Transitioning to the New Erector Standard from a Checklist

Similar documents
MANUAL QUALITY CONTROL & QUALITY ASSURANCE

Certification Standard for Steel Fabrication and Erection, and Manufacturing of Metal Components

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

1. Cast-in-place concrete is specified in Section

SECTION STRUCTURAL STEEL

Evaluation of Highway Guardrail Manufacturers

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

Quality Control and Quality Assurance for Installation of Steel Deck

Special Inspections Instructions

Facilities Planning and Construction (FP&C)

PREFABRICATED STEEL TRUSS SPECIFICATIONS

Project Address: Name of Person Completing Form:

Ironworker Safety Director Training Course. Steve Rank Executive Director of Safety and Health

2016 Port of San Francisco Building Code

Washington Association of Building Officials. Standard 1702 Steel Fabricator Registration Program

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172. April 2017 (Effective June 1, 2017) PREFACE

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Quality Assurance Policy and Procedures

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Critical Structures Construction Issues

Beaver Machine. Quality Manual

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

***************************************************************************************************************

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

QA/QC Program Overview. November, 2015

PROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES

Subcontractor Project Management Plan

Quality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEV\, YORK PROJECT NO

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

EVANS CAPACITOR COMPANY

WELDING ENGINEERING FABRICATION

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

SIKORSKY AIRCRAFT TOOLING BULLETIN SA7303 December 15, 2015

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Scope of Work Bid Package C-3 - West Precast Concrete

Jobsite Layout Considerations

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

SHELTON INDUSTRIAL PATTERN INC.

Forms. VR Form 1 - Special Inspector Roster and Contact Information 2. VR Form 2 - Participating Jurisdiction Roster and Contact Information 5

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

SECTION CLIMBING WALLS

Pressure Control Supplier Quality Requirements Raw Materials Forgings and Wrought Forms SQ-12 Rev: 1.1

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

SECTION CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES. 1. Define and coordinate structural testing and special inspection services.

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

Standards for Testing and Rating Shoring Equipment

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC

General Document or OQE Comments SAT UNSAT

SIERRA MODEL 12 X 24 SPECIFICATIONS

ISO 9001:2008 Quality Manual

SECTION QUALITY REQUIREMENTS

Landscape Services QA/QC Manual Sample Selected pages (not a complete plan)

Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms.

QUALIFICATION TESTING OF FIELD WELDERS

NTPEP Evaluation of Plain and Laminated Elastomeric Bridge Bearings

DIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

Page 1 / 11. Version 0 June 2014

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

INS QA Programme Requirements

QUALITY AND SAFETY ASSURANCE AND CONTROL PROGRAM (2016/17)

SECTION PREFABRICATED PIPE BRIDGE(s)

QUALITY MANUAL W.R. Larson Rd. P. O. Box San Antonio, Texas San Antonio, Texas (830) (210) FAX

Vendor Qualification Survey

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Janitorial QA/QC Manual Sample

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS SAFETY HEIRARCHY

STANDARD PRACTICE INSTRUCTION

AISC Certification Program for Bridge and Highway Metal Component Manufacturers

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I

Quality Assurance in the Amusement Industry CLARK WESTERFIELD

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

ISO General Requirements for Competence of Testing Laboratories Procedure

SECTION CANOPIES. Display hidden notes to specifier. (Don't know how? Click Here) Copyright ARCAT, Inc. - All rights reserved

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

NUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES

0. 0 TABLE OF CONTENTS

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Quality Manual ISO 9001:2000

BUILDING INSPECTOR I/II

DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS

Pressure Control Supplier Quality Requirements Coating & Plating Services SQ-03 Rev: 1.1

Washoe County PLAN SUBMITTAL

Transcription:

Transitioning to the New Erector Standard from a Checklist With the release of the Standard, what does that mean for the industry and you? AISC Certification will be introducing an updated Erector Certification Program in 2014, which will be based on the new Program Requirements for Erectors. This document will be the governing criteria for the program and will reference the 2013 Standard for Structural Steel Erectors (AISC 206-13). Both documents can be found at www.aisc.org/ certification. This program update will supersede the former erector checklist criteria and the existing categories (Certified Steel Erector and Advanced Certified Steel Erector). The updated program is designed to ensure that companies have s in place and demonstrate that they are following them. AISC s Fabricator QMS Programs have already completed a similar transition. New erector applicants who apply beginning September 1, 2014 must meet the new program requirements. For currently certified erector participants, the conversion from the current Certified or Advanced Certified Erector Checklists to the new program requirements will begin on August 1, 2015. The conversion is mandatory for all participants and will be completed by August 2016. This program is part of an ongoing effort to transition AISC Certification programs to a standard-based approach to quality management. The new requirements and standard will better communicate to owners and specifiers exactly what the Erector Certification Program provides. It also continues to offer the industry a valuable means for qualifying firms and serves as an effective way for those firms to communicate their commitment and capability with respect to quality. This Erector Program update promotes a standardbased approach to achieving quality in structural steel erection, noted Jacques Cattan, AISC vice president responsible for certification. Owners, general contractors and engineers who work with AISC-certified steel erectors will benefit because this approach is more economical than the costs that often result from fixing what is found after trying to inspect quality into the product later. Table 1 outlines the new erector standard and compares it to the erector certification checklists. As always, if you have additional questions or comments, please feel free to contact AISC Certification at certification@aisc.org.

Description of Standard v. Checklist Checklist Requirement 1.0 Scope Not previously in Checklists 2.0 Not Used Not previously in Checklists 3.0 References Not previously in Checklists 4.0 Not Used Not previously in Checklists 5.0 Management Responsibility 5.1 Policy for Quality AP15 Is there a corporate policy stating quality goals? 5.2 Policy for Safety AP5 Is there a corporate policy stating safety goals? OP2 Are personnel aware of the corporate safety policy? 5.3 Periodic Management Review Not previously in Checklists 5.4 Responsible Quality and Safety Personnel MG3 Does applicant have an individual on staff assigned to safety functions? Note: the individual may perform other functions in addition to the duties related to safety. OP9 Does the applicant assign safety responsibilities on the site to a specific individual? 5.5 Resource Management AP2 Are there job descriptions for positions within the organization? AP3 Is there biographical information for all key personnel? MG10 Does applicant have a record of the craft workers who are certified welders? OP24 Are crane operators CCO certified or equivalently trained and/or experienced? OP46 Is there a structural engineer on staff or available on a regular basis to address temporary shoring or false work needs and other engineering requirements? AP12 Is there a for periodic inspection of equipment, particularly lifting equipment (specifically lifting beams, cranes and rigging equipment)? OP22 Are there records of preventive maintenance? OP26 Is there a functioning for maintenance of equipment that includes inspections on a regular basis? OP28 Are proper and adequate tools, power and compressed air available and in use to perform the tasks described in the SSPP and performed on the site? 5.6 Quality Management System AP18 Is there a list of erection equipment? OP25 Is there a list of all the equipment sent to the job site by the equipment manager or foreman? AP20 Is there an organization chart showing general office and site supervision and staff with lines defining authority and communication? 5.7 Safety Management System AP4 Does the applicant have a documented safety program? 6.0 Construction Document Review and Communication 7.0 Not Used Not previously in Checklists 8.0 Control of Documents Standard requires written 8.1 Quality Management System and Safety Management System Documents MG2 Does management review project safety and quality requirements prior to the start of erection? OP14 Are specifications or a summary of specifications and special instructions kept on site? OP1 Are job superintendents and foremen knowledgeable and conversant in the requirements of the company safety manual?

Description of Standard v. Checklist Checklist Requirement 8.2 Project Documents OP12 Are a complete set of erection drawings and shop detail drawings maintained at the job site? OP38 Are requests for information necessary to resolve discrepancies and variations from contract requirements documented? OP15 - Is there a at the job site for processing revised and voided drawings? OP18 Is there a record of an anchor bolt survey? OP20 Does the erector have records to demonstrate that he proceeds with erection only after receiving contractor s notification to proceed after concrete has sufficiently cured and that anchor rods, if modified, have the approval of the EOR (engineer of record)? 9.0 Control of Quality Records Standard requires written 9.1 Storage Not previously in Checklists 9.2 Retrieval Not previously in Checklists 9.3 Retention Not previously in Checklists 9.4 Disposition Not previously in Checklists 10.0 Purchasing Standard requires written MG14 Are records kept of daily/weekly/monthly safety checks as may be required in the various safety s of the company? MG13 If applicant purchases items such as, but not limited to, field bolts, weld wire, flux, fabrications, paint, etc., are these items ordered per the applicable specifications called for in the contract documents? 10.1 Purchasing Data OP39 In the event the applicant purchases weld wire, steel material, paint, etc., are the manufacturer s test reports or certificates of compliance on file at the location where the material is being utilized? 10.2 Selection of Subcontractors and Suppliers 10.3 Verification of Purchased Product, Materials and Services Standard requires written MG15 Is there a graduate engineer on staff or available on a contract basis to provide guidance on engineering matters for the company? (The company may employ consultants for specific projects or established s to supplement the staff engineering requirement.) MG21 In the event the applicant is the prime contractor, are s in place to evaluate whether fabrication (including machining castings, galvanizing, etc.) is furnished in accordance with the contract documents? OP40 Have controls been established to monitor the receipt of incoming material? 10.4 Control of Supplied Material OP40 Have controls been established to monitor the receipt of incoming material? 11.0 Material Identification Standard requires written 12.0 Erection Process Control Standard requires written OP29 Have qualified personnel been assigned the responsibility of bolting and welding joints in accordance with applicable specifications? OP31 Has the person responsible for bolting or welding of joints implemented a to verify that connections are made to a specific sequencing plan? OP32 Does the erector have hole-making equipment at the job site that allows holes to be made in accordance with the plans and specifications?

Description of Standard v. Checklist Checklist Requirement 12.1 Welding AP17 Are representative weld s submitted? OP33 Are welders qualified per AWS D1.1 or D1.5? OP34 Do welders understand, comply with, and check their welds to the workmanship and technique requirements of AISC, AWS or other requirements specified by the contract? OP35 Are flux and rod ovens adequate and close enough to where the work is being performed and are they operating per the latest AWS requirements? 12.2 Bolt Installation AP16 Is there a bolt installation? OP30 Are written bolt-tightening s understood by supervision and the bolting crews and available for employees performing the bolting? Is there evidence that the s are being followed? 13.0 Inspection Standard requires written 14.0 Calibration of Inspection, Measuring and Test Equipment Not previously in Checklists MG16 If welding is required, is a competent welding technician (such as a CWI) employed by the applicant? MG17 If utilized or required by contract, are testing service personnel qualified in accordance with SNT TC1-A? OP13 Are job site superintendents and foremen conversant with current workmanship requirements such as those contained in AWS, AREMA, AISC or other specifications? OP31 Has the person responsible for bolting or welding of joints implemented a to verify that connections are made to a specific sequencing plan? OP44 Is a quality control program in effect to allow management to assess whether work is being performed according to specifications? 15.0 Control of Non-Conformances AP19 Is there a Non-Conformance Procedure? OP45 Is there a functioning written for the correction of nonconforming material or work in process? 15.1 Non-conformance with the Quality Management system Not previously in Checklists 15.2 Non-conforming Work Not previously in Checklists 16.0 Corrective Action Standard requires written 17.0 Handling, Storage and Delivery of Product and Materials Not previously in Checklists 18.0 Training MG4 Does applicant have documented training for both supervisory and hourly personnel on their internal safety s? MG5 Does applicant have records of craft workers involved in ongoing training courses? MG6 Is training conducted and documented on what constitutes perimeter and hole protection? MG7 Is fall hazard training conducted? MG8 Is Multiple Lift rigging training conducted as appropriate? MG9 Is Connector Procedures training conducted? MG10 Does applicant have a record of the craft workers who are certified welders? OP36 Is there a record of training of aerial lift operators? 19.0 Internal Audit Standard requires written

Description of Standard v. Checklist Checklist Requirement 20.0 Safety Management System Not previously in Checklists 20.1 Documentation Requirements NAP8 Is there a lock-out/tag-out program? AP9 Is there a for control of protection of openings? AP10 Is there a for fall protection? AP11 Is there a for defining the use of personal protective equipment? MG11 Does executive management receive safety reports per a written from each job site? MG14 Are records kept of daily/weekly/monthly safety checks as may be required in the various safety s of the company? MG22 Is there a for rivet removal? Does the company have a training program for personnel on jobs with substantial rivets to be removed? MG23 Does the company have a lead exposure? Is periodic testing documented? Are written records available? MG24 Are there s to identify and deal with fume, smoke and dust? OP3 Are all accidents reported to Executive Management? OP6 Are MSDS available to the workers? OP7 Is there a first aid/safety station available and is emergency response accessible? OP37 Is there evidence that the lock-out/tag-out program is used? OP47 Does the company have a Hazardous Material Communication training program? AP7 Is there a for rivet removal? AP14 Is there a to use in preparing a Project Specific Erection Plan as defined in the Program Guidelines? MG1 Are Project Specific Erection Plan, Project Specific Safety Plan available for a selected sample of projects on the project listing? MG20 Are erection requirements (such as adjustments, erection aids, delivery sequencing and similar items) reviewed between the erector and the fabricator to allow adjustments to be incorporated into subsequent shop detail drawings? MG25 When jacking is required, are jacking s in place? OP8 Is the Project Specific Erection Plan being implemented and communicated in the field? OP16 Is there a specific person at the site responsible for structure stability/ erection bracing? OP17 Is the stability provision of the Project Specific Erection Plan being effectively implemented? OP21 Is a specific person responsible at each job site for the hoisting of materials? OP23 Is there evidence that critical lifts have been controlled in accordance with the Project Specific Erection Plan? OP41 Are there s in place to control capacity lifts? OP42 Is there a record indicating that lines and grades have been checked and controlled? AP13 Is there a to use in preparing a Project Specific Safety Plan as defined in the Program Guidelines? MG1 Are Project Specific Erection Plan, Project Specific Safety Plan available for a selected sample of projects on the project listing? OP10 Is there evidence, and are there records that perimeters and openings are protected? OP11 Are fall protection practices periodically monitored and recorded by a person trained in fall protection and authorized to require corrections as needed? OP18 Is there a record of an anchor bolt survey? OP20 Does the erector have records to demonstrate that he proceeds with erection only after receiving contractor s notification to proceed after concrete has sufficiently cured and that anchor rods, if modified, have the approval of the EOR (engineer of record)?

Description of Standard v. Checklist Checklist Requirement 20.2 Safety Training OP4 Does applicant hold a safety meeting on the site per their documented safety plan? OP5 Is there evidence of safety orientation for newly hired workers? Item C037-14 August 2014