October 31, Attn: Architects, professional engineers. Design of hazardous areas

Similar documents
Third, use the information from the second step to assist you in completing the Hazardous Materials Inventory Sheet.

HAZARDOUS MATERIALS GENERAL PROVISIONS

Nathan Ellis

Tenant Occupancy Application (No Construction)

Applying the Building Code During Design

Questions, do not hesitate to call my office at or

Reference Guide: Mid-Rise Wood Construction in the Ontario Building Code Report by Morrison Hershfield (January 2015)

INTERIOR ENVIRONMENT

Advanced Ventilation for Residential applications FBC Res 2010.

NFPA 30 FLC-OPS Public Comment Report. Public Comment No. 41-NFPA [ Section No [Excluding any

First Revision No NFPA [ Section No ]

USE AND OCCUPANCY CLASSIFICATION

The Building Codes A.R.E. Building Design and Construction Exam Prep

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

HAZARDOUS MATERIALS GENERAL PROVISIONS

Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

Building Codes and Ordinances ARC 227

ENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE

Dangerous Goods (Storage and Handling) Regulations 2000 and Code of Practice

CODE 101 How To Read The California Building Code

General Commercial Energy Provisions

SECTION : FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES

EXHAUST SYSTEMS CHAPTER 5

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Building Code 8 th Edition

NFPA 30-FLC-SWC Second Revisions Report

International 9/8/11 WORKING PAPER Edition FOR SUMMARY 3503, At the 1.1 DGP/23-WP/15. DGP.23.WP en.docx.

FS , 712, 713, 714

WHO IS THIS COURSE FOR?

INTERIOR ENVIRONMENT

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

UBC. (1997 Edition) (p.1-116) 2-hr. shaft required for

Administrative Changes

BUILDING CODE VARIANCE

TORONTO MUNICIPAL CODE CHAPTER 492, GREEN ROOFS. Chapter 492 GREEN ROOFS. ARTICLE I General. ARTICLE II Requirement for Green Roofs

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

PRESCRIPTIVE COMPLIANCE METHOD

USE AND OCCUPANCY CLASSIFICATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 3 USE AND OCCUPANCY CLASSIFICATION SECTION BC 301 GENERAL

2014 Alberta Building Code Classifications of Buildings and the Types of Occupancies Allowed within Buildings

Victorian Dangerous Goods (Storage & Handling) Regulations 2012 Summary

Basement Renovation Guide For Residential Dwellings

BUILDING CODE COMMISSION

Approval Standard. for. Flammable and Combustible Liquid Storage Buildings

2012 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

Bulletin Building Approvals Department 6911 No. 3 Road, Richmond, BC V6Y 2C1

Classification of the substance or mixture Classification according to 29CFR

FORM 4340 ENVIRONMENTAL QUESTIONNAIRE

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

Dangerous Goods Safety Guidance Note. Licensing and exemptions for storage and handling

FLAMMABLE AND COMBUSTIBLE LIQUIDS

Subpart D Definitions Classification, Packing Group Assignments and Exceptions for Hazardous Materials Other Than Class 1 and Class 7

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

High Piled Combustible Storage Guideline

SECTION BUILDING INSULATION. Display hidden notes to specifier. (Don't know how? Click Here)

DRI Procedure for Moving/Transporting Chemicals 1

301.1 Scope. The provisions of this chapter shall control the classification of all buildings and structures as to use and occupancy.

Version 1.6 Print Date 10/10/2012 Revision Date 07/13/2010. Component CAS-No. Weight percent. Sodium Hydroxide

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Other requirements for stowage and segregation for cargo vessels and passenger vessels.

CHAPTER 5 EXHAUST SYSTEMS

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

BUILDING CODE COMMISSION

2015 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

Lab Safety. Date: WHMIS stands for: W: H: M: I: S:

Bureau Policy for Tent Permit

Alternative Solution Approach to Fire Design

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

2009 IBC Ht. & Area Calculations Talk. Calculation of Building Height & Area under the 2009 IBC. Consultant s Motto

HAZARDOUS MATERIALS TRAINING! What do we do with this stuff, it looks dangerous?!?

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION

Importance Category and Seismic Restraint

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

Material Safety Data Sheet Yeast, Zinc MSDS

Law enforcement on proactive protection of noise and vibration pollution for

Code Review for Theaters and Props

Watermist State of the Art Technology

GLADE PLUGINS SCENTED OIL (CLEAN LINEN )

Radon Vent Pipe System. Labeling Performance Indicators

Hazardous Materials Operations

One and Two Family Additions

DESIGN STANDARD DS 79-03

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

WINDEX ORIGINAL GLASS CLEANER

Project & Environmental Review. Guidelines Demolition. May 2016

Chapter 2: Foundation

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Important Notice To Building Permit Applicants and Designers

FOR SALE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE. 950 South Service Rd. Stoney Creek, ON

DOUGLAS COUNTY ZONING RESOLUTION Section 13 LI - Light Industrial District 3/10/99. -Section Contents-

Dave Harper, Building Official (509) Susan Davis, Administrative Secretary (509)

Transcription:

B u i l d i n g S e r v i c e s N O T I C E October 31, 2016 Attn: Architects, professional engineers Re: Design of hazardous areas The design of hazardous areas requirements in the Building Code apply to the indoor storage, handling, use and processing of dangerous goods, products, whether raw or waste materials, goods in process, or finished goods. Building permit applications for all occupancies that will contain hazardous substances or dangerous goods shall indicate so on the Ontario Building Code Analysis form. (attached) Common occupancy types that may contain dangerous goods or hazardous substances include, but are not limited to, industrial occupancies (including warehouses), laboratories, doctors/dentists offices, medical supply stores, hospitals, nursing homes, schools, repair garages, and construction rental stores. The attached Manual outlines the process required to verify compliance with the Building Code. Effective January 1, 2017, all building permit applications for occupancy types that may include the indoor storage of dangerous goods or hazardous substances shall include the following information from the manual: Figure 1 Questionnaire (page 4) Applicable Data Sheets (pages 5, 8, 16) The requirements contained within Subsection 3.3.6. reflect some, but not all design requirements contained in Division B of the Fire Code as it relates to the design of hazardous areas. Design professionals should refer to the Fire Code for additional requirements that may apply to their circumstances. For additional information, please contact the undersigned. Regards, Jeremy Laur, CBCO Program Manager of Permit Services Building Services City of Guelph 519-837-5615 extension 2379 jeremy.laur@guelph.ca This Building Services Notice should be shared with anyone involved in the design or construction of buildings containing the indoor storage of dangerous goods or hazardous substances. Page 1 of 1 Building Services 519-837-5615 building@guelph.ca

Ontario Building Code Analysis Item Project Location: OBC Reference 1 Project Description New Alteration Addition Change of Use Part 3 2 Major Occupancy Group Division 3 Building Area (m²) Existing New Total 4 Mezzanine Area (m²) Existing New Total 5 Gross Area (m²) Existing New Total 6 Number of Storeys Above Grade Below Grade 7 Height of Building (m) 8 Number of Streets/Access Routes 9 Building Classification 3.2.2. (if applicable) 10 Sprinkler System Existing: Proposed: 11 Standpipe Existing: Proposed: 12 Fire Alarm Existing: Proposed: 13 Water Service/Supply is Adequate 14 High Building (3.2.6) 15 Type of Construction Combustible ncombustible Both 16 Occupant Load Existing: New: Total: m²/person design 17 Washroom Facilities (# of Water Closets) Existing: Men Women Proposed: Men Women Part 9 Part 11 18 Barrier Free Design (Explain) 19 Hazardous Substances, Equipment, Processes and Dangerous Goods - 3.3.1.2. & 3.3.6. 20 Required Fire Resistance Ratings (FRR) Horizontal (hours) Listed Design No. or Description (SB-2) Supporting Members (hours) Floors Roof Mezz. Floors Roof Mezz. 21 Spatial Separations Construction of Exterior Walls Wall Area of EBF (m²) L.D. (m) L/H or H/L Perm % of UPO Prop % of UPO North South East West (Refer to Design of Hazardous Areas Manual) FRR (hrs) Listed Design No. or Description (SB-2) Listed Design or Description Completed By: Phone: Email: Noncombustible Required Construction Cladding October 31, 2016 Building Services T 519-837-5615 E building@guelph.ca

Manual Ontario Building Code Division B, Subsection 3.3.6. DEFINITIONS... 2 Defined terms OBC, Division A, 1.4.1.2.... 2 OBC ANALYSIS... 3 Summary... 3 Figure 1 Questionairre... 4 SECTION 1 Compressed Gas... 5 Data Sheet... 5 Flow Chart 1a... 6 Flow Chart 1b... 7 SECTION 2 Flammable Liquids and Combustible Liquids... 8 Data Sheet... 8 Flow Chart 2a Assembly & Residential... 9 Flow Chart 2b Mercantile... 10 Flow Chart 2c Groups B, D and Schools... 11 Flow Chart 2d Industrial... 12 Flow Chart 2e Storage Rooms... 13 Flow Chart 2f Storage Cabinets... 14 Flow Chart 2g Explosion Venting... 15 SECTION 3 Ammonium Nitrate... 16 Data Sheet... 16 Flow Chart 3a... 17 Disclaimer: The information provided herewithin is not guaranteed to be correct. Reference should always be made to the Building Code and Fire Code, as amended, which are the authoritative sources for information on the construction and use of buildings. Reference should also be made to all other applicable reference documents. This publication should not be relied upon as a substitute for legal or design advice. Created: Nicholas Rosenberg, October 31, 2016 Building Services Modified: name, date T 519-837-5615 E building@guelph.ca

DEFINITIONS Defined terms OBC, Division A, 1.4.1.2. Combustible liquid Combustible liquid means any liquid having a flash point at or above 37.8 C and below 93.3 C. Class II combustible liquids have a flash point greater than or equal to 37.8 C and below 60 C. Class IIIA combustible liquids have a flash point greater than or equal to 60 C and below 93.3 C. Class IIIB combustible liquids have a flash point greater than or equal to 93.3 C. Compressed gas Compressed gas means any contained mixture or material with either an absolute pressure exceeding 275.8 kpa at 21 C or an absolute pressure exceeding 717 kpa at 54 C, or both, or any liquid having an absolute vapour pressure exceeding 275.8 kpa at 37.8 C. Dangerous goods Dangerous goods mean those products or substances that are regulated by the Transportation of Dangerous Goods Regulations made under the Transportation of Dangerous Goods Act, 1992 (Canada). Flammable liquid Flammable liquid means a liquid having a flash point below 37.8 C and having a vapour pressure not more than 275.8 kpa (absolute) at 37.8 C as determined by ASTM D 323, Vapor Pressure of Petroleum Products (Reid Method). Class IA flammable liquids have a flash point below 22.8 C (the upper end of the common range of room temperature) and a boiling point below 37.8 C. Class IB flammable liquids have a flash point below 22.8 C and a boiling point greater than or equal to 37.8 C. Class IC flammable liquids have a flash point greater than or equal to 22.8 C and below 37.8 C. Process plant Process plant means an industrial occupancy where materials, including flammable liquids, combustible liquids or gases, are produced or used in a process. Unstable liquid Unstable liquid means a liquid, including flammable liquids and combustible liquids, that is chemically reactive to the extent that it will vigerously react or decompose at or near normal temperature and pressure conditions or that is chemically unstable when subjected to impact. 2

OBC ANALYSIS Summary The design of hazardous areas requirements in the Building Code apply to the storage, handling, use and processing of dangerous goods, products, whether raw or waste materials, goods in process, or finished goods. Common occupancy types that may contain dangerous goods or hazardous substances, include, but are not limited to, industrial occupancies (including warehouses), laboratories, doctors/dentists offices, medical supply stores, hospitals, nursing homes, schools, repair garages, and construction rental stores. Figure 1 contains a series of questions related to materials and substances identified in Article 3.3.1.2. and Subsection 3.3.6. of the Building Code and Division B of the Fire Code. Figure 1 shall be completed by the owner, or their authorized agent, based on the proposed use of the building. All questions are required to be answered, and subsequent Sections completed, in order to verify compliance with the Building Code, applicable sections of the Fire Code, and other applicable law. General Notes: 1. This document does not reflect all design requirements found in the Fire Code. Refer to the Fire Code for additional requirements that may be applicable, or contact the Guelph Fire Prevention bureau directly. 2. A professional engineer s report may also be required in order to verify compliance with applicable Building Code and Fire Code requirements. 3. A letter of use may be required to be submitted. 3

OBC ANALYSIS Figure 1 Questionairre Project Location: 1 2 3 4 5 6 7 8 9 10 Will there be storage of any explosives, blasting agents, detonators, propellant explosives, fireworks, pyrotechnics or ammunition? - If yes, submit professional engineer s report verifying design compliance with the Explosives Act (Canada), the Explosives Regulations made under that act, and the Corporation of the City of Guelph by-law number (1993)-14362, Fireworks By-law. Note: Up to 1,000kgs of consumer fireworks (Type F.1) and 225kgs of small arms cartridge ammunition (Type C.) may be stored for sale without an explosives licence from NRC. Will there be storage of any compressed gas? - If yes, professional engineer to complete Section 1 below. Will there be storage or dispensing of any flammable liquids or combustible liquids? - If yes, professional engineer to complete Section 2 below. Will there be indoor storage of tires? - If yes, provide volume of intended tire storage area. m 3 Notes: If more than 375m 3, tires shall be in a 2 hour fire compartment. (Ref.: OBC, 3.3.6.5.) If more than 425m 3, refer to Subsection 3.3.1. of the Fire Code. Will there be storage of ammonium nitrate? - If yes, professional engineer to complete Section 3 below. Will any areas of the building be used as a process plant where unstable liquids are handled or small scale unit chemical processes occur? - If yes, identify room name(s) or number(s).. Will there be any type of dust producing processes? - If yes, submit professional engineer s verification (i.e.: report and/or drawing) that the building has been designed in accordance with Section 5.10 of the Fire Code and NFPA 68, Explosion Protection by Deflagration Venting. (Ref.: OBC, 6.2.2.5.) Will there be any type of spray application? - If yes, submit professional engineer s verification (i.e.: report and/or drawing) that the building has been designed in accordance with Section 5.12 of the Fire Code and NFPA 33, Standard for Spray Application Using Flammable or Combustible Materials. (Ref.: OBC, 6.2.2.5.) Will there be any type of special spray processes such as dry powder finishing or automobile undercoating? - If yes, submit professional engineer s verification (i.e.: report and/or drawing) that the building has been designed in accordance with the applicable subsections & reference standards of 5.14 the Fire Code. (Ref.: OBC, 6.2.2.5.) Will there be any type of drying oven or bake oven? - If yes, submit professional engineer s verification (i.e.: report and/or drawing) that the building has been designed in accordance with Section 5.18 of the Fire Code and NFPA 86, Standard for Ovens and Furnaces. (Ref.: OBC, 6.2.2.5.) Will there be any additional hazardous gases, dusts, or liquids that require ventilation in conformance with the Ontario Fire Code, National Fire Code and/or 11 good engineering practice as described in NFPA publications. (Ref.: OBC, 6.2.2.5. and 6.2.13.) Completed by: Signature: Phone: Email: 4

SECTION 1 Compressed Gas Data Sheet Complete the following chart by describing all compressed gasses that will be stored inside the building. Type of compressed gas Flammable (yes/no) Poisonous or corrosive (yes/no) Quantity - # of cylinders - weight (kgs) Lighter or heavier than air? Will the compressed gas react with any other compressed gases in the building? If yes, specify. Has this building been designed in accordance with all applicable Building Code and Fire Code requirements related to the indoor storage of compressed gas? Completed By: Professional Seal: Signature: Notes: 5

SECTION 1 Compressed Gas Flow Chart 1a The following flow chart indicated the construction requirements for protecting flammable compressed gas storage areas from adjacent areas within the building. Spaces that contain hazardous gases, dusts, or liquids shall be ventilated in conformance with the Ontario Fire Code, National Fire Code and/or good engineering practiceas described in NFPA publications. (Ref.: OBC, 6.2.2.5. and 6.2.13.) Note: The Fire Code addresses the following items. Contact Fire Prevention for additional information. The indoor storage of non-flammable compressed gas where the amount exceeds 150kg. The outdoor storage of all compressed gas. The dispensing, filling and distributing of compressed gas. Protecting compressed gas storage areas from adjacent areas within the building Non-Poisonous, Non-Corrosive Poisonous or Corrosive OFC, 5.6.1.1.(5) Quantity: - Aggregate capacity of cylinders not more than 25kgs. Fire Code does not apply OFC, 5.6.1.1.(4) Quantity: - Not more than 3 cylinders, - Heavier than air, and - Aggregate capacity of cylinders not more than 100kgs. - 45 minute gas-tight fire separation - located at or above grade - natural or mechanical ventilation OBC, 3.3.6.3.(3) & 6.2.2.5. OFC, 5.6.2.4.(3) Quantity: - All others. ANY Quantity - 2 hour gas-tight fire separation - located on an exterior wall - can be entered from the exterior - natural or mechanical ventilation - explosion venting - room does not contain fuel-fired equipment or high temperature heating elements - room intended for no other purpose OBC, 3.3.6.3.(1) & 6.2.2.5 OFC, 5.6.2.4.(1) 6

Flow Chart 1b The following flow chart indicates the construction requirements for protecting flammable and/or nonflammable compressed gas storage areas from other compressed gases that may react with one another. Protecting Reactive Compressed Gas Storage Areas from One Another Non-Reactive Reactive Separation not required between compressed gases Combination of gases lighter & heavier than air: - Shall be separated by a 1 hour fire separation. OBC, 3.3.6.3.(5) OFC, 5.6.2.7.(1) All gases lighter than air: - Shall be separated by a 1 hour fire separation, OR - By at least 7.5m, OR - By a 2.0m high masonry wall, with a 1.0m horizontal projection beyond the cylinders. OBC, 3.3.6.3.(6) OFC, 5.6.2.7.(2) All gases heavier than air: - Shall be separated by a 1 hour fire separation, OR - By at least 15m, OR - By a 1.5m high masonry wall, with a 15m horizontal separation distance. OBC, 3.3.6.3.(7) OFC, 5.6.2.7.(3) 7

SECTION 2 Flammable Liquids and Combustible Liquids Data Sheet Complete the follow chart by describing all flammable liquids and combustible liquids that will be stored inside the building. Type of liquid Class Quantity (L) Density (L/m 2 ) Storage, dispensing, or both? Open or closed containers? Storage Method: (fire sep d room, cert d cabinet, incidental use) Has this building been designed in accordance with all applicable Building Code and Fire Code requirements related to the indoor storage or dispensing of flammable and combustible liquids? Completed By: Professional Seal: Signature: Notes: 8

SECTION 2 Flammable and Combustible Liquids The following flow charts identify the construction requirements for protecting flammable and combustible liquid storage areas from adjacent areas within building. (Ref.: OBC, 3.3.6.4.(1)) Spaces that contain hazardous gases, dusts, or liquids shall be ventilated in conformance with the Ontario Fire Code, National Fire Code and/or good engineering practiceas described in NFPA publications. (Ref.: OBC, 6.2.2.5. and 6.2.13.) A process plant intended as a location where Class I and Class II liquids are handled shall not contain a basement or a covered pit. (Ref.: OBC, 3.3.6.9.) Refer to the Fire Code for additional requirements related to the indoor storage of flammable liquids and combustible liquids, including, but not limited to, spill control (4.1.6.) and ventilation (4.1.7.). Flow Chart 2a Assembly & Residential Assembly and Residential, except Schools Maximum quantities within building or separate 1 hour fire compartment 30L of Class I, 150L of Class II, 600L of Class IIIA Single Class: - 30L of Class I - 150L of Class II - 600L of Class IIIA OFC, 4.2.4.2.(2) Two or More Classes: The following equation shall not exceed 1 qi/30 + qii/150 + qiiia/600 qi = quantity of Class I qii = quantity of Class II qiiia = quantity of Class IIIA OFC, 4.2.4.2.(3) Notes: - If these quantities are exceeded in building or fire compartment, go to Flowchart 2e for Storage Rooms or Flowchart 2f for Storage Cabinets. - The dispensing of flammable and combustible liquids is not permitted in these occupancy types. 9

Flow Chart 2b Mercantile Mercantile Maximum quantities Note: Closed containers only! (OFC, 4.2.5.2.(1)) Non-Sprinklered Buildings - Shall be the lesser of: (a) 8L for every m² of the suite, provided not more than 2L/m² is Class I, of which not more than 0.3L/m² is a combination of Class IA and IB. Note: Use a minimum floor area of 250m² as per 4.2.5.1.(4) OR (b) 8,000L, provided not more than 2,000L is Class I, of which not more than 300L is a combination of Class IA and IB. OFC, 4.2.5.1.(2) Sprinklered Buildings - Shall be the lesser of: (a) 24L for every m² of the suite, provided not more than 6L/m² is Class I, of which not more than 1L/m² is a combination of Class IA and IB. Note: Use a minimum floor area of 250m² as per 4.2.5.1.(4) OR (b) 24,000L, provided not more than 6,000L is Class I, of which not more than 1,000L is a combination of Class IA and IB. OFC, 4.2.5.1.(3) Notes: - If these quantities are exceeded, go to Flowchart 2d for storage areas, Flowchart 2e for Storage Rooms or Flowchart 2f for Storage Cabinets. - The transfer of flammable and combustible liquids, in these occupancy types, from or into containers shall take place in a storage room. (Refer to Flowchart 2e for Storage Rooms) 10

Flow Chart 2c Groups B, D and Schools Groups B, D and Schools Maximum quantities Note: Individual container capacities of more than 5L shall conform to ULC/ORD-C30, and shall be not more than a 25L capacity. (4.2.6.4.) All occupancies except: - Automotive shops, and - Industrial arts areas of educational facilities (a) 10L, including not more than 5L of Class I in a single room. (a) OR Automotive shops and industrial arts areas of educational facilities: Up to 75L maximum, including not more than 25L of Class I. OFC, 4.2.6.3.(2) (b) 250L, including not more than 60L of Class II or 10L of Class I in a single 45 minute fire separation. OFC, 4.2.6.3.(1) Notes: - If these quantities are exceeded, go to Flowchart 2e for Storage Rooms or Flowchart 2f for Storage cabinets. - The dispensing of flammable and combustible liquids is not permitted in these occupancy types. 11

Flow Chart 2d Industrial Industrial Maximum Quantities Incidental Use: OFC, 4.2.7.2.(1)(a) Not the principal activity! Storage Areas: OFC, 4.2.7.2.(1)(d) Principal Activity! - This is where the storage, handling or use is the principal activity of the building/occupancy, or when the "incidental use" amounts are exceeded. - With these buildings being quite rare and complex, the Plans Examiner shall review on an individual basis. Closed Containers: - 600L, of which not more than 100L of Class IA. OFC, 4.2.8.2.(1)(a) Storage Tanks: - 5,000L, of Class IB, IC, II or IIIA. OFC, 4.2.8.2.(1)(b) General Storage Areas: - Refer to 4.2.8.4.(1)-(6) for specific requirements. Large Storage Tanks: - Refer to 4.3.12.4.(2) for specific requirements. OFC, 4.2.8.4. OFC, 4.2.8.2.(3) Notes: - If these quantities are exceeded, go to Flowchart 2e for Storage Rooms or Flowchart 2f for Storage cabinets. - The dispensing and transfer of flammable and combustible liquids, in these occupancy types, is permitted in a; storage room in accordance with OFC, 4.2.9. (Refer to Flowchart 2e), storage area in accordance with OFC, 4.2.7.5., or in accordance with OFC, 4.2.8. for incidential uses. 12

Flow Chart 2e Storage and Dispensing Rooms Storage Rooms Fire Separation Requirements (all occupancies) Notes: No openings from storage room to public portion of building. (OFC, 4.2.4.2.(4)(b)) Storage room shall be on first storey. (OFC, 4.2.4.3.) Storage Room Not Protected by Fire Suppression System OFC, 4.2.9.1.(1) Storage Room Protected by Fire Suppression System OFC, 4.2.9.1.(2) Class I Liquids: - 2 hour fire separation required. - Refer to Table 4.2.7.A for maximum quantities. OFC, 4.2.9.1.(3) All Other Class Liquids: Max Quantity: 3,000L Max Density: 200L/m² = 1 hour fire separation OFC, T.4.2.9.A. Doubled Max Quantity: 20,000L Max Density: 400L/m² = 2 hour fire separation OFC, T.4.2.9.A. Doubled Maximum Quantity: 1,500L Maximum Density: 100L/m² = 1 hour fire separation OFC, T.4.2.9.A. Maximum Quantity: 10,000L Maximum Density: 200L/m² = 2 hour fire separation OFC, T.4.2.9.A. 13

Flow Chart 2f Storage Cabinets Storage Cabinets Maximum Quantities (all occupancies) Note: All cabinets shall meet ULC/ORD-C175, ULI 1275, FM Approved, or NFPA 30. Industrial: - Not more than 500L per cabinet, and - Not more than 1,500L per fire compartment*, OR - More than 1,500L per fire compartment* if groups of not more than 1,500L are at least 30m apart. OFC, 4.2.10.3.(2) Care, Treatment, and Detention: - Not more than 500L per cabinet, and - Not more than 500L per fire compartment*. OFC, 4.2.10.3.(3) All Other Occupancies: - Not more than 500L per cabinet, and - Not more than 1,500L per fire compartment*. OFC, 4.2.10.3.(1) * As per the definition of fire compartment in the Fire Code, a fire separation with a 0 hour required fireresistance rating would meet this requirement. 14

Flow Chart 2g Explosion Venting The following flow chart indicates whether or not the building is required to designed in accordance with NFPA 68, Explosion Protection by Deflagration. Explosion Venting OBC, 3.3.6.4.(4) OFC, 4.2.9.6.(2) Storage Dispensing NOTE: Refer to 3.3.6.4.(5)-(8) for dispensing room req ts. Open Containers Closed Containers Open Containers Closed Containers YES NO All Class I Liquids YES Class IA Liquids YES Class IB & Class IC Liquids NO Note: - The explosion venting requirements found in 3.3.6.4.(4) of the Building Code and 4.2.9.6.(2) of the Fire Code are only applicable to Class I liquids. 15

SECTION 3 Ammonium Nitrate Data Sheet Complete the follow chart by describing all ammonium nitrate that will be stored inside the building. Form of ammonium nitrate (crystals, flakes, grains or prills, or any fertilizer grade/other mixture containing 60% or more ammonium nitrate by weight) Quantity (kgs) Has this building been designed in accordance with all applicable Building Code and Fire Code requirements related to the indoor storage of ammonium nitrate? Completed By: Professional Seal: Signature: Notes: 16

SECTION 3 Ammonium Nitrate Flow Chart 3a Construction requirements for protecting ammonium nitrate (NH₄NO₃) storage areas from adjacent areas within the building. Spaces that contain hazardous gases, dusts, or liquids shall be ventilated in conformance with the Ontario Fire Code, National Fire Code and/or good engineering practiceas described in NFPA publications. (Ref.: OBC, 6.2.2.5. and 6.2.13.) Protecting ammonium nitrate storage areas from adjacent areas in the building Quantity: Not more than 1,000 kgs Quantity: More than 1,000 kgs Building & Fire Codes Don't Apply Building shall, - Be not more than 1 storey - Not contain a basement or crawl space - Not contain open floor drains, etc. - Have non-combustible flooring in storage area - Be designed to prevent ammonium nitrate from coming into contact with certain building materials - Have not less than 0.007m² of vent area per m² of storage area, or be provided with mechanical ventilation OBC, 3.3.6.6.(1) OFC, 3.3.3.2. Building shall be sprinklered in conformance with NFPA 13 OBC, 3.3.5.2. OFC, 3.3.3.6.(1) Notes: - Refer to OBC Appendix-3.3.6.6.(1) for information on products stored with ammonium nitrate. - Refer to OFC 3.3.3.2.(6)-(10) for required clearance between ammonium nitrate storage building and property lines. 17