-built Small Terminals

Belt Feeders & Conveyors

Production and Characteristics of Rock Dust Applied in Underground Mines. April 13, 2017

For each ton of molten pig iron, you need: 2600 lbs iron ore or iron ore pellets, 1000 lbs coke 300 lbs of flux (slag, dolomite, limestone, etc).

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO

OUTOTEC TOMRA SENSOR-BASED ORE SORTING SOLUTIONS BENEFITS

Cristal Australia Pty Ltd

IAC/MHC EPC CORE COMPETENCIES PRESENTATION. Innovation. Service. Product Excellence.

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

Capability Statement

Drawdown Hoppers Maximize Active Reclaim

Low Profile Feeder TM (LPF)

KAMENGO. FGD (SYNTHETIC) GYPSUM STORAGE AND FEED (2013) Fort McMurray, Alberta, Canada

Optimized crusher selection for the cement industry

ASTEC Large Modular Wood Pellet Plants. Wood Pellet Plants

How to Design and Build an Efficient Transload Facility? Fabian Ros & Joey A. Chbeir

STACK SIZER TM. Patented Technology. The highest capacity, most efficient, fine wet screening machine in the world

Vale Malaysia Minerals - Teluk Rubiah Maritime Terminal ABB Stockyard Management System

KOCH Transporttechnik. Bernie H. Loyer, VP Minerals Technology, FFE Minerals

HARBOR INFRASTRUCTURE INVENTORIES Presque Isle Harbor, Michigan

Bucketwheel stacker reclaimers

Circular Pelletizing Technology

Ilmenite Pellet Production and use at TiZir

bulk material handling Equipment Optimal Solutions & Technologies TENOVA. innovative solutions for metals and mining

UNSLAKED LIME Ground Unslaked Lime

STARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY. InCoR Holdings Plc MINING AND METALLURGY. April 2014 REPORT Rev. 00 > Internal ref.

ABB Cement Fingerprint Holistic Approach for Cement Industries

COMPLETE OFFERINGS THERMAL PROCESSING AGGLOMERATION MATERIAL HANDLING

THE LIMESTONE PROCESSING HANDBOOK FROM THE FEECO MATERIAL PROCESSING SERIES TOMORROW'S PROCESSES, TODAY. FEECO.com

ArcelorMittal, Canada

CO 2 Emissions Profile of U.S. Cement Industry

HIGHVELD STEEL PROSPECTUS IRON MAKING PLANT 1

Study on the Induration Cycle During Pelletization of Goethitic Iron Ore

Pipe Flow Technology Centre TM. Serving the Global Mining Industry

B-95S. Food Equipment Metal Separation, METAL Detection AND Material Handling

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE

MODERN ENGINEERING AND DESIGN. OLD SCHOOL COMMITMENT.

ATP Oil Shale Plant in China

Entech Pollutec 2014 WASTE TO ENERGY BY TYRANNOSAURUS SOLUTIONS

SIROCCO AIR CLASSIFICATION SYSTEM

Wear Property and Impact Test Rig Design for Comparing Wear Liners used in Transfer Chutes

OUTOTEC ROASTING SOLUTIONS

SUBPART OOO Check-OFF FORM July 11, 2005

Custom-built Small Terminals

Commodity XL Metals and Mining

WE OFFER SOLUTIONS TEMPORARY STORAGE

Canada. Iron and Steel Sector - PI Specifics

ROCK SALT TODAY IQUIQUE CHILE MINE PURE DRY CHILEAN ROCK SALT

Product Directory. Material Handling Solutions.

Presentation ThyssenKrupp Bulk Materials Handling Dr. Markus Oles

Long Term Planning for Open Pit Mines

Bulk Bag Filling. Dust-free filling and weighing of Bulk Bags, Rigid Bins, Drums and IBCs

QMASTOR Coal and Mineral Supply Chain Management

HOW A BLAST FURNACE WORKS

F L I P F L O W W S C R E E N S

Niagara Falls Storage Site Safety Measures During Remediation

A B O V E G R O U N D U N D E R G R O U N D F L E X S T E E L

AUMUND completes Modernisation of the Handling and Storage Systems at OAO Mordovcement

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

Submersible Pump Fulfills Quarry Stone Washing Requirements. By Mike Bjorkman, Vice President and Director of Marketing, BJM Corp.

Who We Are. Located near Port, Rail and Road transportation links, Maritime Welding Inc. can deliver world-class steel fabrication services worldwide.

integrated solutions in material handling

Bulk Bag Unloader Installation, Operation and Maintenance Manual

Inspection of Full Depth Modified Dense-Graded Aggregate Base, Plant Mixed (Tennessee Project)

Imagineering Air-Driven Solutions.

AiCO Cartoning Equpiment

Measuring Bulk Solids on a Conveyor

Minerals Enduron HPGR High Pressure Grinding Roll

The Latest Developments in Iron Ore Processing

BEDESCHI TODAY. Bedeschi today

Your defined goals and objectives:

Engineering Excellence 3

T X S p u e p r e f r i f n i e n Gr G i r n i d n i d n i g n Mi M l i l

Motorized Pulleys Solve Materials Handling Problems in North America

J-Tec Material Handling Weighing // Dosing Solutions

From copper ore to pure copper with the power of TAKRAF and ABB equipment

Betomix Horizontal Mixing Plants

ROCK CRUSHING PLANT APPLICATIONS ADVICE

J.I.C. HYDRAULIC TUBING Seamless & Welded Hydraulic Fluid Line 23 Seamless Burst Pressures & Working Pressures 24 Welded Burst Pressures 25

LIQUID & DRY BULK STORAGE TANKS TITAN ENVIRONMENTAL CONTAINMENT

INTERMODAL TRANSPORTATION, USACE STYLE

FIRM OVERVIEW. Visit Us On The Web

Transcription:

Krech Ojard Engineers provide process engineering to a vast range of industries, including: oil and gas, mineral and mining, agriculture, manufacturing, and transshipment and transload facilities. These industries require advanced material processes for goods such as grains and food, ores and slurry, and varying particulates and fluids. Krech Ojard Process Engineers focus on the design of our clients entire process, operation and control, and optimization of mechanical, chemical, and computer processes, including maintenance, to provide savings in costs, time, and waste, while improving safety. TOOLS FOR A BETTER PROCESS Process design: synthesis of energy recovery networks, air contamination or dust abatement systems, chutes, conveyor systems, material flow, load and unload systems. Process control: model predictive control, controllability measures, robust control, nonlinear control, statistical process control, process monitoring, and thermodynamics-based control. Process operations: scheduling process networks, multi-period planning and optimization, data reconciliation, real-time optimization, flexibility measures, fault diagnosis. Supporting tools: sequential modular simulation, equation based process simulation, global optimization, three dimensional modeling for spacing, fit, and dimensioning custom fit applications.

FINE ORE SURGE CONVEYOR Krech Ojard & Associates has provided engineering services for a large pellet plant operation in northern. Their product is taconite pellets, sold and shipped to steel plants around the world. They currently have five lines of fine ore running into the concentrator building, where it is milled, separated and screened into concentrate before being sent into the pellet plant. KO provided engineering services for a feasibility study of installing new feeders and new conveyors in the reclaim tunnel underneath the fine ore surge pile. This new equipment will be used to reclaim the current dead storage located at the east end of the facility. 3D modeling of the facility was utilized during the review and design phases of the project. FLOW METER UPGRADES Wisconsin Designed and coordinated flow control valves on line #1 of a Wisconsin Terminal. Further projects involved PCV Vibration reductions and flow metering on extended lines at the terminal. Engineering staff utilized 3D modeling for the design of the flow meter upgrades. Animated process flow of existing and new designs was also utilized. The client was having difficulty regulating the flow between meters because there was no actuated flow control valves. Existing steps involved manual pinching of meter valves. By way of the upgraded flow meters, the client s control center will be able to manipulate flow through the meters remotely, which offers a number of benefits to the client. GRAYMONT Superior, Wisconsin Krech Ojard was hired to design all of the refractory, process, and storage equipment, on pile and helical anchor deep foundations, to support the installation of a new kiln #5, and other plant upgrades at Graymont s Superior, Wisconsin limestone plant. The new kiln is a state of the art high efficiency preheater lime kiln. Additional work focused on development of Balance of Plant process flow, conveyor systems, silo dust control, dust collector upgrades, crushing and screening operations, material re-claim tunnel, integrated rail and truck load-out systems, as well as significant structural modifications to existing buildings to support the new process equipment. CONCENTRATOR DERRICK SCREENS STUDY Provided engineering services for a large pellet plant operation in northern. Their product is taconite pellets, sold and shipped to steel plants around the world. In the concentrator building, crushed ore is milled and screened to extract concentrate for pellet production. This process uses vibratory screens to size the milled ore. The plant currently uses ten derrick screens in the concentrator. KO provided engineering services for a feasibility study of installing two additional derrick screens to improve screening rates and efficiency. This study included the development of 3D models to aid in visualization of the equipment and spaces.

FRAC SAND FACILITY Chippewa Falls, Wisconsin Krech Ojard & Associates was retained for engineering services for the design and construction of a new frac sand plant. Krech Ojard performed services from the preparation of preliminary flow sheets through final construction documents and project management for this 2.6 million tons per year frac sand processing facility. Upon completion of flow sheets, Krech Ojard began design of the plant layout and process. Our Mechanical, Structural, and Electrical Groups worked together to ensure that interferences were minimized. Design components for the plant included: Plant Layout Foundation and Structural Steel Design Conveyors and Elevators Material Handling Equipment Sand Processing Equipment Piping Rail and Truck Dumps Raw and Processed Sand Storage Electrical Power Control Systems The Chippewa Falls frac sand facility was a fast track design-build method of delivery requiring close coordination between the owner, contractor and Krech Ojard. PROCESS & INSTRUMENTATION DIAGRAMS Various Locations Recruited to prepare Process & Instrumentation Diagrams (P&IDs) for a taconite processing facility s power plant. All processes are color coded to a uniform table and completed in CAD for easy updating, review, and use by client staff. Krech Ojard professionals followed a process of reviewing existing drawings, conversion of existed P&IDs, creating enhanced standards and new P&IDs, and finally field verifying accuracy. BALLING DRUM REPLACEMENT STUDY Performed a feasibility study at a northern iron ore mine to improve their taconite balling process. The project involved the replacement of two existing ten foot diameter drums with two twelve foot diameter drums, reworking feed and takeaway conveyors, and replacing the existing roll screens with wider, longer roll screens. The current equipment could be difficult to maintain with limited access, so a key element of the design is to improve access to the new equipment. 3D modeling of the entire balling process was the approach taken by Krech Ojard to tackle this problem. 3D modeling allows for previewing installed additional equipment to test allowances, connections, spacing and more. INTERFLOUR VIETNAM Vung Tau, Vietnam KO Structural and Mechanical Groups teamed to design a truss supported 150m long tripper conveyor with integral shuttling cross conveyor designed to fill 96m wide bulk storage bays with various grain commodities. Krech Ojard created fully integrated 3D models of the conveyor to simultaneously resolve interferences, create fabrication drawings and part take offs. 3D modeling combined Imperial and Metric based designs to allow for simultaneous fabrication in US and Pacific venues.

krechojard.com