Visual Inspection Checklist

Similar documents
DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Dam Safety Inspection Checklist

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM

Types of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

DAM AND CANAL SAFETY GUIDELINES

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08


Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1

Sediment Basins and Skimmers. Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

Coal Combustion Facility Assessment Report. October 20, 2010

Curlex II EROSION CONTROL BLANKET SPECIFICATION

City of Charlotte BMP Maintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BMP]

Irrigation System. BWCDD Zanjero Training 2/13/2008

Filter Tube Barriers (Instream)

Chapter 11 Culverts and Bridges

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

Sediment Basin. Fe= (Depends on soil type)

REROUTING DRAINAGE SYSTEMS

Installation and Maintenance of Erosion Control BMPs

PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY

Types of Hydropower Facilities

2C-12 Detention Basin Outlet Structures

Stormwater Local Design Manual For Houston County, Georgia

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

TEMPORARY SEDIMENT TRAP CODE

MODEL Stormwater Local Design Manual. City of Centerville

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

Brush layering construction

LEVEE DEFICIENCY CORRECTION PROCEDURES

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

Chapter 12 Storage. Contents. Overview... 1

TVA Colbert Fossil Facility Ash Disposal Pond 4

Upper San Joaquin River Regional Flood Management Plan Flood Management Operations and Maintenance

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

Application For Waste Regulation (Check all that apply)

FLOOD PLAIN STANDARDS AND REQUIREMENTS. Adopted by City Council on September 16, 2014 Effective January 1, 2015

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

2016 ANNUAL DAM AND DIKE INSPECTION REPORT

Table of Contents. 5-5 Release Rates Year Allowable Release Rate WQCV Release Rate EURV Release Rate...

PAPERWORK REDUCTION ACT A. GENERAL

Recyclex TRM TURF REINFORCEMENT MAT SPECIFICATION

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

Annual Inspection Report

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

VICTORY HALL 401 VALLEY STREET SCOTTSVILLE, VIRGINIA TELEPHONE: (434) FACSIMILE: (434)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

STORMWATER DEVELOPMENT GUIDELINES

LEVEE DEFICIENCY CORRECTION PROCEDURES

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

CCR Annual Inspection (b) for the Ash Pond at the San Miguel Plant. Revision 0

Manure Storage for Environmental Management Systems

Dam Failure Hazard Profile

POND CONSTRUCTION. Woodland Steward Series

STREAMBANK RESTORATION DESIGN

The Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997.

Information for File # PRH

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

Final Summary Report Structural Integrity Assessment Bottom Ash Pond Cholla Power Plant Joseph City, Arizona

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 200 DRAINAGE PLANNING AND SUBMITTAL

Chatham Park Stormwater Manual

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Extended Detention Basin (EDB) Sedimentation Facility

Constructed Wetland Pond T-8

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

E. STORMWATER MANAGEMENT

Irrigation Structures 2. Dr. M. R. Kabir

Storm Drain Inlet Protection

Economics of Implementing Two-stage Channels

Figure 1. Report of Inspection Process Flowchart.

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

Application for resource consent Form B Damming and diversion of water

Evaluation of New Concrete Shrinkage Reducing Additive for Glen Elder Dam Spillway Inlet Slab Repair

North Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Application for Gas Exploration and Production

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

CLOSURE PLAN. CFR (b) Document No. GERS Stingy Run Flyash Pond. Gavin Plant Cheshire, Ohio. October, 2016

JEFFERSON COUNTY STORM WATER MANAGEMENT

Fence and Wall Requirements

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements:

Dam Maintenance Fact Sheet

Task Order Authorization

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

SEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Transcription:

APPENDIX Q. Visual Inspection Checklist

Thispageintentionallyleftblank.

VISUAL INSPECTION CHECKLIST CITY OF AUBURN PUBLIC WORKS DEPARTMENT INSPECTION YEAR: TYPE OF INSPECTION: (Informal, Regular, Formal): DAM NAME: DAM INVENTORY NO: LOCATION: ¼ of the ¼, Section, Township, Range, Lee County OWNER: OPERATOR: DATE OF INSPECTION: RESERVOIR INFORMATION Normal Reservoir Elevation (ft): Reservoir Elevation at time of inspection (ft): WEATHER CONDITIONS (including recent rainfall): INSPECTION PERSONNEL Alabama Licensed Professional Engineer(s): Name Affiliation Area of Expertise Non-Licensed technical expert(s) and advisors(s): Name Affiliation Area of Expertise

City Representative(s): Name Affiliation Dam Owner Representative(s): Name Affiliation Others: Name Affiliation GENERAL INFORMATION Name of Dam: River Basin: Stream Name: Latitude (N): Tributary of: Longitude (W): Purpose of Dam: Hazard Classification: Height of Dam (ft): Normal Surface (ac): Maximum Surface (ac): Principal Spillway Capacity (cfs): Drainage Area (sq. mi.): Length (ft): Normal Capacity (ac-ft): Maximum Capacity (ac-ft): Emergency Spillway Capacity (cfs):

Are the spillway(s) adequate for this classification of dam? Principal: Yes No Emergency: Yes No If not, what percent of the PMP can be passed? Principal: % Emergency: % HISTORY Date Constructed: Designer: Date(s) Reconstructed: Constructed by: Owner & Address: Owner Telephone Number: Owner/Operator present during inspection (yes or no): PREVIOUS INSPECTIONS (date of) Last Informal Inspection: Last Regular Inspection: Last Formal Inspection: EMERGENCY ACTION PLAN (Required for all High and Specified Significant dams) Date of Approved Plan: Date of Plan Revision: Is the notification flowchart complete and current? Is inundation mapping included? Are emergency materials and equipment identified? When was the plan last tested?

DOWNSTREAM HAZARD CLASSIFICATIONS Present Hazard Classification: Changes in Downstream Land Use and Habitation since last inspection: Is present Classification appropriate? OPERATION AND MAINTENANCE Date of Operation and Maintenance Plan: Are instructions adequate? Do operating personnel follow instructions? What are operating personnel capabilities? EXAMINATION OF EMBANKMENT DAMS DESCRIPTION OF STRUCTURE Embankment Material: Cutoff Type (If Known): Impervious Core (If Known): Internal Drainage System: Movement (Horizontal and Vertical Alignment): Junctions with Abutments or Embankments: Miscellaneous: CREST Width of Crest: Erosion on Crest Present: Surface Cracks: Settlement:

UPSTREAM SLOPE Slope (Estimate) (H:V): Trees, Undesirable Growth or Debris, Animal Burrows): Sloughing, Subsidence or Depressions: Slope Protection: DOWNSTREAM SLOPE Slope (Estimate) (H:V): Trees, Undesirable Growth or Debris, Animal Burrows): Sloughing, Subsidence or Depressions: Surface Cracks or Movement at Toe: Seepage: External Drainage System (Ditches, Trenches, Blankets): Condition Around Outlet Structure: GROIN AND TOE AREA Erosion around Groin Area: Seepage at Groin Area: Depressions, Sinkholes: SEEPAGE AND TOE DRAIN/RELIEF WELL FLOW SUMMATION Location Estimated Flow Color (Turbidity)

EXAMINATION OF SPILLWAYS AND OUTLET WORKS TYPE(S) AND DESRICPTION OF SPILLWAY(S) Principal: Emergency: Other: FOR EACH SPILLWAY THE FOLLOWING ASPECTS MUST BE EXAMINED WHERE APPROPRIATE ENTRANCE CHANNEL Vegetation (Trees, Bushes): Debris: Channel Side-Slope Stability: Slope Protection/Erosion: SPILLWAY CREST Joints: INLET RISER

Joints: Floor: SPILLWAY WING WALLS Joints: Drains: DOWNSTREAM APRON CONDUITS Joints: Seepage: Location Estimated Flow Turbidity

TRASH RACKS CHUTES Joints: STILLING BASIN Erosion: OUTLET CHANNEL Vegetation (Trees, Bushes): Debris: Channel Side-Slope Stability: Erosion:

LOW LEVEL OUTLET Condition: Trash Rack: Leakage: Location Estimated Flow Was the low-level outlet operated during the inspection? Were there difficulties operating the low-level outlet? When was the low-level outlet last operated and did this conform with the Operation and Maintenance Procedures? Miscellaneous: EMERGENCY SPILLWAY Vegetation (Trees, Bushes): Debris: Channel Side-Slope Stability: Slope Protection/Erosion: OTHER SPILLWAY Vegetation (Trees, Bushes): Debris: Channel Side-Slope Stability: Slope Protection/Erosion:

EXAMINATION OF OTHER FEATURES INSTRUMENTATION (Monumentation/Surveys, Observation Wells, Weirs, Piezometers, Etc.) location, condition: (A separate report including instrument readings, condition of instruments, observations, and conclusions based upon the collected data should be attached.) RESERVOIR Slopes: Sedimentation: Unusual Conditions Which Affect Dam: APPURTENANT STRUCTURES (Power House, Gatehouse, Penstocks, Water Supply, Other) Description and Condition of each: CONCLUSIONS I certify that the above dam was personally inspected by me and the conditions described herein are correct to the best of my knowledge and belief. I recommend the following repairs be made immediately: The following long-term improvements should also be undertaken:

The following studies should also be undertaken: Have the recommendations above included those from previous Regular or Formal Inspections? Does the Emergency Action Plan or the Operation and Maintenance Procedures require revision? Name of Professional Engineering Company/Consultant Representing the Owner: Company/Consultant Address: Company/Consultant Telephone Number: Alabama Licensed Professional Engineer representing the dam owner in responsible charge of the inspection: Sign Date Alabama Professional Engineer License Number SEAL (Department use only) Dam Name Reference No. Hazard Classification: