Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. D-Dome System.

Similar documents
Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. S-Dome 2.0 System.

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. SpeedRail System.

Mounting systems for solar technology FLAT ROOF SYSTEMS.

ifix INSTALLATION MANUAL PV flat roof installation system Version

mounting systems applications overview

Mounting instructions. novotegra for trapezoidal metal - roof parallel

PITCHED ROOF. Photovoltaic Mounting Systems. Assembly Instructions. for roofing tiles, plain tiles and slate

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

On-roof system Tau Installation manual

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

Installation instructions

TRAPEZOIDAL SHEET METAL RAIL

ST-AK 1/12. Photovoltaic Mounting Systems. Assembly Instructions. Mounting system for roofing with trapezoidal sheet metal

Mounting System MCG 3.0 Membrane-Connected Glass. System description

Mounting systems for solar technology K2 SYSTEMS

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

Installation instructions

ConSole. Installation instructions

moment Engineering + Design Warwick Avenue, Suite #C5 Fairfax, VA Phone: Web:

INSTALLATION INSTRUCTIONS ENGLISH

Installation manual ValkTriple EN-UK

Schüco Mounting System MSE 210 Mounting on trapezoidal roofing

Statics. Stability. Safety. Photovoltaic mounting system

SYSTEM S7-RHOMBOS INSTALLATION MANUAL

PATENT PENDING FLAT ROOF PV SYSTEM. FDGlight

INSTALLATION INSTRUCTIONS ENGLISH

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

Mounting System MCG 3.0 Membrane-Connected Glass. System description

Flat roof for the loading-optimized elevation (adhesive system)

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Mounting System MCG 1.1 Membrane-Connected Glass. System description

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560

INTERSOL MOUNTING SYSTEMS

MOUNTING SYSTEMS FOR TRAPEZOIDAL SHEET AND CORRUGATED SHEET ROOFS

PRODUCT OVERVIEW PV FLAT ROOF MOUNTING SYSTEMS

ASSEMBLY AND OPERATING MANUAL LTW EG CORNER - MANHOLE

Z5033 E3 Ball joint adapter Mounting instructions

Z5028 E3/Ci80 Horizontal bracket Mounting instructions

YINGLI SOLAR TWINMAX MODULES Installation and User Manual

Z5043 MAX Horizontal bracket Mounting instructions

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

Installation manual Flat Roof Insert System

Seismic Installation Manual

Installation manual ValkPro+

ValkPro+ Installation manual. Van der Valk Solar Systems. Use in combination with the Project Report of the ValkPVplanner. Solar Mounting Systems

MOUNTING SYSTEM FOR SLANTED ROOF WITH ROOF TILES. mounting system for slanted roof with roof tiles for solar panels in portrait setup. Rev

Z5010 (Version 2) TV spigot with fixing plate Mounting instructions

SCAFFOLDING RUNWAY SYSTEM

SAFETECH 3.2K ST v1.0. User s manual. Opale-Parachutes.com. Please read this manual before first use.

ValkPitched - Insert

2016 V1 SERAPHIM ECLIPSE PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG

Installation manual ValkFlat East West - Portait

Symmetrical Cladding. Laying instructions

Walraven Support System

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

ASSEMBLY INSTRUCTIONS

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K

Sub-construction for longlight

ETALLODOMI S.A. Head Office: 12, Kastorias str Athens GREECE. Main Warehouse: 49, Agiou Orous str. GREECE

CORNER ELEMENTS CENTRE SUPPORT ACCESSORY BAG PROJECTION SCREEN BAG. 4 pieces- basic frame 52x52 cm (fig.: including SET UP SUPPORT,optional)

RUUKKI FORMA DESIGN INSTRUCTION

Planning and installation instructions

Installation manual Pitched Roof Insert System

Fig Beam Clamp Retaining Strap (B-Line B3367)

ValkFlat East West - Landscape

ValkFlat East West - Portrait

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

Hoesch isodach integral Technical information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

ValkPitched - Clamp. Installation manual. Van der Valk Solar Systems. Use in combination with the Project Report of the ValkPVplanner

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

Fall Protection Guardrails

AEROFOILS 200AF-450AF. Sun Control Systems

Ballasted Roof Mounting Installation Manual

MOUNTING SYSTEMS FOR FIELD PV INSTALLATIONS

Smarter. Safer. Leaner.

EI 30 barriere Self contained fire protection EI 30 from above and below smoke impervious EN

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

ROOF MOUNT KIT OWNERS MANUAL

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

Siding Installation Guide. v us

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Universal Tilting TV Mount 32" to 60" Installation Instructions

WE ARE EXPERTS ON ROOFINGS

Translation authorised by DIBt. to: 1 December January 2017 I /16

All panels can be supplied in a range of styles, to suit the applications pictured below.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

SHORING SYSTEMS FROM SHORING PROFESSIONALS

SECTION COLD-FORMED METAL FRAMING

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)

BoSS Climalite Camera and lighting tower

BESTMOVE STANDING TRANSFER AID

SolarStyl BIPV New Building Integrated Photovoltaic System August V13 Page 0

Photovoltaic open land mounting systems

PE45 AMAZON MONKEY BARS OWNER'S MANUAL

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

Protective Capony RTC-16

Transcription:

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS D-Dome System www.k2-systems.com

Content TTTools overview 3 TTGeneral safety information 4 TTRequired Materials 6 TTAssembly 9 TTNotes 17 QUALITY TESTED SEVERAL CERTIFICATIONS K2 Systems stands for secure connections, highest quality and precision. Our customers and business partners have known that for a long time. Independent institutes have tested, confirmed and certified our capabilities and components. Please find our quality and product certificates under: www.k2-systems.com/en/technical-information 2

Tools overview 6 mm 6-30 Nm (4,5-22,2 lb-ft) 6 mm 3,0 m 6,0 m 3

General safety information Please note that our general mounting instructions must be followed at all times and can be viewed online at www.k2-systems.com/en/technical-information TTThe equipment may only be installed and operated by qualified and adequately trained installers. TTPrior to installation, ensure that the product complies with on-site static loading requirements. For roof-mounted systems, the roof load-bearing capacity must always be checked. TTNational and local building regulations and environmental requirements must be adhered to. TTCompliance with health and safety regulations, accident prevention guidelines and applicable standards is required. Protective equipment such as safety helmet, boots and gloves must be worn. Roofing works must be in accordance with roofing regulations utilising fall protection safeguards when eaves height exceeds 3 m. At least two people must be present for the duration of the installation work in order to provide rapid assistance in the event of an emergency. TTK2 mounting systems are continuously developed and improved and the installation process may thereby change at any time. Prior to installation consult our website at www.k2-systems.com/en/technical-information for up-to-date instructions. We can send you the latest version on request. TTThe assembly instructions of the module manufacturer must be adhered to. TTEquipotential bonding/grounding/earthing between individual parts is to be performed according to country specific standards, as well as national laws and regulations. TTAt least one copy of the assembly instructions should be available on site throughout the duration of the installation. TTFailure to adhere to our general safety and assembly instructions and not using all system components, K2 is not liable for any resulting defects or damages. We do not accept liability for any damage resulting in the use of competitor s parts. Warranty is excluded in such cases. TTGerman law shall apply excluding the UN Convention on CISG. Place of venue is Stuttgart. Our General Terms of Business apply. TTIf all safety instructions are adhered to and the system is correctly installed, there is a product warranty entitlement of 12 years! We strongly recommend reviewing our terms of guarantee, which can be viewed at www.k2-systems.com/en/technical-information We will also send this information on request. TTDismantling of the system is performed in reverse order to the assembly. T T K2 stainless steel components are available in different corrosion resistance classes. Each structure or component must be carefully checked for possible corrosion exposure. 4

The following guidelines apply The D-Dome System can be installed under the following conditions. Please clarify in advance whether the manufacturer authorises clamping on the short side. For the module list, please contact your account manager orwww.k2-systems.com. ROOF REQUIREMENTS TTThis system can be used on all established flat roof constructions with a pressure resistant substrate and a roof pitch of up to 5. From a roof pitch of 3.1, the system must be fixed mechanically. See installation instructions for roof anchors. TTThe roof surface must be clean and dry. Roof irregularities must be corrected or removed where appropriate. TTThe coefficient of friction of the roof must be determined on-site. See video https://youtu.be/os-cedx_qek STATIC REQUIREMENTS TTSufficient roof structure load-bearing capacity, as well as insulation pressure capacity TTFor framed modules with a frame height of 30-50 mm TTPermissible module dimensions: length 1550-2000 mm, width 950-1100 mm IMPORTANT MOUNTING INSTRUCTIONS TTOn-site general standards and regulations for lightning protection must be observed and consultation with a specialist to create a lightning protection concept is recommended (use lightning protection clamp if necessary). TTExternal influences that act on this system are only reflected in the design of the ballast to a limited degree. For instance, unevenness, thermal elongation, moss, water accumulation and ageing of the sheeting cannot be considered, although these factors might also precipitate system displacement under certain circumstances. We recommend you check whether the system requires additional mechanical attachment, as the impact of these influences may be greater on slanted roofs. TTThe inclination of the Dome system is 10. TTA minimum distance to the roof edge of 600 mm must be observed. TTAt least two modules must be assembled discontiguous to use this mounting system. TTEnsure a thermal separation (distance between module blocks) after a maximum of 11 m in the module row direction and in the direction of the base rail. Note: For separation distances> 500 mm, additional ballast required. TTTightening torque of 14 Nm for all module clamps. TTIn the event of exceptional circumstances (such as storms, heavy rain, earthquakes, etc.), the system should be checked by a specialist. Should an inspection find damage or plastic deformation (such as in the module clamp area) the components must be replaced. TTAdhere to module manufacturer recommendations for clamping area and module installation (see module manufacturer instructions). Check whether manufacturer approval is available for corner clamping. TTCompatibility of building protection mats with roof covering must be checked. TTIt is important to ensure that the rain water flow is not hindered. TTThe lightning current capacity of the D-Dome system was verified according the test procedures in DIN EN 50164-1 (see chapter about the integration in existing lightning arrester systems). 5

Required Materials In order to assemble the K2 Systems D-Dome installation system, the following listed system components are essential. The piece quantities are calculated on the basis of the respective requirements. The listed item numbers facilitate the comparison of items. Mounting Rail K2 SpeedRail 22, 6,10 m 1001163 Material: aluminium EN AW-6063 T66 K2 FlatConnector Set The set consists of: TT1 FlatConnector, aluminium TT2 Bolts with serrated under head M8x20, stainless steel TT2 M K2 slot nut with clip, stainless steel 1006039 K2 Dome D1000 2.0 Wide: 65 mm Material: aluminium EN AW-6063 T66 2001962 K2 Dome SD 2.0 2001968 Wide: 65 mm Material: aluminium EN AW-6063 T66 K2 Bolts with serrated under head 2001729 according to M8x20 DIN 912/EN ISO 4762 Material: stainless steel A2, WS 6 mm M K2 Slot nut with clip 1001643 Material: stainless steel und PA K2 Dome Wire Hanger Accessory for module cable mounting Material: stainless steel (1.4310) 2002324 6

K2 Building protection mat Dome 470x180x18 mm Material: Unlaminated PUR-bonded rubber granulate 2001696 Alternatively: K2 Building protection mat Dome alu 2001695 470x180x18 mm Material: PUR-bound rubber granules with aluminium triplex foil, laminated The respective use of a laminated or unlaminated building protection mat depends on the type of roof membrane and must be checked on site. K2 Building protection mat Dome SD 160x180x18 mm Material: Unlaminated PUR-bonded rubber granulate 2001740 Alternatively: K2 Building protection mat Dome SD alu 2001739 160x180x18 mm Material: PUR-bound rubber granules with aluminium triplex foil, laminated The respective use of a laminated or unlaminated building protection mat depends on the type of roof membrane and must be checked on site. K2 Module middle clamp XS Set The Set consists of: TT1 Middle clamp XS, aluminium mill finish/ black TT1 Allen bolt M8, stainless steel A2 TT1 MK2 solt nut with clip, stainless steel and PA TT1 Securing washer S8, stainless steel A2 item number system-specific K2 Universal module clamps OneMid 2002514 Module frame height: 32-42 mm Alternatively: K2 Module End Clamp Standard Set item number system-specific 7

Required Materials OPTIONAL COMPONENTS FOR BALLASTING: K2 SpeedPorter 2002300 Ballast support for slabs and stiffening Material: aluminium EN AW-6063 T66 K2 Dome Porter 1750 mm Ballast support for slabs Pair of L-Profiles to carry required ballast as concrete slabs or similar Material: aluminium 2000081 Alternatively: K2 Dome Porter 2050 mm K2 Dome Porter Screw Set (optional to the K2 Dome Porter) one set per Porter 2001140 2000155 The set consists of: TT2 M K2 slot nut with clip (1001643), stainless steel, PA TT2 Allen Bolt M8x20 (1000190), WS 6 mm, stanless steel A2 steel A2 SYSTEM VARIANT 1/4 CLAMPING UNIT FOR NON-APPROVED MODULES OR HIGHER LOAD REQUIREMENTS. ADDITIONAL REQUIRED MATERIAL: K2 FlexClamp Material: aluminium and stainless steel A2 1005873 Two-piece clamp set for fastening the modules in the 1/4 points including Allen bolt M8x25, Allen bolt M8x20, M K2 slot nut and locking washers Suitable for module frame heights of 34-50 mm. 4 sets required per module. K2 Bolts with serrated under head M8x20 according to DIN 912/ EN ISO 4762 2001729 Material: stainless steel A2, WS 6 mm M K2 Slot nut with clip 1001643 Material: stainless steel A2 and PA K2 Connector Material: aluminium L-bracket for coupling of module rows Support of ballasting potentially required 1005874 K2 Dome Please note that for this assembly variant the number of Dome pieces increases. 8

(A) Assembly Detail 1: gap width in module direction Lights distance between SpeedRail (D) (B) (D) (C) SPACING BY D-DOME 2.0 SYSTEM: (A) Module block in module direction: max. 11 m (B) Module block in rail direction: max. 11 m (C) Gap width along the base rail: min. 20 mm (D) Gap width between module blocks in module row direction: min. 140 mm, max. modulewide (E) Distance to rail end: min. 40 mm (E) 9

Assembly 1 POSITION SPEEDRAIL Prior to placing the SpeedRail as a base rail, insert a protection layer between the roof covering and the rail in order to avoid any damages to the roof covering. With membrane roofs the Aluminium-coated side shall face downwards. Place the Speedrail onto the protection layer without penetrating the roof. The protection must have to be placed under the load bearing components Dome D1000 and Dome SD. Position the protection mats and base rail according the requirements of the array. The spacing between the mats/base rails is determined by the module dimensions (module length + 20mm). Connect the K2SpeedRails to the protection mats via the pre-cut WINGS. The rail ends of the K2SpeedRails must not protrude the protection mats. Materials required: K2 SpeedRail, building protection mat Dome and Dome SD 2 MOUNT THE FLATCONNECTOR Two SpeedRails are connected at the rail joint using a rail connector. This locks the SpeedRails in the longitudinal direction. Insert 2 MK2 slot nuts in the rail and turn 90 clockwise to lock. Fasten rail connectors with two Bolts with serrated under head M8. The connector should be between the Dome D1000 and Dome SD. If the rail lengths permit, the rail joint can also be positioned directly below the Dome D1000 without a rail connector. However, it must be ensured that the joint is between the two fittings and under no circumstances directly at the screw position. Torque 14 Nm Materials required: FlatConnector Set 10

3 FIT DOME D1000 Insert two MK2 slot nuts in the rail and turn 90 clockwise until they lock. Thereafter, position the Dome D1000 on the rail. Position the protection mat so that two WINGS are under the Dome D1000. Only then fasten the Dome D1000 with two bolts with serrated under head M8x20. 4 FIT DOME SD Insert one MK2 slot nut in the rail on each side of the Dome D1000 and turn 90 clockwise until they lock. Then align two dome SD shown in the adjacent graph. The distance between SD and Dome Dome D1000 corresponds to about the module width. Before fastening ensure care should be taken that the protection mat and its WINGS are under the Dome SD and the rails at the array edges do not protrude. Finally the Dome SD is loosely fastened with a bolt with serrated under head. 5 MOUNT THE DOME WIRE HANGER Place the Dome Wire Hanger on the Dome D1000 in the channel for fastening the module clamps. The nose of the Dome Wire Hanger upwards - pointing towards the module. Before attaching to the module, connect the module cable. Then attach the cable to the Dome Wire Hanger. 11

6 BALLASTING THE SYSTEM Weighted down with ballast using bricks or slabs. Please follow the guidelines listed on the ballast weight table on (page 14). Ballasting without additional item(s): If only light ballasting up to 5 kg is required, insert one brick directly into the hollow chamber of the Dome D1000. K2 SpeedPorter Installation Depending on ballast size, position each SpeedPorter with the appropriate distance and insert the ballast. Ballasting with K2 Porter: The L-Profiles are fastened to the rails with the screws and MK2 slot nut included in the set. Torque: 16 Nm. The spacing of the L-Profiles depends on the number of bricks used. The Porters can be positioned both centrally to the Dome D1000, or laterally to the middle Dome. Warning: K2 Porters must be mounted so that all base profiles within a module block are connected. K2 Porters for bracing can be used for ballast reduction in the corner areas. According to the technical design, these must always be positioned on the three outside modules. 12

Ballast weight table Ballast weight in kg Recommended additional items Recommended brick dimensions in cm Max. no. of bricks Installation recommendations Up to approx. 5 kg No additional articles required 20x10x8 20x20x10 20x20x6 2 1 2 2 bricks in the cavity of the Dome D1000 1 brick in the cavity of the Dome D1000 2 bricks in the cavity of the Dome D1000 Approx. 5 kg to approx. 40 kg K2 SpeedPorter Set, one side of the dome 40x40x4 30x30x5 2 3 Where necessary, an additional 2 bricks 20x10x8 in Dome D1000 Approx. 40 kg to approx. 80 kg K2 SpeedPorter Set, both sides of the dome 40x40x4 30x30x5 2 3 Where necessary, an additional 2 bricks 20x10x8 in Dome D1000 Approx. 80 kg to approx. 100 kg K2 Porter 40x40x4 30x30x5 Where necessary, an additional 2 bricks 20x10x8 in Dome D1000 Warning: Pay attention to module inclination when using Porter! For ballast weights exceeding 100 kg, please consult a K2 technician. We are happy to assist you with selecting the optimal ballast components once you the ballast size is determined. Table for bricks and slabs * Type Weight in kg Dimensions (LxBxH) in cm Paving bricks 2,2 3,5 4,5 5,4 7,2 10x10x10 20x10x8 20x10x10 20x20x6 20x20x8 Flagstones (slabs) 14 19 22 40x40x4 40x40x5 50x50x4 * recommended values 13

7 POSITION MODULE AND FASTEN DOME SD The modules are laid horizontally, in the centre of two Dome D1000s. The specially affixed bars serve as the stop. Thereafter, the module is positioned on two Dome SDs. The only loosely fastened Dome SD together with the protection mat SD 160x180x18 mm are pushed towards and against the module and then fastened. Before fastening ensure that the WINGS of the protection mat are under the Dome SD and the rails at the array edges do not protrude. Torque: 16 Nm. Attention: Only modules approved for corner clamping may be used, see point Important mounting instructions on page 5. Please take care not to cover any drainage holes in modules, otherwise potential condensation cannot run off. 8 FASTEN MODULE Fix the module in place at the end of a row with universal module end clamp OneEnd. Klick the Stance in the notches. Place clamps on the module frames and fix them. Alternatively, use the standard end clamp sets. Insert the M K2 nut into the slot of the Dome SD and the Dome and turn clockwise by 90. Place clamps on the module frames and fix them. Between every two modules, use two XS middle clamp sets. Insert clamp sets in the Dome and SD notches and rotate 90. Place the clamps onto the module frame and fix them in place. Tightening torque: 14 Nm 14

Alternative system variant: 1/4 clamping unit THE FOLLOWING GUIDELINES APPLY: T TThe system is approved for snow loads of up to 4 kn/m² and wind loads of up to 1.3 kn/m². T TThe K2 D-Dome D1000 System is suitable for modules with a frame height of 34-50 mm. In general, thinfilm modules may not be used with this system. T TFor the installation of the D-Dome D1000 Systems, only the additional clamp sets may be fitted. The K2 AddOn may not be used. T TIf required, bricks can be inserted in the L-bracket for ballasting. STEPS 1-4 SEE PAGE 13-16 5a PRE-MOUNT CLAMP SETS ON DOMES. The parallel distance between the individual flat rails is defined by the dimensions of the modules and their clamping area. For a standard module, the recommended distance between the SpeedRails corresponds to half of the module length. In individual cases, the module installation instructions for the clamp area must be adhered to. Insert the pre-mounted FlexClamp Set into the nuts of the domes and secure by tightening the screw. Torque: 14 Nm 15

6a POSITION MODULE AND DOME SD SCREW IN The modules are laid horizontally, in the centre of two D1000 domes. Thereafter, the module is positioned on two Dome SDs. The top part of the FlexClamp has to be lifted then the module frame is inserted between the top and bottom part of the FlexClamp. The lightly fastened Dome SDs are pushed together with the protection mat SD 160x180x18mm to the stop of the FlexClamp Set in direction of the module and screwed in. Before fastening ensure that the protection mat and its pre-cut WINGS are under the Dome SD and the rails at the array edges do not protrude. Torque: 16 Nm. 7a FASTEN MODULE The upper part of the FlexClamp Set is screwed to the middle piece with the supplied screws and washers. Torque: 14 Nm. 8a DOME CONNECTOR ROWS As the rows are not connected as in the case of the D-Dome system, they must be connected separately. This can be accomplished by screwing the L-bracket directly onto the flat rail or together with the Dome D1000. A minimum of 3 rows per double elevation systems must be connected. The number and exact position of the dome connector angle depends on the wind load at the location, as well as required ballasting and must be planned according to the individual system. The connection cannot be located above thermal separation. 16

9a BALLASTING THE SYSTEM For some roof areas, the system may require additional ballast for protection against potential wind suction. Dome connector angles can be used for the additional ballasting. If ballasting is required in the edge area, then the Scale Dome can be used in the same way as the Dome corner clamping. See the ballast table on page 13. INTEGRATION IN EXISTING LIGHTNING PROTECTION SYSTEMS: In general, all components of a PV system according to VDE 0100, part 712 must be included in the on-site equipotential bonding. For this low-impedance connections between all the components necessary to create the assembly system. The lightning current capacity of the D-Dome system was verified according the test procedures in DIN EN 50164-1 (see chapter about the integration in existing lightning arrester systems). Please follow all instructions given by the module and inverter manufacturers. An existing lightning protection system must not be impaired by a PV system. At the customer s request, K2 Systems can recommend components required for creating connections capable of carrying lightning currents. Please contact a K2 representative for additional details. Ensure that the lightning protection concept is approved by a lightning protection planning office or a lightning protection specialist. Please refer to the relevant standards for planning requirements. 17

Notes 18

19

Mounting systems for solar technology THANK YOU FOR CHOOSING A K2 MOUNTING SYSTEM. Systems from K2 Systems are quick and easy to install. We hope these instructions have helped. Please contact us with any questions or suggestions for improvement. Our contact data: TTwww.k2-systems.com/en/contact TTService Hotline: +49 (0)7159 42059-0 German law shall apply excluding the UN Convention on CISG. Place of venue is Stuttgart. Our General Terms of Business apply. Please refer: www.k2-systems.com K2 Systems GmbH Industriestraße 18 71272 Renningen Germany Tel. +49 (0) 7159-42059 - 0 Fax +49 (0) 7159-42059 - 177 info@k2-systems.com www.k2-systems.com D-Dome Assembly GB V18 0418 Subject to change Product illustrations are exemplary and may differ from the original.