GKC CONSULTING COMPANY

Similar documents
RAILTECH SYSTEM & SERVICES (RSS) - Flash Butt Welding Solutions

W. W. HAY SEMINAR SERIES. Tower 55 Multimodal Improvements NATIONAL UNIVERSITY RAIL CENTER UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN

Passenger/Freight Railroad Projects in Michigan

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

Metro Blue Line Improvements & Project Update

CORPORATE QUALITY MANUAL ISO 9001:2008 INTRODUCTION

Stone Consulting, Inc. Industrial Railroad Projects

CONSUMERS ENERGY Holland, Michigan

Caltrain Rapid Rail Plan

Sieve Size 2" 1" 3/8" No. 10 No. 40 No. 200 % Passing Size

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

LRTC Light Rail and Road based Transit Consultants

Engineering Management Manual

Transit and Rail Solutions

Railway Alignment Design and Geometry

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

PERSONNEL COMMISSION. Class Code: 5128 Salary Range: 34 (C1) PURCHASING AGENT JOB SUMMARY

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

Sounder Extension to DuPont

South Sounder Capital Improvements Program

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018

Increasing Russia's Transit Potential. Mikhail Goncharov Advisor to President of RZD

Environmental Assessment May 2007

Passenger service for the Dudding Hill line: brief for feasibility study

TECHNICAL MEMORANDUM

[Docket No. FRA ; Notice No. 1] [Draft Safety Advisory ] Draft Safety Advisory Related to Temporary Signal Suspensions

Agenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Transportation Modeling Tools. Rainer Dronzek November 3, 2006

NIGG YARD FOR SALE. TAIN, NEAR INVERNESS, SCOTLAND

LA 23 NOGC Railway Relocation PE/NEPA Project

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

SERVICE FROM A SINGLE SOURCE INNOVATIVE WEICHENSYSTEME. voestalpine VAE Führend bei Weichen und Signaltechnik From planning to maintenance

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF ANN ARBOR AND THE REGENTS OF THE UNIVERSITY OF MICHIGAN FOR THE DEVELOPMENT OF THE FULLER ROAD STATION

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015

Fixing America s Surface Transportation Act: Safety Provisions Affecting Rail Operations. Presented by Justin J. Marks FEBRUARY 22, 2016

THE DESIGN PROCESS HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN AUGUST 2010 AUG. 02, 2010

Stockton Freight & Passenger Rail Mobility Enhancement

Region of Waterloo Stage 1 Light Rail Transit Project. Definitions, Acronyms, Cited References Article 1 Definitions.

S-09: Auburn Station Access Improvements

Pacific Northwest High Speed Rail Corridor Amtrak Cascades Passenger Service Update

Introduction Manufacturing Process Manufacturing Process and Quality Control Standard Dimensions and Weights Chemical composition and mechanical

SEASONAL EFFECT ON THE OPTIMIZATION OF RAIL DEFECT INSPECTION FREQUENCY

Steel Railway Bridge Fatigue and the Evolution of Railway Car Loadings

The Narragansett Electric Company d/b/a National Grid. and Clear River Energy LLC. (Burrillville Interconnection Project) RIPUC Dkt. No.

SERVICES and QUALIFICATIONS

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators

Employment Application

Impact of the global maritime container transport on rail traffic in Europe Klaus-Jürgen Uhl, Senior Adviser, MC Mobility Consultants

Using Hybrid LiDAR for Positive Train Control (PTC) Systems

Pattullo Bridge Replacement Project. Cost Report

Georgia Department of Transportation Railroad Coordination Submission Checklist

Unidirectional Simulation Objectives

Appendix E Cost Estimating Methodology for High-Speed Rail on Shared Rightof-Way

Route Selection and Design of a Coal Shuttle Railroad: Experiences of a Recent Railroad Engineering Graduate

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

CTA Blue Line Forest Park Branch Feasibility/Vision Study Village of Forest Park Board of Directors. Tuesday, October 13, 2015

SLIDE RAIL SHORING SYSTEMS

Peter Klitz Senior Planner Transit Network Management TransLink (Metro Vancouver)

(iii) Senior Management Course, lasting not less than 4 weeks from a recognized Institution;

INDIANA HARBOR BELT RAILROAD COMPANY

Outcome of the Global Sustainable Transport Conference 2016 (Ashgabat, Turkmenistan)

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL

extent feasible. Per the and low constructability,

Red and Purple Modernization Phase One Project Redevelopment Project Area Transit Tax Increment Financing. Public Meeting. September 13, 2016

GROUNDS SERVICE MANAGER

Documenting Climate Change Considerations in the National Environmental Policy Act Process. Jeff Houk FHWA Resource Center June 7, 2010

comprehensive vegetation management services

INDIAN RAILWAY BUDGET REVIEW February 26,2015

Table of Contents 26L Locomotive Air Brake Apprenticeship Training Program (ATP) Basic Operating Rules and Safe Railway Practices

Standards Respecting Railway Clearances. May 14, 1992 (TC E-05)

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

TENDER FOR INTEGRATED FEASIBILITY STUDY AND OBTAINING RAILWAYS APPROVALS FOR THE RAILWAY SIDING AT PROPOSED SITE AT JAMMU

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INFRASTRUCTURE

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours

Railway R&D at Monash

Caltrain Business Plan Draft Business Strategy and Scope. Board of Directors December 7, 2017 Agenda Item 9

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Senior engineer in designing of cooling- and drain water systems in hydro power plants.

Dulles Corridor Metrorail Project. Project Labor Agreement. Executive Summary. 1.0 Background. 2.0 Project labor agreements (PLAs)

White Paper April 23, 2018

ORANGE COUNTY COMMUNITY SUPERVISION AND CORRECTIONS DEPARTMENT JOB POSTING

Central Corridor Passenger Rail Feasibility Study. Prepared for Massachusetts Department of Transportation June 2017

T H E I N D U S T R I A L R E V O L U T I O N

Project Overview. A Collaborative Effort

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Wisconsin s Passenger Rail Development Program

Transport and automotive industry of the Republic of Kazakhstan

ASA August 1. Vandergraaf

UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS Photo credit: Tom Arban Photography

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

NEARS Class I Rail Network Capacity

Hydrogen-Powered Railway Vehicles (Hydrail): A Vision

Transit, Intercity Bus, Taxi 8-1

Cotton Belt Corridor. Area Focus Group (AFG) North Dallas September 11, John Hoppie, Capital Planning

TranSys Research Ltd

Transcription:

GKC CONSULTING COMPANY George K. Clem, President 501 Graham Drive Chesterton, Indiana 46304-1615 phone/fax: 219-926-1378 www.gkcconsulting.com george.clem@comcast.net A career of 40 years in the railway industry has provided the means for the establishment of my own successful business. Experience has been gained from both sides of the industry; as the Manager of Engineering with a railway supplier, and the Manager of Engineering with a railroad. Through the years, I have developed an extensive network of railroaders, vendors, and experts that I can rely on to obtain detailed technical information on any aspect of the railway industry. George K. Clem GKC Consulting Company Page 1 of 5

EXPERIENCE GKC CONSULTING COMPANY 1995 PRESENT Established my own business, providing assistance with project management; developing new equipment (enlisting people from various fields working together); capital development plans; creating quality assurance procedures; technical training; proposals. HOLLAND COMPANY 1985 1995 A manufacturer of rail welding equipment and freight car parts, and provider of rail welding contract service. Sales and services provided internationally. During 1989-95, gross income grew from $9 million to over $28 million. Manager of Engineering Directed all engineering administration, design, and manufacturing for a new division, Equipment Development. (1992-95) Directed the activities of five departments: Engineering, Quality Assurance, New Product Development, Manufacturing, and Service. (1988-92) Directed Engineering and Manufacturing for the Rail Weld Division and Freight Car Parts Division. (1985-88) CHICAGO SOUTH SHORE & SOUTH BEND RAILROAD 1968 1985 A 90-mile freight railroad and electrified commuter railway carrying 12,000 passengers per day and 10 million ton-miles of freight. Manager of Engineering/Assistant Chief Engineer (1978 1985) Directed strategic planning, new projects, assisted overall administration. Directed the construction and maintenance of all facilities including track, buildings, bridges, electrification system, power sub-stations, and computerized supervisory control. Responsibilities included the selection and maintenance of all track equipment, catenary equipment, and fleet vehicles. Managed 78 people, all maintenance of way equipment and inventory. Prepared department's annual budget. Engineer of Maintenance of Way & Structures (1968 1978) (Also held positions of Engineer, Engineering Aide, Surveying chain-man) Started as temporary employee for the summer as college student and worked both full and part time while attending Purdue University. Learned surveying, project management, budgeting, estimating, drafting, and civil engineering. Became full time Engineer in 1972. George K. Clem GKC Consulting Company Page 2 of 5

GKC CONSULTING COMPANY ACHIEVEMENTS CLIENT COMMUTER & FREIGHT RAILROAD Since 1995, I have had a continuing contract as a consultant with this 90 mile electrified, rapidtransit railroad, assisting them with the maintenance of way. Involved in long range planning; capital projects; maintenance of way equipment, track and structures; stations; and the design, construction, and inspection of all of these. Among the projects I have done, or am currently working on: Westlake Corridor Study I prepared a conceptual route study for track through the city of Hammond, Indiana. Three routes were proposed: One route was at grade, crossing two major railroads and many major streets. A second route was aerial, over-passing all major railroads and streets. The third route, was under-passing all major railroads and streets. Exhibits and preliminary costs estimates were made for use in the route discussion process. This study was used to obtain funding for detailed engineering and costs for the favored route. Project Manager Designed and managed the addition of a second mainline track and the relocation of the existing track. Responsible for planning and construction of new passenger station. Strategic Planning Prepare five year, and annual maintenance plans, allocating over $23 million. The plans includes track, structures, signals, overhead power distribution, M/W equipment, fleet vehicles, and materials. I am involved in this continuing project, participating in regular meetings and creating plans, which include required manpower, timelines, and associated costs. South Bend, Indiana Railroad Relocation for Airport Prepared drawings for the proposed track alignment that terminates at the airport. These drawings were super-imposed on aerial photographs providing a true visual representation. Tracks proposed for the railroad operations included: passing tracks, terminal tracks, and storage tracks. The railroad used these exhibits for operational approvals. Innovative Design for Elevated and Handicapped Platforms Working to upgrade its passenger stations, a new concept of elevated and handicapped passenger platforms had to be developed to accommodate the wider freight trains that also use the track. Two different concepts of moving platforms had to be created. As Project Manager, part of my work includes revising, approving, and supervising the design, manufacture, and installation. Maintenance of Way Quality Assurance Manual Lacking written MOW procedures, I wrote a QA manual and trained their staff, addressing the specifics of their track and right-of way maintenance, following the recommendations of AREMA. George K. Clem GKC Consulting Company Page 3 of 5

CLIENT CIVIC GROUP ROUTE FEASIBILITY STUDY A civic group in Michigan City, Indiana wants the railroad to relocate the track that runs down the middle of the street. I prepared a report for them on methods for obtaining funding for a detailed route study relocation, moving the track out of city streets, into a combined railroad corridor. Estimated costs were provided for each phase of the project. Phases included conceptual, route approval, detailed engineering and construction. CLIENT EQUIPMENT MANUFACTURER Engineered and supervised the manufacture of a track vehicle; a high speed rail tribometer (patented) used to help manage track lubrication by measuring the coefficient of friction of rail. I coordinated the development and testing with the client and the AAR/TTC. The HSRT is now performing contract service to railroads. CLIENT STEEL MILL Developed track maintenance quality assurance programs, and instructed their staff and crews on track maintenance, derailment prevention and investigation, repair welding of frogs and turnouts; designed new track layouts for the plant, and inspected the track construction. Maintenance Savings of $500,000 The first year following my planning and training, this client (with 100 miles of track and 800 turnouts) saved $500,000. I produced a customized track quality assurance manual, standards for installation and maintenance practices, and trained personnel. Derailments were reduced by 50% within three months. Additional training was provided to determine the causes of derailments and eliminate them. Track Layout Plant track modifications were required for the delivery of unit coal trains to a new coke manufacturing plant. I designed track layout for coal handling, and assisted with construction work and placed track in service. CLIENT RAIL WELDING COMPANY Quality Assurance Manual Authored rail welding quality assurance manual and trained their staff in the methods necessary to maintain those quality standards Marketing Brochures Wrote and produced two 20 page marketing brochures containing concise explanations and photographs of their intrack rail welding and cut-and-slide processes. CLIENT TRACKWORK MANUFACTURER (ENGLAND) Worked to restore the hardness of rail after welding and forging. Analyzed their operation and designed a plan of action. Also, designed air-cooling equipment for the process, which was manufactured in England. George K. Clem GKC Consulting Company Page 4 of 5

CLIENT INTERNATIONAL TRANSPORTATION SERVICE (KAZAKHSTAN) I was hired to work for a railroad in Central Asia. Formerly part of the Soviet Union, but now an independent state, they needed to buy equipment on the open market. I wrote the tender specifications (general and specific) for 15 new maintenance of way machines. Tenders were required to be in English and Russian. My work was completed in Central Asia, and also in my office via e-mail. CLIENT INTERNATIONAL DEVELOPMENT CONSULTING COMPANY (INDIA) As the team leader of a group railroad experts we assessed the quality and progress of the construction of various railroad projects in India. This involved on-site inspections of track, bridges, stations, and electric catenary throughout the country. Written reports on our findings, along with our recommendation were made. EDUCATION 1971 Purdue University: BS Construction Engineering Technology Minor: Civil Engineering 1969 Purdue University: AAS Architectural Technology Minor: Electrical Engineering ASSOCIATIONS American Railway Engineering and Maintenance-of-Way Association (AREMA) A member since 1972: AREMA is responsible for writing the industry standards for railway maintenance as published in the Railway Engineering Manual, updated annually. Member of Committee 27 Maintenance of Way Work Equipment: Committee is comprised of people in the railway industry with experience and knowledge in maintenance of way equipment. We write the Specifications for On-Track Machinery. American Welding Society - Committee 15D: Rail Welding My participation in rail welding associations includes; authoring the rail welding standards for the American Welding Association s Recommended Practices for the Welding of Rails and Related Rail Components for Use by Rail Vehicles, Chapter 5 Flash Welding (FW)(Electric Flash Butt Welding) of Rail (ANSI/AWS D15.2-94, An American National Standard) PATENTS US 06192736 Tribometer for testing efficiency of lubrication on rail (2001) US 04854088 Method for Rail Grinding (1989) US 04751794 In Track Rail Base Grinder (1988) George K. Clem GKC Consulting Company Page 5 of 5