SECTION 07 TECHNICAL SPECIFICATIONS 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER (LA)

Similar documents
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 66 kv LIGHTNING ARRESTORS

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132/220/400 KV SUB-STATION

Technical Specification for LV ABC Fuse Switch Disconnectors

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 66/132 KV SUB-STATION

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

TECHNICAL SPECIFICATION FOR CLAMPS & CONNECTORS FOR 400/220 KV SUB-STATION

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

SEAL & SIGNATURE OF THE TENDERER

SPECIFICATION: LINE TAPS FOR ALUMINIUM/ACSR AND COPPER CONDUCTORS

Notes Changed note Date. 1 (A) Changed template 09 / 07 / 2008

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT

P.V.C. INSULATED UNARMOURED COPPER CABLES

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: -

SPECIFICATION FOR ALL ALUMINIUM ALLOY STRANDED CONDUCTOR

THE KENYA POWER AND LIGHTING CO. LTD

Technical Specification for Live Line Tap Connectors

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 70mm 2 FLEXIBLE TINNED COPPER CONDUCTOR 3.3kV EPR INSULATED WITHOUT METALLIC SCREEN

MESP TECHNICAL SPECIFICATION FOR ELECTRIC CABLE 400mm 2 ALUMINIUM CONDUCTOR 1.9kV XLPE INSULATED WITH METALLIC SCREEN

An Insight into Design, Development & Testing of Insulation Piercing Connectors for LV Application

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

General Requirements. Technical Specifications for Insulators of Transmission Lines

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION MEDIUM VOLTAGE TRANSFORMERS

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

TECHNICAL SPECIFICATION

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

GUIDELINES FOR SUB-SYSTEM COMPLETION CERTIFICATES AND TEST RECORDS FOR ELECTRICAL INSTALLATIONS IN POTENTIALLY EXPLOSIVE ATMOSPHERES

SECTION BASIC ELECTRICAL REQUIREMENTS

Standard of Practice - Campus Electrical Distribution System

SECTION PACKAGE BOOSTER PUMP STATIONS

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

TECHNICAL SPECIFICATIONS

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

SECTION HIGH EFFICIENCY DISTRIBUTION TRANSFORMERS

SUPPLY AND DELIVERY OF 200KVA EARTHING TRANSFORMER TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. PLS PART I TENDER PROCEDURES

Technical Specifications and General Guidelines for Mass Flow Meters at Petroleum Oil Installations. Note:

Monolithic Isolation Fittings

NPS/002/020 Technical Specification for 11 & 20kV Power Cables

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-BIPV-SM-P125-36

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

Wash Down Duty Non-Contact Sensor

TESTING PTE EARTHING

City of Ottawa Street Lighting. Streetlight Brackets and Adapters

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

TECHNICAL SPECIFICATION FOR CONDUCTORS

SUGGESTED SPECIFICATIONS Pump Frames through 64132

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-P156-60

SECTION COOLING TOWER

Energy Division Insulators

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

DETAIL SPECIFICATION. MICROPHONE, CARBON (MICROPHONE M-29( )/U and M-52( )/U) INACTIVE FOR NEW DESIGN AS OF 30 MARCH 1999

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.

Specification for 11 KV outdoor GOD Air Break Isolator along with earth switch,post insulators, CT, PT and the Double pole Structure.

Technical Specification for Aluminium Castings, Pole Caps and Pressed Symbols

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

Not Applicable DD/MM/YY Completed Forms to be submitted by 30/08/2013 : Hrs IST. Date of Opening for Technical Bids 30/08/2013 : 14.

(Condensed from National Electric Code)

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

SPECIFICATION SHEET JUNCTION BOXES

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

PART MATERIAL REMARK Metal Case with Pig-tail. Brass (Metal Case) Copper (Pig-tail) Star Contact Copper Silver Plated

Field Economy Unit Instruction Manual

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

SCHEDULE-III TECHNICAL SPECIFICATION OF 11 KV CTPT METERING SETS AGAINST TN-2134

METERING GUIDE PART 1 METERING GENERAL

SECTION SLUDGE HOLDING TANK DECANTER PUMP

MATERIAL AND EQUIPMENT STANDARD FOR PIG LAUNCHING AND RECEIVING TRAPS

Diffused Aeration Piping Equipment

Jet Tunnel Fans.

The complete guide to transformers and packaged substations

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SOMFY SPECIFICATION March 2012 SECTION... ROLLER WINDOW SHADES SOMFY LS 40 MOTOR RANGE. Disclaimer for advice given to architects and engineers

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

Power Zone Center. Your solution for power distribution and control systems

Agilent 16047D Test Fixture

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014

Surge arrester 3EB4. with polymeric composite housing for operating aboard traction units

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN

Section - III Evaluation and Qualification Criteria

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

Pioneer Forced Draft Cooling Tower Specifications

IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS

NATIONAL INSTITUTE OF SOLAR ENERGY (An Autonomous Institute, Ministry of New & Renewable Energy, Government of India)

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

3M Cold Shrink Silicone Rubber Connector Insulators 8440 Series

Transcription:

SECTION 07 TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER (LA)

7.0 TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER 7.1 GENERAL This section of the document includes the design, manufacture, testing & inspection of 11kV Outdoor Type Single Phase Metal Oxide (ZnO) Gapless Lightning Arrester. 7.2 CLIMATE DATA The equipments to be supplied against this tender shall be suitable for satisfactory use under the following climatic condition: Climate : Tropical, intense sunshine, heavy rain, humid. Maximum Humidity and Temperature sometimes occur simultaneously. Maximum Temperature : 40 0 C Minimum Temperature : 03 0 C Average daily Temperature : 30 0 C Average isokeraunic level : 80 days/ year Relative humidity : 50-100% Average annual rain fall : 3454 mm Maximum wind velocity : 200 km/ hour Altitude : Sea level to 300 metres Atmospherical, Mechanical and Chemical impurities : Moderately polluted Equipments as specified will be installed in tropical locations and in a hot humid environment with presence of the insects and vermin. The information is given as a guide for Tenders and no responsibility for its accuracy will be accepted, nor will any claim based on the above be entertained. 7.3 SYSTEM PARTICULARS SL. SYSTEM CHARACTERISTICS VOLTAGE LEVEL NO. 1. Normal System Voltage, KV 230 132 33 11 (Voltage Class) 3. Maximum System Voltage, KV 245 145 36 12 4. System Frequency, Hz 50 50 50 50 5. Phase Rotation RST RST RST RST (Anti-Clock wise) 6. Type of System Grounding Solid Solid Solid Solid 7. Rated Fault Level 12550 6000 1500 381 (3-Phase Symmetrical), MVA 3 sec. 8. Basic Installation Level, KV 750 650 170 75 LOW VOLTAGE 415/ 240V CHARACTERISTICS: 9. Normal System Voltage, V (Voltage Class) 415/ 240 10. Type of System Grounding Solid

7.4 STANDARDS Performance, Design & Testing of Outdoor Type Single Phase Metal Oxide (ZnO) Gapless Lightning Arrester shall conform to the latest edition of the IEC-60099-4/ ANSI- C 62.11 or equivalent international Standards unless otherwise specified herein. 7.5 SPECIFICATIONS 1 Application Distribution Transformer/ Line/ Cable protection of heavy duty class. 2 Type of Arrester Metal Oxide (ZnO), Gapless 3 Construction Single Unit, basically consisting of gapless hermetically sealed in with non-linear characteristics with high energy capacity, all enclosed in porcelain housing. 4 Installation Outdoor 5 Mounting Pole Mounted steel bracket 6 Nominal System Voltage 11 kv 7 Maximum System Voltage 12 kv to 15 kv 8 System Frequency 50 Hz 9 Number of Phase 3 10 Rated Arrester Voltage 10.5 kv (rms) 11 Maximum Continuous Operating Voltage 8.4 kv (rms) 12 Rated Arrester Current 5 KA 13 Power Frequency withstands voltage of 35 kv (Dry) & 30 kv (Wet) Lightning Arrester Housing, Dry & Wet. 14 Impulse Withstand Voltage of Lightning Arrester 75 kv (peak) Housing. 15 Lightning Impulse Residual Voltage (8/20 35 kv (peak) micro-second wave) 16 Steep Current Impulse Residual Voltage at 40 kv (peak) 10KA of 1 micro-second front time. 17 High Current Impulse Withstand Value (4/10 65 KA micro-second) 18 Creepage distance (minimum) 25 mm/ kv 19 Standard Performance, Design & Testing shall be in accordance to IEC-99-4/ ANSI- C 62.11 or equivalent international Standards unless otherwise specified herein. 7.6 FEATURES & ACCESSORIES - The arresters shall be ZnO type, basically consisting of gap-less hermetically sealed in with non-linear volt-ampere characteristics with high energy capacity. ZnO arrester shall have excellent thermal stability for high energy surges, external pollution & temporary over voltage. - The Line lead & earthing terminal with clamps shall be provided, suitable to accommodate AAC/ ACSR/ Copper Conductor of diameter from 10.0mm to 15 mm.

- All ferrous parts exposed to atmosphere shall be Cadmium plated. The arrester shall be suitable for mounting vertically. The housing shall be of high quality porcelain containers of heavy construction sealed against the entry of moisture and oxygen and free from influence of moisture and weather condition. - Each Single pole arrester shall be furnished with a stainless steel rating plate mentioning manufacturer s name, client name, year of manufacturing & model of LA. - Mounting steel bracket and fixing bolts, nut, washer etc. shall be provided with the arrester for steel crossarm. The mounting steel bracket & necessary fittings shall be hot dip galvanized as per BS-729. - The Bidder shall indicate the methods need to provide pressure relief or to prevent explosive sheltering of the porcelain housing. No chemical action shall be take place nor shall the arrester material show deterioration as a result of the specified operating duty. No maintenance other than routine inspection shall be required under service conditions. 7.7 INFORMATION REQUIRED The Bidder/ Manufacturer as per tender requirements shall provide all information. Besides these, the following information/ Documents have to be submitted:- (a) Detail dimensional drawing of the offered type LA. (b) Manufacturer's ISO 9001 certificate. (c) Manufacturer's Printed catalogue describing specification, technical data, rated voltage, current, creepage distance, characteristics curve etc. of the offered type LA. 7.8 DOCUMENTATION 1) Type Test Reports (as stated in Clause 7.9) for offered type 11kV Single Phase Lightning Arrester from STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per relevant Standards (unless other wise specified). 2) At least 2 (two) pieces of offered type 11kV Single Phase Lightning Arrester as sample along with the tender. The submitted sample should comply the technical requirements of the tender document. It is noted that the submitted sample of the responsive Tenderers will be tested as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender at CERS, BPDB or BUET/ CUET/ KUET/ RUET. If the submitted sample failed in test to conform the technical specification, the tender of the Tenderer will be rejected. The cost of test will be borne by the Purchaser. 7.9 TEST REPORTS The following test reports including tests carried out for the offered type 11kV Single Phase Lightning Arrester in accordance with the latest version of IEC-60099-4/ANSI-C 62.11 Standard, which are issued by STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory by confirming design to the tender document shall be submitted with the offer:- a) Insulation Withstand tests on the Arrester housing; b) Step Current Impulse Residual Voltage test; c) Lightning Impulse Residual Voltage test; d) Long Duration Current Impulse withstand test; e) High Current Impulse operating duty test; f) Power Frequency voltage versus time curve; g) Partial Discharge test. 7.10 APPROVAL OF DRAWINGS & SPECIFICATIONS

The Bidder shall have to submit 3 sets of Design, Drawing, Technical Specification, Features & Accessories, Guaranteed Technical Particulars of offered type Lighting Arrester along with manufacturer's printed catalogue, to the Engineer, Director, Design & Inspection II, BPDB within 15 days from the date of signing the Contract for approval, prior to the manufacturing of the goods. 7.11 TESTS AT MANUFACTURERS WORKS General Functional electrical, material, mechanical and hydraulic tests shall be carried out at manufacturers premises. The extent and method of recording the results shall be agreed by the Purchaser in ample time to enable the tests to be satisfactorily witnessed or to make any changes to the proposed program of tests. Material Tests The supplier shall provide test pieces free of charge as required to enable the quality of the material to be determined at the supplier s expense. Purchaser may at its own discretion and by specific arrangement accept certified particulars of tests carried out in the absence of his authorized representative. Type Test Type tests are required to prove the general design of the offered equipments/ materials. The Tenderer shall submit the type test reports of the offered equipments/ materials from STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender. Routine Tests All equipments/ materials shall be subjected to routine tests as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender at the manufacturers works and shall include, but not be limited to an operational test. 7.12 TECHNICAL ORIENTATION AND QUALITY TEST WITNESS Witnessing of the manufacturing process and tests of the equipment at manufacturer s premises including transfer of technical know-how shall be required/held as detailed elsewhere in Particular Conditions of Contract (GCC 32.1) of tender document and other than this the following will be as follows: The Purchaser or its representative shall have the right to inspect, examine and test the workmanship and performance of the goods/materials to confirm their conformity to the specification. The Purchaser or its representative shall be entitled at all reasonable time during manufacture or after manufacture to inspect, examine and test of goods/materials at the manufacturers premises, workmanship and performance. The test shall be carried out as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the contract at the manufacturer premises. An inspection team will be formed by Purchaser or its representative immediate after signing of the contract to control the quality and monitoring the manufacturing process (where required). The manufacturer will allow inspection team to inspect the manufacturing process and quality control and progress of the work at any time need by BPDB s inspection team. This team will witness the Factory/Technical orientation & Quality test at the manufacturer's plant. The Manufacturer shall have facilities to carry out all tests at its premises and shall provide free of charge such assistance, labor, materials, electricity, fuel, stores, apparatus and instruments as may be requisite and as may be reasonably demanded to carry out such test efficiently. The inspection team maximum 2 (two) times may inspect (if required) the goods during the manufacturing process or after manufacture of Goods as required and shall also request to supplier for the purchase/ import/ shipping documents of major/key materials of Goods and shall check in accordance with Guaranteed Technical Particulars (GTP) and guarantees of the contract. All expenses for such tests shall be borne by the supplier.

The manufacturer shall have all testing facilities at the manufacturer's premises to carry out the tests in accordance with the relevant IEC Standards. If, any test(s) pending due to lack of testing facilities at the manufacturer's premises, then the Inspection team shall select sample of Goods and sent the selected sample to any independent Testing Laboratory of the manufacturer's country to carry out the test(s). All cost of testing of the selected sample(s) including carrying, loading, un-loading etc. will be borne by the supplier. The Supplier shall, after consulting the purchaser, give notice to the Purchaser in writing of the date and the place where the material or equipment will be ready for quality witness testing. When the purchaser intends to attend the test he shall promptly inform the supplier accordingly in writing, so that supplier can take action. The purchaser shall give the supplier timely notice in writing of his intention to attend the test. The supplier/ manufacturer shall submit (if required by inspection team) the testing procedure & list of testing/ measuring equipment, meters etc. used for Factory/Technical orientation & Quality test witness prior to carry out such witness test(s). The supplier/ manufacturer shall submit the valid Calibration Certificate from competent authority of the testing/ measuring equipments, meters etc. used for Factory/Technical orientation & Quality test and the following documents to inspection team prior to carry out such witness test(s).: I. Updated valid Calibration Certificates of the testing/ measuring equipments, meters etc. used for Factory/Technical orientation & Quality test. II. The factory test report (Routine test report) of Goods to be supplied under the contract. Failing to submit the above documents, the inspection team may not perform to carry out such witness test(s) and all the liabilities along with delay (if any) will be borne by the Bidder/Manufacturer. It is noted that at the time of Factory/Technical orientation & Quality Test witness BPDB's Inspection team will check the calibration seal/ certificate of the testing/ measuring equipment, meters etc. by the competent authority. If the calibration seal/ certificate of the testing/ measuring equipment, meters etc. are not found and the calibration not done within the due date then BPDB's Inspection team will not witness the test. In that case the Bidder/ Manufacturer shall complete the calibration of the testing/ measuring equipment, meters etc. from the competent authority within a reasonable period without any delay in delivery period. The Factory/Technical orientation & Quality Test witness shall be carried out as per latest version of relevant IEC/BS/ANSI/ASTM/BDS or equivalent international standards as mentioned in the contract at the manufacturer's premises or other places where the required test facilities are available and only routine tests as agreed upon inspection team will be performed. All expenses for such tests shall be borne by the supplier. When the purchaser intends to attend the test he shall promptly inform the supplier accordingly in writing, so that he can take action. The purchaser shall give the supplier timely notice in writing of his intention to attend the test. Where the supplier provides for tests on the premises of the supplier or of any manufacturer of the supplier, except where otherwise specified, shall provide free of charge such assistance, labor, materials, electricity, fuel, stores, apparatus and instruments as may be requisite and as may be reasonably demanded to carry out such test efficiently. These tests shall be performed as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender and only routine tests as agreed upon, will be performed. As and when the purchaser is satisfied that any materials/ equipments shall have passes the tests referred to in this clause, purchaser shall notify the contractor in writing to that effect. Should any inspected/ tested goods fail to conform to the specification, the Purchaser shall have the right to reject any of the items or complete batch if necessary. In that case Supplier has to replace the equipment and to make good of them and the supplier shall conduct similar pre-delivery Inspection and factory tests without any financial involvement to the purchaser. In case any of the Equipment found not conforming to the specification at the time of post landing Inspection, the supplier will in no way be relieved from the responsibility of replacing them on making them good at their own cost, despite the Equipment were found

good at the time of Factory Acceptance Test. Nothing in this clause shall in any way release the supplier from any warranty or other obligations under the tender. No goods shall be packed, prepared for shipment/delivery unless it has been approved including factory Test reports and written instructions have been issued by the Purchaser. On successful completion of Pre-shipment inspection/quality test witness, delivery of goods will be made to the designated stores under contractor s/supplier s responsibility until Post-Landing Inspection is successfully completed without any obligation on part of BPDB. Quality and quantity of the delivered goods will be determined at the time of post-landing inspection at the designated stores in presence of the authorized representative of the contractor/supplier. After approval of the satisfactory Post-Landing Inspection, R&I Report will be issued following the contractual obligations. The goods supplied under this Contract shall be fully insured in addition, All risks insurance, including war risks, riots, strikes and/or theft shall be acquired for 110% of the delivered cost of the goods on Warehouse to Warehouse basis until the issuance of the R & I after satisfactory completion of Post-Landing Inspection of the goods supplied. The Tenderer has mentioned the place of Technical Orientation and Quality Test Witness in the following table:- Sl. Period of Technical Orientation Place & Country of Technical Item No. and Quality Test Witness Orientation and Quality Test Witness 7.13 POST-LANDING INSPECTION AND TESTING : The Supplier shall inform the purchaser immediately after arrival of the goods at the designated store of BPDB (as per delivery schedule). An Inspection team of BPDB shall perform the post-landing inspection in presence of supplier's representative. The Supplier shall arrange the program of post-landing inspection. Any defect or damage have been found at post-landing inspection, the defective or damaged materials/ goods to be replaced by the supplier at his own cost within the stipulated time. The purchaser s right to inspect, test (where necessary) and reject the goods after delivery at the designated store of BPDB shall in no way be limited or waived by reason of the goods having previously been inspected, tested and passed by the purchaser prior to the good's delivery. The Inspection team will check the physical conditions and quantity of the goods delivered. If necessary, the inspection team will select the sample of good(s) and sent the selected sample goods to CERS, BPDB or BUET/ CUET/ KUET /RUET (as selected by the inspection team) to carryout the test(s) as per contract to confirm the conformity to the approved Technical Specifications, Guaranteed Technical Particulars (GTP), drawings and relevant standards. If the tested sample(s) fail to confirm the specifications in tests, the full consignment will be rejected. All cost of testing of Materials/ Goods including carrying, loading, un-loading etc. will be borne by the supplier. 7.14. PACKAGING AND SHIPPING Packing of equipment has been detailed elsewhere in Particular Conditions of Contract of tender document. ----O----

SECTION - 8 A) GUARANTEED TECHNICAL PARTICULARS OF 11KV SINGLE PHASE LIGHTNING ARRESTER

8.01GUARANTEED TECHNICAL PARTICULARS OF 11KV SINGLE PHASE LIGHTNING ARRESTER (To be filled up by the Manufacturer in Manufacturer Letterhead Pad, otherwise the bid shall be rejected) Sl. No. Description Unit BPDB's Requirement 01 Manufacturer s Name and Country - To be mentioned 02 Manufacturer s model No. - To be mentioned 03 Type of the Arrester & Construction - Metal Oxide (ZnO), Gapless- Outdoor(Single Unit, basically consisting of gapless hermetically sealed in with non-linear characteristics with high energy capacity, all enclosed in porcelain housing.) 04 Rated Arrester Voltage kv 10.5 05 Rated Arrester Current KA 5 06 Max. Continuous Operating Voltage kv rms 8.4 07 Power Frequency withstand voltage of the Arrester Housing, Dry & Wet kv rms 35 (Dry) & 30 (Wet) 08 Impulse withstand Voltage of the Arrester Housing. kv (peak) 75 09 Lightning Impulse Residual Voltage (8/20 microsecond kv (peak) 35 wave) 10 Steep Current Impulse Residual Voltage at 10 KA kv (peak) 40 of 1 micro second front time. 11 High Current Impulse Withstand Value (4/10 micro KA 65 second) 12 Temporary Over voltage capability: a) 0.1 Second kv (peak) To be mentioned b) 1.0 Second kv (peak) To be mentioned c) 10 Second kv (peak) To be mentioned d) 100 Second kv (peak) To be mentioned 13 Leakage Current at rated voltage ma < 1 ma 14 Total Creepage distance (minimum) mm/ kv 25 15 Overall dimension : a) Height mm To be mentioned b) Diameter mm To be mentioned 16 Total weight of Arrester Kg. To be mentioned 17 Outline dimensional drawing of offered LA and mounting Bracket. 18 Printed catalogue describing specification, technical data of LA - To be Submitted - To be Submitted 19. Manufacturer's ISO 9001 certificate. - To be Submitted 20. Standard - IEC-60099-4/ ANSI- C 62.11 Manufacturer's Guaranteed Particulars Seal & Signature of the Manufacturer Seal & Signature of the Bidder

8.02 SCHEDULE OF MANUFACTURERS NAME AND PLACES OF MANUFACTURE & TESTING Item No Description Manufacture's name Place of Manufacture 01 11KV Single Phase Lightning Arrester Place of Testing & Inspection Seal and Signature of the Bidder

SECTION 9 DRAWINGS

SECTION 07 B) TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT (DOFC) WITH FUSE LINK

7.1 GENERAL 7.0 TECHNICAL SPECIFICATION OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT WITH FUSE LINK This section of the document includes the design, manufacture, testing & inspection of 11KV Outdoor Drop Out Fuse Cut-out (DOFC) with Fuse Link. 7.2 CLIMATE DATA The equipments to be supplied against this tender shall be suitable for satisfactory use under the following climatic condition: Climate : Tropical, intense sunshine, heavy rain, humid. Maximum Humidity and Temperature sometimes occur simultaneously. Maximum Temperature : 40 0 C Minimum Temperature : 03 0 C Average daily Temperature : 30 0 C Average isokeraunic level : 80 days/ year Relative humidity : 50-100% Average annual rain fall : 3454 mm Maximum wind velocity : 200 km/ hour Altitude : Sea level to 300 metres Atmospherical, Mechanical and Chemical impurities : Moderately polluted Equipments as specified will be installed in tropical locations and in a hot humid environment with presence of the insects and vermin. The information is given as a guide for Tenders and no responsibility for its accuracy will be accepted, nor will any claim based on the above be entertained. 7.3 SYSTEM PARTICULARS SL. SYSTEM CHARACTERISTICS VOLTAGE LEVEL NO. 1. Normal System Voltage, KV 230 132 33 11 (Voltage Class) 3. Maximum System Voltage, KV 245 145 36 12 4. System Frequency, Hz 50 50 50 50 5. Phase Rotation RST RST RST RST (Anti-Clock wise) 6. Type of System Grounding Solid Solid Solid Solid 7. Rated Fault Level 12550 6000 1500 381 (3-Phase Symmetrical), MVA 3 sec. 8. Basic Installation Level, KV 750 650 170 75 LOW VOLTAGE 415/ 240V CHARACTERISTICS: 9. Normal System Voltage, V (Voltage Class) 415/ 240 10. Type of System Grounding Solid

7.4 STANDARDS Performance, Design & Testing of Outdoor Drop Out Fuse Cut-out (DOFC) and Fuse Link shall conform to the latest edition of the IEC 282-2/ BS 729/ ANSI-C 37.40, 37.41 & 37.42 and NEMA Standard or equivalent international Standards unless otherwise specified herein. 7.5 SPECIFICATIONS 1 Installation Outdoor mounted on cross-arm angle/ channel structure. 2 Application Protection of 11/0.415KV, 250/200/100KVA Distribution Transformer. 3 Type Open drop out expulsion. 4 Nominal rated voltage (3 phase) 11 kv 5 Maximum System voltage (3 phase) 12 kv 6 Frequency 50 Hz. 7 Continuous Current Rating 100 A 8 Basic Insulation Level (Impulse Voltage) 75kV (To earth and between poles) 9 Power Frequency withstand Voltage, Dry & Wet 35kV (To earth and between poles) 10 Creepage Distance 25mm/kV (Minimum) 11 Fuse holder type Heavy duty, sealed cap with eye at upper end of the fuse holder. 12 Fuse link continuous ratings 16 amps for 100KVA Transformer 25 amps for 200KVA Transformer 40 amps for 250KVA Transformer 13 Fuse link type K-type as per NEMA standard, medium melting high surge. 14 Rated interrupting capacity, 8 KA (RMS) 15 Standard Design, manufacture, testing and performance shall be in accordance with the latest revision of relevant IEC 282-2/ BS 729/ ANSI-C 37.40, 37.41 & 37.42 and NEMA Standard. 7.6 FEATURES & ACCESSORIES (a) DOFC shall be with Guide. (b) Each cut-out shall be completed including fuse holder and fuse link. (c) The design shall provide reasonable protection against earthing by animals or birds. (d) The terminal shall be Tin-plated and shall be suitable to accommodate for ACSR Merlin/ Grosbeak/ Hawk or suitable conductor as required. (e) All moveable current-carrying contacts shall be silver plated. (f) Bracket shall be provided for steel cross-arm mounting with nuts bolts etc. (g) All hardware shall be non-ferrous metal or if ferrous should be hot dip galvanized after fabrication in accordance to latest revision of relevant IEC 282-2/ BS 729/ ANSI-C 37.40, 37.41 & 37.42 and NEMA Standard. (h) Fused cut-out units to latest revision of relevant IEC 282-2/ ANSI-C 37.40, 37.41 & 37.42 Standard are required to protect and provide insulator for distribution transformer. The unit shall be supplied complete with galvanized steel brackets bolt nuts and washers for mounting. They shall be provided with a latch

mechanism, which will open the fuse element when the fuse has operated. The latch mechanism shall be constructed as to operate easily from the ground with the aid of an operating stick. (i) Insulators shall be of the post type made of porcelain to withstand a mechanical force of 1600N. Current carrying equipment shall be made of copper or copper alloy. The nominal rating of the unit shall be 100A. In addition the units shall be capable of being opened under normal transformer magnetizing currents of transformers up to 250KVA to permit transformer isolation. (j) Termination shall be suitable for connection of compression terminal lugs. (k) The fuse element shall be totally enclosed by a fuse holder to protect it from the atmosphere specified electrical characteristics of the fuse units shall be to latest revision of relevant IEC standard. (l) Fuse links for the fuse cut-out units shall be of the disconnecting type suitable for opening closing and removal by an operating stick. (m) Each fuse link shall be suitable for a common fuse base. (n) Each DOFC shall be furnished with a stainless steel rating plate mentioning manufacturer s name, client name, year of manufacturing, Contract No & model no. in English. 7.7 INFORMATION REQUIRED The Bidder/ Manufacturer as per tender requirements shall provide all information. Besides these, the following information/ Documents have to be submitted: (a) Detail Outline and General Arrangement drawings. (b) Manufacturer s printed catalogue describing specification and technical data of the offered type DOFC and Fuse Link (c) Maximum clearing time and minimum melting time curve characteristics for Fuse Link. (d) Manufacturer's ISO 9001 certificate. 7.8 DOCUMENTATION 1) Type Test Reports (as stated in Clause 7.9) for offered type DOFC & Fuse Link from STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per relevant Standards (unless otherwise specified). 2) Bidder shall submit at least 2 (two) pieces of offered type DOFC and 3 (three) pieces of each type of offered Fuse Links as samples along with the bid. The submitted sample(s) should comply the technical requirements of the tender document. It is noted that the submitted sample(s) of the responsive Tenderer s will be tested as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender at CERS, BPDB or BUET/ CUET/ KUET/ RUET. If the submitted sample failed in test to conform the technical specification, the tender of the Tenderer will be rejected. The cost of test will be borne by the Purchaser. 7.9 TYPE TESTS REPORT The following Type Test report for offered type DOFC & Fuse Link from by STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per latest revision of relevant IEC/ BS/ ANSI and NEMA Standard of design confirming to the tender document shall submit with the offer. a) Impulse voltage withstand tests. b) Power frequency withstand tests. c) Temperature rise tests. d) Time/ Current Characteristics tests. 7.10 APPROVAL OF DRAWINGS & SPECIFICATIONS The Bidder shall have to submit 3 sets of Design, Drawing, Technical Specification, Features & Accessories, Guaranteed Technical Particulars of offered type Lighting Arrester along with manufacturer's printed

catalogue, to the Engineer, Director, Design & Inspection II, BPDB within 15 days from the date of signing the Contract for approval, prior to the manufacturing of the goods. 7.11 TESTS AT MANUFACTURERS WORKS General Functional electrical, material, mechanical and hydraulic tests shall be carried out at manufacturers premises. The extent and method of recording the results shall be agreed by the Purchaser in ample time to enable the tests to be satisfactorily witnessed or to make any changes to the proposed program of tests. Material Tests The supplier shall provide test pieces free of charge as required to enable the quality of the material to be determined at the supplier s expense. Purchaser may at its own discretion and by specific arrangement accept certified particulars of tests carried out in the absence of his authorized representative. Type Test Type tests are required to prove the general design of the offered equipments/ materials. The Tenderer shall submit the type test reports of the offered equipments/ materials from STL (Short-Circuit Testing Liaison) Member testing organisation or laboratory as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender. Routine Tests All equipments/ materials shall be subjected to routine tests as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender at the manufacturers works and shall include, but not be limited to an operational test. 7.12 TECHNICAL ORIENTATION AND QUALITY TEST WITNESS Witnessing of the manufacturing process and tests of the equipment at manufacturer s premises including transfer of technical know-how shall be required/held as detailed elsewhere in Particular Conditions of Contract (GCC 32.1) of tender document and other than this the following will be as follows: The Purchaser or its representative shall have the right to inspect, examine and test the workmanship and performance of the goods/materials to confirm their conformity to the specification. The Purchaser or its representative shall be entitled at all reasonable time during manufacture or after manufacture to inspect, examine and test of goods/materials at the manufacturers premises, workmanship and performance. The test shall be carried out as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the contract at the manufacturer premises. An inspection team will be formed by Purchaser or its representative immediate after signing of the contract to control the quality and monitoring the manufacturing process (where required). The manufacturer will allow inspection team to inspect the manufacturing process and quality control and progress of the work at any time need by BPDB s inspection team. This team will witness the Factory/Technical orientation & Quality test at the manufacturer's plant. The Manufacturer shall have facilities to carry out all tests at its premises and shall provide free of charge such assistance, labor, materials, electricity, fuel, stores, apparatus and instruments as may be requisite and as may be reasonably demanded to carry out such test efficiently. The inspection team maximum 2 (two) times may inspect (if required) the goods during the manufacturing process or after manufacture of Goods as required and shall also request to supplier for the purchase/ import/ shipping documents of major/key materials of Goods and shall check in accordance with Guaranteed Technical Particulars (GTP) and guarantees of the contract. All expenses for such tests shall be borne by the supplier.

The manufacturer shall have all testing facilities at the manufacturer's premises to carry out the tests in accordance with the relevant IEC Standards. If, any test(s) pending due to lack of testing facilities at the manufacturer's premises, then the Inspection team shall select sample of Goods and sent the selected sample to any independent Testing Laboratory of the manufacturer's country to carry out the test(s). All cost of testing of the selected sample(s) including carrying, loading, un-loading etc. will be borne by the supplier. The Supplier shall, after consulting the purchaser, give notice to the Purchaser in writing of the date and the place where the material or equipment will be ready for quality witness testing. When the purchaser intends to attend the test he shall promptly inform the supplier accordingly in writing, so that supplier can take action. The purchaser shall give the supplier timely notice in writing of his intention to attend the test. The supplier/ manufacturer shall submit (if required by inspection team) the testing procedure & list of testing/ measuring equipment, meters etc. used for Factory/Technical orientation & Quality test witness prior to carry out such witness test(s). The supplier/ manufacturer shall submit the valid Calibration Certificate from competent authority of the testing/ measuring equipments, meters etc. used for Factory/Technical orientation & Quality test and the following documents to inspection team prior to carry out such witness test(s).: I. Updated valid Calibration Certificates of the testing/ measuring equipments, meters etc. used for Factory/Technical orientation & Quality test. II. The factory test report (Routine test report) of Goods to be supplied under the contract. Failing to submit the above documents, the inspection team may not perform to carry out such witness test(s) and all the liabilities along with delay (if any) will be borne by the Bidder/Manufacturer. It is noted that at the time of Factory/Technical orientation & Quality Test witness BPDB's Inspection team will check the calibration seal/ certificate of the testing/ measuring equipment, meters etc. by the competent authority. If the calibration seal/ certificate of the testing/ measuring equipment, meters etc. are not found and the calibration not done within the due date then BPDB's Inspection team will not witness the test. In that case the Bidder/ Manufacturer shall complete the calibration of the testing/ measuring equipment, meters etc. from the competent authority within a reasonable period without any delay in delivery period. The Factory/Technical orientation & Quality Test witness shall be carried out as per latest version of relevant IEC/BS/ANSI/ASTM/BDS or equivalent international standards as mentioned in the contract at the manufacturer's premises or other places where the required test facilities are available and only routine tests as agreed upon inspection team will be performed. All expenses for such tests shall be borne by the supplier. When the purchaser intends to attend the test he shall promptly inform the supplier accordingly in writing, so that he can take action. The purchaser shall give the supplier timely notice in writing of his intention to attend the test. Where the supplier provides for tests on the premises of the supplier or of any manufacturer of the supplier, except where otherwise specified, shall provide free of charge such assistance, labor, materials, electricity, fuel, stores, apparatus and instruments as may be requisite and as may be reasonably demanded to carry out such test efficiently. These tests shall be performed as per latest version of relevant IEC/ BS or equivalent international standards as mentioned in the tender and only routine tests as agreed upon, will be performed. As and when the purchaser is satisfied that any materials/ equipments shall have passes the tests referred to in this clause, purchaser shall notify the contractor in writing to that effect. Should any inspected/ tested goods fail to conform to the specification, the Purchaser shall have the right to reject any of the items or complete batch if necessary. In that case Supplier has to replace the equipment and to make good of them and the supplier shall conduct similar pre-delivery Inspection and factory tests without any financial involvement to the purchaser. In case any of the Equipment found not conforming to the specification at the time of post landing Inspection, the supplier will in no way be relieved from the responsibility of replacing them on making them good at their own cost, despite the Equipment were found

good at the time of Factory Acceptance Test. Nothing in this clause shall in any way release the supplier from any warranty or other obligations under the tender. No goods shall be packed, prepared for shipment/delivery unless it has been approved including factory Test reports and written instructions have been issued by the Purchaser. On successful completion of Pre-shipment inspection/quality test witness, delivery of goods will be made to the designated stores under contractor s/supplier s responsibility until Post-Landing Inspection is successfully completed without any obligation on part of BPDB. Quality and quantity of the delivered goods will be determined at the time of post-landing inspection at the designated stores in presence of the authorized representative of the contractor/supplier. After approval of the satisfactory Post-Landing Inspection, R&I Report will be issued following the contractual obligations. The goods supplied under this Contract shall be fully insured in addition, All risks insurance, including war risks, riots, strikes and/or theft shall be acquired for 110% of the delivered cost of the goods on Warehouse to Warehouse basis until the issuance of the R & I after satisfactory completion of Post-Landing Inspection of the goods supplied. The Tenderer has mentioned the place of Technical Orientation and Quality Test Witness in the following table:- Sl. Period of Technical Orientation Place & Country of Technical Item No. and Quality Test Witness Orientation and Quality Test Witness 7.13 POST-LANDING INSPECTION AND TESTING : The Supplier shall inform the purchaser immediately after arrival of the goods at the designated store of BPDB (as per delivery schedule). An Inspection team of BPDB shall perform the post-landing inspection in presence of supplier's representative. The Supplier shall arrange the program of post-landing inspection. Any defect or damage have been found at post-landing inspection, the defective or damaged materials/ goods to be replaced by the supplier at his own cost within the stipulated time. The purchaser s right to inspect, test (where necessary) and reject the goods after delivery at the designated store of BPDB shall in no way be limited or waived by reason of the goods having previously been inspected, tested and passed by the purchaser prior to the good's delivery. The Inspection team will check the physical conditions and quantity of the goods delivered. If necessary, the inspection team will select the sample of good(s) and sent the selected sample goods to CERS, BPDB or BUET/ CUET/ KUET /RUET (as selected by the inspection team) to carryout the test(s) as per tender to confirm the conformity to the approved Technical Specifications, Guaranteed Technical Particulars (GTP), drawings and relevant standards. If the tested sample(s) fail to confirm the specifications in tests, the full consignment will be rejected. All cost of testing of Materials/ Goods including carrying, loading, un-loading etc. will be borne by the supplier. -----00-----

SECTION - 8 B) GUARANTEED TECHNICAL PARTICULARS OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT WITH FUSE LINK

8.01 GUARANTEED TECHNICAL PARTICULARS OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT AND FUSE LINK (To be filled up by the Manufacturer in Manufacturer Letterhead Pad, otherwise the bid shall be rejected.) 8.01 11KV OUTDOOR DOFC Sl. No. Description Unit BPDB's Requirement 1. Manufacturer s Name and Country - To be mentioned 2. Manufacturer s Model no. - To be mentioned 3. Frequency Hz 50 4. System Nominal Voltage kv 11 5. System Maximum Voltage kv 12 6. Continuous current rating of cut-out. A 100 7. Basic Insulation Level (BIL) (To earth and between Poles) kv 75 8. Creepage Distance mm 25mm/kV 9. Power Frequency withstands Voltage, Dry & Wet (To earth and between Poles) kv 35 10. Fuse Type A Fuse Link 11. Installation - Outdoor 12. Operating Mechanism - Manual 13. Mounting Position - Vertical 14. Type of contact - Silver plated 15. Maximum Switching Voltage kv To be mentioned 16. Insulator material strength KN 1.6 17. Safety clearance between the terminals mm To be mentioned 18. Dimensions (L x W x H) mm To be mentioned 19. Total weight of unit Kg To be mentioned 20. Outline and General arrangement drawings. - To be submitted 21. Manufacturer's ISO 9001 certificate. - To be submitted 22. Printed Catalogue describing specification and technical data 23. Standard (IEC 282-2/ BS 729/ ANSI-C 37.40, 37.41 & 37.42 and NEMA Standard) - To be submitted - To be mentioned Manufacturer's Guaranteed Particulars Manufacturer s Seal & Signature Bidder Seal & Signature

8.02 GUARANTEED TECHNICAL PARTICULARS OF 11KV OUTDOOR DROP OUT FUSE CUT-OUT AND FUSE LINK (To be filled up by the Manufacturer in Manufacturer Letterhead Pad, otherwise the bid shall be rejected.) 8.02 11KV FUSE LINK Sl. No. Description Unit BPDB's Requirement 1 Manufacturer s Name & Country - To be mentioned Manufacturer's Guaranteed Particulars 2 Manufacturer s Model no. - To be mentioned 3 Type - K-Type (NEMA Standard) 4 Rated Voltage kv 11 5 Frequency Hz. 50 6 Rated Current Amps. a) 16 amps b) 25 amps b) 40 amps 7 Rated interrupting capacity KA (rms) 8 8 Time/ Current Characteristics - To be furnished 9 Material of fuse Link - To be mentioned 10 Material of fuse cartridge - To be mentioned 11. Standard (IEC 282-2/ BS 729/ ANSI-C 37.40, 37.41 & 37.42 and NEMA Standard) - To be mentioned Manufacturer s Seal & Signature Bidder's Seal & Signature

8.3 SCHEDULE OF MANUFACTURERS NAME AND PLACES OF MANUFACTURE & TESTING Item No Description Manufacture's name Place of Manufacture 01 11kV Outdoor Drop Out Fuse Cut-out and Fuse Link Place of Testing & Inspection Seal and Signature of the Bidder

SECTION 9 DRAWINGS