PART PG GENERAL REQUIREMENTS FOR ALL METHODS OF CONSTRUCTION

Similar documents
ASME BPVC.I SECTION I. ASME Boiler and Pressure Vessel Code An International Code. R ul e s for Const ruction of Powe r Boi l e rs

VIII. Rules for Construction of Pressure Vessels. Division 1. ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE

ASME B31.3 Process Piping. 19. What s Different in B31.1

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

PART 2, S2.6.2 ULTRASONIC THICKNESS TESTING

Reinforced Thermoset Plastic Corrosion-Resistant Equipment

Reinforced Thermoset Plastic Corrosion-Resistant Equipment

PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS

AASHTO/AWS D1.5M/D1.5:2008. Table of Contents

Gas Transmission and Distribution Piping Systems

Reinforced Thermoset Plastic Corrosion-Resistant Equipment

DIN EN : (E)

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low-Temperature Service 1

SECTION III DIVISIONS 1 AND 2

Gas Transmission and Distribution Piping Systems

UNIFIED FACILITIES GUIDE SPECIFICATIONS

PART UIG THE ASME CODE FOR IMPREGNATED GRAPHITE PRESSURE VESSELS

2007 ASME Boiler & Pressure Vessel Code 2007 Edition July 1, 2007

A Comparison: ASME B31.1 Power Piping versus ASME B31.3 Process Piping

M. F. Sullivan. 9/27/2016 Dr. Sandor Somogyi

ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE. Part B Nonferrous Material Specifications

UFGS (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Pipeline Transportation Systems for Liquids and Slurries

INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1

Code on Nuclear Air and Gas Treatment

ASME CODE CHANGES 2015 EDITION

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS)

Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service 1

Specification for Welding of Tanks, Vessels, and Other Equipment in Sanitary (Hygienic) Applications

Standard Specification for Wrought Austenitic Stainless Steel Piping Fittings 1

Date: August 2011 To: Purchasers of API 650, Welded Steel Tanks for Oil Storage, 11th Edition Re: Addendum 3

Safety Standard for Pressure Vessels for Human Occupancy

SECT. VIII CHANGES

NOTICE REGARDING CODE CASES OF THE ASME B31 CODE FOR PRESSURE PIPING

ASME B31.3 Process Piping

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004)

2017 ASME Boiler & Pressure Vessel Code

ASME B31.3 INTERPRETATIONS NO. 18

MATERIALS AND WELDING 2002

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

Comparison of BS and BS EN for steel materials

Subpart C Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120)

CROSBY H-SERIES DIRECT SPRING SAFETY VALVES

Simoneau Presentation

AISI S E1 AISI STANDARD. Errata to North American Specification. for the Design of Cold-Formed. Steel Structural Members.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

QUALITY ASSURANCE SPECIFICATION WELDING HEAT TREATMENT PAGE 1 OF 6

Draft - For Committee Use Only

Yes, but also refer to and for other provisions relevant to doorsheets. Yes. See Sections and

Initial Reliability Requirements

Standard Specification for Stainless Chromium-Nickel Steel-Clad Plate 1

REFERENCE SYLLABUS. for WELDING EXAMINER & WELDING EXAMINER IN TRAINING CERTIFICATES OF COMPETENCY EXAMINATIONS

YARWAY HANCOCK CONTINUOUS BLOWDOWN GLOBE VALVE SERIES 5505

Canadian Welding Bureau Comparative Review AWS D1.1 vs CSA W47.1 & CSA W59

ANSI/AWS D An American National Standard. Structural Welding Code Sheet Steel

W-09 ANCHOR CHAIN CABLES AND ACCESSORIES FOR SHIPS

The Impact Testing Enigma A Review of ASME Section VIII, Division 1, Subsection C, Part UCS, Impact Testing Requirements

AWS B4.0:2007 An American National Standard. Standard Methods for Mechanical Testing of Welds

Materials and Qualification Procedures for Ships

PSL/26 ISSUE 13 PCN CERTIFICATION AVAILABLE. Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB

SECTION HANGERS AND SUPPORTS FOR PLUMBING

NAVIGATING ASME SECTION VIII (DIV.1): MANAGING YOUR PRESSURE VESSELS - PART 1 FEATURING:

Contents. Tables. Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters. Foreword.

2004 NBIC Interpretations

Presented by: Gary Scribner Manager of Technical Services. Shanghai April The National Board of Boiler and Pressure Vessel Inspectors

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

Corporation SEAMLESS PIPE

Section 906. STRUCTURAL STEEL

COMPLETE REVISION June Process Industry Practices Vessels. PIP VESLP001 Low-Pressure, Welded Vessel Specification

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

ASME BPVC Advantage. Product Code Number: ASMBP. Types of Data. Section I Power Boilers

Stainless Steel Aeration Equipment Specification

Code Cases. Boilers and Pressure Vessels. ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE

PIP VESAC001 Air-Cooled Heat Exchanger Specification (Supplement to API STD 661, 7 th Edition)

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

DIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: CAST CONNEX CORPORATION

FABRICATION OF HEAVY WALL Cr-Mo / Cr-Mo-V REACTORS CHALLENGES AND TECHNOLOGY UPGRADATION AT LARSEN & TOUBRO LIMITED INDIA

ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE. Code Cases. Nuclear Components ASME FINAL Covers_Code Nucl MECH 5.9.

Molybdenum. Standard Specification for Pressure Vessel Plates, Alloy Steel, Chromium- Designation: A 387/A 387M 03

QC Inspection and Qualification Procedure- TX-EDU-VT-1-07, Revision # by Richard J DePue, Supersedes IW-VT-1 Visual Inspection Procedure

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

SPECIFICATION FOR PRESSURE VESSEL PLATES, CARBON STEEL, FOR MODERATE- AND LOWER-TEMPERATURE SERVICE

Qualification scheme for welders of hull structural steels

Materials and Qualification Procedures for Ships

For Committee Use Only

NATIONAL STANDARD OF THE PEOPLE S REPUBLIC OF CHINA 中华人民共和国国家标准. Heat Exchangers 热交换器. Issued on: December 5, 2014 Implemented on: May 1, 2015

DARTMOUTH COLLEGE DESIGN September 15, 2004 &CONSTRUCTION GUIDELINES

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

Pressure Equipment Repair and Alteration Requirements

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

MATERIALS AND WELDING 2010

MATERIALS AND WELDING 2009

Transcription:

CONTENTS Foreword... xv Statements of Policy... xvii Personnel... xix Preamble... xxxi Summary of Changes... xxxiii List of Changes in BC Order... xxxvi PART PG GENERAL REQUIREMENTS FOR ALL METHODS OF CONSTRUCTION... 1 PG-1 Scope... 1 PG-2 Service Limitations... 1 PG-3 Referenced Standards... 1 PG-4 Units... 1 PG-5... 2 PG-6 Plate... 2 PG-7 Forgings... 3 PG-8 Castings... 3 PG-9 Pipes, Tubes, and Pressure-Containing Parts... 3 PG-10 Material Identified With or Produced to a Specification Not Permitted by This Section, and Material Not Fully Identified... 6 PG-11 Miscellaneous Pressure Parts... 7 PG-12 Water Level Indicators and Connector... 8 PG-13 Stays... 9 PG-14 Rivets... 9 PG-16... 9 PG-17 Fabrication by a Combination of Methods... 10 PG-18 Validation by Proof Test... 10 PG-19 Cold Forming of Austenitic... 10 PG-21 Maximum Allowable Working Pressure... 10 PG-22 Loadings... 11 PG-23 Stress Values for Calculation Formulas... 12 PG-25 Quality Factors for Steel Castings... 12 PG-27 Cylindrical Components Under Internal Pressure... 13 PG-28 Welded Access or Inspection Openings Under External Pressure... 16 PG-29 Dished Heads... 16 PG-30 Stayed Dished Heads... 18 PG-31 Unstayed Flat Heads and Covers... 18 v

Openings and Compensation PG-32 Openings in Shells, Headers, and Heads... 21 PG-33 Compensation Required for Openings in Shells and Formed Heads... 25 PG-34 Flanged-in Openings in Formed Heads... 28 PG-35 Compensation Required for Openings in Flat Unstayed Heads and Flat Stayed Plates... 28 PG-36 Limits of Metal Available for Compensation... 28 PG-37 Strength of Compensation... 29 PG-38 Compensation for Multiple Openings... 29 PG-39 Methods of Attachment of Pipe and Nozzle Necks to Vessel Walls... 30 PG-42 Requirements for Fittings, Flanges, and Valves... 31 PG-43 Nozzle Neck Thickness... 34 PG-44 Inspection Openings... 34 PG-46 Stayed Surfaces... 34 PG-47 Staybolts... 35 PG-48 Location of Staybolts... 35 PG-49 Dimensions of Staybolts... 36 PG-52 Ligaments... 36 PG-53 Ligaments... 38 PG-55 Supports and Attachment Lugs... 39 Boiler External Piping and Boiler Proper Connections PG-58 Outlets and External Piping... 39 PG-59 Application Requirements for the Boiler Proper... 43 and Application PG-60 Requirements for Miscellaneous Pipe, Valves, and Fittings... 45 PG-61 Feedwater Supply... 48 Safety Valves and Safety Relief Valves PG-67 Boiler Safety Valve Requirements... 48 PG-68 Superheater and Reheater Safety Valve Requirements... 52 PG-69 Certification of Capacity of Safety and Safety Relief Valves... 52 PG-70 Capacity of Safety Valves... 57 PG-71 Mounting... 57 PG-72 Operation... 58 PG-73 Minimum Requirements for Safety and Safety Relief Valves... 58 Fabrication PG-75... 62 PG-76 Cutting Plates and Other Stock... 62 PG-77 Plate Identification... 62 PG-78 Repairs of Defects in... 62 PG-79 Tube Holes and Ends... 62 PG-80 Permissible Out-of-Roundness of Cylindrical Shells... 63 PG-81 Tolerance for Formed Heads... 63 PG-82 Holes for Stays... 63 Inspection and Tests PG-90... 63 PG-91 Qualification of Inspectors... 65 PG-93 Inspection and Repair of Flat Plate in Corner Joints... 65 PG-99 Hydrostatic Test... 65 vi

Certification by Stamping and Data Reports PG-101 Heating Surface Computation... 66 PG-104... 66 PG-105 Code Symbol Stamps... 66 PG-106 Stamping of Boilers... 68 PG-107 Field Assembly... 71 PG-108 Stamping for Field-Assembled Boilers... 71 PG-109 Stamping of Pressure Piping... 72 PG-110 Stamping of Safety Valves... 72 PG-111 Location of Stampings... 72 PG-112 Manufacturer s Data Report Forms... 73 PG-113 Master Data Report Form... 75 Figures PG-28 Maximum Internal Projection of Welded Access or Inspection Openings... 16 PG-31 Some Acceptable Types of Unstayed Flat Heads and Covers... 19 PG-32 Chart Showing Limits of Sizes of Openings With Inherent Compensation in Cylindrical Shells... 23 PG-33.1 Nomenclature and Formulas for Reinforced Openings... 26 PG-33.2 Some Representative Configurations Describing the Dimensions t e, h, and d... 27 PG-33.3 Chart for Determining Value of F... 28 PG-38 Illustrations of the Rule Given in PG-38.4... 30 PG-42.1 Welding End Transitions Maximum Envelope... 33 PG-46.2 Acceptable Proportions for Ends of Through-Stays... 35 PG-52.1 Diagram for Determining the Efficiency of Longitudinal and Diagonal Ligaments Between Openings in Cylindrical Shells... 37 PG-52.2 Example of Tube Spacing With Pitch of Holes Equal in Every Row... 38 PG-52.3 Example of Tube Spacing With Pitch of Holes Unequal in Every Second Row... 38 PG-52.4 Example of Tube Spacing With Pitch of Holes Varying in Every Second and Third Row... 38 PG-52.5 Example of Tube Spacing With Tube Holes on Diagonal Lines... 38 PG-52.6 Diagram for Determining Equivalent Longitudinal Efficiency of Diagonal Ligaments Between Openings in Cylindrical Shells... 40 PG-58.3.1 Code Jurisdictional Limits for Piping Drum Type Boilers... 41 PG-58.3.2 Code Jurisdictional Limits for Piping Forced-Flow Steam Generator With No Fixed Steam or Waterline... 42 PG-59.1 Typical Boiler Bushings... 44 PG-60 Typical Arrangement of Steam and Water Connections for a Water Column... 47 PG-67.4 Requirements for Pressure Relief Forced-Flow Steam Generator... 50 PG-80 Maximum Permissible Deviation From a Circular Form e for Cylindrical Parts Under External Pressure... 64 PG-105.1 Official Symbols for Stamps to Denote The American Society of Mechanical Engineers Standard for Boilers... 67 PG-105.2 Official Symbol for Stamp to Denote The American Society of Mechanical Engineers Standard for Assembly... 67 PG-105.3 Official Symbol for Stamp to Denote The American Society of Mechanical Engineers Standard for Welded Piping... 67 PG-105.4 Official Symbol for Stamp to Denote The American Society of Mechanical Engineers Standard for Safety Valves... 67 PG-106 Form of Stamping (U.S. Customary)... 69 vii

Tables PG-19 Post Cold-Forming Strain Limits and Heat-Treatment Requirements... 11 PG-39 Minimum Number of Threads Per Connection... 31 PG-68.7 Superheat Correction Factor, K sh (U.S. Customary)... 53 PG-68.7M Superheat Correction Factor, K sh (SI)... 54 PART PW REQUIREMENTS FOR BOILERS FABRICATED BY WELDING... 76 PW-1... 76 PW-5... 76 PW-8... 77 PW-9 of Welded Joints... 77 PW-10 Heat Treatment... 78 PW-11 Radiographic and Ultrasonic Examination of Welded Butt Joints... 78 PW-13 Head-to-Flange Requirements... 78 PW-14 Openings in or Adjacent to Welds... 78 PW-15 Welded Connections... 78 PW-16 Minimum Requirements for Attachment Welds... 81 PW-19 Welded-in Stays... 86 Fabrication PW-26... 88 PW-27 Welding Processes... 88 PW-28 Welding Qualification and Weld Records... 88 PW-29 Base Metal Preparation... 89 PW-31 Assembly... 89 PW-33 Alignment Tolerance, Shells and Vessels (Including Pipe or Tube Used as a Shell)... 90 PW-34 Alignment, Tube and Pipe... 90 PW-35 Finished Longitudinal and Circumferential Joints... 90 PW-36 Miscellaneous Welding Requirements... 91 PW-38 Preheating... 91 PW-39 Requirements for Postweld Heat Treatment... 91 PW-40 Repair of Defects... 101 PW-41 Circumferential Joints in Pipes, Tubes, and Headers... 102 PW-42 Joints in Valves and Other Boiler Appurtenances... 103 PW-43 Loading on Structural Attachments... 104 Inspection and Tests PW-46... 106 PW-47 Check of Welding Procedure... 106 PW-48 Check of Welder and Welding Operator Performance Qualifications... 106 PW-49 Check of Heat Treatment Practice... 106 PW-50 Qualification of Nondestructive Examination Personnel... 106 PW-51 Acceptance Standards for Radiography... 106 PW-52 Acceptance Standards for Ultrasonic Examination... 107 PW-53 Test Plates... 107 PW-54 Hydrostatic Test... 110 viii

Figures PW-9.1 Butt Welding of Plates of Unequal Thickness... 77 PW-9.2 Prohibited Welded Joint... 78 PW-15 Examples of Weld Strength Calculations... 80 PW-16.1 Some Acceptable Types of Welded Nozzles and Other Connections to PW-16.2 Shells, Drums, and Headers... 82 Some Acceptable Forms of Welds for Lugs, Hangers, and Brackets on Shells, Drums, and Headers... 86 PW-19.4(a) Some Acceptable Types of Diagonal Braces for Installation by Welding... 87 PW-19.4(b) Unacceptable Types of Diagonal Braces for Installation by Welding... 87 PW-43.1 Method of Computation of Attachments to Tubes... 104 PW-43.2 Chart for Determining Load Factor, L f... 105 PW-53.1 Test Specimens From Longitudinal Welded Test Plates... 108 PW-53.2 Method of Forming Longitudinal Test Plates... 108 PW-53.3(a) Details of Tension Test Specimens... 110 PW-53.3(b) Details of Bend Test Specimens... 111 Tables PW-11 Required Radiographic and Ultrasonic Examination of Welded Butt Joints... 79 PW-33 Alignment Tolerance of Sections to Be Butt Welded... 90 PW-39 Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments... 92 PW-39.1 Alternate Postweld Heat Treatment Requirements for Carbon and Low Alloy Steels... 101 PW-43.1 Tube Attachment Angle Factor, K... 105 PART PR REQUIREMENTS FOR BOILERS FABRICATED BY RIVETING... 112 PART PB REQUIREMENTS FOR BOILERS FABRICATED BY BRAZING... 113 PB-1... 113 PB-5... 114 PB-6 Brazing Filler Metals... 114 PB-7 Fluxes and Atmospheres... 114 PB-8... 114 PB-9 Strength of Brazed Joints... 114 PB-10 Brazed Joint Efficiency... 115 PB-14 Application of Brazing Filler Metal... 115 PB-15 Permissible Types of Joints... 115 PB-16 Joint Clearance... 115 PB-17 Joint Brazing Procedure... 115 PB-18 Openings... 115 PB-19 Brazed Connections... 115 Fabrication PB-26... 116 PB-28 Qualification of Brazing Procedure... 116 PB-29 Qualification of Brazers and Brazing Operators... 117 PB-30 Cleaning of Surfaces to Be Brazed... 117 PB-31 Clearance Between Surfaces to Be Brazed... 117 ix

PB-32 Postbrazing Operations... 117 PB-33 Repair of Defective Brazing... 117 Inspection and Tests PB-46... 117 PB-47 Check of Brazing Procedure... 117 PB-48 Brazer and Brazing Operator... 118 PB-49 Visual Examination... 118 PB-50 Exemptions... 118 Marking and Reports PB-51... 118 Figure PB-15 Some Acceptable Types of Brazed Joints... 116 Tables PB-1 Maximum Temperatures [ F ( C)] for Brazing Filler Metal... 114 PB-16 Recommended Joint Clearance at Brazing Temperature... 116 PART PWT REQUIREMENTS FOR WATERTUBE BOILERS... 119 PWT-1... 119 PWT-5... 119 PWT-8... 119 PWT-9 Tubes and Pipe... 119 PWT-10 Tube Wall Thickness... 119 PWT-11 Tube Connections... 119 PWT-12 Staybolting Box-Type Headers... 123 PWT-13 Staying Segment of Heads... 123 PWT-14 Firing Doors... 123 PWT-15 Access and Firing Doors... 123 Figures PWT-11 Examples of Acceptable Forms of Tube Attachment... 122 PWT-12.1 Box-Type Header Joint... 123 PWT-12.2 Method of Forming Waterleg Joints by Welding... 123 Table PWT-10 Maximum Allowable Working Pressures for Seamless Steel and Electric Resistance Welded Steel Tubes or Nipples for Watertube Boilers, Where Expanded Into Drums or Headers, for Different Diameters and Gages of Tubes Conforming to the Requirements of Specifications SA-178 Grade A, SA-192, and SA-226... 120 x

PART PFT REQUIREMENTS FOR FIRETUBE BOILERS... 124 PFT-1... 124 PFT-5... 124 PFT-8... 124 PFT-9 Thickness Requirements... 124 PFT-10 Shell Joints... 124 PFT-11 Attachment of Heads and Tubesheets... 124 PFT-12 Tubes... 125 Combustion Chambers PFT-13 Combustion Chamber Tubesheet... 126 PFT-14... 127 PFT-15 Plain Circular Furnaces... 127 PFT-17 Ring-Reinforced Type... 127 PFT-18 Corrugated Furnaces... 128 PFT-19 Combined Plain Circular and Corrugated Type... 129 PFT-20 Attachment of Furnaces... 129 PFT-21 Fireboxes and Waterlegs... 130 Stayed Surfaces PFT-22... 130 PFT-23 Working Pressure for Stayed Curved Surfaces... 131 PFT-24 Staying Horizontal Return Tube Boilers... 132 PFT-25 Staying Segments of Heads... 132 PFT-26 Area Supported by Stay... 132 PFT-27 Maximum Spacing... 132 PFT-28 Staybolts and Stays... 134 PFT-29 Flexible Staybolts... 134 PFT-30 Crown Bars and Girder Stays... 134 PFT-31 Stay Tubes... 135 PFT-32 Stresses in Diagonal Stays... 135 Doors and Openings PFT-40 Welded Door Openings... 136 PFT-41 Openings in Wrapper Sheets... 136 PFT-42 Fireside Access Openings... 136 PFT-43 Requirements for Inspection Openings... 136 PFT-44 Opening Between Boiler and Safety Valve... 136 Domes PFT-45 Requirements for Domes... 136 Setting PFT-46 Method of Support... 137 xi

Piping, Fittings, and Appliances PFT-47 Water Level Indicators... 137 PFT-48 Feed Piping... 138 PFT-49 Blowoff Piping... 138 PFT-50 Thickness of Furnaces and Tubes Under External Pressure... 139 PFT-51 Maximum Allowable Working Pressure... 139 Figures PFT-12.1 Some Acceptable Forms of Tube Attachment on Firetube Boilers... 126 PFT-17.2 Acceptable Type of Ring-Reinforced Furnace... 127 PFT-18.1 Morison Furnace... 128 PFT-19 Connection Between Plain and Corrugated Furnace... 129 PFT-20 Welding Ogee Ring... 129 PFT-21 Some Acceptable Methods of Forming Waterleg Joints by Welding... 130 PFT-23.1 Stayed Wrapper Sheet of Locomotive-Type Boiler... 131 PFT-25 Example of Staying of Heads Adjacent to Cylindrical Furnaces... 133 PFT-27 Pitch of Staybolts Adjacent to Upper Corners of Fireboxes... 134 PFT-32 Measurements for Determining Stresses in Diagonal Stays... 135 PFT-46.1 Spacing and Weld Details for Wall-Support Lugs Set in Pairs on Horizontal-Return Tubular Boilers... 138 PFT-46.2 Welded Bracket Connection for Horizontal-Return Tubular Boilers... 138 PART PFH OPTIONAL REQUIREMENTS FOR FEEDWATER HEATER (WHEN LOCATED WITHIN SCOPE OF SECTION I RULES)... 141 PFH-1... 141 PART PMB REQUIREMENTS FOR MINIATURE BOILERS... 142 PMB-1... 142 PMB-2 Scope... 142 PMB-5... 142 PMB-8... 142 PMB-9 Welding... 142 PMB-10 Washout Openings... 143 PMB-11 Feedwater Supply... 143 PMB-12 Blowoff... 143 PMB-13 Water Gages... 143 PMB-14 Fixtures and Fittings... 143 PMB-15 Safety Valves... 143 PMB-16 Steam Stop Valves... 143 PMB-17 Automatic Devices... 143 PMB-21 Hydrostatic Tests and Inspection... 143 PART PEB REQUIREMENTS FOR ELECTRIC BOILERS... 145 PEB-1... 145 PEB-2 Scope... 145 xii

PEB-3 Optional Requirements for the Boiler Pressure Vessel... 145 PEB-5... 145 PEB-8... 146 PEB-9 Welding... 146 PEB-10 Inspection Openings... 146 PEB-11 Feedwater Supply... 146 PEB-12 Blowoff... 146 PEB-13 Water Level Indicators... 146 PEB-14 Pressure Gages... 146 PEB-15 Safety Valves... 146 PEB-16 Automatic Devices... 147 PEB-17 Hydrostatic Test... 147 PEB-18 Inspection and Stamping of Boilers... 147 PEB-19 Manufacturer s Data Report for Electric Boilers... 148 PART PVG REQUIREMENTS FOR ORGANIC FLUID VAPORIZERS... 149 PVG-1... 149 PVG-5... 149 PVG-8... 149 PVG-9 Requirements... 149 PVG-10 Gage Glasses... 149 PVG-11 Drain Valves... 149 PVG-12 Safety Valves... 149 Figure PVG-12 Constant C for Vapor Related to Ratio of Specific Heats (k p c p /c v )... 150 PART PHRSG REQUIREMENTS FOR HEAT RECOVERY STEAM GENERATORS... 151 PHRSG-1... 151 PHRSG-2 Scope... 151 PHRSG-3 Requirements for Superheater and Reheater Condensate Removal Connections... 151 PHRSG-4 Desuperheater Drain Pots... 151 PHRSG-5 Certification... 153 Figure PHRSG-4 Some Acceptable Desuperheater Spraywater Protection Device Arrangements... 152 MANDATORY APPENDICES I Submittal of Technical Inquiries to the Boiler and Pressure Vessel Committee... 155 xiii

II Standard Units for Use in Equations... 157 NONMANDATORY APPENDIX A Explanation of the Code Containing Matter Not Mandatory Unless Specifically Referred to in the Rules of the Code... 158 Index... 242 xiv