WorkWrite-Up and Bid Document Eloise Ellis 14664 E 630rd peggs, OK 74452- (918) 598-3552 Contractor Name Contractor Signature --..~~--.-.---~-.---.--..-- Bid Due Date: Trade Area Description Comments Manual Spec Quantity Enter Bid Carpentry 1 Base Trim/Pine Colonial 2-1/4" FingerjointiReplace. Replace base trim, colonial, fingerjoint,2-1/4" pine. remove and replace all trim, paint to match existing trim. 6.N 90 LF I 2 Closet ShelflWood. Install new closet shelf/ 1" x 12". Install shelves at end of shower. 6.Z. 12 LF I 3 Grab Barllnstall new grab bars. Owner shall determine location. Include blocking for support. 4 Interior Wall/Partition/2"x 4"x 8'/Replace. Replace 2" x 4" x 8' interior partition wall/ 16" O.C. (framing only). 5 Medicine Cabinet/Steel. Install new medicine cabinet/steel frame w/mirror-16"x 22". Install new grabbars in bathroom only. install at end of new handicap shower replace med cabinet 11.A.3 6.C. 11.2.Z 3 EA I 4 LF I 1 EA I Friday, May 20,2016 14664 E 630rd peggs, OK Page 1of7
Carpentry 6 Paper Holder/Replace paper holder replace paper holder 10.E.2. 1 EA I 7 Towel Bar/Install new towel bar/24". install towel bars 10.E.2. 2 EA I 8 Wali/PartitionlDemolish. Completely remove wall dividing remove partition wall. Work shall include both bathrooms 9.0.1. 70 SF I repairs to all adjacent surfaces to match existing. BATHROOM #2 9 Door/Remove door & Finish. Remove door remove door and 8.Z. 1 EA I and finish inside and out. Match existing inclose with studs materials and finish. and sheetrock. EXTERIOR 10 Door/Exterior/6-Panel Steel/Pre- remove and replace 8.A. 1 EA I Hung/Install. Install new exterior entrance new entry door door, pre-hung-steel six panel. Use Stanley #13757 or written approved equal/work shall include paint-both sides. INTERIOR Friday, May 20,2016 14664 E 630rd peggs, OK Page2of7
Trade Area Description Comments Manua/Spec Quantity Enter Bid Carpentry 11 INTERIOR LocksetlLever-Handled/Replace door install on bathroom handle with lever-handled lockset. and master 16.B.1. 2 EA I bedroom door. LIVING ROOM #1 12 Interior Wall/Partition/2"x 4"x 8'/Replace. remove and replace Replace 2" x 4" x 8' interior partition wall/ wall to get handicap 6.C. 7 LF I 16" O.C. (framing only). shower installed Concrete 13 Floor/Concrete/Replace Section. Replace remove and replace 4.P.2 section of concrete floor. section of concrete 35 CFI to move plumbing EXTERIOR 14 Sidewalk/Concrete/Demolish. Remove remove existing 2 80 SF I concrete sidewalk. sidewalk, and brick under front door. 15 Wheel Chair Ramp/Concrete/Install new 4' cap front porch, 16.A 20 LF I wide concrete wheel chair ramp/include handrails on all sides and landings at top and bottom. pour ramp down to approach, include handrails. Drywall & Finish Friday, May 20, 2016 14664 E 630rd peggs, OK Page 3 of7
Drywall & Finish 16 Drywall/Ceiling/Install new 5/8" drywall on replace sheetrock 9.0 30 SF I ceiling/finish completely. Work shall include where needed, due tape, bed and texture to match existing to wall removal surfaces. 17 Drywall/Wall/Install new 1/2" drywall on install sheetrock 9.0 280 SF I wall/finish completely. Work shall include tape, bed and texture to match existing surfaces. where needed or removed Electrical 18 Light Fixture & SwitchlWet Area/Replace. replace bar light, Replace existing light fixture and switch with move light to ceiling 13.0. 2 EA I new wet-area approved light fixture and with new fixture. switch. Remove heat vent light 19 Light Fixture/Heat-Vent-Lightllnstall new install over new bathroom light (100 watt), heater (1450 shower 13.0.16 1 EA I watt), vent fan (70 CFM) and switch. Use Broan model 655 or written approved equal. 20 OutletlGFCI/Replace existing outlet with install new GFI and new GFCI outlet. move all electric to 13.0.6. 3 EA I handicap bathroom Flooring Friday, May 20, 2016 14664 E 630rd peggs, OK Page 4 0/7
Flooring 21 Vinyl Floor Tile/Install new vinyl floor tile/12" remove and replace 9.L 140 SF I x12"x1/8". tile in bathroom Paint & Finish 22 Interior Surfaces/Paint all interior surfaces paint entie bathroom 9.N. 140 SF I of structure - Two Coats. Entire interior excluding kitchen and bath cabinets. Work shall include minor repairs to all surfaces. SF=FLOOR AREA OF ENTIRE STRUCTURE. BEDROOM #1 23 WalislWood/Paint walls--wood/two coats. paint area where 9.N.3 100 SF I door was inclosed LIVING ROOM #1 24 Walls/Drywall/Paint walls--drywall/two coats. paint wall that was 9.N.3 80 SF I removed for tub installiation Plumbing Friday, May 20, 2016 14664 E 630rd peggs, OK PageS of7
Trade Area Description Comments Manua/Spec Quantity Enter Bid Plumbing 25 Commode/High Rise/lnstall new high rise install commode 16.C. 1 EA I commode with two (2) grab bars. 26 Faucet/Shower/Pressure Balanced/lnstall install new shower new shower faucet/pressure balancedlwith valve 16.C. 1 EA I glide bar. 27 Lavatory Sink & FaucetiADAlWall Hung. install new sink and Install new wall hung lavatory sink supply faucet 16.C. 1 EA I lines, drain lines, shutoffs and insulation for all water and drainlines. Use Orion #52000020 sink and Delta model 520- WFMPU faucet or written approved equal. 28 Pipe/PVC Drainline/Replace Section/lnterior move drainlines or Line. Replace section of PVC DWV shower to where it 11.A 3 EA I pipe/lnterior line. was relocated 29 Shower/Handicap/Pre-Fab/lnstall new install in bathroom. handicap shower/pre-fab/60" x 30" x 72" Needs to be one 16.C. 1 EA I high with molded seat and pressure piece wheelchair balanced shower valve with glide bar. accessable shower. 30 Water Line/Copper/Replace Section. move lines where Replace section of copper water line. needed 11.A 3 EA I BATHROOM #2 Friday, May 20,2016 14664 E 630rd peggs, OK Page 60/7
Plumbing 31 BATHROOM #2 Bathtub/Demolition. fixture/bath tub. Remove plumbing remove both showers to make one big bathroom 11.A 2 EA 1'----- TOTAL Friday, May 20,2016 14664 E 630rd peggs, OK Page 70f7