Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika

Similar documents
Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika

Zambia s Context-assessment and proposal support for National Climate Change Capacity Building Programme

POLICY BRIEF. BORDERING ON A WATER CRISIS: The Need for Integrated Resource Management in the Mara River Basin

EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE

APPROVED: OCTOBER 10, 2003

HOT SPOT AND SENSITIVE AREAS FOR THE KINGDOM OF TONGA.

UNITED REPUBLIC OF TANZANIA ACTION PLAN FOR IMPLEMENTATION OF THE RAMSAR STRATEGIC PLAN (DRAFT) Wildlife Division (WD)

THE FIRST IRAQI NATIONAL REPORT TO THE CONVENTION ON BIOLOGICAL DIVERSITY

Proposal for Annual Plan 2007

NATIONAL ENVIRONMENT MANAGEMENT COUNCIL IMPLEMENTATION OF THE MILLENNIUM ECOSYSTEM ASSESSMENTS (MA) IN TANZANIA. September 2008

Project Proposal for Development of Chu River Basin Management Plan

REDD Readiness Progress Fact Sheet COUNTRY: TANZANIA June, 2012

LINKING BIOLOGICAL AND CULTURAL DIVERSITY IN THE STATE OF SABAH MALAYSIA BY GERALD J JETONY

Sustainable Integrated Water Resources and Wastewater Management Project in Pacific Island Countries. National Stakeholder Consultation Process

National Perspectives on Ecosystem Based Approaches (EbA) A case of Tanzania

By Mathayo Athuman Environmental Engineer P.O.Box 390, Musoma, Tanzania.

ICRI Scorecard. Presented by Marea E. Hatziolos The World Bank

Integrated Water Resources Management (IWRM) Planning What is an IWRM Plan Why do we need one?

World Forest Day 21 st March 2019.

Prespa Lakes Basin. Strategic Action Programme. Marketing the Trilateral Prespa Park. Integrated Ecosystem Management in the Prespa Lake Basin

1. Background Provisioning Regulating: Cultural:

Greater Gombe Ecosystem Conservation Program

The 3 rd National Biodiversity Strategy and Action Plan. Ministry of the Environment, JAPAN

Guidelines for reviewing laws and institutions to promote the conservation and wise use of wetlands

Tripartite Meeting on Sustainable Urbanization for Poverty Eradication

COOPERATION BETWEEN CMS AND CBD (Prepared by the Secretariat)

Partnerships Briefs for Small Island Developing States

ENVIRONMENTAL ISSUES IN THE SOUTH EAST ASIAN REGION: AN OVERVIEW OF THE IMPLEMENTATION PROSPECTS OF RENEWABLE ENERGY

RUMAKI SEASCAPE PROGRAMME

10 th International Riversymposium and Environmental Flows Conference

The Economics of Ecosystems and Biodiversity (TEEB)-India Initiative July, 2015, MoEFCC Indira Paryavaran Bhawan, Jor Bagh, New Delhi

Novel forms of livestock and wildlife integration adjacent to protected areas in Africa

Preliminary national diagnostic for environment statistics

Provincial Policy Statement 2014 Training Aid

12 TH WORLD LAKE CONFERENCE

MINISTRY OF NATURAL RESOURCES AND TOURISM TANZANIA FOREST SERVICES (TFS) AGENCY

The role of nature conservation in cross- sectoral adaptation strategies to climate change - and related activites of the BfN

SURINAME READINESS PREPARATION PROPOSAL PC MARCH 2013, WASHINGTON D.C.

Consultation Document

Economy and Environment Principles for Policy Development

Experience of Maldives in NBSAP Target Setting

Voluntary Guidelines for Securing Sustainable Small-Scale Fisheries in the Context of Food Security and Poverty Eradication

Thematic issue-area: Integrated Marine and Coastal Area Management

A Conservation programme for Bolgoda Wetland Complex

Country Report Myanmar

CRITERIA AND INDICATORS FOR SUSTAINABLE FOREST MANAGEMENT OF THE MCPFE. Review of Development and Current Status

Land Accounting for SDG Monitoring and Reporting

,- to oversee, support, and, whenever appropriate, conduct activities and programmes to study, and monitor the status of, biological diversity;

14. Tropical Rainforest Heritage of Sumatra (Indonesia) (N 1167)

Outline for. Protected Areas Management Planning

GLOBAL ENVIRONMENT FACILITY (GEF) PROJECT EXECUTIVE SUMMARY

Strategic Plan of Action

Detailed methodology for TDA finalisation and SAP development

Environmental Register Act

Integrated Climate Change Adaptation Strategies (ICCAS)

Water Accounts and Statistics for Sustainable Development Goal 6

A S T A T E M E N T O F P R I N C I P L E S A N D P R O C E S S

NATIONAL PLAN REPUBLIC OF PALAU

ILBM implementation for the Sustainability of Himalayan Lakes

4. Institutional Structure and Coordination for REDD+ Activities 6. Stakeholder Consultations and Communication

Guide to the Convention on Biological Diversity. Module A-1

Senior Minister, Minister of Environment

Centre for Biodiversity Policy and Law

HAMOUN WETLANDS CURRENT SITUATION AND THE WAY FORWARD

Briefing for the Minister of Civil Defence

PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND: GEF Trust Fund

The Experience of Trinidad &

Development of Environment Statistic Under the National Statistical System (NSS) in Myanmar

DETAILED TERMS OF REFERENCE FOR

Draft Resolution on Ramsar Community 1 Accreditation

Improving the condition of Solway Tweed s water environment Tweed area management plan

Summary of Other Human Activities in the Coastal and Marine Environment

TEXAS COASTAL PROTECTION PLANNING INITIATIVES

(7) NGO Programmes 7-3) Overseas NGO Projects for Nature Conservation by NGO Supporting Programme

2.4 Ecosystem services

Pangani River Basin Management Project. Terms of Reference for Project Internal Review

TABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING...

NATIONAL REPORT CONVENTION ON BIOLOGICAL DIVERSITY

National Biodiversity Strategy and Action Plan (NBSAP), St. Lucia -page 33. We need to protect our watersheds to safeguard our supplies of freshwater

SUMMARY 2013 EDITION

WETLAND RESTORATION PROGRAMS IN THE PRUT RIVER BASIN

Lake Victoria Environmental Management Programme Phase 3

ACTION PLAN FOR IMPLEMENTING THE CONVENTION ON

INVENTORY AND MANAGEMENT OF CAMBODIA WETLANDS PROJECT

a) Status and trends b) Challenges and opportunities

Please fill in the form in the grey spaces, by following the instructions in italic.

Draft COASTAL SUSTAINABILITY CHARTER. and POLICY FRAMEWORK FOR COASTAL AUSTRALIA. Discussion Paper

DETAILED TERMS OF REFERENCE FOR

Water Resources Management in Cambodia

Public consultation as part of the Fitness Check of the EU nature legislation (Birds and Habitats Directives)

Please provide the following details on the origin of this report Contracting Party. Namibia. National Focal Point

SUSTAINABLE AND INTEGRATED MANAGEMENT OF THE

Memorandum of Understanding FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS (FAO) NILE BASIN INITIATIVE (NBI)

APPENDIX III LOGICAL FRAMEWORK ANALYSIS

Beekeeping for restoration of degraded ecosystems and improving livelihoods in East Africa

4. Agency (or Institution) Responsible for Implementing the Project

The Fight for the Reef campaign Federal Election Scorecard Policies. 23 May 2016

Council of the European Union Brussels, 3 March 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika. Lake Tanganyika The Transboundary Diagnostic Analysis

Water resources management and REDD+ in East Africa

Transcription:

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan Tanzania Conclusions of the National Working Group Planning Meeting Preparation for the National Sectoral Problem Review and the National Environmental Priorities and Strategies Review 27 May 1998 SAPtan1.doc

Contents 1. BACKGROUND - THE STRATEGIC ACTION PLAN 1 1.1 Proposed Development of the SAP 1 2. NATIONAL WORKING GROUP PLANNING MEETING 2 2.1 Meeting Objectives 2 3. NATIONAL SECTORAL PROBLEM REVIEW 3 3.1 Baseline Reviews 3 3.2 Main Topics and Preparation of Background Materials 3 3.3 Background Document Structure 4 4. NATIONAL ENVIRONMENTAL PRIORITIES AND STRATEGIES REVIEW 5 5. COMPOSITION OF THE NATIONAL WORKING GROUP FOR THE SAP 5 6. NATIONAL TIMETABLE OF ACTIVITIES 5

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan - Tanzania - Conclusions of the National Working Group Planning Meeting Summary The Tanzanian National Working Group of the Lake Tanganyika Biodiversity Project - LTBP 1 - contributing to the development of a Strategic Action Plan (SAP) for Lake Tanganyika, held their first planning meeting in Dar es Salaam in May 1998. The meeting has initiated the process of plan development recommended by the Regional Steering Committee, and will be holding two National Workshops to support the consultation process. The first workshop, dealing with the environmental priorities and threats to the Lake and Shore biodiversity, will be held in July. The second workshop, focusing on the capacity of existing environmental management options, policies and strategies to counteract these threats, will be held in September. The National Working Group has assigned tasks for preparing background materials to be presented at the workshop, to specific individual within key institutions responsible for each topic. The consultation process, building on the existing group membership, will be expanded for the specific requirements of the development of the SAP, and includes representatives from the communities, the private sector, local and international NGOs, the University, and international aid organisations. 1. Background - The Strategic Action Plan The project document has as the first immediate objective establish a regional long-term management plan for pollution control, conservation and maintenance of biodiversity in Lake Tanganyika.. Since the project document was prepared, the planning ideas incorporated in this immediate objective have been encapsulated in the concept of a Strategic Action Plan - SAP. Fundamental to this concept is the recognition that management plans have to be continually revised in response to changing circumstances, there can be no final plan. The SAP therefore establishes an agreed planning and management process, and prioritises initial interventions based on best available information. 1.1 Proposed Development of the SAP Following the decision of the Steering Committee held in January 1998 to proceed with the formulation of a regional Strategic Action Plan for Lake Tanganyika, the Steering Committee endorsed a process based on seven stages through which the SAP would be developed. Convene the National Working Groups for the SAP Convene Technical Advisory Committee for the SAP National Sectoral Problem Review National Environmental Priorities and Strategies Review Transboundary Diagnostic Analysis 1 Full title Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan - Tanzania - Conclusions of the National Working Group Planning Meeting Draft Strategic Action Plan Signed Strategic Action Plan The Steering Committee has set a goal, which is to have the SAP ready for signing by the four countries at a regional meeting to be held in March 1999. 2. National Working Group Planning Meeting The National Coordinator (Vice President s Office) called an extraordinary National Working Group meeting which was held on 26 and 27 May in Dar es Salaam. This report presents the main conclusions of the meeting with specific proposals for further actions necessary to carry out the consultation and planning process in Tanzania. The report is in addition to the minutes of the meeting, serving as an abridged record for the Tanzanian National Working Group, and as a guide to the other three participating countries round the lake on the process that Tanzania is adopting to support the development of the SAP. 2.1 Meeting Objectives The purpose of this meeting was to decide on the scope of the consultation process that would be necessary to fulfil Tanzania s commitment to preparing the SAP, and to ensure that Tanzania s national concerns are adequately represented in the final SAP. The meeting was structured round six priority objectives: Define the required National consultation process, including additional meetings, workshops or discussions considered necessary. Identify information requirements for the National Sectoral Problem Review. Allocate preliminary tasks to National Working Group members and to other individuals in associated institutions to prepare background documentation for the National Sectoral Problem Review. Agree on the most appropriate membership for the National Working Groups for the SAP process, including additional governmental and nongovernmental organisation and private sector representation for both the National Sectoral Problem Review and the National Environmental Priorities and Strategies Review. Agree a final timetable for all meetings of the National Working Groups for the entire SAP process, specifying dates. Details of the second workshop, the National Environmental Priorities and Strategies Review, will be discussed as the final issue in the first workshop. At that time, the topics to be discussed will be agreed, and tasks allocated in preparing background materials.

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan - Tanzania - Conclusions of the National Working Group Planning Meeting 3. National Sectoral Problem Review The meeting agreed to hold a five day workshop to define the main sectoral problems that Tanzania has in the management of the lake and the catchment, that threaten the biodiversity value of the lake. The potential management zone is taken as including the lake and the lake catchment. The biodiversity value of the lake is taken to include the biodiversity value of the adjacent shore and wetlands. As such the biodiversity value specifically includes, for example, the value of resident and migratory bird species that depend on lake resources. The emphasis of the problem review is therefore on the impacts on lake and shore biodiversity resulting from human activities within the lake and catchment. The review will also address the feasibility of management interventions to counteract those threats. 3.1 Baseline Reviews The National Working Group are fully aware that there has already been considerable work carried out already, and that much of this has been summarised in the Baseline Reviews that have been prepared by LTBP. Copies of the Baseline Reviews are held at the National Coordinators Office and have also been distributed to other institutions in Tanzania. The information in the baseline reviews was presented at the inception workshop during which countries gave an initial indication of the priority of the problems that threatened the lake resources and, based on this the focus of attention for the special studies. The background materials for the workshops will therefore take the baseline reviews as a starting point, expanding them to include new information and threats and opportunities for improved management that have developed over the intervening period. 3.2 Main Topics and Preparation of Background Materials The project assigned specific background topics to individuals in key institutions, to collate relevant information and prepare brief summaries of the information for presentation at the workshop. The purpose of these summaries is to highlight critical aspects of activities that are threatening the resource and problems and opportunities for managing those activities. The review of problems must include trends and projections, such as population growth and expanded population pressure and demands on resources, and associated economic activities such as increased levels of shipping. Descriptions of the lake and shore biodiversity resource should focus on threatened species, habitats and ecosystems, and should not be merely lists of species.

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan - Tanzania - Conclusions of the National Working Group Planning Meeting All summaries should make reference to source materials. Source materials should be brought to the workshop, where possible, to allow participants to refer to original materials. The following topics were included as requiring background documentation for the workshop: Lake and Shore Biodiversity - Habitats, Ecosystems, Indicator Species, Threatened Species, Threatened Habitats, Alien Species / Genetically Modified Species. Fishing - Industrial Catch and Trends, Artisanal Catch and Trends, Fishing Practices / Gear, Regulation / Enforcement, Ornamental Trade, Socio-Economics, Piracy, Processing/ Marketing, Fishing Impact on Biodiversity. Sediment - Sources/Types/Quantity, Hydrological Data, Sediment Load, Land Use, Industrial and Civil Works, Mining/Quarrying, Deforestation, Sediment Impacts on Biodiversity. Pollution - Agrochemical, Shipping Pollution, Dangerous Cargo, Regulation, Urbanisation / Settlement, Sewage Treatment, Sanitation, Solid Waste Disposal, Harbour Oil Spills, Power generation, Tourism / Recreation, Mining, Industrial Development, Small Industries, Pollution Impact on Biodiversity. Protected Area Management - Parks Management, Protected Area Encroachment, Socio-Economics, Marine Parks Management, Tourism, Poaching (Crocodiles and hippos), Impact of Protected Area Management on Biodiversity. Catchment Land Use - Demography (including. refugees), Urbanisation, Water Resources Management, Agricultural Systems, Forestry, Wetlands, Hydropower. The topics specifically excluded such problem areas as Global Warming, as there are no local management initiatives that can tackle such issues. 3.3 Background Document Structure Of the six main topics, the first deals with the biodiversity resources, while the remaining five topics cover threats to that resource resulting from human activities on the lake and in the catchment. However, all authors should follow a similar document structure. 1. Review and update baseline materials, identifying key documents and sources. 2. Prepare a summary focusing on: Either biodiversity issues that are under threat from human activities, including specific threatened ecosystems and habitats (Lake and Shore Biodiversity) Or human activities that threaten the lake and shore biodiversity 3. Review trends and projections of the future scale and sources of threats 4. Review potential and actual management interventions to counter threats

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan - Tanzania - Conclusions of the National Working Group Planning Meeting 5. Identify gaps in management capacity or knowledge that are a constraint to countering threats to lake and shore biodiversity 4. National Environmental Priorities and Strategies Review The meeting decided that the specific topics that would be included in the second workshop would be decided at the National Sectoral Problem Review, based on the conclusions of discussions on priority problems. However, it is clear that the workshop will review the effectiveness of existing sectoral and cross sectoral policies and legislation in effecting appropriate management interventions to counter the problems identified. The workshop will also review the policies with respect to future national environmental management objectives. 5. Composition of the National Working Group for the SAP The present National Working Group includes representatives from the following organisations and institutions: Vice Presidents Office; National Environment Management Council; Prime Ministers Office; Ministry of Natural Resources and Tourism - Fisheries Division; National Land Use Planning Commission; Planning Commission; TANAPA; Institute of Resource Assessment; Lake Victoria Environmental Programme; Ministry of Water; TAFIRI; It is now proposed to expand the consultation process to include the following institutions. Attorney Generals Chambers; District Executive Directors Kigoma / Nkasi; Ministry of Agriculture; Ministry of Communications (Shipping); Ministry of Energy and Minerals; Ministry of Home Affairs; Ministry of Lands and Human Settlement; Ministry of Natural Resources and Tourism - Wildlife Divisions; Regional Administrative Secretaries Rukwa / Kigoma; SIDO; University of Dar es Salaam; AWF; CARITAS; Diocese of Western Tanganyika; TACARE; UNDP; Wildlife Conservation Society of Tanzania; WWF; Aquaproducts; Lake Tanganyika Biodiversity Project; Mahale Lodge Operator It is worth noting that both Regional and District level staff are now incorporated into the consultation process, as well as local and international NGOs. The private sector is represented by Aquaproducts who are involved in the ornamental fish trade and the Mahale Lodge operator. All proposed members of the expanded National Working Group will be invited to both meetings to ensure continuity in the consultation process. 6. National Timetable of Activities The following timetable was proposed at the meeting: June Confirmation of individual responsibilities for preparing background materials for the National Sectoral Problem Review, finalisation of the TORs for

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan - Tanzania - Conclusions of the National Working Group Planning Meeting the preparation of the background materials, identification of an individual within the Ministry of Agriculture who will be responsible for drawing up the information on agricultural, bush and forest fires. June 16 National Working Group Meeting including all those involved in materials preparation, to review progress.. May/June preparation of background materials. July 27 to 31 National Sectoral Problem Review Workshop. September 21 to 25 National Environmental Priorities and Strategies Review. In addition the National Working Group have indicated that they are arranging for the following regional meeting which is proposed for Arusha. July 20 and 21 Regional Steering Committee Meeting and first Technical Advisory Committee Meeting (subject to agreement with the other participating countries).

Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan - Tanzania - Conclusions of the National Working Group Planning Meeting Annex 1 Matrix of Background Topics and Institutions

Institutions Participating in the National Sectoral Problem Review Workshop Attorney Generals Chambers District Executive Directors Kigoma / Nkasi Ministry of Agriculture Ministry of Communications (Shipping) Ministry of Energy and Minerals Ministry of Home Affairs Ministry of Lands and Human Settlement Ministry of Water MNR&T Fisheries Division MNR&T Wildlife Division Prime Ministers Office Regional Administrative Secretaries Rukwa / Kigoma Vice Presidents Office Institute of Resource Assessment National Environment Management Council National Land Use Planning Commission Planning Commission SIDO Individuals Responsible for Preparing Background Documentation and Presenting it to the Workshop TAFIRI TANAPA University of Dar es Salaam AWF CARITAS Diocese of Western Tanganyika TACARE UNDP Wildlife Conservation Society of Tanzania WWF Aquaproducts Lake Tanganyika Biodiversity Project Lake Victoria Environmental Programme Mahale Lodge Operator Topics requiring Background Documentation To be identified Tindyebwa Kihynrwa Mihayo/Mkhandi Haule Mung'ong'o Chisara Shilungushela Marwa Chitamwebwa Kessy Nkatagu Chale Lake and Shore Biodiversity Habitats Ecosystems Indicator Species Threatened Species Threatened Habitats Alien Species / Genetically Modified Species Fishing Industrial Catch and Trends Artisanal Catch and Trends Fishing Practices / Gear (Beatrice Marwa) Regulation / Enforcement Ornamental Trade Socio-Economics Piracy MATtz1 Page 1

Institutions Participating in the National Sectoral Problem Review Workshop Attorney Generals Chambers District Executive Directors Kigoma / Nkasi Ministry of Agriculture Ministry of Communications (Shipping) Ministry of Energy and Minerals Ministry of Home Affairs Ministry of Lands and Human Settlement Ministry of Water MNR&T Fisheries Division MNR&T Wildlife Division Prime Ministers Office Regional Administrative Secretaries Rukwa / Kigoma Vice Presidents Office Institute of Resource Assessment National Environment Management Council National Land Use Planning Commission Planning Commission SIDO TAFIRI TANAPA University of Dar es Salaam AWF CARITAS Diocese of Western Tanganyika TACARE UNDP Wildlife Conservation Society of Tanzania WWF Aquaproducts Lake Tanganyika Biodiversity Project Lake Victoria Environmental Programme Mahale Lodge Operator Processing/ Marketing MATtz1 Page 2

Institutions Participating in the National Sectoral Problem Review Workshop Attorney Generals Chambers District Executive Directors Kigoma / Nkasi Ministry of Agriculture Ministry of Communications (Shipping) Ministry of Energy and Minerals Ministry of Home Affairs Ministry of Lands and Human Settlement Ministry of Water MNR&T Fisheries Division MNR&T Wildlife Division Prime Ministers Office Regional Administrative Secretaries Rukwa / Kigoma Vice Presidents Office Institute of Resource Assessment National Environment Management Council National Land Use Planning Commission Planning Commission SIDO TAFIRI TANAPA University of Dar es Salaam AWF CARITAS Diocese of Western Tanganyika TACARE UNDP Wildlife Conservation Society of Tanzania WWF Aquaproducts Lake Tanganyika Biodiversity Project Lake Victoria Environmental Programme Mahale Lodge Operator Fishing Impact on BD Sediment Sources/Types/Quantity Hydrological Data Sediment Load Sediment Impacts on BD Land Use Industrial and Civil Works Mining/Quarrying Deforestation Pollution Agrochemical Shipping Pollution Dangerous Cargo Regulation Urbanisation / Settlement Sewage Treatment Sanitation Solid Waste Disposal Harbour Oil Spills MATtz1 Page 3

Institutions Participating in the National Sectoral Problem Review Workshop Attorney Generals Chambers District Executive Directors Kigoma / Nkasi Ministry of Agriculture Ministry of Communications (Shipping) Ministry of Energy and Minerals Ministry of Home Affairs Ministry of Lands and Human Settlement Ministry of Water MNR&T Fisheries Division MNR&T Wildlife Division Prime Ministers Office Regional Administrative Secretaries Rukwa / Kigoma Vice Presidents Office Institute of Resource Assessment National Environment Management Council National Land Use Planning Commission Planning Commission SIDO TAFIRI TANAPA University of Dar es Salaam AWF CARITAS Diocese of Western Tanganyika TACARE UNDP Wildlife Conservation Society of Tanzania WWF Aquaproducts Lake Tanganyika Biodiversity Project Lake Victoria Environmental Programme Mahale Lodge Operator Power generation Tourism / Recreation Mining Industrial Development Small Industries Pollution Impact on BD Protected Area Management (excl. Forest Reserve) Parks Management Protected Area Encroachment Socio-Economics Marine Parks Management Tourism Poaching (Crocs/hippos) Impact of Protected Area Management on BD Catchment Land Use Demography (incl. Refugees) Urbanisation Water Resources Management Agricultural Systems Forestry MATtz1 Page 4

Institutions Participating in the National Sectoral Problem Review Workshop Attorney Generals Chambers District Executive Directors Kigoma / Nkasi Ministry of Agriculture Ministry of Communications (Shipping) Ministry of Energy and Minerals Ministry of Home Affairs Ministry of Lands and Human Settlement Ministry of Water MNR&T Fisheries Division MNR&T Wildlife Division Prime Ministers Office Regional Administrative Secretaries Rukwa / Kigoma Vice Presidents Office Institute of Resource Assessment National Environment Management Council National Land Use Planning Commission Planning Commission SIDO TAFIRI TANAPA University of Dar es Salaam AWF CARITAS Diocese of Western Tanganyika TACARE UNDP Wildlife Conservation Society of Tanzania WWF Aquaproducts Lake Tanganyika Biodiversity Project Lake Victoria Environmental Programme Mahale Lodge Operator Wetlands Hydropower MATtz1 Page 5