WATER POLLUTION CONTROL PLANT

Similar documents
Your Guide to the. Budd Inlet Treatment Plant

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018

Chapter 2: Description of Treatment Facilities

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

Wastewater Treatment Works... The Basics

OVERVIEW CAPACITY & CONDITION

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Water Pollution. Objective: Name, describe, and cite examples of the eight major types of water pollution.

Baltimore City Department of Public Works

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER:

Anderson Water Pollution Control Plant

Water Reuse Terminology

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

Developing Watershed Plans to Restore and Protect Our Waters

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

CITY OF YUMA WASTEWATER TREATMENT PLANTS. Cactus Moon Education, LLC.

About the RRC. February

Frequently Asked Questions

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX

IEUA FY Recycled Water Annual Report. Water Smart Thinking in Terms of Tomorrow

CHAPTER 2.0 EXISTING FACILITIES

Decentralized Scalping Plants

Where does drinking water come from?

WASTEWATER TREATMENT

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County

Meridian s Class A Recycled Water Program

Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives

EXPRESS TERMS: Existing Part 650 is repealed in its entirety and New Part 650 is adopted.

EASTERN GOLETA VALLEY COMMUNITY PLAN D. WATER, WASTEWATER, AND SOLID WASTE MANAGEMENT. Land Use and Development Policies and Implementation Strategies

Alexandria Renew 2015 Report to Fairfax. A year of transformation

SECTION 7. Public Infrastructure, Facilities and Services. 8Chapter 8 INFRASTRUCTURE ELEMENT

CANADA-WIDE APPROACH FOR THE MANAGEMENT OF WASTEWATER BIOSOLIDS. October 11, 2012 PN 1477

Wastewater Pollutants & Treatment Processes. Dr. Deniz AKGÜL Marmara University Department of Environmental Engineering

Myths and Facts. Myth: The Seaterra Program will not provide a high level of treatment for our wastewater.

Donner Summit PUD Interactive Map Pop-up Text and Photos June 30, 2015

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.

Oxnard Wastewater Treatment Plant

Constructed Wetlands for Wastewater Treatment: A Planning & Design Analysis for San Francisco

California Regional Water Quality Control Board San Francisco Bay Region

Irvine Ranch Water District Michelson Water Recycling Plant. Irvine, CA LOCATION: MBR MANUFACTURER: COMMENTS:

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

Public Information Meeting Wastewater Master Plan

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

20. UTILITIES AND SERVICE SYSTEMS

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

Review of on-site and communal water and sanitation systems for remote communities

Wastewater Treatment clarifier

Homework Solution for Module 15 Waste Water Treatment Plants. 2. What is the difference between municipal and industrial wastewater?

Urban Geology Spring 2011

Sewage Treatment - overview

Potable Water Supply, Wastewater & Reuse Element

2017 Annual Performance Report

Wastewater Treatment Plant Compliance. Strategies for Surviving an NPDES Permit Inspection (National Pollutant Discharge Elimination System)

EXISTING FACILITIES DESCRIPTION

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director

Wastewater Treatment Processes

SBR PROCESS FOR WASTEWATER TREATMENT

Wastewater Treatment Systems, Wastewater Issues and Permits

DRAFT. Recycled Water Cost of Service and Rate Study Report. Napa Sanitation District

6/22/2018 INTRODUCTIONS. Wastewater Rates and Charges Citizens Advisory Committee. June 21, 2018 June 21, Why are we here?

Wastewater in Ontario: The ECO's perspective on onsite and decentralized wastewater management

SANJOSE. Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Toni J. Taber, CMQ City Clerk SUBJECT: SEE BELOW. DATE: April 14, 2016

Tour of Altamonte Springs Regional Water Reclamation Facility

Surviving an NPDES Permit Inspection. General info about permits, limits, & reporting

APPENDIX C 2012 RECYCLED WATER FEASIBILITY STUDY PUBLIC COMMENT RESPONSES

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP)

Treating Waste as a Resource

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

Notice of Preparation

Emerging Issues in the Water/Wastewater Industry. Austin s Full-Scale Step-BNR Demonstration

Water Pollution. Chapter 20

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM. Cost Estimates... 3

Presentation Outline

Best Practice in Sewage and Effluent Treatment Technologies

Watershed Training Workshop

TULARE LAKE COMPOST EXCEPTIONAL QUALITY COMPOST FOR THE CENTRAL VALLEY

Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project

Conducting Successful Energy Audits for Both Water and Wastewater Utilities By: Rich Atoulikian, HDR

Energy & Material Cycle of Waste-water

WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB

Long Beach Water Department Fiscal Year 2018 Annual Budget Summary

ES.1 Solids Master Planning Background and Goals

Implementing EMS to Improve Operational Performance and Energy Management for Dallas Water Utilities. TACWA Meeting May 31, 2013

Raw water sources, facilities, and infrastructure

CHAPTER SEVEN: UTILITIES

Current Treatment Approaches and Planning for the Future A Panel Discussion

Lesson W9 Wastewater and CSOs

Renewing the Water Industry. March 23, 2017 Karen Pallansch, CEO Alexandria Renew Enterprises

Transcription:

WATER POLLUTION CONTROL PLANT Welcome to the Sunnyvale Water Pollution Control Plant For 60 years, Sunnyvale s Water Pollution Control Plant has worked tirelessly 24 hours a day and 7 days a week. Rain or shine, the Plant continually serves Sunnyvale residents, even though the majority of what happens here goes unseen. We are that committed to providing excellent service. We are equally committed to being strong environmental stewards by ensuring that the treated wastewater discharged into the San Francisco Bay is of the highest quality and consistently meets rigorous and evolving regulatory standards. Thank you for taking an interest in what we love doing. We are convinced that the pride we take in a job well done is reflected by our continued and unwavering service. Serving Sunnyvale for 60 years with reliable and effective wastewater treatment

How it all began Sunnyvale was incorporated in 1912 and all of its sewage would flow directly to San Francisco Bay untreated Originally constructed in 1956, the Donald M. Sommers Water Pollution Control Plant (Plant) has come a long way from its humble beginnings of simple primary treatment of municipal and cannery waste. Over the years, the Plant has undergone periodic upgrades, incorporating new technologies in wastewater treatment to improve the quality of its discharge as the City of Sunnyvale s population has grown to over 149,000 (2017). 1 million gallons = 50 swimming pools of water In its present form, the Plant is designed to treat 29.5 million gallons of wastewater per day (MGD) to tertiary standards, but can handle much higher flows during storm events. Currently, the Plant is undergoing a major long-term Capital Improvement Program known as the Clean Water Program to rebuild and upgrade the entire facility and ensure it s continued service to Sunnyvale residents and the protection of the San Francisco Bay ecology well into the future. 2

Who we are. Some 60 talented employees from various backgrounds keep the Plant running and in service. A skilled team of Operators work diligently 24 hours a day and continually monitor all treatment processes, while specialized Maintenance Mechanics ensure equipment and instrumentation reliability in a critical utility setting. Support Service staff form the backbone of the Plant workforce by assisting the general public, vendors, and other City staff, and providing administrative support. As part of the Pollution Prevention Program, a dedicated group of Environmental Compliance Inspectors work closely with a wide variety of businesses to ensure that the composition of their wastewater is in compliance with City requirements and does not compromise the integrity of the Plant or the sewer collection system. Such businesses range from aerospace to semiconductor manufacturers and dental offices to restaurants. Lab/Field Technicians support the Inspectors by routinely collecting on-site wastewater samples that are analyzed for pollutants. To ensure wastewater gets to where it s going, the Water and Sewer System Division is comprised of a team of individuals who vigilantly inspect and clean the collection system, perform repairs and upgrades, and support the Environmental Compliance Inspectors. Environmental Outreach staff engage the community on water pollution prevention, conservation, and watershed stewardship. Staff work closely with schools and educate businesses and industries, and the community. Operators are present 24 hours a day, 7 days a week The Plant boasts an on-site laboratory, in which Laboratory Chemists analyze a variety of samples using sophisticated equipment capable of detecting minute concentrations of pollutants. Wastewater samples include those collected from businesses as well as the various treatment processes throughout the Plant. In addition to testing the wastewater samples, Chemists test the drinking water for the City of Sunnyvale, conduct research projects and prepare sample tests for regulatory agencies. 3

Sunnyvale Water Pollution Control Plant History 1956 Plant begins operation at 7.5 million gallons per day (MGD) 1962 Expansion to 15 MGD 1978 Tertiary treatment added; capacity up to 22.5 MGD 1960s Oxidation ponds added: 115 and 325 acres 1972 Clean Water Act established 198 Present cap reached 29.5 MG How the Plant Works Primary Treatment While wastewater treatment may sound simple, it involves a number of physical, chemical and natural biological process steps and stations to get the job done. The three major treatment levels are primary, secondary and tertiary treatment. By the time the treatment process is complete, the water is clean enough to meet all standards for either recycled water uses or discharge into San Francisco Bay. The Plant currently produces and delivers an average of 250 million gallons of recycled water per year. Throughout the treatment process, the Plant focuses with great attention on safety, compliance, efficiency and cost effectiveness. Solids removal using influent screening/grinding, raw sewage pumping and metering, grit removal and primary sedimentation. During primary treatment, roughly 60% of influent solids are removed. Preaeration tanks and primary sedimentation basins. Secondary Treatment: aerial Photo of 440 Acres of Oxidation Ponds. 4

Plant Master Plan 2000 Expanded recycled water to 8 MGD 2016 Sunnyvale Clean Water Program 4 acity : D 2008 Strategic Implementation Plan (SIP) initiated Secondary Treatment The goal of secondary treatment is to remove most of the remaining dissolved and suspended solids, and to convert ammonia to nitrate. After most of the heavy solids have been removed during primary treatment, the water flows by gravity into 440 acres of oxidation ponds. From there it is pumped to the fixed growth reactors, and then to dissolved air flotation tanks. Following secondary treatment, 92% of influent solids will have been removed and nitrate will be the dominant form of nitrogen. Tertiary Treatment Effluent from the dissolved air flotation tanks is pumped to the tertiary treatment facilities, which includes effluent filtering, chlorine disinfection and dechlorination prior to discharge. Following tertiary treatment, 96% of influent solids will have been removed. Chlorine contact channels treating effluent prior to discharge to the San Francisco Bay. Rotating arm of fixed growth reactors distributing pond effluent over plastic growth media. 5

What s in those purple pipes? Water is arguably the most precious resource on the planet, without which life would cease to exist. Since 2002, the Plant has been diverting up to 10% of the wastewater it receives to the production of recycled water that meets or exceeds the stringent requirements contained in Title 22 of the California Code of Regulations. Recycled water produced at the Plant is distributed through purple pipes to more than 100 users throughout Sunnyvale. In a given year, the Plant produces roughly 250 million gallons of recycled water to offset potable water that would otherwise be used for irrigation of private and public landscapes, parks and golf courses; for use in decorative ponds; and for other approved uses. In response to California s ongoing drought, the Plant has partnered with the Santa Clara Valley Water District to expand the scale of recycled water production and enhance the reliability and efficiency of its delivery. RECYCLING GETS A BOOST There are more than 100 recycled water users in Sunnyvale Where do biosolids come from? Biosolids are a natural product produced at the Plant through a process known as anaerobic digestion, in which tiny microbes breakdown organic matter and remove harmful pathogens in wastewater. The finished product resembles dark soil and has a rich nutrient content, which makes for a great fertilizer. In fact, the majority of the biosolids produced at the Plant are hauled off-site and applied to agricultural fields. As if that wasn t enough, the microbes also produce biogas, which is captured and utilized for its methane content by generating engines to produce all the power the Plant needs to operate. 6

SUNNYVALE CLEAN WATER PROGRAM We re rebuilding what has worked so well. The Water Pollution Control Plant handles wastewater treatment for more than 149,000 residents and business people who don t have to think twice about it. Since 1956, the Plant has protected the health and well-being not only of its human customers but also the southern San Francisco Bay. With decades of operation under its belt, some components of the Plant are nearing the end of their useful lives and much of the aging infrastructure needs replacing. Fortunately, the City is well into its planning for the future. While age is a major driver for the City s Water Pollution Control Plant Master Plan, other factors include the need for operational reliability, increased capacity, emerging regulations and innovative technology that will guide the Plant rebuild over the next 20-plus years. All of these improvements are encompassed in the Sunnyvale Clean Water Program (Program), which is the City s long-term capital improvement program to renovate the Plant through a series of projects and upgrades. What the Sunnyvale Clean Water Program will do. a Minimize capital and operational costs for rate payers by selecting the best and most costefficient technologies that meet our needs. b Meet current and future regulatory standards for water and air quality. c Provide a more reliable power supply through renewable energy produced by the Plant. d Enhance safety measures and maximize the use of existing space at the facility. e Extend the useful life of existing facilities where practical to get maximum benefit. f Ensure projects are designed and built to adapt to future financial and regulatory changes. g Employ innovative technologies that improve operational efficiency. h Protect against flooding and risks associated with sea level rise. The Clean Water Program is a long-term capital improvement program to renovate Sunnyvale s aging wastewater treatment infrastructure through a series of construction projects 7

For more information visit us at Sunnyvale.ca.gov Sunnyvalecleanwater.com Phone: 408-730-7260 There are a total of 37 wastewater treatment facilities serving the Bay Area There are more than 280 miles of sewer pipes in Sunnyvale