Key Words: Sediment, Land Use Change, Desilting Work, Desander (Settling Basin)

Similar documents
SOIL EROSION MODELING USING RUSLE AND GIS ON CAMERON HIGHLANDS, MALAYSIA FOR HYDROPOWER DEVELOPMENT. Soo Huey Teh

CASE STUDY OKUYOSHINO, JAPAN

Annex 5 - Hydropower Model Vakhsh

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Keywords: Marshland Conservation, Scientific Investigation, Specialist, Balancing Reservoir

Xayaburi Hydroelectric Power Project

Mingtan Pumped Storage Power Project Taiwan

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

HYDROLOGY - BASIC CONCEPTS

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Implementing Party & Period - Project: Oslo Lysverker (Preparation and Application), (Construction), (in Operation)

PRELIMINARY INVESTIGATION AND DESIGN CONSIDERATIONS FOR THE REHABILITATION OF TRASH SCREEN AT JOR RESERVOIR LOW LEVEL OUTLET

CASE STUDY JHIMRUK, NEPAL

Subject: - Development of Fisheries Floating Nets for Resettlement Program of Hydropower Project Cirata Dam

Chakachamna Hydro. AEA Geothermal Conference

HYDRODYNAMIC NUMERICAL MODELLING OF DAM FAILURE AND IMPACTS ASSESSMENT OF SUSU DAM WITH MIKE

Reservoir on the Rio Boba

Hydrology Overview of Lake Taupo and the Waikato River as it relates to the Waikato Hydro Scheme (WHS) (Ohakuri Site Visit)

NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

FEASIBILITY STUDY OF FLUSHING SEDIMENTS FROM MOSUL RESERVOIR, IRAQ

Water Balance Assessment of the Roseires Reservoir

MANGLA DAM KEY FACTS. 380 ft. (above riverbed) Gross Storage Capacity: Live Storage Capacity: Year of Completion: 1967

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Keywords: Fish ladder, Investigation of Upstream Migration, Sweetfish, Fish Straying Prevention Device, Sodium Lamp Lighting

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4

Types of Hydropower Facilities

Performance improvement of headworks: a case of Kalignadaki A Hydropweor Project through physical hydraulic modelling

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

Development of Semenyih Dam Storage Prediction Model

CONCEPTION OF CHIYODA EXPERIMENTAL CHANNEL

From Upstream to Downstream:

Tsukabaru Dam Miyazaki Prefecture, Japan (Asia)

11- Benefits due to power generation

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855)

Solution for Irrigation Engineering

Fig Micro-hydro s economy of scale ( based on data in 1985)

is the draw off from the reservoir f-g: similar to c-d To meet the demand rate of x cumec the departure S 2

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES

The Consistent Development in the Whole River System

Control and Mitigation of Drinking Water Intake Problems along Nile River

FORM B: DAMMING AND DIVERSION OF WATER

July, International SWAT Conference & Workshops

HPP CEBREN. Prepared by: Development and Investments Department

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Stormwater Management in Your Backyard: Stormwater 101

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26

Estimating catchment sediment yield, reservoir sedimentation and reservoir effective life using SWAT Model

Energy Resources. Assosciate Professor

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

Camp Far West Hydroelectric Project Relicensing

2 Hydrology Studies. 2.1 Introduction

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

DRAFT SEDIMENT and EROSION CONTROL PLAN. BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION. Prepared by:

D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD

POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT

Available online at Nigerian Journal of Basic and Applied Science (December, 2012), 20(4):

Mijo River Project. Steve Hall, Spencer Taylor, Jennie Purcell Brigham Young University 4/11/2012

Watershed Response to Water Storage. 8/1/2012 Paul Wymar Scientist Chippewa River Watershed Project

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains)

Modelling the Effects of Climate Change on Hydroelectric Power in Dokan, Iraq

Hydrologic Characteristics of the Owens River Basin below the Upper Owens River

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim

LEAKAGE ASSESSMENT OF WATER CONVEYANCE TUNNEL FOR HYDROPOWER PLANT VIA WATER BALANCE

Application for resource consent Form B Damming and diversion of water

Country Profile - Republic of Korea INFORMATION

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Inter-office memo. Bear Creek Reservoir. Elliot Headpond. Jordan Generating Tailrace. Diversion Reservoir. Maximum Normal Elevation (m) Minimum Normal

USE OF WHATSAPP MOBILE APPLICATION IN PROJECT MANAGEMENT OF LARGE INFRASTRUCTURE PROJECT

Water Supply Reallocation Workshop

Terry McGuire & Phil Leigh. New Mills Hydro. Heron Corn Mill. (case study)

EXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

In-Situ Measurement of Selected Water Quality Parameters in Ringlet s Lake, Cameron Highlands

The MASMA and Sustainable Drainage Systems

TRANSFORMING CHALLENGES INTO OPPORTUNITIES

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT MCMANUS ASH POND A (AP-1) 40 CFR (c)(1)(i)-(xii)

Expert Group Meeting on Sustainable Application of Waste-to-Energy in Asian Region

DIVERSION CHANNEL OF BELO MONTE HPP

Content of Presentation

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown

FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO )

Integrated Water Resource Management and Pollution Sources in Cameron Highlands, Pahang, Malaysia

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

Siphon Pipeline Resistance Characteristic Research

Study on the Dynamic Control of Dam Operating Water Levels of Yayangshan Dam in Flood Season

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

Prepared by: PacifiCorp 825 NE Multnomah Street Portland, OR 97232

Sacramento and San Joaquin Basins Study & Climate Adaptation Options

Hypothetical Flood Computation for a Stream System

PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT

A Tale of Two Dams and a dry river. November 1, 2011 Planning, Resources and Technology Committee Mojave Water Agency

Annex C. Hydrological Investigation

Keeyask Generation Project Request to Release Impounded Water with TSS Concentrations Greater than 25 mg/l in Spring 2017

Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM

A large pumped storage scheme for seasonal reliability of national power supply?

Transcription:

IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case study 04-03: Reservoir Sedimentation - Cameron Highlands Hydroelectric Scheme, Malaysia Key Issues: 4-Reservoir Sedimentation Climate Zone: Af: Highland Tropical Humid Subjects: - Sediment Management Effects: - Prevention of sediment entering into the Telom Tunnel - Prevention of sediment accumulation in Ringlet Reservoir Sultan Abu Bakar Dam Project Name: Country: Cameron Highlands Hydroelectric Scheme Pahang, Malaysia (Asia) Implementing Party & Period - Project: Tenaga Nasional Berhad (TNB) 1978 (Completion of construction) - - Good Practice: Tenaga Nasional Berhad (TNB) 1970 s - Key Words: Sediment, Land Use Change, Desilting Work, Desander (Settling Basin) Abstract: Since the early 1970s, mitigation measures for sedimentation have been carried out periodically at various locations in the Cameron Highlands Scheme to minimize its impact on the operation and maintenance of the five hydro stations. These measures include construction of a silt retention weir, pumping of sediment, and de-silting of tunnels, and have successfully reduced sediment inflow into the reservoir. 1. Outline of the Project The Cameron Highlands Hydroelectric Scheme is situated in the northwest of the state of Pahang, Malaysia. It was constructed in the period between 1957 and 1964. The scheme consists of four small run-of-river and one storage hydro projects and has five power stations. The main features of the storage project beside the 100 MW underground power station are a 40-m high concrete buttress dam with gated spillways, four side-stream diversion schemes of Sg. Plau ur, Sg. Kial, Sg. Kodol, and Sg. Telom, some 20 km length of tunnels, the Bertam Intake and other appurtenant structures. The major specifications and the layout plan of the scheme are shown in Table 1, Table 2 and Figure 1 respectively.

Table 1 Specifications of the Sultan Abu Bakar Dam (the Ringlet Reservoir) Gross Storage [MCM] 6.7 Usable Storage [MCM] 4.7 Dam Height [m] 40 Dam Type [m] Concrete & Rockfill Normal Water Level [EL. m] 1,068.3 Low Water Level [EL. m] 1,065.3 item Table 2 Specifications of the Hydro Projects Kampung Raja P/S Kuala Terla P/S Robinson Falls P/S Habu P/S Sultan Yussuf P/S Max. Output [MW] 1 x 0.8 1 x 0.5 3 x 0.3 2 x 2.75 4 x 25.0 Max. Discharge [m 3 /sec] 1.253 1.718 0.173 4.347 5.493 Rated Head [m] 80 37 235 91 573 Gross Head [m] 83.8 39.3 243.7 97.5 587.3 Annual Generation [GWh] 6 5 7 32 320 Operational Year 1964 1964 1959 1964 1963 Intake Water Level [EL. m] 1,378.3 1,284.7 1,410.6 1,165.7 1,070.8 Tail Water Level [EL. m] 1,296.3 1,245.62 1172.0 1,071.2 493.5 Catchment Area [km 2 ] 30.8 43.3 21.4 132.7 183.4 Generation Type Run-of-river Run-of-river Run-of-river Run-of-river Dam & Waterway Turbine Type HF HF HP HF HP ROBINSON FALLS P/S HABU P/S TELOM TUNNEL KUALA TERLA P/S SULTAN YUSSUF P/S KAMPUNG RAJA P/S SULTAN ABU BAKAR DAM Figure1 Layout Plan of the Cameron Highlands Hydroelectric Scheme 2

The Ringlet Reservoir is a man-made lake created upstream of the concrete dam on Sg. Bertam. It impounds the waters of Sg. Bertam and its tributaries and those of Sg. Telom, Sg. Plau ur, Sg. Kodol and Sg. Kial which have been diverted from the Telom catchment through the Telom Tunnel into the Bertam catchment. The designed gross storage of the reservoir is about 6.7 million cubic meters, of which, 4.7 million cubic meters is usable storage. Water from the Ringlet Reservoir is channeled through a tunnel to the Sultan Yussuf (Jor) Power Station and then is discharged through a tailrace tunnel into the Jor Reservoir of the Batang Padang Hydroelectric Scheme. The Ringlet Reservoir, which has an estimated dead storage of 2.0 million cubic meters, would have a useful life of approximately 80 years. 2. Features of the Project Area 2.1 Catchment Characteristics The Cameron Highlands catchment is situated on the Main Range of the Peninsular Malaysia. The average elevation of the catchment area is approximately 1,180 m with the highest peak, Gunung Brinchang at approximately 2,032 m above sea level and many of the other peaks are over 1,524 m. The Cameron Highlands catchment that contributes water to the Ringlet Reservoir includes several sub-catchments and has an area of 183 km 2. The main rivers of the Cameron Highlands catchment, namely the Sg. Telom and Sg. Bertam drain eastwards into the Sg. Pahang and subsequently into the South China Sea in the eastern coast of the Peninsular Malaysia. Table 3 Detailed Breakdown of the Cameron Highlands Catchment Area Major Catchment Telom Sub-Catchment Area [km 2 ] Plau ur 9.6 Kial 22.7 Kodol 1.3 Telom 76.4 Total [km 2 ] Bertam Bertam 73 73 110 2.2 Land Use Changes The construction of the Cameron Highlands/Batang Padang Hydroelectric Scheme in the sixties has provided in addition to the power generation facilities, some reasonable good access into the interior of the Cameron Highlands area. It may have therefore helped to encourage land development and other economic activities growth in the area during and post construction periods. Forest in the Cameron Highlands area is progressively being cleared to make ways for agricultural and construction activities. Table 4 Land Use Changes in Bertam Catchment Vegetation/ Land Use Bertam Catchment [km 2 ] 1950 s 1980 s 1990 s Forest 46.5 45.1 43.5 Tea/Orchards 15.2 10.4 6.6 Vegetable/Flower 5.1 7.0 8.1 Urban - 4.1 4.2 Open/Grassland/Scrub Forest 5.8 6.0 10.2 3

Table 5 Land Use Changes in Telom Catchment Vegetation/ Land Use Telom Catchment [km 2 ] 1950 s 1980 s 1990 s Forest 99.1 90.3 74.1 Tea/Orchards 6.3 6.2 6.2 Vegetable/Flower 5.0 10.7 23.2 Urban - 0.5 1.1 Open/Grassland/Scrub Forest - 2.7 5.8 3. Major Impacts Extensive deforestation and indiscriminate earth bulldozing in the Cameron Highlands area for agricultural and housing development has resulted in widespread soil erosion over the land surface. The extent of soil erosion occurring in the area particularly that of Cameron Highlands Scheme catchment is increasing, the impact of natural vegetation destruction on the environment and the stations generation/operation is a major cause for concern. It leads to sedimentation of the streams and the Ringlet Reservoir from which water is drawn to the power station. Excessive sediment particles drawn into the power station will cause damage and shorten the useful life of the mechanical parts of the generating plant, whereas excessive sediment deposited in the Ringlet Reservoir will affect its storage as well as useful life of the reservoir. There were incidences of water qualities and aquatic lives in the Ringlet Reservoir being badly affected in the past when excessive sediment/silt content and high chemical content (e.g. pesticides and fertilizers) resulted in dying of fish and wide spread of water hyacinth. Cases of landslide have also been reported which have led to the destruction of properties and crops as well as loss of lives. A number of studies were conducted in the past to examine the effects of development in the hydro scheme catchment on the hydro power station. The studies (Choy, 1987, 1989, and 1991) have shown that the operation and maintenance as well as energy generation of the hydro stations of the Cameron Highlands Scheme are affected by the land development. The severity of sedimentation has led to a study which reported that the carrying capacity of the Telom Tunnel had been reduced to 40% (WLPU, 1986). Further studies of the land use impact (Choy & Hamzah, 2001, and Choy 2002) and a review of some previous studies recently done, give the following findings: Average annual temperature for urbanized area in the catchment has increased slightly in recent years. There is an increase in the annual mean runoff for the catchment subsequent to the land use changes (Figure 2 and Figure 3). 4

Annual runoff (mm) 2500.0 2000.0 1500.0 Runoff = 0.6495(Rainfall) - 13.641 Period: 1964 to 1983 (R = 0.85) Runoff = 0.7226(Rainfall) - 90.07 Period: 1984 to 1998 (R = 0.87) 1000.0 1000.0 1500.0 2000.0 2500.0 3000.0 3500.0 Annual total rainfall (mm) rainfall-runoff 1964-1983 rainfall-runoff 1984-1998 Linear Linear 線形 (rainfall-runoff 1964-1983) 線形 (rainfall-runoff 1984-1998) Figure 2 Rainfall-Runoff Correlation for Upper Bertam (at two different periods) 2500.0 Annual runoff (mm) 2000.0 1500.0 Runoff = 0.8537(Rainfall) - 339.91 Period: 1987 to 1998 (R = 0.77) Runoff = 0.7495(Rainfall) - 167.06 Period: 1964 to 1980 (R = 0.90) Runoff = 0.4608(Rainfall) + 280.34 Period: 1981 to 1986 (R = 0.90) 1000.0 1000.0 1500.0 2000.0 2500.0 3000.0 Annual total rainfall (mm) rainfall-runoff 1964-1980 rainfall-runoff 1981-1986 rainfall-runoff 1987-1998 Linear (rainfall-runoff 1964-1980) Linear (rainfall-runoff 1981-1986) Linear (rainfall-runoff 1987-1998) Figure 3 Rainfall-Runoff Correlation for Sg. Telom (at 3 different periods) 5

Water utilization for generation decreases due to increased infiltration losses in dry days and spilling losses in wet days because of intake closing or increases in peak flow (Figure-4 and Figure-5). 250 Cum. Annual Energy Output (GWh) Cum. Annual Energy Output (GWh) 200 150 100 50 1972 1982 Slope, Sr1 = 0.1802 Slope, Sr2 = 0.1565 1992 Slope, Sr3 = 0.1348 Slope, Sr4 = 0.1574 0 0 200 400 600 800 1000 1200 1400 Cum. Cum. Annual Annual Runoff Runoff (Million mm3) 3 ) Figure 4 Double Mass Curve (Annual Runoff vs. Annual Energy Output) of Robinson Falls Power Station (1964 to 1998) 1200 1000 Cum. Annual Energy Output (GWh) Cum. Annual Energy Output (GWh) 800 600 400 200 1970 1986 Slope, Sh2 = 0.1707 Slope, Sh3 = 0.1238 Slope, Sh4 = 0.158 Slope, Sh1 = 0.1863 0 0 1000 2000 3000 4000 5000 6000 7000 Cum. Annual Runoff (Million mm3) 3 ) Figure 5 Double Mass Curve (Annual Runoff vs. Annual Energy Output) of Habu Power Station (1964 to 1998) 6

The suspended sediment load in the Sg. Telom and Sg. Bertam River have increased by twentyfold and seventeenfold respectively since 1960 s (Figure 6 and Figure 7). 100.0 SEDIMENT DISCHARGE = 0.0097 (DISCHARGE)3.8197 Period: Before 1964, (R = 0.91) Discharge (m 3 /sec) Discharge ( Cumecs ) 10.0 1.0 SEDIMENT DISCHARGE = 0.2718 (DISCHARGE)3.6193 Period: Aug 1990 to Aug 2000, (R = 0.90) SEDIMENT DISCHARGE = 0.1119 (DISCHARGE)3.5868 Period: Aug 1987 to Jul 1990, (R = 0.83) 0.1 0.1 1.0 10.0 100.0 1000.0 10000.0 Suspended Sediment Discharge ( Tonnes / Day ) Suspended Sediment Discharge (tons/day) Figure 6 Sediment Rating Curve Sg. Telom at 49 M.S. (before 1964 and from August 1987 to now) 100.0 SEDIMENT DISCHARGE = 0.8295 (DISCHARGE)3.9635 Period: 1955, (R = 0.98) Discharge (m 3 /sec) Discharge ( Cumecs ) 10.0 1.0 SEDIMENT DISCHARGE = 1.7079 (DISCHARGE)4.1649 Period: Nov 1986 to Jan 1990, (R = 0.80) SEDIMENT DISCHARGE = 6.0076 (DISCHARGE)2.9612 Period: Feb 1990 to Aug 2000, (R = 0.89) 0.1 0.1 1.0 10.0 100.0 1000.0 10000.0 Suspended Sediment Discharge ( Tonnes / Day ) Suspended Sediment Discharge (tons/day) Figure 7 Sediment Rating Curve Sg. Bertam at Robinson Falls (before 1955 and from November 1986 to now) 7

Since its operation in 1963, the Ringlet Reservoir has lost nearly 53% of its gross storage to sedimentation, which is presently estimated as reaching a volume of about 3.5 4.0 million cubic meters. Figure 8 shows the storage capacity curve of the Ringlet Reservoir. The currently estimated sediment deposition rate in the Ringlet Reservoir is in the range between 350,000 to 400,000 cubic meters per year. Figure 9 shows the decline in trap efficiency over time for the Ringlet Reservoir calculated using the Brune s method on an annual basis, which shows the current trapping efficiency of the reservoir to be about 56 % as shown in Figure 9. STORAGE CAPACITY (m3) 8.00E+06 7.00E+06 6.00E+06 5.00E+06 4.00E+06 3.00E+06 2.00E+06 1.00E+06 0.00E+00-1.00E+06 1040.0 1045.0 1050.0 1055.0 1060.0 1065.0 1070.0 1075.0 ELEVATION (m) 1963 2000 多項式 Approx. (1963) 多項式 Approx. (2000) Figure 8 Ringlet Reservoir Reservoir Capacity Curve (1963 vs. 2000) (Choy & Hamzah, 2000) 100 90 80 70 Trap Efficiency (%) 60 50 40 30 20 10 0 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 Operation Period Figure 9 Ringlet Reservoir Trap Efficiency vs. Operation Period 8

Most of the incoming sediment is therefore unlikely to be deposited in the Ringlet Reservoir and will be carried down to the Sultan Yussuf Power Station and discharged into the Jor Reservoir. Presently, 45.2% of the 3.9 million cubic meters gross storage of Jor Reservoir is filled with sediment. A study in 1999/2000 (SNC-Lavalin, 2000) indicates that the sediment deposition in the Ringlet Reservoir has not affected the safety of the dam. However, the substantial reduction in the live storage of the reservoir would largely reduce the capability of the Sultan Yussuf Power Station to generate peaking power for the load requirement of the National Grid and would also reduce the capability of the reservoir to regulate incoming high flow. The former will make the Sultan Yussuf Power Station to be no different from other run-of-river stations and will result in financial loss; the latter will pose a risk of the dam being without flood control capacity, hence leading to frequent spillage and flooding of the downstream Bertam Valley during monsoon. 4. Mitigation Measures Since the early seventies, mitigation measures (Choy & Fuad Omar, 1990; Choy & Fauzan, 1997) have been carried out periodically at various locations of the Cameron Highlands Scheme to minimize the impact of sedimentation on the operation and maintenance of the five hydro stations. These measures include: Manual removal of sediment accumulating behind the intake weirs of Kampung Raja, Kuala Terla and Habu. Construction of a small timber silt retention weir on Sg. Ringlet in the late seventies and a concrete silt retention weir downstream of the Habu Power Station in the early nineties. Pumping and excavation of sediment accumulating at upstream of the Telom Intake and Robinson Falls Intake and in the Ringlet and Habu Silt Retention Ponds. Desilting of the Telom Tunnel in the seventies and again in the early nineties. Construction of a new desander (settling basin) in front of the original Telom Intake structure to improve the sediment self-scouring efficiency (Photo 1). Photo 1 Desander in front of the Telom Intake 5. Results of Mitigation Measures As a result of the above mitigation measures, the inflow and accumulation of sediment in the Ringlet Reservoir has been checked and reduced by a significant amount as shown in the following Figure 10. 9

MEASURED DEPOSITED SEDIMENT (m3) 7.0E+06 6.0E+06 5.0E+06 4.0E+06 3.0E+06 2.0E+06 1.0E+06 0.0E+00 1960 1970 1980 1990 2000 2010 2020 PERIOD MEASURED Figure 10 Ringlet Reservoir Sediment Deposition Rate If there is no action at all to check the sediment inflow, the reservoir will theoretically lose its entire storage before or by the end of the year 2000 due to sedimentation. The desilting works carried out during the period between mid-seventies and early nineties appears to have prevented more than 1.5 million cubic meter of sediment from entering and accumulating in the Ringlet Reservoir. The completion of the new Telom Desander and the Habu Silt Retention Weir and subsequent desilting works has apparently prevented at least another further 1.5 million cubic meter of sediment from accumulating in the Ringlet Reservoir during the last few years. There is an improvement in energy production per unit of river discharge (kwh/m 3 ). 6. Reasons for Success The desilting works, new Telom Desander and Habu Silt Retention Weir completed in the period between the seventies and early nineties has produced positive and fruitful results of reducing the inflow of sediment into the Ringlet Reservoir. However, the following should be taken into account: The mitigating measures are only able to lessen but not stop the sediment accumulation in the Ringlet Reservoir. Nearly 53% of the storage capacity of the Ringlet Reservoir has already been filled with sediment. There is a plan to expand the development area in the Cameron Highlands area in the future. It is prudent to take early action on the following: 10

To construct another silt retention weir on Sg. Ringlet at the Ringlet end of the Ringlet Reservoir so as to further reduce the sediment inflow into the reservoir. To examine the feasibility of desilting the reservoir so as to regain portion of the lost storage capacity due to sedimentation. To implement a watershed management plan and to impose the requirements for soil conservation practices in all future development. 7. Further Information 7.1 References 1) Fook Kun, CHOY, Fauzan HAMZAH: Cameron Highlands Hydroelectric Scheme-Performance of the Ringlet Reservoir, ICOLD, Florence, Italy, 1997. 2) Fook Kun, CHOY, Fauzan HAMZAH: Cameron Highlands Hydroelectric Scheme- Landuse Changes Impacts and Issues, Hydropower 01, Bergen, Norway, 2001. 3) Fook Kun, CHOY: Cameron Highlands Hydroelectric Scheme- Landuse Impacts On Performance and development. International Symposium On Reservoir Management In Tropical and Sub-Tropical Regions, Iguassu, Brazil 2002. 7.2 Inquiries TNB Hidro Sdn. Bhd. Tel: +60-5-243-5822 Fax: +60-5-243-5823 E-mail: nismail@tnbh.com.my This case history of hydropower good practice is published for educational and informational purposes only and may not be used for any other purpose. Duplication for commercial purposes is prohibited. The author(s) of this publication make no express or implied warranties concerning this case history, including no warranty of accuracy or fitness for a particular purpose. 11 C New Energy Foundation, Japan, 2006

12