DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

Similar documents
Electrical Work. NOV Embankments Over Swamps and Compressible Soils

LIST OF ACTIVE OPSSs

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

SUPPLEMENTAL DRAWINGS

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

H3-29 DIVISION 900 FENCING AND GUIDE RAILS

H3-2 LIST OF ACTIVE ONTARIO PROVINCIAL STANDARD DRAWINGS Division 900 Fencing and Guide Rails

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

G2-0 LIST OF ACTIVE MTODs

Index to Technical Specifications

LIST OF STANDARD DRAWINGS H2-9 - SERIES 9: Fencing, Guide Rails

G2-0 LIST OF ACTIVE MTODs

LIST OF ACTIVE STANDARD SPECIAL PROVISIONS

Abbreviations, Building Descriptions Topography Plan Features, Monument Features

CITY OF GUELPH CONTRACT NO SUPPLEMENTAL SPECIAL PROVISIONS

CONSTRUCTION SPECIFICATION FOR REMOVAL

LIST OF STANDARD DRAWINGS H2-2 - SERIES 2: Grading

NOTICE. Registration Form and Notice of Needed Revisions

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

LIST OF ACTIVE STANDARD SPECIAL PROVISIONS

G2-0 LIST OF ACTIVE MTODs

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR REMOVAL

CONSTRUCTION SPECIFICATION FOR REMOVAL

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

CONSTRUCTION SPECIFICATION FOR REMOVAL

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

Select Subgrade Material, Compacted

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

CONSTRUCTION SPECIFICATION FOR REMOVAL

Maine Turnpike Authority

Revision No. 8. April Engineering and Construction Services Division Standard Specifications for Road Works. TS No. All TS specifications

Maine Turnpike Authority

Minimum Sample and Test Requirements (MSTR)

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

Maine Turnpike Authority

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

Include the appropriate special provisions as required.

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

Significant Changes. 101 Definitions and Terms. 102 Bidding Requirements and Conditions 105 Control of Work

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation

RESIDENT ENGINEER S MANUAL 2014 SPECIFICATIONS ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSTRUCTION DIVISION

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings

Appendix I. Cost Estimate Tables

Maintains the status quo even though deteriorated. To keep at original condition or use.

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

Include the appropriate special provisions as required.

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs)

Provincial Highways Management. Ministry of Transportation PRODUCTION RATES. Contract Management Office Estimating Section

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CORPORATION OF THE TOWN OF WHITBY


SECTION MEASUREMENT AND PAYMENT

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

INDEX A Abbreviations... 2 Acceptability of materials and work Acceptance, final Access to the work... 35, 66, 91 Accommodations for publi

I2-0 LIST OF ACTIVE SSDs

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

CITY OF GUELPH CONTRACT NO SUPPLEMENTAL SPECIAL PROVISIONS

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration

CONSTRUCTION SPECIFICATION FOR ENERGY ATTENUATORS

Construction Specification for General Excavation

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

MAY 11, 2017 T-MC-107A & T-MC-107B1

ADDENDUM #2 - MARCH 16, 2012 CONTRACT ENG FAIRBANK LAKE ROAD (M.R.4) IMPROVEMENTS Hwy 17W to C Johnson Rd

Maine Turnpike Authority

CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

South Dakota Department of Transportation Average Unit Prices from Low Bids

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

Section 403. DRAINAGE STRUCTURES

Transcription:

OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006 127 Schedule of Rental Rates for Construction Equipment Including Model and Specification Reference APR 2006 128 Supply of Pre-Qualified Material and Products NOV 2005 180 Management of Excess Material NOV 2000 182 Environmental Protection for Construction in Waterbodies and on Waterbody Banks DIVISION 2 GENERAL GRADING NOV 2003 201 Clearing, Close Cut Clearing, Grubbing, and Removal of Surface and Piled Boulders NOV 2000 206 Grading NOV 2004 209 Embankments Over Swamps NOV 2004 212 Borrow DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) NOV 2003 301 Restoring Unpaved Roadway Surfaces APR 99 302 Priming Granular Base NOV 2006 304 Single and Double Surface Treatment NOV 2004 305 Granular Sealing JULY 90 307 Stockpiling of Patching Materials NOV 2006 309 Cold Mixed, Cold Laid, Open and Dense Graded Bituminous Mix NOV 2004 310 Hot Mix Asphalt APR 2004 311 Asphalt Sidewalk, Driveway, and Boulevard and for Sidewalk Resurfacing November 2006 Page 1

APR 2004 312 Asphalt Curb and Gutter Systems NOV 2002 313 Hot Mix Asphalt - End Result NOV 2004 314 Untreated Granular, Subbase, Base, Surface, Shoulder, and Stockpiling NOV 2005 316 Extruded Expanded Polystyrene Frost Heave Treatment NOV 2003 320 Open Graded Drainage Layer MAY 94 330 In-Place Full Depth Reclamation of Bituminous Pavement and Underlying Granular NOV 2003 331 Full Depth Reclamation with Expanded Asphalt Stabilization APR 2004 332 Hot In-Place Recycling and Hot In-Place Recycling with Integral Overlay NOV 2003 333 Cold In-Place Recycling NOV 2000 334 Cold Recycled Mix NOV 2005 335 Cold In-Place Recycling With Expanded Asphalt NOV 2005 336 Micro-Surfacing APR 99 337 Slurry Seal NOV 2004 341 Routing and Sealing Cracks in Hot Mix Asphalt Pavement MAR 98 350 Concrete Pavement and Concrete Base NOV 2005 351 Concrete Sidewalk NOV 2000 352 Concrete Steps NOV 2006 353 Concrete Curb and Gutter Systems NOV 2006 355 Installation of Interlocking Concrete Pavers MAR 95 360 Full Depth Repair of Concrete Pavement or Concrete Base NOV 2005 361 Rubblizing Concrete Pavement and Concrete Base MAR 98 362 Fast Track Full Depth Repairs to Concrete Pavement SEPT 96 364 Partial Depth Repairs in Concrete Pavement NOV 2003 369 Sealing or Resealing of Joints and Cracks in Concrete Pavement and Concrete Base November 2006 Page 2

DIVISION 4 DRAINAGE AND TUNNELS NOV 2005 405 Pipe Subdrains NOV 2004 407 Maintenance Hole, Catch Basin, Ditch Inlet and Valve Chamber Installation NOV 2004 408 Adjusting or Rebuilding Maintenance Holes, Catch Basins, Ditch Inlets, and Valve Chambers NOV 2005 409 Closed Circuit Television Inspection of Pipelines NOV 2006 410 Pipe Sewer Installation in Open Cut NOV 2004 412 Sewage Forcemain Installation In Open Cut NOV 2006 413 Manure Pipeline Installation in Open Cut NOV 2003 415 Pipeline and Utility Installation by Tunnelling NOV 2003 416 Pipeline and Utility Installation by Jacking & Boring APR 99 421 Pipe Culvert Installation in Open Cut APR 2004 422 Precast Reinforced Concrete Box Culverts and Box Sewers in Open Cut NOV 2002 450 Pipeline and Utility Installation in Soil By Horizontal Directional Drilling NOV 2006 460 Pipeline Rehabilitation by Cured-in-Place Pipe NOV 2005 462 Cement Mortar Lining of Watermains NOV 2004 463 Pipeline and Conduit Installation by Pipe Bursting DIVISION 5 MISCELLANEOUS NOV 2005 501 Compacting NOV 2005 503 Site Preparation for Pipelines, Utilities, and Associated Structures NOV 2005 504 Preservation, Protection, and Reconstruction of Existing Facilities NOV 2005 506 Dust Suppressants NOV 2005 507 Site Restoration Following Installation of Pipelines, Utilities, and Associated Structures NOV 2006 510 Removal NOV 2004 511 Rip-Rap, Rock Protection, and Granular Sheeting NOV 2004 512 Installation of Gabions November 2006 Page 3

NOV 2005 514 Trenching, Backfilling, and Compacting NOV 2005 515 Rock Excavation for Pipelines, Utilities, and Associated Structures in Open Cut NOV 2005 516 Excavating, Backfilling, and Compacting for Maintenance Holes, Catch Basins, Ditch Inlets, and Valve Chambers NOV 2005 517 Dewatering of Pipeline, Utility, and Associated Structure Excavation NOV 2006 518 Control of Water from Dewatering Operations DEC 90 530 Winter Sanding and Salting DEC 90 531 Treatment and Stockpiling of Screened Sand for Winter Sanding JUNE 91 532 Pavement Marking NOV 2005 538 Support Systems NOV 2003 539 Temporary Protection Systems NOV 2006 540 Standard Highway Fence NOV 2005 541 Chain-Link Fence NOV 2006 542 Expanded Metal Anti-Glare Screen DEC 90 543 Traffic Control Signing NOV 2005 547 QuadGuard System NOV 2005 548 TRACC System NOV 2005 549 TAU II System NOV 2006 550 Inertial Module System NOV 2001 551 Steel Box Beam Barrier NOV 2002 552 Steel Beam Guide Rail and Cable Guide Rail FEB 91 553 Concrete Barriers NOV 89 554 Guide Rail Energy Absorbing Terminals APR 2003 555 Guide Rail End Treatment - Eccentric Loader JULY 91 556 Connecticut Impact Attenuation System JULY 92 557 Trend End Treatment November 2006 Page 4

APR 2003 558 Crash-Cushion Attenuating System NOV 2006 559 Guide Rail End Treatment - Extruder Terminal System APR 88 565 Protection of Trees AUG 90 570 Topsoil NOV 2001 571 Sodding NOV 2003 572 Seed and Cover NOV 2006 577 Temporary Erosion and Sediment Control Measures DIVISION 6 ELECTRICAL NOV 2004 601 Electrical Work - General MAR 93 602 The Installation of Electrical Chambers MAR 93 603 The Installation of Ducts NOV 2004 604 Cable Installation APR 2003 609 Grounding NOV 2006 610 Removal of Electrical Equipment and Materials NOV 2002 611 The Installation of Underpass Luminaires SEPT 84 614 The Installation of Power Supply Equipment NOV 2006 615 Pole Erection NOV 2001 616 Footings and Pads for Electrical Equipment NOV 2005 617 Installation of Roadway Luminaires SEPT 84 620 Traffic Signal Equipment SEPT 84 621 Electrical Traffic Control Devices SEPT 93 622 The Installation of Traffic Signal Controllers JAN 90 623 Traffic Actuation Equipment SEPT 84 624 Traffic Signal Interconnection Equipment NOV 2005 630 Installation of Sectional Steel High Mast Lighting Poles APR 2004 631 Concrete Footings - High Mast Lighting Poles November 2006 Page 5

DIVISION 7 WATERMAINS NOV 2006 701 Watermain Installation in Open Cut NOV 2000 702 Cathodic Protection of Watermains and Fittings DIVISION 8 UNASSIGNED CURRENTLY NO S DIVISION 9 STRUCTURAL NOV 2002 902 Excavating and Backfilling - Structures NOV 2002 903 Deep Foundations JAN 95 904 Concrete Structures NOV 2006 905 Steel Reinforcement for Concrete NOV 2004 906 Structural Steel for Bridges NOV 2006 907 Structural Wood Systems MAR 98 908 Metal Traffic Barriers and Metal Railings for Structures FEB 93 909 Prestressed Concrete - Precast Members NOV 2005 910 Stressing Systems for Post-Tensioning NOV 2004 911 Coating Structural Steel Systems NOV 2006 913 Embedded Work in Structures for Electrical Systems MAR 98 914 Waterproofing Bridge Decks with Hot Applied Asphalt Membrane NOV 2005 915 Sign Support Structures MAR 98 918 Modular Bridge Structures for Temporary Installations JAN 95 919 Formwork and Falsework NOV 2005 920 Deck Joint Assemblies, Preformed Seals, Joint Fillers, Joint Seals, Joint Sealing Compounds, and Waterstops - Structures NOV 2003 922 The Installation of Bearings NOV 2006 928 Structure Rehabilitation - Concrete Removal November 2006 Page 6

MAY 94 929 Abrasive Blast Cleaning - Concrete Construction MAY 94 930 Structure Rehabilitation - Concrete Patches and Overlays MAY 94 931 Structure Rehabilitation - Shotcrete MAR 98 932 Crack Repair - Concrete MAR 98 935 Cathodic Protection APR 2004 942 Prestressed Soil and Rock Anchors November 2006 Page 7