Current Fee Recommended Fee

Similar documents
Adopted Overthe-Counter Fee

CITY OF SOUTH GATE SCHEDULE OF FEES APPROVED

Building/Zoning Permit Fee Structure

SCHEDULE OF FEES APPLICABILITY PAYMENT TYPES ACCEPTED FEES PLANNING PERMIT FEES

SCHEDULE B RESIDENTIAL BUILDING FEES

Administrative Fees Approved

37101 Newark Boulevard, Newark, CA Fax Revised 3/2016

GWINNETT COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT

RESIDENTIAL CONSTRUCTION PERMIT FEES

Medina County Building Department

The following is required for a complete permit submittal for each unit.

An Applicant s Guide to Residential Building Permits.

THE DEVELOPMENT REVIEW BOARD. 1. New construction or relocation of single-family homes, including mobile/modular and manufactured homes.

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Dave Harper, Building Official (509) Susan Davis, Administrative Secretary (509)

Plan Review, Permit & Inspection Fees Schedule

B U I L D I N G P E R M I T A P P L I C A T I O N

START RIGHT A G U I D E T O L + I S E R V I C E S

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

CODE OF ORDINANCES, DENVER, IOWA

Application Requirements for obtaining a Building Permit

b. Nonfixed and movable fixtures, cases, racks, counters and partitions not over five (5) feet nine (9) inches high.

RESIDENTIAL BUILDING PERMIT PROCEDURES

WARWICK TOWNSHIP Dept. of Planning & Zoning

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e

NOTICE TO APPLICANT WARNING TO OWNER AND AFFIDAVIT

RESIDENTIAL BUILDING PERMIT CHECKLIST FOR THE CITY OF SANTA ROSA

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

Rules and Regulations

ADMINISTRATION CHAPTER 1

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

BUILDING PERMIT APPLICATION

The following materials and documents are required in order for you to obtain a Building Permit:

City of Milford, Connecticut Information Regarding Permits

SECTION 5 EXCEPTIONS AND MODIFICATIONS

TOWN OF CHEEKTOWAGA BUILDING PERMIT FEE SCHEDULE

CITY OF COEUR D'ALENE Residential Permit Application

BUILDING CODES & DESIGN CRITERIA

The Town of Dennis. Building Department Fee Schedule FY2014

RESIDENTIAL BUILDING PERMIT INFORMATION

City of Jacksonville Development Guide Building Permits

CODE COMPLIANCE PLAN REVIEW PROCEDURES

City of Centerville Building, Zoning & Code Enforcement Department

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

The following is required for a complete permit submittal for each unit.

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

A. Applicability and Review Authority.

COMMUNITY DEVELOPMENT

Civic Address (Street No. & Name):

SOLAR ENERGY SYSTEMS APPLICATION

THE CONSTRUCTION SUPERVISOR

Construction Application for Permit (CAP) Instructions

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Administrative Changes

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

Each proposed project will be reviewed for compliance with the following codes as applicable.

Advanced Ventilation for Residential applications FBC Res 2010.

Student Handout. Authors: NAWIC Education Foundation, Jessica Frichtel & Tim Bingham. Experiential Learning Opportunity

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

TOWN OF BEDFORD BUILDING DEPARTMENT 55 CONSTITUTION DR. BEDFORD, NH FEES, POLICIES & REQUIREMENTS CURRENT CODES

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

Short title. This chapter may be cited as the "Kern County Building Code."

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

TEXT AMENDMENT TO THE MUNICIPAL CODE OF THE VILLAGE OF GLENVIEW

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

CITY OF BERKLEY, MICHIGAN FENCE APPLICATION

Residential Building Permit Application

IECC Commercial Significant Changes Summary Tier I

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

PROCEDURE FOR REQUESTING A BUILDING PERMIT

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

City of Donnelly. Permit Application Information and Instructions

THE FOLLOWING INFORMATION IS REQUIRED TO OBTAIN A CITY OF OTHELLO COMMERCIAL BUILDING PERMIT:

PRE-FABRICATED HOUSING

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

Energy Trigger (A Existing Building Upgrade Mechanism Model)

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

PIKES PEAK REGIONAL BUILDING DEPARTMENT

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates

WINDMILL CROSSING HOMEOWNERS ASSOCIATION, INC. Architectural Committee Guidelines For Townhomes

CEQA Categorical Exemption Determination

Continuing Certificate of Occupancy Pre-Inspection Checklist

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

BUILDING PERMIT BASICS

County of Prince William 5 County Complex Court, Prince William, VA (703) , Fax (703)

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Transcription:

BUILDING DIVISION STRUCTURAL FEES Occupancy A. Residential Interior Remodel with no structural Current per additional sq ft Online (when 1. 250 sq ft $825 $744 $0.51 $610 2. 500 sq ft $825 $871 $0.28 $737 3. 1,000 sq ft & up (per sq ft) $1,079 $1,011 $0.28 $877 B. Residential Interior Remodel/Additions with Structural & Guest houses 1. 250 sq ft $825 $1,151 $0.88 $1,017 2. 500 sq ft $825 $1,372 $0.44 $1,238 3. 1,000 sq ft & up (per sq ft) $1,079 $1,593 $0.44 $1,459 C. Residential, New Construction 1. 500 sq ft $2,596 $2,973 $0.71 $2,839 2. 1,500 sq ft $3,021 $3,684 $0.72 $3,550 3. 2,500 sq ft $3,918 $4,405 $0.86 $4,271 4. 3,500 sq ft & up (per sq ft) $4,615 $5,263 $0.86 $5,129 5. Master Plan up to 1,500 sq ft $1,567 $1,705 $0.73 $1,571 6. Mastered Plan up to 1,500 sq ft $2,478 $2,469 $1.53 $2,335 7. Manufactured Single Family Dwelling $634 $911 $0.00 $777 8. Multi Family (apartments, hotel, care group $7,748 $3,408 n/a $3,274 facilities, etc. 1-10 units) 9. Each add'l unit (above 10 but less than 20) $180 $221 n/a $87 10. Detached Accessory (garage, workshop, hobby, $634 $994 n/a $860 etc.) C. Commercial/Industrial - New Construction(A, B,E, F, H, I, M, S Occupancies) 1. 1,000 sq ft $2,176 $3,888 $0.80 $3,754 2. 5,000 sq ft $4,373 $7,069 $0.34 $6,935 3. 10,000 sq ft $6,228 $8,747 $0.12 $8,613 4. 50,000 sq ft & up (per sq ft) $13,541 $13,693 $0.12 $13,559 D. Tenant Improvement - no Structural (A, B,E, F, H, I, S Occupancies) 1. 500 sq ft $1,460 $1,053 $0.74 $919 2. 1,000 sq ft $1,810 $1,388 $0.40 $1,254 3. 3,000 sq ft & up (per sq ft) $3,110 $1,925 $0.20 $1,791 E. Tenant Improvement - with Structural (A, B,E, F, H, I, S Occupancies) 1. 500 sq ft $1,460 $1,388 $1.07 $1,254 2. 1,000 sq ft $1,810 $1,925 $0.48 $1,791 3. 3,000 sq ft & up (per sq ft) $3,110 $2,887 $0.48 $2,753 F. Agricultural (U occupancies- not including Detached Acc) 1. 2,400 sq ft $2,263 $2,857 $0.13 $2,723 2. 12,000 sq ft $5,583 $4,151 $0.12 $4,017 3. 20,000 sq ft & up (per sq ft) $7,520 $5,131 $0.12 $4,997 Adopted

BUILDING DIVISION STRUCTURAL FEES Occupancy Current per additional sq ft Online (when Adopted Definitions: Residential- single Family Dwelling(SFD), Guest House (500 sq ft max), Pool House, Converted Space into Living space, Second Dwelling Single Family Dwelling (SFD)- Custom Single Family Home for single lot not multiple use Master Plan - A plan that will be plan reviewed for future "mastered plans" with intent of multiple use Mastered Plan - reviewed from a "Master Plan" includes site specific requirements- site plan, floor plan, etc. Res multi family - Includes Apartments, duplex, fourplex, hotel, condo's, Townhomes, etc. Commercial/Industrial - New Construction - All Nonresidential Uses not classified as a "U"(A, B,E, F, H, I, S Occupancies) Tenant Improvement - Nonstructural any improvements to structure that would require permits- includes remodels Tenant Improvement - with Structural any improvements to structure that would require permits-includes remodels Agricultural - Occupancies classed as a "U" or meet definition of Limited Ag Structure- Barns Additional Factors - Inspections: Shell Buildings 50% of fee Additional Factors - Plan Checks: Minor Plan Check Modifications $174 Shell Buildings 50% of fee In Flood Zone $174 Other: HCD 433A Form Filing Add two hours, plus cost of filing with Clerk-Recorder Retrofit Mobile Homes (fees waived if submitted online)

BUILDING PERMIT FEES Current Online (when available) Adopted Notes MECHANICAL, PLUMBING, AND ELECTRICAL PERMIT FEES A. Mechanical Permit s 1. FAU less than 100,000 Btu/h $123.00 $199.00 $166.00 Currently available online 2. FAU greater than 100,000 Btu/h $221.00 $232.00 $199.00 Currently available online 3. Suspended, wall, or floor-mounted heaters $123.00 $232.00 $199.00 4. Appliance vents not included in an appliance $123.00 $199.00 $166.00 permit 5. Boiler or compressor, up to 200,000 Btu $314.00 $398.00 $365.00 6. Boiler or compressor, over 50 HP / Absorption $348.00 $564.00 $531.00 system over 1,750,000 Btu/h. 7. Air-handling unit, including attached ducts. $123.00 $199.00 $166.00 Currently available online 8. Evaporative cooler $123.00 $199.00 $166.00 Currently available online 9. Ventilation fan connected to a single duct $123.00 $199.00 $166.00 Currently available online 10. Hood and duct system (includes exhaust hoods- $348.00 $531.00 $498.00 Types I and II) 11. Walk-in-Box/Refrigerator $187.00 $399.00 $365.00 12. Stand Alone Mechanical Plan Check (hourly rate) $127.00 $133.00 $133.00 13. Other Mechanical Inspections (per hour) $127.00 $133.00 $133.00 B. Plumbing/Gas Permit s -$33.00 1. Building sewer install / repair / replacement (per $123.00 $199.00 $166.00 100 lf) 2. Rainwater systems (per drain) $123.00 $299.00 $266.00 3. Water Piping Replacement (each 2,500 lf) $123.00 $265.00 $232.00 4. Gas Piping - (each 2,500 lf) $123.00 $199.00 $166.00 Currently available online 5. Gas System - Retag (which includes one outlet) $123.00 $199.00 $166.00 6. Water Heater $123.00 $99.00 $66.00 7. Industrial waste pretreatment $190.00 $398.00 $365.00 interceptor/grease Trap 8. Solar Water System Fixtures (i.e. Tanks, Water $127.00 $299.00 $265.00 Treatment Equipment) - (Each) 9. Stand Alone Plumbing Plan Check (hourly rate) $127.00 $133.00 $133.00 11. Other Plumbing and Gas Inspections (per hour) $127.00 $133.00 $133.00 C. Electrical Permit s 1. Pole or platform-mounted lighting fixtures (each $0.00 $465.00 $431.00 5) 2. Generator Installation $441.00 $597.00 $564.00 3. Outline Lighting, or Marquees supplied from one branch circuit (each) 4. Power Apparatus: new $299.00 $266.00 5. Residential Roof mounted photovoltaic system $504.00 $500.00 $471.00 set by State statute. Currently available online DevSvcs Building NEW fee sch, 3 of 11

Current Online (when available) Adopted Notes 6. Residential Ground mounted photovoltaic system 7. Non-Residential Roof mounted photovoltaic system 8. Non-Residential Ground mounted photovoltaic system: $504.00 $637.00 $604.00 $504.00 $637.00 $604.00 a. < 500 kw $602.00 $730.00 $697.00 b. 500 kw & greater $602.00 $796.00 $763.00 9. Solar Roof tiles- Residential System new $664.00 $631.00 10. Power Walls- Batteries Systems new $199.00 $166.00 11. Electric Vehicle Charging station Residential new $266.00 $232.00 12. Electric Vehicle Charging station Non-Residential new $531.00 $498.00 13. Electrical Services: a. Residential $155.00 $232.00 $199.00 b. Non-Residential $253.00 $265.00 $232.00 c. Temporary Power Service $123.00 $232.00 $199.00 14. Stand Alone Electrical Plan Check (hourly rate) $127.00 $133.00 $133.00 15. Other Electrical Inspections (per hour) $127.00 $133.00 $133.00 MISCELANEOUS FEES 1. Alternate Materials and Methods Request (AMMR) 2. Antenna: $127.00 $133.00 per hour with one hour min a. Equipment Container $567.00 $531.00 $498.00 b. Cellular / Mobile Phone Tower Co Location $631.00 $717.00 $684.00 c. Cellular / Mobile Phone Tower, free standing $821.00 $1,128.00 $1,095.00 3. Board of Appeals - Filing / Processing/ Hearing $127.00 $186.00 $153.00 4. Certificate of Occupancy $0.00 $398.00 $365.00 5. Change of Occupancy No TI with Plan Check & Inspection (per hour) $821.00 $332.00 $299.00 6. Cistern, Water Storage Tanks - (Each) $694.00 $431.00 $398.00 7. Commercial Coach (Per Unit) $504.00 $730.00 $697.00 8. Deck / Balcony: 9. First 300 square feet $392.00 $465.00 $432.00 10. Each additional 100 square feet $0.00 $133.00 $100.00 11. Deed Restriction - Each Review $127.00 $133.00 $100.00 12. Demolition $251.00 $199.00 $166.00 DevSvcs Building NEW fee sch, 4 of 11

Current Online (when available) Adopted Notes 13. Document/Plans Scanning $64.00 $133.00 $100.00 DevSvcs Building NEW fee sch, 5 of 11

Current Online (when available) Adopted Notes 14. Duplicate Plans $127.00 $133.00 $100.00 15. Siding: 16. First 400 square feet $187.00 $199.00 $166.00 Currently available online 17. Each additional 400 square feet $32.00 $33.00 $0.00 18. Stucco or Veneer Applications: 19. First 400 square feet $314.00 $332.00 $299.00 20. Each additional 400 square feet $32.00 $33.00 21. Fence or Wall (wood, chain link, wrought iron): 22. > 8 feet in height, 1st 100 linear feet $179.00 $332.00 $299.00 23. Each additional 100 linear feet $28.50 $42.00 $9.00 24. Fence or Freestanding Wall (masonry / garden): 25. Up to 12', first 100 linear feet $179.00 $465.00 $431.00 26. Greater than 12', first 100 linear feet n/a $597.00 $564.00 27. Each additional 100 linear feet $28.50 $119.00 $86.00 28. Fireplace - Masonry $504.00 $332.00 $299.00 29. Fireplace - Manufactured $314.00 $358.00 $325.00 Currently available online 30. Flag pole (greater than 6 feet in height) $314.00 $305.00 $272.00 31. Fuel Storage Tanks (Each) $948.00 $431.00 $398.00 32. Limited Agriculture Building $502.00 $730.00 $697.00 33. Patio Cover (includes ICC Products): 34. Lattice first 500 square feet $377.00 $332.00 $299.00 35. Solid cover first 500 square feet $377.00 $372.00 $339.00 36. Each additional 500 square feet $63.00 $40.00 $7.00 37. Engineered design (not ICC products - additional n/a $212.00 $179.00 fee) 38. Pre-fab/engineered carports 500 sf or less $504.00 $372.00 $339.00 39. Patio Enclosure: 40. Wood frame up to 1,000 square feet $630.00 $597.00 $564.00 41. Each additional 1,000 square feet $189.00 $133.00 $100.00 42. Other than wood framed up to 1,000 square feet n/a $465.00 $431.00 43. Each additional 1,000 square feet n/a $80.00 $46.00 44. Enclosure walls under existing roof; 1st 1,000 sq $1,139.00 $531.00 $498.00 feet of enclosed area 45. Each additional 1,000 square feet of enclosed $508.00 $133.00 $100.00 area 46. Permit Renewal (1-Year max) $127.00 $133.00 $100.00 DevSvcs Building NEW fee sch, 6 of 11

47. Re-roofing - Residential: Current Online (when available) Adopted Notes 48. Roof Structure Replacement / Upgrade - repitch $504.00 $597.00 $564.00 49. Residential Reroof $187.00 $199.00 $166.00 Currently available online 50. Non-Residential Reroof $250.00 $265.00 $232.00 Currently available online 51. Fire Suppression (per 1,000 square feet for residential) $314.00 $372.00 $339.00 Commercial requires Fire Department fee 52. Retaining Wall - Not part of structure $504.00 $332.00 $299.00 Hourly, one hour min. Current fee charged by linear foot 53. Soils Review - Each Review $127.00 $133.00 $100.00 54. Signs: 55. Pole/Monument $504.00 $531.00 $498.00 56. Wall / Roof $317.00 $332.00 $299.00 57. Freeway sign $567.00 $597.00 $564.00 58. Snow Load Review - Each Review $127.00 $133.00 $100.00 59. Storage Racks - >5'9' $381.00 $332.00 $299.00 60. Storage Sheds >120 sf and <300 sf $694.00 $465.00 $431.00 61. Storage Sheds Pre-Engineered >120 sf and <300 $696.00 $332.00 $299.00 sf 62. Greenhouse (secured/ventilated) new $730.00 $697.00 63. Windows, skylights, doors, sliders, etc.: 64. Replacement (per 5) $187.00 $199.00 $166.00 Currently available online 65. New Window (structural) plans required (per 5) 66. Swimming Pool / Spa (in-ground): $504.00 $664.00 $631.00 67. Vinyl-lined / fiberglass $631.00 $796.00 $763.00 68. Gunite $853.00 $929.00 $896.00 69. Previously Mastered Pool $599.00 $796.00 $763.00 70. Master plan review only for pools - gunite or $539.00 $332.00 $299.00 vinyl 71. Commercial pool (up to 800 sf) $951.00 $1,128.00 $1,095.00 72. Transfer $63.50 $66.00 73. Windmill (Each) $682.00 $531.00 $498.00 DevSvcs Building NEW fee sch, 7 of 11

A. Building Division Hourly Rate: Current Online (when available) Adopted Notes 1. Hourly Rate for Services Provided by the Building $127.00 $133.00 Division and services not specifically identified (to be charged in 15 min increments) 2. After Hours (Scheduled) Call-Out (1 hour $254.00 $266.00 min) 3. Counter / Telephone Research / or Written $31.75 $33.00 Response (First 15 Minutes): 4. Emergency (Non-Scheduled) Call-Out (4 hour $508.00 $531.00 min) 5. Expedited Plan check fee hourly (1.5 hour min) $190.50 $199.00 6. Estimates (1/2 hour min) new $66.00 7. Services Beyond Standard (per the Director) (hourly rate) 8. Hourly Rate for Services Provided by the Code Enforcement Division and services not specifically identified (to be charged in 15 min increments) B. Maintenance s: 1. General Plan Maintenance (Imposed as a percentage of total NEW construction fees only) 2. Technology Investment (Imposed as a percentage of ALL construction fees ) $127.00 $133.00 $79.00 $121.00 4.50% 4.50% 1.00% 2.00% DevSvcs Building NEW fee sch, 8 of 11

DEVELOPMENT SERVICES - PLANNING DIVISION PLANNING DIVISION FEES 1. Appeal - Land Use Planning: Current Adopted Notes a. b. Filing - Clerk of the Board Planning/Processing - Development $50.00 $400.00 $50.00 $400.00 From administrative actions, actions of the Planning Commission or Advisory Agency. Pay to the Clerk of the B From d administrative actions, actions of the Planning Services Commission, Zoning Administrator or Advisory Agency. Pay to Development Services. Filing to Clerk of the Board is not applicable for appeals of Zoning Administrator 2. Administrative Permits: are ZONE SPECIFIC as listed in the Zoning Ordinance Use Tables. a. Administrative Permit Temporary Uses - Zone specific examples: Seasonal sales (christmas trees, pumpkins, strawberries, citrus crops), Construction yards-off-site in conjunction with an approved project, Employee work-site trailer/modular unit 12 mo. max., Trailer/similar structure as classroom/office 12 mo. max, Real estate office, Similar temporary activities determined by the Zoning Ad i i b ibl i h $489.00 $366.00 determinations to Planning Commission $163.00 $176.00 Minimum $163.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (1 hr.). Any b. Temporary Mobile Home ("Aunt Minnie") $530.00 $507.00 Initial permit is for two years. Requires annual application for extension. c. Temporary Mobile Home ("Aunt Minnie") 1 Year Extension. 3. Airport Land Use Commission (ALUC) Review- Staffing Costs $82.00 $88.00 One-year extension of term, must be filed within 60 calendar days of expiration. $652.00 $704.00 Minimum ($652.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (4 hrs.). Any 4. Certificate of Correction $978.00 $1,055.00 Minimum ($978.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (6 hrs.). Any 5. Certificate of Merger $489.00 $704.00 Minimum ($489.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (3 hrs.). Any 6. Conditional Use Permit considered by Planning Commission. $2,608.00 $7,212.00 Minimum ($2,608.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (16 hrs.). Any 7. Counter / Telephone Research / or Written Response (First 15 Minutes): $0.00 $0.00 No charge. a. Additional time - 16 or more minutes $40.00 $44.00 Per each 1/4 hour or portion thereof. 8. Development Agreement $163.00 $176.00 Per hour, with $4,890.00 $5,280 (30 hrs.) retainer. Hourly rates apply should project work exceed base charge (30 hrs.). retainer shall be 9. Development Agreement Minor Amendment $163.00 $176.00 Per hour, with $652.00 $704 (4 hrs.) retainer. Hourly rates apply should project work exceed base charge (4 hrs.). Any 10. Extension of Time for Filing Map $815.00 $1,055.00 Minimum ($815.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (5 hrs.). Any 11. Final Map Checking s: Parcel/Subdivision $326.00 $352.00 Minimum ($326.00), plus Hourly Rate. Hourly rates Maps, Waivers apply should project work exceed base charge (2 hrs.). Any 12. General Plan Amendment $163.00 $176.00 Per hour, with $9,943.00 $7,040 (61 40 hrs.) retainer. Hourly rates apply should project work exceed base charge (40 hrs.). retainer shall be 13. Land Conservation Agreement - Cancellation or Easement Exchange $163.00 $176.00 Per hour, with $6,031.00 $6,512 (37 hrs.) retainer. Williamson Act. Hourly rates apply should project work exceed base charge (37 hrs.). Any remainder of retainers (including General Plan Maintenance and Technology Investment s) paid as a retainer shall be returned to payor Dev Svcs Planning Schedule, 9 of 11

DEVELOPMENT SERVICES - PLANNING DIVISION PLANNING DIVISION FEES 14. Land Conservation Agreement - New contracts, recissions, amendments, non-renewals, Current $163.00 $176.00 Adopted Notes Per hour, with $978.00 $880 (6 5 hrs) retainer. Williamson Act. Hourly rates apply should project work exceed base consistency reviews charge (5 hrs.). Any remainder of retainers (including General Plan Maintenance and Technology Investment s) paid as a retainer shall be 15. Legal Lot Determinations / Certificate of $163.00 $1,759.00 Per hour, with $1,141.00 (7 hrs) retainer. Compliance 16. Lot Line Adjustment $652.00 $704.00 Minimum (652.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge( 4 hrs.). Any 17. Mining and Reclamation $163.00 $176.00 Per hour, with $16,952.00 $18,304 (104 hrs.) retainer. Hourly rates apply should project work exceed base charge (104 hrs.). Any remainder of retainers (including General Plan Maintenance and Technology Investment s) paid as a retainer shall be 18. Mining Inspection and Financial Assurance Review $2,771.00 $176.00 Per hour, with $2,992 (17 hrs) retainer. Minimum ($2771.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (17 hrs). Any remainder of retainers (including General Plan Maintenance and Technology Investment s) paid as a retainer shall be d 19. Minor Use Permit are ZONE SPECIFIC as listed in the Zoning Ordinance Use Tables. a. Minor User Permits - Categorically Exempt $652.00 $1,759.00 Projects that are taken in as categorically exempt and are determined to fall under a different CEQA exemption shall be required to pay the difference in fees and converts to Minimum plus Hourly Rate. b. Minor Use Permits Requiring Negative/Mitigated Negative Declaration $1,630.00 $5,101.00 Minimum ($1,630.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (10 hrs.). retainer shall be 20. Miscellaneous Planning Projects $163.00 $176.00 Per hour. For all planning projects/tasks/reviews not specifically identified in the fee schedule. DDS shall determine amount of initial retainer. 21. Mitigated / Negative Declaration $163.00 $176.00 Per hour, with $1,467.00 $1,584 (9 hrs.) retainer. Hourly rates apply should project work exceed base charge (9 hrs.). retainer shall be 22. Mitigation and Condition of Approval $163.00 $176.00 Per hour, with $978.00 $1,056 (6 hrs.) retainer. Hourly rates Monitoring apply should project work exceed base charge (6 hrs.). Any 23. Parcel Map $1,956.00 $4,046.00 Minimum ($1,956.00), plus Hourly. Hourly rates apply should project work exceed base charge (12 hrs.). retainer shall be 24. Planned Unit Development $163.00 $176.00 Per hour, with $9,454.00 $10,208 (58 hrs.) retainer. Hourly rates apply should project work exceed base charge (58 hrs.). retainer shall be 25. Pre-Application Meeting $489.00 $528.00 Minimum ($489.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (3 hrs.). Any 26. Preparation of Environmental Impact Report Actual Cost Actual Cost 27. Publishing / Legal Notices Actual Cost $250.00 $163 retainer applied to actual cost of publishing. Balance of unused retainer returned to payor, if publishing cost exceeds retainer, applicant shall pay the difference. 28. Rezone $163.00 $176.00 Per hour, with $5,868.00 $6,336 (36 hrs.) retainer. Hourly rates apply should project work exceed base charge (36 hrs.). retainer shall be 29. Right-of-Way Abandonment $1,467.00 $2,639.00 Minimum ($1,467.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (9 hrs.). Any Dev Svcs Planning Schedule, 10 of 11

DEVELOPMENT SERVICES - PLANNING DIVISION PLANNING DIVISION FEES Current Adopted Notes 30. Site Development Permit $652.00 $176.00 Per hour, with $704.00 (4 hrs.) retainer. Minimum ($652.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (4 hrs.). Any remainder of 31. Specific Plan $163.00 $176.00 retainers (including General Plan Maintenance and Technology Investment s) paid as a retainer shall be returned to payor Per hour, with $14,018.00 $15,136 (86 hrs.) retainer. Hourly rates apply should project work exceed base charge (86 hrs.). retainer shall be 32. Subdivision Map: $163.00 $176.00 Per hour, with $4,401.00 $4,928 (287 hrs.) retainer. Hourly rates apply should project work exceed base charge (28 hrs.). retainer shall be 33. Third-Party Contracted Services Actual Cost Actual Cost Contractor must be approved by the Department of Development Services and work product must meet the satisfaction of the Department. 100% applicant funded via deposit of funds to cover contracted services (pass-through). 34. Third-Party Contract Management 30% of Contracted Amount Retainer Required 35. Variance 30% of Contracted Amount Retainer Required Applies to Development, Administration, Progammatic and Fiscal Monitoring of 3rd Party Contracts. May also apply to project charges when sufficient funds are not available within the project retainer balance to cover those charges. a. Variance- Minor $1,467.00 $1,583.00 Minimum ($1,467.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (9 hrs.). Any b. Variance-Non-Minor $2,119.00 $176.00 Per hour, with $2,288.00 (13 hrs.) retainer. Minimum ($2,119.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (13 hrs.). Any remainder 36. Waiver of Parcel Map $1,956.00 of retainers (including General Plan Maintenance and Technology Investment s) paid as a retainer shall be returned to payor Minimum ($1,956.00), plus Hourly Rate. Hourly rates apply should project work exceed base charge (12 hrs.). retainer shall be 36. Zoning Clearance $81.50 $88.00 Minimum ($81.50), plus Hourly Rate. Hourly rates apply should project work exceed base charge (.5 hrs). Any 37. Zoning Ordinance Amendment $163.00 $176.00 Per hour, with $4,890.00 $5,280 (30 hrs.) retainer. Hourly rates apply should project work exceed base charge (30 hrs.). retainer shall be 38. Grading (Discretionary - Review by Planning New $176.00 Per hour, with $2,992 (18 hrs.) retainer. Hourly rates apply Commission should project work exceed base charge (18 hrs.). Any 39. General Plan Maintenance 4.50% 4.50% Applicable to Project Costs, when paid as part of a retainer - unused remainder shall be 40. Technology Investment 1.00% 2.00% Applicable to Project Costs, when paid as part of a retainer - unused remainder shall be 41. Hourly Rate for Services Provided by the Planning Division $163.00 $176.00 Dev Svcs Planning Schedule, 11 of 11