Experts in tunneling with Tunnel Boring Machines

Similar documents
Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

TBM Selection and Specification

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc.

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling)

From Colonia Jardín to Cuatro Vientos

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association

Pipe Jacking. Japan Sewage Works Association

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

Design Data 4. Jacking Concrete Pipe

Design Data 4M. Jacking Concrete Pipe

Pipe Jacking. Progress is built on ideas.

Reinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines

Trenchless Technology

COMPETITIVENESS OF PIPE-JACKING TUNNEL LININGS

An introduction to. pipe jacking

Concrete Pipe Jacking

Tunnels. Introduction in Shield tunnelling Pipe jacking & tunnelling Slurry & hydroshield Slurry versus EPB Principles of support pressure

Trenchless Pipeline Crossings

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

4th International Engineering and Construction Conference - July 28, 2006

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking

Venice Pumping Plant Dual Force Main Project Draft EIR

Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata

Pipe Jacking Association An introduction to pipe jacking and microtunnelling

Hardrock Tunnel Boring Machines

Shieldhall Tunnel construction of the first shaft, service chamber, cut and cover and the tunnel boring machine launch chamber at Craigton

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

PIPEJACKING AND MICR OTUNNELLIN G. James C. Thomson, C. Eng., Eur. Ing. Chairman Jasoo Consultancy Group London- Geneva- Washington DC

TRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS

SPECIFICATION : BORING AND JACKING

Prof. Eng. Daniele PEILA

Performance review of a pipe jacking project in Hong Kong

A case study of twin bored tunnelling under mixed-face soil - Bendemeer MRT station project (Downtown Line 3), Singapore

TRENCHLESS TECHNOLOGY. Department of Civil Engineering.

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

GEOTECHNICAL BASELINE REPORTS APPLYING THE GUIDELINES TO MICROTUNNELING

Wastewater Capital Projects Management Standard Construction Specification

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Construction OS&H Project planning and control for safe OS&H

SEATTLE S BRIGHTWATER UNDERGROUND CONVEYANCE SYSTEM TUNNELING & UNDERGROUND CONSTRUCTION

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

Evergreen Line Rapid Transit Project

Workshop Brief Notes on: Construction of Pipe Roof and Support System

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.

Diaphragm wall Construction

13/05/2016. Introductions of Pipe Roof. Focuses. Application of Rectangular Shield Jacking

Solutions for tunneling and mining TBM. Expanding Horizons Underground

ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING

Analysis of the EPB-TBM Excavation Parameters Used in a Tunnel Construction in Istanbul

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

The 114m Preston Tunnel and Rising Main improvement scheme has been completed as part of United Utilities

IDENTIFYING ISSUES IMPACTING PRODUCTIVITY OF BOX JACKING PROJECTS BHAUMI BHAVAN CHAURASIA. Presented to the Faculty of the Graduate School of

Urban EPB Tunneling in Limited Space: A Case Study of the San Francisco Central Subway Project

SPECIAL PURPOSE SIMULATION TEMPLATE FOR UTILITY TUNNEL CONSTRUCTION

Introduction to Tunnel Construction

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

INNOVATIVE DIRECT PIPE METHOD CASE HISTORIES

4D grouting pressure model of a bored tunnel in 3D Tunnel

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

Summary, Conclusion and Outlook

obras SuBtErrÁnEAS, S.A.

Tunnelling and Underground Space Technology

Major Pipe Jacking for Perth Desalination and Main Sewer Projects

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel.

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

Monitoring Earth Pressure Balance Tunnels in Los Angeles

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October

4D grouting pressure model PLAXIS

BELFAST SEWERS MOURNE CONDUIT. Summary. Summary

Pump storage hydro power plant (PSKW) Reißeck

Table of Contents TOC. Chapter 14 - Trenchless Construction. 14A General Information. 14B New Construction. 14C Rehabilitation

Soil conditioning for EPB tunnelling in choesionless soil, clay and rock masses and backfilling in shield tunnelling

Liquid Waste Coordination Committee

INFRASTRUCTURE TUNNELS

Construction Ground-Borne Noise & Vibration

CHALLENGES AND SUCCESSES OF OPEN SHIELD PIPE JACKING CONSTRUCTION IN A CONGESTED NEIGHBORHOOD

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout

YOUR GROUND DRILLING PARTNERS.

Aveng Ground Engineering Profile

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

HCC completes up-line tunnel for DMRC CC30

STANDARD SPECIFICATIONS SECTION JACKED CASING

Remote Monitoring of Gauge Cutter Wear in Pressurized Face Tunneling

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

Pipetron Tunnel Construction Issues

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E'

2

Current Hydro Power Plant Projects of Verbund in Austria and the use of High Strength Steel an Operators View

Executive Committee. p. 35. p. 72. p. 96. p. 151

Transcription:

www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines

info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution of pipelines using the pipe jacking technique with tunnel boring machines. Since then, Eurohinca succeeded in more than 200 projects completing more than 80 kilometers of tunnels. EUROHINCA is the Spanish microtunneling market leader and one of the better equipped tunneling contractors in Europe. EUROHINCA employs highly specialized personnel and owns 14 Tunnel Boring Machines (11 made by the German manufacturer Herrenknecht) with different diameter and operating principles to be able to complete a large variety of underground applications. EUROHINCA has gained a wide experience in the execution of tunnels in difficult ground conditions, operating its TBM s and rental equipment. MAIN CLIENTS PUBLIC ADMINISTRATIONS EUROHINCA cooperates with various government and public agencies in feasibility studies and develops alternative construction methods to minimize the impact on public using the most advanced Trenchless technologies. EUROHINCA acquired the highest Spanish classifications for civil works contractor for, among others, water supply, sewers and outfalls. EUROHINCA promotes the Trenchless technology being highly involved in Trenchless Conferences, Associations, Masters and publications in professional journals. CONSTRUCTION COMPANIES Depending on the specific characteristics of each project, EUROHINCA can participate as a partner in Joint Ventures or as a subcontractor of construction companies of recognized prestige. Specialized in the operation of TBM s, EUROHINCA brings the necessary experience to successfully complete the most complex projects. ENGINEERING FIRMS EUROHINCA provides support to the most important engineering firms in the design and optimization of tunneling projects to be executed by TBM, and in identifying the best economically and socially profitable solution.

ADVANTAGES OF TRENCHLES TECHNOLOGY TUNNELS TRENCH Less effect on existing services. Lower environmental impact. Minimizes spoil and waste generated. Compact installation. Guidance System. Position and tendencies of the T.B.M. TYPICAL APPLICATIONS SEWER AND WATER SUPPLY NETWORKS. COLLECTORS. CROSSINGS UNDER EXISTING SERVICES TBM MINING (roads, streets, railways, rivers, airport runways, golf courses, etc. ) SEA OUTFALLS. WATER RELEASE OR INTAKE. TUNNELS WITH TUNNEL BORING MACHINES. UNDERGROUND CORRIDORS. GAS AND OIL PIPELINES. DRAINAGE AND EVACUATION SYSTEMS. PIPE ARCHING FOR ROAD OR RAILWAY CROSSINGS. STEEL PRESSURE PIPES. Increased security for workers. (Works inside a shield) Less risk of surface settlements. (Excavation Front is supported) Higher outputs. Minor delays. Reduced impact on ground water level. WATER INTAKE AND RELEASE FOR FISH FARM OR DESALINATION PLANTS. WATER WASTE PIPE AND INTAKES IN RESERVOIR DAM. Guidance System. Selection ring program Launch shaft in pipe jacking outfall. A Coruña Road crossing with pipe jacking info@eurohinca.com

info@eurohinca.com CLOSE FACE TUNNEL BORING MACHINES EPB SHIELDS The EPB Shields (Earth Pressure Balance) are TBM machines that support the tunnel face with the pressure applied by the excavated soil located inside the excavation chamber; the controlled extraction of the soil from the excavation chamber by means of a variable speed auger allows the adjustment of the pressure applied to the tunnel face. The excavated material is transported to the launching shaft by conveyor belts or muck wagons. The EPB Shields were initially designed to bore soft, cohesive ground, (mainly clay), but with the use of foam and polymers it is possible to bore other type of soils as sand or even rock. EPB control panel Back up of EPB Assembling an EPB machine in the launching shaft

CLOSE FACE TUNNEL BORING MACHINES HIDROSHIELDS The TBM mix shield, or hydro shield, supports the tunnel face by the pressure of the bentonite suspensions injected in the excavating chamber and mixed with the excavated material. This mixture is crushed in the excavation chamber and is evacuated by hydraulic pumps to the launch shaft where a separation plant separates the excavated material from the bentonite suspension. The Hydro shield TBM can be used in almost all type of grounds, and performs well in sand, rock, under ground water level (Sea outfalls) and it is specially indicated for small diameters. Hydro shield machine in port after an outfall drive Breakthrough of Hydro shield in reception shaft Hydro shield control panel mounted in launch shaft Separation plant on launch shaft info@eurohinca.com

info@eurohinca.com OPEN FACE TUNNEL BORING MACHINES OPEN SHIELDS - ROADHEADERS OR EXCAVATORS Open face shields allow a visual contact to tunnel face. The front is excavated by powerful roadheaders or excavators. The extraction of the excavated material is made by muck wagons pushed by locomotives or winches. Ii is an economic and optimal solution for non urban areas with cohesive soils and above ground water level. Roadheader in open shield TBM CHOICE Range of ground per TBM Front face in an excavator open shield A detailed and comprehensive geotechnical study (including ground investigation, ground water level, type of soil, resistance to simple compression, rock abrasivity, etc...) is the basis for the selection of the appropriate TBM equipment and tunnel excavation method. With complete information it is possible to define the most suitable TBM, cutter head configuration and tools, characteristics of the lining, the alignment of the tunnel, and also, if necessary, preventive measures to be taken, monitoring systems, etc.. Rock tunnel face

TUNNEL LINING Two types of lining are typically employed in microtunneling: SEGMENTAL LINING Precast concrete elements that are installed inside the tail skin shield of the TBM, building a complete ring that constitutes the final tunnel lining. The thrust of the machine is made on the last ring installed: this allows to excavate great lengths and curved tunnels alignment. Segments in the Back up of the T.B.M. PIPE JACKING Prefabricated pipes (concrete, steel, etc..) that form the lining of the tunnel and are installed and pushed from the launch shaft pushing forward the TBM to the ending shaft. To reduce the friction between the pipe and the ground during the jacking phase bentonite is injected in the overcut. Intermediate jacking stations are necessary for long distances. Last lining ring in the reception shaft Jacking frame in launching Shaft Bentonite injection points in a pipe jacking tunnel Downloading a jacking pipe info@eurohinca.com

www.eurohinca.com C/ Juan de Arespacochaga y Felipe, 12 28037 Madrid - SPAIN Tel. (+34) 91 423 75 00 Fax: (+34) 91 423 75 01 info@eurohinca.com