SOLICITATION ADDENDUM NO. 1 RFP THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

Similar documents
SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC CONTROL OSHPD

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

4. Number of drawings required: ( ) Locations of nearest streets

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11.

ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS Replace Aboveground Fuel Tanks Saint Clair County MidAmerica Saint Louis Airport

ADVERTISEMENT FOR BIDS

Suspension Systems for Acoustical Lay-in Ceilings Seismic Design Categories D, E & F

MATERIAL ALLOWANCES AND UNIT PRICES

SEISMIC CONTROL MEASURES By Richard Lévesque, ing., P.Eng., LEED AP

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ADDENDUM NUMBER ONE (1) September 30, 2015

PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION ALTERNATES

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

Exhibit A Scope of Services and Deliverables

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Sprinkler Identification Numbers (SINs)

SECTION TURBINE VENTILATORS

SECTION PLATE CONNECTED WOOD TRUSSES

a difficult challenge when trying to achieve effective coverage within a shallow space. The Model CC1 Combustible

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

Architectural Services

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. Product Data shall be provided for each type of product indicated.

RISER DETAIL NTS SHANNON FIRE PROTECTION, LLC SCALE: 3/32" = 1'-0"

SECTION HANGERS AND SUPPORTS FOR PLUMBING

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

High Piled Combustible Storage Guideline

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

2014 Commercial Plan Submittal Checklist

SECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM

Construction Contract Basics

BUREAU Joe Iuviene, AIA January 20, 2017

CODE COMPLIANCE PLAN REVIEW PROCEDURES

SPECIFIC APPLICATION MODEL "IC" INTERSTITIAL COMBUSTIBLE CONCEALED SPACE UPRIGHT SPRINKLER GL5608

1.2 DEFINITIONS, REFERENCES, AND OVERALL STANDARDS Follow 07500

SECTION ACOUSTICAL PANEL CEILINGS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

BAYFRONT PARK RAILING REQUEST FOR PROPOSALS

FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 414/January 2004 INSTALLING SEISMIC RESTRAINTS FOR DUCT AND PIPE

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

2012 IPC Sections

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Molded Grating and Treads Products and Fabrications REVISED 11.

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

EXAM GUIDE. & Services. Overview a Knowledge / Skills 1. Sample Multiple-Choice Questions 4 Sample Multiple-Choice Answers 15

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

A/E Design Deliverable Checklist

Design & Construction Standards, Revised January

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 15-BS-2353 as follows:

Underground Piping for Private Hydrants & Sprinkler Supply Line

PSU LINCOLN HALL BROADWAY ADDITION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

PURCHASING DEPARTMENT

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION EXPANSION CONTROL

KINETICS Pipe & Duct Seismic Application Manual

Daytona Beach Pier Building Renovation Jun 2010

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION EVERETT MIDDLE SCHOOL ADDENDUM NO.

02800 SHADE STRUCTURES

American Metal Specialties, Inc.

Ordinance No July 1, 2016

SECTION CRC575 UNITARY CLEANROOM WALL SYSTEM STUDLESS CLEANROOMWALL SYSTEM ME175 3-IN-1 CLEANROOM WALL SYSTEM

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

Engineering Specifications

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL Acoustic Ceiling Tiles

THOMAS JEFFERSON UNIVERSITY HOSPITAL STANDARD OPERATING PROCEDURE FOR THE BUILD OUT OF TELECOMMUNICATIONS ROOMS AND ASSOCIATED SPACES

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Transcription:

Beaverton School District Capital Program Purchasing 16550 SW Merlo Road, Beaverton, OR 97006 Phone: 503-591-4539 SOLICITATION ADDENDUM NO. 1 RFP 15-0013 THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED. This Addendum modifies the Invitation to Bid (ITB) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the ITB document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the ITB. Failure to do so may result in Bid rejection. See the ITB regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing. This addendum is to be acknowledged in the space provided on the Bidder Certification form supplied in the solicitation document. Failure to acknowledge receipt of this addendum may be cause to reject your offer. The closing date IS CHANGED TO: May 7, 2015 at 3:00 PM CHANGES: Extend the deadline for questions April 30th Issue Final Addenda May 4th (if required) Submit Proposals May 7th 3:00pm *See attachment for additional changes CLARIFICATIONS: Questions and Answers: Q Does the bid price need to be included in the electronic copy of the bid? There are times when the price is added on site right before the bid is sealed and delivered. A Put everything that is in your official sealed bid on a flash drive or cd/dvd except the bid price.it may be excluded from your electronic copy. Q Is there an engineer s estimate for the project? A $350,000 - $400,000 Q Was the existing covered play structure included with the original school construction or was it added later? A It was built when the school was built in 2008, so we have most of the original design drawings. Q Will the new covered play structure have sky lights like the existing one? A Please included in the bid as a deductive alternate. Q Are basketball hoops to be added under the new cover? A No. RFP 15-0013, Addendum #1 April 27, 2015

Q Do we need netting to keep balls in the play area? A No. We don t need the ball retention wall, netting or the high fence. Q Will there be access through the gate at the west end of the school yard? A Yes Michael Mathews Construction Purchasing Manager RFP 15-0013, Addendum #1 April 27, 2015

SA 15002 BEAVERTON SCHOOL DISTRICT 4.06.15 Springville K-8 Site Improvements (ADD #1 04/24/15) Portland, OR SECTION 00 09 10 ADDENDA ADDENDUM NUMBER 1 DATE: April 24, 2015 PROJECT: Beaverton School District, Springville K-8 Site Improvements Portland, OR PROJECT NUMBER: SA 15002 This Addendum modifies the Bid Set documents, dated April 16, 2015, with amendments and additions noted below. CHANGES TO THE SPECIFICATIONS Item No. Reference Description 1.01 Section 00 00 00 Table of Contents ADD the following Sections: 00 09 10 - Addendum #1 21 00 00 - Fire Protection 1.02 Section 01 20 00 Design Build Requirements REVISE Section 01 20 00, paragraph 1.6A. ADD 1.6A3 to read as follows: 3. Fire Protection Section 21 00 00 4. Any other components required by Building Department 1.03 Section 21 00 00 Fire Protection ADD Section 21 00 00 per the attached. CHANGES TO THE DRAWINGS Item No. Reference Description 1.04 Sheet L2.00 REVISE Notes on Renovation Legend. Note for CCA-Free Wood Mulch should read as follows: "CCA-Free Wood mulch. Provide Mirafi 140 nonwoven geotextile or approved equal, and scarify surface prior to geotextile placement. See Architectural for Seatwall." (No Attachment) 1.05 Sheet A1.0 - Site Plan ADD note regarding Existing Concrete Blocks. See attached ASK-A1.00-02. 1.06 Sheet A1.0 - Site Plan ADD note regarding Landscape Demo. See attached 00 09 10-1 ADDENDUM #1

SA 15002 BEAVERTON SCHOOL DISTRICT 4.06.15 Springville K-8 Site Improvements (ADD #1 04/24/15) Portland, OR 1.07 Sheet A2.0 - Plans and Details 1.08 Sheet A2.0 - Plans and Details 1.09 Sheet A3.0 - Elevations and Sections 1.10 Sheet A3.0 - Elevations and Sections 1.11 Sheet A3.0 - Elevations and Sections ASK-A1.00-01. ADD Note on Plan 1 regarding paving at North columns. See attached ASK-A2.00-01. REVISE Note on Plan 1 at South columns to read "Demo and Replace Existing Ground Cover as Req'd for New columns." (No Attachment). UPDATE location of hatch indicating yellow paint. See attached ASK-A3.00-02 ADD note regarding skylights. See attached ASK- A3.00-01. ADD note regarding paint at columns. See attached ASK-A3.00-01. 00 09 10-2 ADDENDUM #1

SA 15 002 BEAVERTON SCHOOL DISTRICT 4.06.15 Springville K-8 Site Improvements Permit Set Portland, Oregon Addendum #1 4.24.15 SECTION 21 00 00 PART 1 GENERAL FIRE PROTECTION 1.1 SUMMARY A. Work included: 1. Designing and providing modifications to the existing automatic wet fire sprinkler to provide a water curtain system for the west wall of the existing Multipurpose Room directly adjacent to the new Covered Play Structure as required to provide a 2 hour fire rating for the roof structure in accordance with the latest edition of NFPA 13 and locally enforced codes and regulations. 2. Verify existing conditions and current water pressure prior to bid or design. 3. Coordinate sprinkler pipe routing with existing conditions and verify that new water curtain and existing wet systems will have adequate flow. Provide connection(s) to existing system where necessary to achieve proper flow and coordinate pipe routing and connections with general contractor. B. Provide hydraulic calculation as required to size the new water curtain system and assure proper flows. C. Include all permit costs in the contract price. D. Coordinate with appropriate sub-contractors to provide all miscellaneous appurtenances required for complete systems per NFPA and the local fire bureau. 1.2 SUBMITTALS A. Submit one electronic version of the submittals to the owner's representative for review. The submittals shall have major topic tabs and an index. Submittal items larger than 8 1/2" x 11 shall be a reproducible drawing. B. Include shop drawings with the submittals where necessary to determine clearance, where the contractor proposes alternate equipment or material arrangements, and when requested by the owner's representative. C. The owner's representative must approve all material and equipment prior to installation. D. Submittals shall include: 1. Manufacturer's catalog or technical data showing performance, dimensions, materials of construction and recommended methods of installation. 2. Specifically note locations of exposed piping on the shop drawings for Owner's representative review. 3. After Owner's representative's review, prepare fire protection system shop drawings as required by code showing location piping, piping sizes, valves, drain valves and other related items. Submit drawings to the governing fire bureau and appropriate insurance services (per owner's requirements) for review. After changes by the reviews are made, submit 5 sets of approved drawings to the Owner's representative. 4. Final submittals are to include the governing fire bureau stamp of design acceptance. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Sprinkler Heads: Tyco, Viking, Gem, Central, Reliable or approved equal. 1. Sprinkler Heads: Heads to be U.L. listed standard product of the manufacturer, matching existing heads in area and approved for their specific use. 4. Non-Ceiling Area: Upright with standard brass finish. 5. Sidewall Heads: Satin chrome finish. 6. Provide the number of spare sprinklers required by NFPA code for each type in metal cabinet with sprinkler wrench. 7. Provide hard wire sprinkler head guards. 21 00 00-1 Fire Protection

SA 15 002 BEAVERTON SCHOOL DISTRICT 4.06.15 Springville K-8 Site Improvements Permit Set Portland, Oregon Addendum #1 4.24.15 2.2 DESCRIPTION A. Piping Material: 1. Black Steel: Schedule 40 black steel or steel tubing with flanged, screwed or mechanical joint fittings. B. Other piping systems designed for fire protection systems acceptable if in conformance with NFPA, UL, other applicable codes and the local fire jurisdiction. C. Provide test orifices, miscellaneous valves, signing and appurtenances as required. PART 3 EXECUTION 3.1 INSTALLATION A. General: Provide only NFPA approved and U.L., Inc. listed components. B. Provide complete hydraulically designed system(s) as required by the Oregon Structural Specialty Code -2014 edition, NFPA Standard 13 and the governing fire bureau. 1. Determine the hazard level, area coverage requirement, flow requirements, head spacing, etc. 2. The exact number of heads and design required will be determined by the contractor based upon drawings approved by the local fire bureau. The contractor is to provide fully designed and functional sprinkler systems meeting the requirements of NFPA and the local fire bureau. Provide all design, heads and equipment required for the complete functional systems. 3. Coordinate sprinkler mains with drain fixtures and verify adequate drain receptors are available for the system, inspectors test, etc. 4. Install wire head guards on new sprinkler heads. C. Provide hangers, brackets, supports, anchors and related appurtenances, as required, to support all piping and equipment provided under this section. Piping and equipment supports shall conform to NFPA Standard 13. D. Anchorage and Seismic Restraints: 1. The contractor is responsible to determine the means and methods of equipment installation and support. 2. Provide supports for all apparatus as specified, detailed, as required by the manufacturers of specific equipment and the project governing code authorities. 3. Provide seismic restraints on all mechanical equipment in conformance with the 2010 Oregon Structural Specialty Code; Section 1613 "Earthquake Loads" and ASCE 7. Costs for seismic calculations are to be included in the bid price. 4. Provide details directly to the governing code jurisdiction for anchorage to floors, roofs, etc., sway bracing and seismic restraints. Details to show locations and sufficient support details as required by the governing code jurisdiction. 5. Provide supplementary drawings and calculations as required by governing code jurisdictions noting seismic support data/calculations as required for permit purposes. 6. Mechanical seismic criteria is as follows: a. Occupancy Classification II b. Seismic Design Category C c. Component Importance Factor (Ip) 1.5 E. Sprinkler Head Installation: 1. Heads are to be coordinated with speakers, smoke detectors, ceiling grilles and other ceiling mounted appurtenances. 2. Spaces with multiple heads are to have the heads spaced symmetrically within the space. If more than the minimum head number is required for a symmetrical pattern within the space coordinated with other ceiling appurtenances, the symmetrical and coordinated appearance will govern the final layout and design. F. Piping Installation: Fire protection piping systems to be installed in conformance with NFPA Standard 13. Install all piping in a true and even manner with lines pitched for drainage and system arranged so it can be entirely emptied of water. G. Non-Ceiling Areas: Piping locations shall be exposed and coordinated with lights, ducts and other equipment. Review all exposed sprinkler head locations with the owner's representative prior to installation. H. Perform all tests and arrange for required inspections of installed system as required by NFPA. 21 00 00-2 Fire Protection

SA 15 002 BEAVERTON SCHOOL DISTRICT 4.06.15 Springville K-8 Site Improvements Permit Set Portland, Oregon Addendum #1 4.24.15 3.2 FIRESTOPPING PENETRATIONS IN FIRE-RATED WALL / FLOOR ASSEMBLIES A. Contractors shall provide proper sizing when providing sleeves or core-drilled holes to accommodate their through penetrating items. All voids between sleeve or core-drilled hole and pipe passing through, shall be firestopped to meet the requirements of ASTM E-814. END OF SECTION 21 00 00-3 Fire Protection