Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.

Similar documents
Journal of Urban and Environmental Engineering E-ISSN: Universidade Federal da Paraíba Brasil

Process Monitoring and Performance Evaluation of 10 MLD Sewage Treatment Plant at Kotra

Wastewater Treatment Design of Waste Stabilization Ponds

Performance Evaluation of Waste Stabilization Ponds in Mwanza City, Tanzania

IOSR Journal of Engineering (IOSRJEN) ISSN (e): , ISSN (p): Vol. 04, Issue 06 (June. 2014), V4 PP 50-57

World Journal of Engineering Research and Technology WJERT

Available online Journal of Scientific and Engineering Research, 2017, 4(1): Research Article

World Journal of Engineering Research and Technology WJERT

Australian Journal of Basic and Applied Sciences. Comparison between Using UASB & HUASB for Wastewater Treatment

ISSN: [Nadi* et al., 5(11): November, 2016] Impact Factor: 4.116

KEY WORDS Anaerobic lagoons ; reaction constant ; operation ; per capita sludge ; loading rate.

Effects of high-strength faecal sludge in wastewater stabilization ponds: Port-au-Prince, Haiti

Journal of Chemical and Pharmaceutical Research

Basic knowledge of Wastewater

Effects of Organic Load, ph, and EC Variations of Raw Wastewater and Weather Condition on the Efficiency of Yazd Stabilization Ponds

Lagoons Operation and Management in New Brunswick

1/11/2016. Types and Characteristics of Microorganisms. Topic VI: Biological Treatment Processes. Learning Objectives:

Jackson Lake Analysis

UNIT - 2 STREAM QUALITY AND ITS SELF PURIFICATION PROCESS

Environmental Impact assessment (EIA) for Drainage Water in Rural Areas of Egypt (Case Study)

Performance Evaluation of Wastewater Treatment Plant Based on SBR Technology- A Case Study of Kaithal Town, Haryana (India)

Research Article Design, Construction and Performance Evaluation of a Model Waste Stabilization Pond

Utilizing algal oxygen production for advanced wastewater treatment in a Moving Bed Biofilm Reactor (MBBR) the Biologically Aerated Reactor (BAR )

Sixteenth International Water Technology Conference, IWTC , Istanbul, Turkey 1

EVALUATION OF A WATER TREATMENT PLANT PERFORMANCE CASE STUDY

The physical and chemical characteristics of Danube water quality near Kovin (Vojvodina) in Serbia

PHYSICO-CHEMICAL ANALYSIS OF EFFLUENT FROM DAIRY INDUSTRY

(Print), ISSN (Online) Volume 4, Issue 6, November December (2013), IAEME TECHNOLOGY (IJCIET)

A Short term study of Dissolved Oxygen behavior in Adyar River, Chennai

WASTEWATER QUALITY STUDIES OF INLET AND OUTLET AT MUNICIPAL WASTEWATER TREATMENT PLANT AT BHOPAL, INDIA

SDG#6 Ensure access to water and sanitation for all

WATER QUALITY PROTECTION IN RURAL AREAS OF EGYPT

Secondary Wastewater Treatment

ASSESSMENT OF WATER QUALITY OF BUDHI GANDAK RIVER AT MUZAFFARPUR, BIHAR, INDIA

ENVE 302 Environmental Engineering Unit Processes

WATER QUALITY PROTECTION IN RURAL AREAS OF EGYPT

Phosphorus recovery from wastewater by biological algal uptake

River pollution monitoring: a case study of the Ruaraka River in Kenya J.S. Kilani Department of Civil Engineering, University of

EVALUATION OF WATER QUALITY: PHYSICO-CHEMICAL PARAMETERS AT DHAMOLA RIVER FROM DIFFERENT SOURCES OF SAHARANPUR CITY

Phytoremediation for Sewage Treatment by Varying Load Constructed Wetland under Hydroponic Condition Using Vetiver Grass

Studies on Polluting Parameters from Dairy Sector of Pune,Maharashtra (India)

NAPHTHA REMOVAL FROM PETROLEUM INDUSTRIAL EFFLUENT

Sequence Batch Reactor A New Technology in Waste Water Treatment

Daw Khin Aye Myint Executive Engineer Engineering Department (Water & Sanitation) Yangon City Development Committee

Water Pollution. Objective: Name, describe, and cite examples of the eight major types of water pollution.

CE 370. Wastewater Characteristics. Quality. Wastewater Quality. The degree of treatment depends on: Impurities come from:

Experimental Investigation on Quality Assessment and Pollution Control of Kanampalayam Lake

Page 1 For More Information Call (801)

LOCATION: Circle Your Location

Determination of design criteria for UASB reactors as a wastewater pretreatment system in tropical small communities

EFFECT OF SOLAR AND HYDRAULIC JUMP ON WASTE STABILIZATION POND

Obstructions in waste stabilization pond use in Uganda

. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA)

Water Quality. CE 370 Lecture 1. Global Distribution of Earth s s Water

WATER QUALITY ENGINEERING

Study on Wastewater Quality and Its Difference with Upstream and Downstream at Politeknik Mukah Drainage System

PHYSICAL TREATMENT OF PETROCHEMICAL WASTEWATER

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT

BOD/COD a Measure of Dairy Waste Treatment Efficiency- A Case Study

Dundalk Wastewater Treatment Plant

REPORT ON PERFORMANCE EVALUATION OF SEWAGE TREATMENT PLANT TIRUNELVELI, TAMILNADU

American Water College 2010

ORGANIC MATTER AND NUTRIENT REMOVAL BY WASTE STABILIZATION PONDS; A CASE IN AKOSOMBO, GHANA

Anderson Water Pollution Control Plant

B. O. What? B.O. What? (Biological Oxygen Demand B.O.D.)

Studying the Wastewater Parameters of Thermal Power Station

AMMONIA VOLATILISATION IN WSP: A CASCADE OF MISINTERPRETATIONS?

An evaluation of septic tank performance

International Journal of Science, Environment and Technology, Vol. 4, No 5, 2015,

Auburn University Department of Civil Engineering Introduction to Environmental Engineering CIVL Laboratory #6 Chemical Oxygen Demand (COD)

Performance of Sewage Oxidation Pond in USM Engineering Campus

Wastewater Treatment through Root Zone Technology with Special Reference to Shahpura Lake of Bhopal (M. P.), India

Application of chlorine dioxide for secondary effluent polishing

The National Center for Agricultural Research and Extension

Impact of discharge wastewater final effluents on the qualities of a receiving watershed in a typical rural community of the Eastern Cape Province

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis

Water quality assessment of Ajay River with reference to suitability for agricultural purposes

INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCES Volume 2, No 2, Copyright 2010 All rights reserved Integrated Publishing Association

Journal of Chemical and Pharmaceutical Research

A study on the starch and cellulose industries wastewater treatment by biological methods

Water Chemistry Monitoring

Characterization and Design of Sewage Treatment Plant in Bidar City

Physico-chemical characterization of raw and diluted effluent from Distillery Industry

Biomonitering of Tapti River Water Flowing Through Jalgaon District with Reference to Water Pollution

operation of continuous and batch reactors. Contrary to what happens in the batch reactor, the substrate (BOD) of the wastewater in the continuous rea

Performance of Organic overloaded WWTP Comprise Primary followed by Secondary Attached Growth Biological Treatment- Case Study

Journal of Chemical and Pharmaceutical Research, 2012, 4(4): Research Article

Performance Of UASB Reactor At Different Flow Rate Treating Sewage Wastewater

Removal of Chromium and Cadmium from Wastewater in Waste Stabilization Ponds, Yazd-Iran

Homework Solution for Module 15 Waste Water Treatment Plants. 2. What is the difference between municipal and industrial wastewater?

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES

Nitrogen removal in constructed wetland treating wastewater from the seafood industry

Core Notes for Module 6 (Elective) of the Course Environmental Engineering Sustainable Development in Coastal Areas Mr M S Haider

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

Comparative Analysis of Physicochemical Parameters of Hasdeo River Barrage & Arpa River Water Samples of Bilaspur Region

Development of a hybrid water treatment system using solar still cum sand filter with ceramic media

ASSESSMENT OF WATER QUALITY AT PAON DHOI RIVER DURING MONSOON AND AFTER SEASON, SAHARANPUR (U.P.)

Evaluation of gradual hydroponic system for decentralized. wastewater treatment and reuse in rural areas of Palestine.

YIR01WQ2 Total oxygen in river stations by river size

Mr.Kyaw Zin Assistant Director Department of Engineering (Water Supply & Sanitation) NayPyiTaw Development Committee, NAYPYITAW, MYANMAR

Transcription:

IOSR Journal of Engineering (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 05, Issue 01 (January. 2015), V1 PP 10-18 www.iosrjen.org Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. A. M. AbdEL-rahman, 1 Ahmed. AbdEL-halim 2, Ali. A. M. Gad 2, M. Hashem 2. 1 M.SC. Researcher, Civil Engineering Department, Faculty of Engineering, Assiut University, Egypt. 2Associate Professor, Civil Engineering Department, Faculty of Engineering, Assiut University, Egypt. Abstract: - Sewage can be defined as discharges from domestic and sanitary appliances or simply a complex mixture of materials from varied sources. This complex mixture contains both soluble and insoluble materials. Waste stabilization ponds are recognized as the solution to domestic wastewater treatment in developing countries. The use of such natural systems is considered to be very important. This is because it is cheap, easy to construct and they do not require high skilled laborite. In this study, samples were taken from the raw wastewater and effluents of treatment ponds of Elzaraby waste stabilization ponds over a period of one year. The treated effluent is either discharged into surface waters or reused for agricultural irrigation. The samples were analyzed according to the standard methods. The results obtained from the samples taken in different seasons showed the maximum wastewater temperature were in the influent (35 0 C) in summer season, and the minimum were (18 0 C) in season. The values of hydrogen power (ph) and dissolved oxygen (DO) is increased along the ponds series. The average annual overall removal efficiency of TSS and TDS were 70% and 26%, while the maximum overall efficiency of BOD 5 was in summer (88%) and minimum efficiency was (73%) in season. I. INTRODUCTION The increasing demands for domestic wastewater due to population growth, improvement in living standards and the growing industrial sector will increase the total amount of wastewater available for reuse as an important source. The major issues include public health and environmental hazards as well as technical, institutional, socio-cultural and sustainability aspects. Waste stabilization ponds (WSP) are large shallow basins enclosed by earth embankments in which raw wastewater is treated by entirely natural processes involving both algae and bacteria[1], WSPs are usually the most appropriate method for domestic and municipal wastewater treatment in developing countries, where the climate is most favorable for their operation. WSPs are low-cost, low-maintenance, highly efficient. The only energy they use is direct solar energy, so they do not need any electromechanical equipment, saving expenditure on electricity and more skilled operation. WSPs can be classified with respect to the types of biological activity occurring in a pond. Three types are distinguished; anaerobic, facultative and maturation ponds. Usually WSPs system comprises a single series of the aforementioned three ponds types or several such series in parallel [2]. Sanitation services in Egypt are less developed than water supply services. At present, there are more than 323 wastewater treatment plants in the country. The capacity of wastewater treatment plants has increased by 10 times in the last two decades. The existing capacity is 12 million m3/day. Length of wastewater collection networks / sanitation pipelines increased from 28,000 km in 2005 to 34,000 km in 2010 [3]. Urban coverage with improved sanitation gradually increased from 45% in 1993 to 56% in 2004, reaching 100% in urban and 40% in rural areas by the end of 2012. The low coverage in rural sanitation results in serious problems of water pollution and health conditions due to the discharge raw domestic wastewater directly into the waterways [4]. The main objectives of this study is to evaluate the performance of waste stabilization ponds (WSPs) in Elzaraby village, Abutig, Assiut governorate Egypt. some physical and biological characteristics of the waste water through the treatment plant are investigated. II. MATERIAL AND METHODS 2.1. Description of wastewater treatment plant A recent full-scale system of WSPs was constructed in 2009 in Elzaraby village in Upper Egypt (Fig.1). Elzaraby WSPs are designed to treat domestic waste water from Abutig city, with mean daily design flow rate of 16500 m 3 /day. 10 P a g e

Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. Fig. 1. Elzaraby Waste stabilization ponds. The physical characteristics of the ponds are given in (Table. 1). The wastewater after screening is used to feed two parallel anaerobic ponds (A1~A2). The two effluent of the anaerobic ponds is used to feed two facultative ponds (F1~F2), the effluent from the facultative ponds passes through two parallel lines of maturation ponds. Each line comprising a first, second and third maturation pond, (M1~M6). The treated effluent is either discharged into surface water or reused for agriculture irrigation. Ponds Table 1. Design basis for physical and operational characteristic of Elzaraby WSPs. Dimensions (m)of the water body Design basis Bottom/top Length (m) Bottom/top Width (m) Water Depth (m) Water Volume (m3) Flow rate (m3/day) A1-A2 146/163.6 45.4/63 4.4 37257 8250 4.5 F1-F2 277.8/288.8 154/164 2.5 112680 8250 14 M1-M2 158/164 104/110 1.5 25854 8250 3.0 M3-M4 158/164 104/110 1.5 25854 8250 3.0 M5-M6 158/164 104/110 1.5 25854 8250 3.0 HRT (day) 11 P a g e

Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. 2.2 Wastewater sampling Wastewater samples were collected monthly from the plant through a period of one years, from Spt. 2011 to Aug. 2012 to study the seasonal removal efficiency of LAS in natural WSPs, Monthly-samples of raw wastewater after screening and effluents from each type ponds were collected (S1to S5) as shown in ( Fig. 2) of the sampling points. The samples were collected in plastic containers of 2 liter capacity. Fig. 2. The layout of Elzaraby WSPs The following parameter were studied; water temperature (T), (ph) value, dissolved oxygen (DO), biochemical oxygen demand (BOD 5 ), total suspended solid (T.S.S), total dissolved solids (T.D.S), electrical conductivity (EC),Turbidity(FTU)as in (table.2). All analysis have been carried out according to standard methods for examination of water and waste water (APHA, 2005) [5]. 12 P a g e

Wastewater temperature 0C Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. III. RESULTS AND DISCUSSIONS In this study, a complete one year monthly samples of wastewater were taken from WSPs of Elzaraby plant from locations S 1 ~S 5 totally 60 samples. The average seasonal values of T, ph, DO, TSS, TDS,EC, BOD 5 and Tur through the ponds were calculated. 3.1 Wastewater temperatures in the ponds The wastewater temperature for the four season of the year from (Spt. 2011 to Aug. 2012) through the water pass in WSPs are illustrated in (Fig. 3). Measured temperatures of wastewater through the ponds were ranged between 18 0 C and 35 0 C. The maximum wastewater temperature in anaerobic ponds was 31.8 0 C in summer season while the minimum was 22.1 0 C in season. In facultative ponds, the temperature were ranged between 20.1 0 C to 30.6 0 C in and summer, respectively. In the last maturation ponds the minimum and maximum temperature were 18 0 C in and 27 0 C in summer season. 36.00 33.00 30.00 27.00 24.00 21.00 18.00 15.00 Fig. 3. Wastewater temperature for different season through the wastewater pass in Elzaraby WSPs. 13 P a g e

ph value Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. As shown in (Fig. 3), it is clear that the wastewater temperature decreases along the pass of the ponds and maximum temperature occurs in summer season[6]. The decreasing rate is find to be much higher in the summer season (8 0 C) than that in the season (4.4 0 C), this due to the higher evaporation rate from the surface of the ponds which accomplished with higher latent heat in summer compared with that in season. 3.2 ph variations along the pond series The average seasonal variation of the measured ph value for the raw sewage and effluent from each type of ponds in the period from Spt. 2011 to Aug. 2012 are presented in (Fig. 4). The average ph value of raw wastewater ranged between 6.63~7.4, while increased in anaerobic ponds to be 6.75 and 7.8 as minimum and maximum values in and summer seasons, respectively. In maturation ponds the measured ph recorded a maximum value in summer 8.8 and a minimum value in was 7.7. As shown in Figure, the ph values of the ponds wastewater has it s higher values in the summer season, and it increases along the wastewater pass with the highest values in the last maturation ponds. The increased of ph value in maturation ponds is due to rapid photosynthesis by the pond algae, which consumes Carbon dioxide (CO 2 )faster than it can be replaced by bacterial respiration; as a result carbonate and bicarbonate ions dissociate. Algae fix the resulting CO 2 from the dissociation while hydroxyl ions (OH - ) accumulate so raising the ph value. Similar results were found by[7]. 3.3 DO concentration along the ponds series From (Fig -5) it is clear that the DO average concentration values for four season along Elzaraby WSPs series were increased along the ponds and recorded a maximum values in summer season and minimum values in season (ranged from 0.0 to 6 mg/l), while the mean values in the ponds during autumn and spring season are located in the intermediate range between summer and season. It is clear that the value of DO in the summer season increases relative to the season, because the rate of algae photosynthesis and the cellular metabolism of microorganisms in the ponds are enhanced by high temperatures and retarded by low temperatures. Algal oxygen production is directly related to photosynthesis, which depends on temperature variations. From the figure [8]. 9.00 8.50 8.00 7.50 7.00 6.50 6.00 facultative maturation maturation Fig. 4. Seasonal variation of ph value measured along Elzaraby WSPs. 14 P a g e

DO concentration mg/l Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. 6.00 5.00 4.00 3.00 2.00 1.00 0.00 Fig. 5. Seasonal concentration value of DO measured along Elzaraby WSPs. 3-4 T.S.S values along the ponds series For a comparison between the mean values of the measured T.S.S in the different four seasons of the year are plotted as shown in (Fig. 6 ). The average T.S.S values in raw wastewater recorded 202, 153, 227 and 326 mg/l in,, and summer seasons respectively, while they recorded in the effluent in last maturation ponds 74,75, 105 and 110 mg/l in,, and summer seasons respectively. From the figure it is clear that T.S.S concentration values increased in hot seasons and decreased in cold seasons. The reason of these phenomena is that high wastewater in hot season accomplished with high photosynthesis and evaporation rates. High rate of photosynthesis generates many new cells of algae which increases the values of the T.S.S in the ponds. Also, a high evaporation rate in the summer tends to increase the T.S.S concentration in the ponds and T.S.S concentration values is decreased along the ponds series [9]. 320 300 280 260 240 220 200 180 160 140 120 100 80 60 Fig. 6. Average Seasonal variation values of measured T.S.S along the ponds series at Elzaraby WSPs. 15 P a g e

Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. 3-5 T.D.S values along the ponds series For comparison the mean annual values of the measured T.D.S in the different four seasons of the year are plotted as shown in (Fig. 7), from the figure it is clear that T.D.S concentration values decreased along the ponds series [ 10]. From the it is clear that the overall removal efficiency of T.D.S increased in hot seasons and decreased in cold seasons. The reason of these phenomena is that high wastewater temperature in hot season accomplished with high photosynthesis and high evaporation rates, the result showed higher removal efficiency of TDS than other study in Ethiopia the avarege annual removal efficiency of the ponds was 26%. 600 550 500 450 400 350 300 250 Fig. 7. Average Seasonal variation values of measured T.D.S along the ponds series at Elzaraby WSPs. 3-6 Average Turbidity values along the ponds series. As shown in (Fig.8), in the period of investigation turbidity concentration values increased in hot seasons and decreased in cold seasons, and the overall removal efficiency of turbidity from Elzaraby WSPs in summer menthes is higher than other menthes. The reason of these phenomena is that high wastewater temperature in hot season [11]. 450 400 350 300 250 200 150 100 50 0 Fig. 8. Average Seasonal variation values of measured Turbidity along the ponds series at Elzaraby WSPs. 3-7 Average values of measured conductivity along the ponds series for the four seasons. For comparison the mean values of the measured EC in different four seasons of the year are plotted as shown in (Fig. 9). The average EC values in raw wastewater recorded 1260, 1169, 1285 and 1553 μs/cm in,, and summer seasons respectively, while they recorded in the effluent in last maturation ponds 1070, 855, 1121 and 1249 μs/cm in,, and summer seasons respectively. From the 16 P a g e

BOD concentration mg/l Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. figuer It is clear that the maximum EC values occur in the summer season, while the minimum EC values are in the season because high air and water temperature and high evaporation rate occurs in summer season relative to other seasons[8]. 1600 1500 1400 1300 1200 1100 1000 900 800 700 Fig. 9. Average Seasonal variation values of measured EC along the ponds series at Elzaraby WSPs. 3-8 BOD average seasonal concentration value For comparison the mean values of the measured unfiltered BOD 5 in different four seasons of the year are plotted as shown in (Fig. 10). The average concentration of BOD 5 values in raw wastewater were ranged between 426.3 mg /l to 305 mg/l in summer and seasons respectively, while they recorded in anaerobic ponds 314~167.5 mg/l as a maximum and a minimum values. In facultative ponds BOD 5 concentrations were found to be ranged between 275~111 mg/l, while the effluent of the last maturation ponds has BOD 5 concentrations of 43.5, 51.5, 55 and 73.3 mg/l in autumn,, spring and summer seasons, respectively. 430 380 330 280 230 180 130 80 30 Fig. 10. Seasonal concentration value of BOD measured along Elzaraby WSPs. From (Fig. 10). It is clear that the maximum BOD 5 values occur in the summer season, while the minimum BOD 5 values are in the season. The reason of this phenomenon is that high air and water temperature and sun light intensity occurs in summer season relative to other seasons, which increased algal grow [12]. 17 P a g e

Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. IV. CONCLUSION 1- The wastewater temperatures of the plant were decreased along the ponds series and recorded 35 0 C as a higher values in anaerobic ponds in sumer season, while recorded 18 0 C as minimum values in season in the last maturation ponds. 2- The average variation values of measured ph of Elzaraby WSPs is increased along the ponds series from 6.36 (minimum values occurred in raw wastewater) to 8.8 as a maximum values in the last maturation ponds, so faecal bacteria die very quickly and the photosynthesis activity of algae becomes less. Also, the high ph values occurred in ponds leads to high efficiency removed of heavy metal. 3- Concentration values of measured DO is increased along the pond series and recorded maximum values in summer season in the last maturation ponds. 4- The electrical conductivity EC is recorded variation values and changed seasonally along the ponds series, the values of EC increased in summer season relative to other months. 5- The maximum overall removal efficiency of measured T.S.S was 70% in summer season and recorded 48% as minimum values in season, furthermore the average over all removal efficiency of T.S.S from the ponds series along the study period was 59%. The average concentration values of the last maturation ponds T.S.S was 85 mg/l so, the treated wastewater allow to be reused in agriculture in grade (C) as in Egyptian Code for the Use of Treated Wastewater in Agriculture. 6- The maximum overall removal efficiency of BOD 5 was in summer (88%) and minimum efficiency was (73%) in season, while The average values of measured BOD 5 in the last maturation ponds was 60 mg/l which allow to be reused in agriculture in grade (B,C) as in Egyptian Code for the Use of Treated Wastewater in Agriculture REFERENCE [1] Mara, D. D. "Domestic Wastewater Treatment in Developing Countries", Earth scan, London, Sterling, VA, 2004 [2] Ramadan, H., Ponce, V. "Design and Performance of Waste Stabilization Ponds".info@virginglobe.com Version 081218, 2011 [3] Abdel- Kader, A.M., Abdel-Rassoul, S.M. (2010)., Prospects of water conservation in Egypt(special reference to wastewater reuse).fourteenth international water technology conference, 25-27 March 2010. [4] MWRI/USAID (2000): Policies and procedures for improved urban wastewater discharge and reuse. Appendix 2: Health impact and water quality standards in wastewater irrigation. Report No.34, Egyptian Ministry of Water Resources and Irrigation and US Agency for International Development, available online at http://pdf.usaid. gov/pdf_docs/pnacs687.pdf (last accessed 3 January 2013). [5] APHA (2005). Standard methods for the examination of water and wastewater, 20th and 21st ed. American Public Health Association, Washington, DC. [6] Haydeh Hayati1, Mohammadreza Doosti1, Mohammadhossein Sayadi., Performance evaluation of waste stabilization pond in Birjand, Iran for the [7] treatment of municipal sewage. Civil and Environmental Engineering Department, University of Birjand, Birjand, Iran., 2013 [8] Bastawey. M.A. (2010). Diurnal variation of some physical chemical parameters in natural waste stabilization ponds in upper Egypt. [9] Nasr. F.A., El-Ashmawy. A., Eltaweel. G., El-Shafai. S.A. (2007). Waste Stabilization Ponds for Wastewater Treatment and Reuse in Egypt. Environmental Sciences Division, Department of Water Pollution Research [10] Ebrahimi, A., Ehrampoosh, M., Samaie, M., Ghelmani, S., Talebi, P., Dehghan, M., Honardoost, A., Shahsavani, E., 2010. Removal Efficiency of Linear Alkyl Benzene Sulfonate (LAS) in Yazd Stabilization Pond. Scientific Information Database, Iran. [11] Hasan, A. Program of Water and Environmental Engineering 461652, 2011 Natural WWT, 2- WSP. [12] Ram Kumar Kushwah, Avinash Bajpai, Suman Malik and Archana Singh, Assessment of Some Physicochemical Parameters in Influent and Effluent and Water from Sewage Treatment Plant at Bhopal, M.P. (India) Water Research & Development Vol. 1 No.1 59-62 January-April 2011 [13] Gad, A., Ali, A., 2005. The pereformance of an existing system of waste stabilization ponds in upper Egypt. In: First Ain Shams University International Conference on Environmental Engineering. 18 P a g e