INTEGRATED WATER RESOURCES MANAGEMENT ROAD MAP

Similar documents
IWRM in Karnataka, India: Crafting a new future

EXPRESSION OF INTEREST

Lesson 3: Integration what does it mean?

Water Resources and Irrigation Reform

Regional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank

PRESENTATION ON RIVER BASIN MANAGEMENT

Participatory Watershed Governance Water Sustainability at Scale through Inclusive Approaches

Support to Water Sector Development in Central Asia: The ADB Approach

High-level political forum on sustainable development

Water Use Efficiency

IWRM best practices in the 4-Ps Pilot Basin - towards Integrated River Basin Management

Hydrological Training Programme for Pacific Island Countries INTEGRATED WATER RESOURCES MANAGEMENT

MODERNISING IRRIGATION INFRASTRUCTURE & MANAGEMENT

Water Scarcity and the Need for Efficient Utilization of Water Resources. Dr. Hazim El-Naser Minister of Water and Irrigation/Jordan

Integrated Water Management Developer Guidance

Session 3: Water Accounting in Australia

The Roadmap for Implementing IWRM

Water Use Efficiency

ECONOMIC AND FINANCIAL ANALYSIS

Enhancing links between irrigation and agriculture: policy innovations and initiatives

4 th India Water Week & 1 st Indian Irrigation Forum 7 April 2016, New Delhi

Conference on New Thinking on Water Governance 2-3 July 2009 Lee Kuan Yew School of Public Policy National University of Singapore

STATE WATER POLICY. 1. The Need for a State Water Policy

5 th World Water Forum

Creating Synergy and ADB s Water Policy

APPENDIX III LOGICAL FRAMEWORK ANALYSIS

GROUNDWATER MANAGEMENT STRATEGY

Pakistan Development Forum. Presentation by

Introducing A Framework For National Water Sector Apex Bodies To Assess Their Effectiveness 1

South Asia Water and Climate Change

Building Blocks and Strategies for Agriculture Water Management Policy Lessons from Modernization Programmes in Asia

Global environmental challenges: sustainable solutions

WSSSRP II Logframe. Revised December 2015

Key Design Principles for Community Water and Sanitation Services

Operationalizing IWRM through River Basin Planning and Management

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

Keywords - Integrated water resources management, decision support system, capacity development

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name. Sindh Water Sector Improvement Project Region

IWRM And Water Planning in Gurara River Basin Engr. Abdul-Qadir D. Aliyu

Andhra Pradesh State Water Policy, 2008

Asian Development Bank. Business Opportunities Seminar

Bangladesh: Water Resources Planning Organization (WARPO)

Sri Lanka: National Water Resources Authority

Public Participation in Strategic Environmental Assessment

Vision for Water for the World Bank

Islamic Republic of Pakistan: Institutional Transformation of the Punjab Irrigation Department to a Water Resources Department

ADB s Water Policy and the Need for National Water Sector Apex Bodies 1

SUMMARY 2013 EDITION

Political Perspective of Managing Water Demand

Muscat Declaration on Water adopted by the First Ministerial Forum on Water of the Group of 77 Muscat, Sultanate of Oman, February 2009

SDGs and Transboundary Water Cooperation

Organizational Report Department of Water Resources Management, MoNRE Vietnam

ECE Convention on transboundary waters Second International Conference Poland, April Integrated management of water in river basins

FAO s initiatives on Water Management in the Caribbean

Final Report for the Karnataka Integrated and Sustainable Water Resources Management Investment TABLE OF CONTENTS

Madhya Pradesh State Water Policy, 2003

National Water Demand Management Policy

Water Planning for Water Security -in the Timor-Leste context-

Changing Consumption Patterns Commitments Agenda 21: Chapter 4 and UN Commission on Sustainable Development

Environmental Assessment and Review Framework. India: Karnataka Integrated and Sustainable Water Resources Management Investment Program

The Dublin Statement on Water and Sustainable Development

SEPP (Waters) Review. Veronica Lanigan & Sally Lock

Regional Water Experts Consultation Meeting

Jamaica Water Sector Policy Paper

Strategy and Methodology for Improved IWRM

Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647)

Logical Framework and Objectively Verifiable Impact Indicators

People s Republic of China: Research on Innovative Mechanism for Open Agricultural Investment

Resilient Water Solutions

Pro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS

Protocol on Climate Change Adaptation and Disaster Risk Management in Fisheries and Aquaculture under the Caribbean Community Common Fisheries Policy

Government of Orissa Department of Water Resources. State Water Policy 2007

Ministerial Declaration --- Message from the Lake Biwa and Yodo River Basin---

Transboundary Water Cooperation in the context of the SDGS An Overview

Rashid Ali Khan, FAO (Ret.) Gurgaon, Haryana

National Policy Dialogue on IWRM in Tajikistan

Report on Implementation of the 31 st APRC Key Recommendations for FAO s Action related to Regional Priority Framework and Achievement of

UN-Water and Global Water Partnership (GWP) Roadmapping for Advancing Integrated Water Resources Management (IWRM) Processes

Tamilnadu Hydrology Project-II. DSS(Planning) for IWRD By SGSWRDC, TNWRD, Chennai

The sustainable management of water in agriculture an OECD perspective. Wilfrid Legg Trade and Agriculture Directorate

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

Irrigation Policy, 2060

NATIONAL WATER POLICY,

Presentation on IWRM best practices in Pilot 4 Ps Basin towards Integrated River Basin Management. Cambodia National Mekong Committee

Asia s Water Sector: Challenges and Opportunities

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24

Project Proposal for Development of Chu River Basin Management Plan

CONJUNCTIVE USE OF GROUNDWATER & SURFACE WATER obstacles and benefits of a planned approach. Dr STEPHEN FOSTER GW-MATE Director (IAH President)

India-EU Water Partnership (IEWP) Workplan

NATIONAL STRATEGIES. 5 th Regional Workshop, Southeast and Eastern Asia Safe and Productive use of Wastewater in Agriculture,

Introductory Remarks for CMI/World Bank Conference on Desalination, NRW and Public-Private Partnerships

ADB Business Opportunities Seminar. Urban and Water. Vienna, Austria 21 November 2018

Chapter 1. Introduction

Does use of the blue/green/grey water concept improve or dumb-down water management? Charles Batchelor

TD 603. Water Resources Milind Sohoni sohoni/ Analysis Framework for the 2009 Maharashtra MWRRA Tarrif Document

United Nations Economic Commission for Europe Convention on the Protection and Use of Transboundary Watercourses and International Lakes

Water Security: In Search of the Optimal Balance

1. Introduction The Local Government Association of NSW and Shires Association of NSW (the Associations) are the peak bodies for NSW Local Government.

Transcription:

Karnataka Integrated and Sustainable Water Resources Management Investment Program (RRP IND 43253) INTEGRATED WATER RESOURCES MANAGEMENT ROAD MAP 1. Integrated River Basin Management Activities to improve water access and services for users, including the environment, in river basins based on the principles of integrated water resources management. Required activities include: Establishment of effective river basin management arrangements including financing arrangements; Preparation of State River Basin Inventory; (iii) Development and implementation of river basin plans in selected river basins including participation of stakeholders, updating of water resource inventory, inter-sectoral planning of water development and management; groundwater development and management plans; water quality and quantity planning and management systems to maintain river health; and plan financing; (iv) Preparation of pilot, community based, integrated Land and Water Management Plans in selected subbasins and/or irrigation areas; Operational management systems to implement basin water plans and where possible to include flow monitoring, volumetric measurement of abstractions, flow control and enforcement, and sharing of water; and (vi) Implementation of public awareness, information education and communication systems and campaigns on relevant water sector issues. Access for all people in the basin to adequate water supply and sanitation Water consumption is within the sustainable limits of water availability in river basins and sub-basins. Sources of water for domestic, irrigation, industrial, hydropower, aquaculture, leisure, and other uses are developed and managed consistent with water availability and sustainability (iii) River basin planning is transparent, integrative, consultative, effective, and uses information based systems including modelling and spatial data (iv) River basin planning and management integrates rain water, surface water, groundwater; water quantity, water quality; water and land use; and in-stream flow needs with all relevant sectors involved Agreed policies, rules, and operational procedures including monitoring to implement river basin plans and water use by different sectors are implemented effectively AC IWRM WRD WRDO CWC, WRA, TB, KNNL, other nigams, DMI, CADA, DA, DE, DF, DMG, WD, KUWSDB, WUCS; local government, civil society

2 2. Institutions and Policies for IWRM Institutions is used in its broadest sense including organizations, legislation, policies and other protocols that define the relations among water sector organizations and their clients. Planning for IWRM (in this context, river basin planning) is seen as a mechanism for promulgating and implementing policies of government. Activities required include: Organizational alignment for IWRM processes with interim arrangements initially for selected river basins Organizational capacity building for IWRM processes, including career development and reward systems (iii) Alignment and implementation of legislative framework (iv) Preparation of a State IWRM Strategy to and development of water resources policies aligned with economic, social and environmental objectives Regulation (such as sustainable water utilization, wastewater discharge and water tariff approaches) (vi) Institutional development for participatory irrigation management (PIM) including formation and strengthening water user committees (vii) Capacity building of staff of agencies including IWRM Certification Program recognized as an international standard think tank providing advice to SGOK Appropriate IWRM institutional frameworks within SGOK with clearly defined responsibilities and working partnerships with stakeholders in Karnataka leading to coordinated water resource management in the State (iii) National and international IWRM research and policy partnerships established with providing access to state-of-art knowledge (iv) State IWRM Strategy in place and regularly updated and guiding strengthening of water sector governance Policies, procedures and responsibilities suitable for Karnataka piloted and established to sustainably manage water resources (surface water, groundwater, quantity and quality) and involving major water users including the environment (vi) Decision makers, advisers, technical experts, and other key stakeholders effectively carry out their responsibilities with regard to water resources policy, planning and management (vii) Policy makers and other stakeholders knowledge and willingness raised to undertake necessary reform measures WRD CADA Directorate CWC, WRA,

3 (viii) Capacity of WRD and water related agency staff raised to ensure long term IWRM 3. Data, Information, and Knowledge Management Data, information and knowledge are fundamental to all aspects of decision making in water resource planning and management. IKM theme will include: Preparation of a Strategy and Plan for Strengthening the Water Resources Information System; Data collection on surface and groundwater quantity and quality and collation of other natural resource data, such as land cover, ecosystems, etc., as well as such socioeconomic data such as population, poverty, and land use; for priority river basins; (iii) Hydrological monitoring in the K-8 and other priority river basins; (iv) Data archiving and management, including the collation of data from various sources, validation, computerization, and so on; Data sharing and dissemination among government agencies, research establishments, and providing public access to data; (vi) Identification, development and implementation of appropriate decision-support tools, including geographic information systems, hydrologic and hydraulic models, and other analytical tools; and (vii) Research to increase knowledge in such fields as catchment processes, demography, etc., as well as new technologies for water conservation IWRM and river basin planning and policies are based on strong data and information sources and decision support systems A comprehensive State database on land and water resources in place and in a form that is accessible to all who need it to facilitate sustainable management of the State s water resources (iii) Agencies concerned with water management monitor and record water resources to agreed standards and according to their responsibilities (iv) Effective data-sharing arrangements in place among agencies and stakeholders in the basin and with central agencies including data sharing agreements Research programs are providing highly relevant information to support IWRM WRDO KNNL, other nigams, CWC, DPS, DITB; DeG; DMI, DA, DE, DF, DMG, WD, KUWSDB 2020

4 and environmental protection. 4. IWRM Based Irrigation Management Modernization of irrigation services, consistent with water management policies including infrastructure for irrigation water supply, integration with tank storages, command area works, water measurement and control systems, and improved operation and maintenance of the infrastructure developed in the process. It includes: (iii) Participatory project planning, including irrigation modernisation planning (infrastructure and management development distinct from broader basin planning); matching cropping patterns to available water and increased income, water distribution plans, responsive to stakeholders; Modernising systems including canal lining, structure repair / replacement; incorporating tanks and off line storage, command area improvement including pipeline systems, drip irrigation, improved drainage systems to eliminate waterlogging; Automatic flow measurement and transmission of flow data for the main distribution system to monitor and enable volumetric measurement for each outlet to enable water control and bulk water charging for each WUCS; (iv) Operating and maintaining infrastructure including timely and volumetrically based water supply, asset management and full recovery of at least O&M costs; Capacity building of both system operations staff and water user All water supply infrastructure capable of operating at design capacity Sustainable asset-management practices in place for all waterrelated infrastructure in the basin (iii) Institutions managing the infrastructure, volumetric supply of irrigation water to users and cost recovery of O&M at government, water authority and WUCS levels (iv) Reliable delivery of irrigation services within the constraints of available water resources Commitment of involvement of water users in planning and management of irrigation systems KNNL and other nigams CADA Directorate DA, WUCS

5 organisations; and (vi) Establishment of effective selfmanaged WUCS institutions for participatory irrigation management. 5. Water Use Efficiency and Water Productivity 6. Stakeholder involvement and Increasing water use efficiency (WUE) and water use productivity (WUP) is a high government priority in order to save water that can be used for other purposes including use by industry, urban areas, and irrigation. However by focusing on single irrigation systems impacts at the larger basin level on downstream users and the environment are often overlooked. Also a focus on agricultural production does not necessarily translate into increased incomes to farmers. This theme will include: Development of the concepts and understanding of water productivity, water use efficiency, crop and agricultural productivity and their practical application to IWRM Basin scale assessments of water use efficiency and water productivity including by remote sensing to identify the actual scope for making real water savings as well as to support river basin planning and management. (iii) Improving WUE and Irrigation Systems by undertaking comprehensive assessments of irrigation systems using the FAO MASSCOTE tools, the assessments would also support Irrigation modernisation and Land and Water Management Plan activities Engagement of relevant stakeholders in planning and implementation, monitoring and evaluation of water resources (iii) River basin and water resources planning treats the water resource as finite Increased provision of water for irrigation or industry expansion is based on real water savings. Modernisation of irrigation systems is based on comprehensive assessments of system configuration and conditions (iv) The interests of farmers of increased profitability is recognised in irrigation and water resources planning Communities in selected basins are aware of and actively participate in the conservation, KNNL and other nigams CADA Directorate DA, DITB KNNL and other nigams February

6 Capacity Building management is a key foundation of IWRM. Stakeholders include the communities, utilization, and protection of natural resources businesses and government agencies active in the basins. Building the capacity of stakeholders for IWRM is important to sustainable water resources management. Stakeholder participation will include: (iii) Communities are actively involved in deciding levels of services and water tariffs by water management utilities Education, awareness raising, and capacity building of communities and individuals on water management issues; and Community involvement in river basin planning and management, irrigation modernisation, and Land and Water Management Plan programs. Local communities are actively participating in forums for planning and managing basin water resources (iv) Government commitment to stakeholder and community participation in river basin planning, water resources management and irrigation system management = Advanced Centre of IWRM, CADA = Command Area Development Authorities, CWC = Central Water Commission, DA = Department of Agriculture, DE = Department of Ecology and Environment, DeG = Department of e-governance, DF = Department of Fisheries, DITB = Department of Information Technology and Biotechnology, DMG = Department of Mines and Geology, DMI = Department of Minor Irrigation, DPS = Department of Planning and Statistics, KNNL = Karnataka Neeravari Nigam Limited, KUWSDB = Karnataka Urban Water Supply and Sewerage Board, TB = Tungabhadra Board, WD = Watershed Development Department, WRA = Water Resources Authority, WRD = Water Resources Department, WRDO = Water Resources Development Organization, WUCS = Water User Cooperative Societies.