EXHIBIT H SECOND AVENUE SUBWAY PROJECT SITE PRIORITIZATION AND ADDITIONAL DOCUMENTARY RESEARCH PROTOCOL

Similar documents
Unanticipated Discoveries Plan EXHIBIT J UNANTICIPATED DISCOVERIES PLAN FOR ARCHAEOLOGICAL PROPERTIES INCLUDING HUMAN REMAINS

CHAPTER 21: COMMITMENT OF RESOURCES

Figure Preferred Alternative Modified Alternative 2 Means of Egress

NOTICE OF ADOPTION OF OFFICIAL PLAN AMENDMENT NO. 6 TO THE YORK REGION OFFICIAL PLAN

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

III. Corrections and Additions

Appendix B Section 106 Memorandum of Agreement

Syracuse General Redevelopment Plan Study Areas #1-3

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES

Department of Planning and Land Services Director

1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY

ANTIQUITIES PERMIT APPLICATION FORM ARCHEOLOGY

MAINE MEDICAL CENTER

City of Kitchener. Telecommunication Tower and Antenna Protocol. October 1, Table of Contents. Site Selection Design & Landscaping

Section 9 Implementation

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

WHEREAS, the VDOT anticipates receiving Federal financial assistance for the Project from the Federal Highway Administration (FHWA); and

Fence and Wall Requirements

2.1 Summary of Existing and Future Population Estimates

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

Purpose of the Countywide Transportation Plan SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

URBAN RENEWAL DISTRICT II TAX INCREMENT FINANCING CRITERIA FOR REVIEW

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

Inventory Methodology for Oklahoma Depression-era Bridges and Bridgeclass

WAUKEE CENTRAL URBAN RENEWAL PLAN WAUKEE CENTRAL URBAN RENEWAL AREA WAUKEE, IOWA

SANTA CRUZ LOCAL AGENCY FORMATION COMMISSION SPHERES OF INFLUENCE POLICIES AND GUIDELINES

6. The following paragraphs provide further interim guidance where the ACHP regulations are not specific to the Corps Regulatory Program:

Open Access Transmission Tariff ATTACHMENT K

CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT

52 North Broadway DEIS Scoping Outline

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

FINAL SCOPING DOCUMENT

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

Spring Valley Formerly Used Defense Site Nebraska Avenue Parking Lot

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

Guidelines for Phase I, II, and III Archaeological Investigations. and Technical Report Preparation

TRANSIT SERVICE GUIDELINES

34 th Street SBS Community Advisory Committee Meeting #6. March 28, 2012

CONSTRUCTION PROJECT TEMPORARY FACILITIES SITING POLICY February 19, 2003

Indirect and Cumulative Effects

Outline for. Protected Areas Management Planning

Curtiss-Wright/Scientech Seismic HRA Insights and Lessons Learned from the Application of EPRI Report TR

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Chesapeake Bay TMDL 2017 Mid-Point Assessment

Rapid City Area Metropolitan Planning Organization OPERATIONS PLAN

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

San Pablo Avenue and Buchanan Street Pedestrian Safety Improvements Project Contract Addendum No. 1 - Sidewalk Reconstruction

Request for Proposals for Marketing Services

Red and Purple Modernization Phase One Project Redevelopment Project Area Transit Tax Increment Financing. Public Meeting. September 13, 2016

COUNCIL FOR THE BUILT ENVIRONMENT TRACK B REPORT. Lamar Street Utility Corridor 1/5/2017. Jim Riley, Utilities & Energy Services 11/7/2016

Introduction Page I-1 INTRODUCTION

Province - Department of Municipal and Provincial Affairs Nunatsiavut Government. Activities Responsibility Timing

District of North Vancouver Construction Traffic Management Plan Guidelines

Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services

Executive Summary of the Plan of Reorganization

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

II. Corrections and Additions

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

INTERIM CONSULTATION PROCEDURE WITH TREATY 8 FIRST NATIONS September 2011

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

SCHERTZ ROADWAY IMPACT FEE

Evaluation/Monitoring Report No. 248

Railyard Enterprise Project (REP) Supplemental Scoping

FCC Reporting Requirements for Eligible Telecommunications Carriers Receiving High Cost Support

Campbell River Project Water Use Plan Physical Works Terms of Reference

2017 Archaeology Audit Program Procedure Manual. April 2017

Section mstoric DISTRICT REVIEW BOARD ESTABLISHED.

Template for ToR for Transaction Advisory Services

Roman Catholic Archdiocese of Vancouver Campus Master Plan (CMP):

Problem Screening Guideline January, 2016

Civil Engineering and Architecture Detailed and Performance Objective Outline

Commerce Park. Draft Environmental Impact Report. CITY OF FONTANA Citrus Commerce Park SCH SEPTEMBER 2014 VOLUME 1. Project Applicant:

TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION

TRANSPORTATION IMPACT STUDIES

Summary of Phase I Archaeological Survey for the NICTD Double Track NWI, Gary, IN, to Michigan City, IN

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

California Environmental Quality Act Part 1: CEQA Basics

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

Revision no: 01 Date: Global Supplier Quality Assurance Network

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

IX. STRATEGIC PLAN ELEMENT

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

CERTIFICATION AND FINANCING PROPOSAL

A. INTRODUCTION AND METHODOLOGY

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER

AREA STRUCTURE PLAN PROCESS

Potable Water Supply, Wastewater & Reuse Element

PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2014 ANNUAL REPORT

Administrative Hearing Staff Report

22.1 INTRODUCTION 22.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT

EPA s Final Vapor Intrusion Guidance

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

Evaluating and Building Portfolio Management Maturity

PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing

Transcription:

I. Purpose and Need EXHIBIT H SECOND AVENUE SUBWAY PROJECT SITE PRIORITIZATION AND ADDITIONAL DOCUMENTARY RESEARCH PROTOCOL The Second Avenue Phase 1A Archaeological Assessment, dated March 2003 (herein Phase 1A ) identified areas of potential archaeological sensitivity (herein archaeologically sensitive areas ) within the Areas of Potential Effect (APEs) for archaeological resources. The archaeologically sensitive areas contain a wide range of potential archaeological resource categories, including precontact resources and historical resources. Examples of historical resources include, but are not limited to, residential, commercial, industrial, and military sites. In addition, six areas were identified as potentially sensitive due to potential for human burials. Through the review of boring logs undertaken by a professional archaeologist retained in conjunction with MTA NYCT s Soil Borings Program (see Exhibit G, Second Avenue Subway Project: Soil Borings Program and Archaeological Resources Protocol, for further details), archaeologically sensitive areas identified in the Phase 1A will be further assessed and refined using indicators of subsurface conditions, such as the presence of fill and/or original historic soil layers. Areas that the boring logs identify as exhibiting archaeological sensitivity or for which findings were inconclusive will be carried forward for additional documentary analysis, as described below. The purpose of the additional documentary analysis program is to gather more information on the archaeologically sensitive areas, including previous disturbance and historic occupation and use, to: 1) establish a list of sites that will be field tested, and 2) prioritize those sites based on their potential to yield significant information and address meaningful research issues according to Historic Properties criteria. This will be accomplished by: 1. Refining the geographic boundaries of archaeologically sensitive areas; 2. Evaluating the potential research value of each site; and 3. Assessing the feasibility of field testing archaeologically sensitive areas. This will include prioritizing sites based on site accessibility and traffic, pedestrian, and safety constraints, and identifying sites that may be tested in advance of construction and could contain a public educational component. To accomplish the additional documentary research analysis, MTA NYCT shall adhere to the procedures of the Protocol set forth below. It is anticipated that the research described in this Protocol will be accomplished primarily during the Preliminary Engineering phase of the project, though certain activities may continue into the Final Design phase due to further refinements to the project, the addition of new project elements, and/or changes to the project. PA.H-1

II. Site Prioritization and Additional Documentary Research Protocol A. Establish Archaeological Resource Categories for Additional Archaeological Analysis For the purposes of the additional analyses to be undertaken as part of this Protocol, the types of potential archaeological resources identified in the Phase 1A have been grouped into the following four categories: 1. Precontact Resources; 2. Historical Resources (all resource categories except 19th Century Residential and Cemeteries); 3. 19th Century Residential Resources; and 4. Cemeteries. Distinct procedures will be employed for each of these four categories. The steps for the evaluation of each archaeological resource category are provided below. B. Protocol for Precontact Resources See also Flowchart A, Precontact Resources annexed to this Protocol. 1. Assess project effects. For each site, assess potential project effects. For sites where the project will have no effects, no further analysis will be undertaken. For sites where disturbance could occur, MTA NYCT will follow the procedures for precontact resources set forth below in II.B.2-6. 2. Evaluate the potential research value of each site. 3. Assess testing feasibility with assistance from appropriate technical experts and government agencies. For each site, assess the feasibility of gaining access to the site by considering potential testing constraints, such as traffic, pedestrians, and safety. The potential for testing with a public education component in advance of construction will also be evaluated. 4. Based on information obtained in Steps II.B.2 and II.B.3, establish a list of sites to be field tested. 5. Prioritize sites within list based on the potential of each site to yield significant information and address meaningful research issues according to Historic Properties criteria. 6. Prepare a report for submission to the New York State Historic Preservation Officer (SHPO), the Federal Transit Administration (FTA), and New York City Landmarks Preservation Commission (LPC) summarizing the results of the analyses for precontact resources. PA.H-2

C. Protocol for Historical Resources except 19th Century Residential and Cemeteries See also Flowchart B, Historical Resources except 19th Century Residential and Cemeteries annexed to this Protocol. 1. Assess project effects. For each site, assess potential project effects. For sites where the project will have no effects, no further analysis will be undertaken. For sites where disturbance could occur, MTA NYCT will follow the procedures for historical resources set forth below in II.C.2-7. 2. For each site, undertake additional documentary research as applicable to determine prior disturbance, historical site occupation, and use. 3. Evaluate the potential research value of each site. 4. Assess testing feasibility with assistance from appropriate technical experts and government agencies. For each site, assess the feasibility of gaining access to the site by considering potential testing constraints, such as traffic, pedestrians, and safety. The potential for testing with a public education component in advance of construction will also be evaluated. 5. Based on information obtained in Steps II.C.2 through II.C.4, establish a list of sites to be field tested. 6. Prioritize sites within list based on the potential of each site to yield significant information and address meaningful research issues according to Historic Properties criteria. 7. Prepare a report for submission to SHPO, FTA, and LPC summarizing the results of the analyses for historical resources. D. Protocol for 19th Century Residential Resources The signatories to the recognize that there are a large number of areas sensitive for 19th century historical resources and as a result, there exists the potential for research redundancy. Therefore, additional steps are proposed in the evaluation of sites containing potential 19th century residential resources to avoid research redundancy during the testing phase. See also Flowchart C, 19th Century Residential Resources annexed to this Protocol. 1. Assess Project effects. For each site, assess potential project effects. For sites where the project will have no effects, no further analysis will be undertaken. For sites where disturbance could occur, MTA NYCT will follow the procedures for 19th century residential resources set forth below in II.D.2-9. PA.H-3

2. Group and map 19th century sites according to the following time periods: a) Early 19th century (pre-1852); b) Mid 19th century (1852-1870); and c) Late 19th century (1871-1899). 3. Review public utility records for sewer and water hook-up dates. Eliminate sites that did not exist before hook-up and prioritize others according to date of construction prior to hook-up. Using the criteria defined below, sites designated as low priority will not be carried forward for further evaluation. a) LOW PRIORITY: structures built within 10 years of hook-up (research potential would only relate at a maximum to a 10 year span); b) MEDIUM PRIORITY: structures built between 10 and 20 years before hook- up; and c) HIGH PRIORITY: structures built 20 years or more before hook-up. 4. Review New York City Department of Buildings (NYCDOB) records for disturbance information for high and medium priority sites and for sites lacking an approximate date of construction. The signatories to the recognize that it may not be possible to access certain data at NYCDOB, and that it is therefore likely that some assumptions will have to be made based solely on cartographic information. 5. Assess testing feasibility for high and medium priority sites with assistance from appropriate technical experts and government agencies. For any such site, assess the feasibility of gaining access to the site by considering potential testing constraints, such as traffic, pedestrians, and safety. The potential for testing with a public education component in advance of construction will also be evaluated. Eliminate sites that have a high or medium priority for research but only a low or medium rating for site accessibility. 6. For all sites that have high or medium priority for research potential and a high priority for testing feasibility, arrange sites hierarchically based on construction date so that an appropriate size sample of each age group is represented considering that age group s research potential. This would reduce research redundancy during the testing phase. 7. Based on information obtained in Steps II.D.2 through II.D.6, establish list of sites to be field tested. The final site testing list shall reflect a broad diversity of historical neighborhoods, income groups, and cultural groups. 8. For sites identified in the list described in Step II.D.7, perform additional indepth research, such as the review of census and conveyance records, street directories, and historical photographs to stratify these sites for testing priority, based on their potential to yield significant information and address meaningful research issues according to Historic Properties criteria. PA.H-4

9. Prepare a report for submission to SHPO, FTA, and LPC summarizing the results of the analyses for 19th century residential resources. E. Protocol for Cemeteries See also Flowchart D, Cemeteries annexed to this Protocol. 1. Establish the appropriate descendant communities for each cemetery site and initiate contact with them. 2. Undertake intensive documentary research for each cemetery site: a) Research and review interment and reinterment records to establish the ethnicity, religious affiliation, and number of burials and reburials at each cemetery, to the extent possible. b) Research and review conveyance records to establish cemetery boundaries, to the extent possible. 3. For each cemetery, assess potential project effects to determine if the Project has the potential to disturb any human remains. 4. Assess potential testing issues for each site, such as street and sidewalk closures. 5. Establish list of sites to be field tested based on potential project effects. 6. Prepare a report for submission to SHPO, FTA, and LPC summarizing the results of the analyses for cemeteries. III. Reporting to SHPO, FTA and LPC Following completion of the analyses for each archaeological resource category, MTA NYCT shall prepare reports as described in Steps II.B.6, II.C.7, II.D.9, and II.E.6 and shall submit such reports to SHPO, FTA, and LPC. PA.H-5

FLOWCHART A PROTOCOL FOR PRECONTACT RESOURCES REVIEW ADDITIONAL BORING LOGS REVISE ARCHAEOLOGICAL SENSITIVITY DETERMINATIONS BASED ON SUBSURFACE CONDITIONS SITE FOUND DISTURBED SITE FOUND TO RETAIN POTENTIAL SENSITIVITY NO FURTHER ACTION ASSESS POTENTIAL IMPACTS SITE WILL BE OR MAY BE IMPACTED NO IMPACTS EVALUATE AND PRIORITIZE SITES FOR TESTING ACCORDING TO POTENTIAL RESEARCH VALUE AND TESTING FEASIBILITY TESTING RECOMMENDED FOR ALL OR A NUMBER OF SITES BASED ON PRIORITIZATION FACTORS. SOME SITES MAY DROP OUT DUE TO FEASIBILITY, ACCESS, RELATIVELY LOW SENSITIVITY, REDUNDANCY, OR A CHANGE IN SITE STATUS TO NO IMPACT. NO FURTHER ACTION* *IF CONSTRUCTION PLANS CHANGE AND IMPACTS WILL OCCUR, THEN

FLOWCHART B PROTOCOL FOR HISTORICAL RESOURCES EXCEPT 19TH CENTURY RESIDENTIAL AND CEMETERIES ESTABLISH DISTURBANCE THROUGH REVIEWING ADDITIONAL BORING LOGS REVISE ARCHAEOLOGICAL SENSITIVITY DETERMINATIONS BASED ON SUBSURFACE CONDITIONS SITE FOUND DISTURBED SITE FOUND TO RETAIN POTENTIAL SENSITIVITY NO FURTHER ACTION ASSESS POTENTIAL IMPACTS SITE WILL BE OR MAY BE IMPACTED NO IMPACTS UNDERTAKE ADDITIONAL RESEARCH TO INCLUDE REVIEWING BUILDING DEPARTMENT RECORDS, PUBLIC UTILITY RECORDS, STREET DIRECTORIES, CENSUS DATA AND HISTORICAL PHOTOGRAPHS NO FURTHER ACTION* *IF CONSTRUCTION PLANS CHANGE AND IMPACTS WILL OCCUR, THEN EVALUATE AND PRIORITIZE SITES FOR TESTING ACCORDING TO POTENTIAL RESEARCH VALUE AND TESTING FEASIBILITY TESTING RECOMMENDED FOR ALL OR A NUMBER OF SITES BASED ON PRIORITIZATION FACTORS. SOME SOME SITES MAY DROP OUT DUE TO FEASIBILITY, ACCESS, RELATIVELY LOW SENSITIVITY, REDUNDANCY, OR A CHANGE IN SITE STATUS TO NO IMPACT

FLOWCHART C PROTOCOL FOR 19TH CENTURY RESIDENTIAL RESOURCES ESTABLISH DISTURBANCE THROUGH REVIEWING ADDITIONAL BORING LOGS REVISE ARCHAEOLOGICAL SENSITIVITY DETERMINATIONS BASED ON SUBSURFACE CONDITIONS SITE FOUND DISTURBED SITE FOUND TO RETAIN POTENTIAL SENSITIVITY NO FURTHER ACTION ASSESS POTENTIAL IMPACTS SITE WILL BE OR MAY BE IMPACTED NO IMPACTS UNDERTAKE ADDITIONAL RESEARCH TO INCLUDE PUBLIC UTILITY RECORDS AND BUILDING DEPARTMENT RECORDS. EVALUATE AND PRIORITIZE SITES ACCORDING TO POTENTIAL RESEARCH VALUE (ALL LOW PRIORITIY SITES FALL OUT) NO FURTHER ACTION* *IF CONSTRUCTION PLANS CHANGE AND IMPACTS WILL OCCUR, THEN ASSESS AND PRIORITIZE HIGH AND MEDIUM PRIORITY SITES BASED ON TESTING FEASIBILITY, ACCESS, AND POTENTIAL RESEARCH REDUNDANCY PRIORITIZE SITES FOR SUBSURFACE TESTING BY COMPLETING ADDITIONAL RESEARCH TO INCLUDE REVIEWING STREET DIRECTORIES, CENSUS DATA, CONVEYANCE RECORDS AND HISTORICAL PHOTOGRAPHS

FLOWCHART D PROTOCOL FOR CEMETERIES ESTABLISH APPROPRIATE DESCENDANT COMMUNITY(S) AND INITIATE CONTACT INTENSIVE DOCUMENTARY RESEARCH TO ESTABLISH INTERMENT AND DISINTERMENT DATA, AND BOUNDARIES IF POSSIBLE REASSESS PROJECT EFFECTS SITE TO BE IMPACTED NO AVOIDANCE POSSIBLE SITE TO BE AVOIDED ASSESS POTENTIAL TESTING ISSUES PROPOSED FIELD TESTING FOR ALL OR SOME SITES BASED ON POTENTIAL PROJECT EFFECTS TO ESTABLISH PRESENCE/ABSENCE OF EXISTING BURIALS WITH COORDINATION THROUGH SHPO, NYCLPC, AND DESCENDANT COMMUNITY(S) NO FURTHER ACTION* * IF CONSTRUCTION PLANS CHANGE AND IMPACTS WILL OCCUR, THEN