Using a Programmatic Agreement as a Bridge to the Future: Streamlining Historic Review Clearance for Hundreds of Wooden Trestle Bridges Presenters:

Similar documents
NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM

Appendix C: Port Jervis Line Capacity Improvements Analysis. Technical Memorandum 2: Passing Siding Alternative

CSX BRIDGE OVER TENNESSEE RIVER SLOUGH NEAR BRIDGEPORT, ALABAMA BRIDGE REPLACEMENT AND TRACK IMPROVEMENTS. Introduction

UPDATED 04 OCT 07. Following are sample questionnaires to be used to collect information from owners of affected facilities.

New Haven-Hartford-Springfield High-Speed Intercity Passenger Rail Project

3.4 HISTORIC, ARCHEOLOGICAL, AND CULTURAL RESOURCES

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

Silviculture Exemption Update

2.0 Purpose. 3.0 Work Plan. Page 1 of 7

White Paper April 23, 2018

FINAL ENVIRONMENTAL IMPACT STATEMENT/RECORD OF DECISION AND SECTION 4(F) EVALUATION

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

Maintaining Environmental Compliance during a Natural Disaster: CSX Transportation s Emergency Response to the Historic South Carolina Flooding

Distribution Restriction Statement Approved for public release; distribution is unlimited.

US Army Corps of Engineers

Norfolk Southern s Online Rebuild of the Coosa River Bridge

Raritan River Bridge Replacement. Public Information Session September 2016

Definitions 3/3/2010. Choosing the Select: The Results of the Indiana Historic Bridge Inventory. Road School 2010

Notice of Proposed Draft Program Comment to Exempt Effects. of Transportation-Related Undertakings within Rail Rightsof-Way.

WELCOME The Walk Bridge Project CTDOT Project No

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Ports and Waterways: Lifeline for U.S. Agriculture

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

BRIDGING GLOBAL TRADE

Composite Highway Bridge Design

U.S. Army Corps of Engineers Water Resources Regulatory Program: Emergency Stream Restoration

Safe, innovative, quality construction since Riding on the Strength

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Widening the Harrods Creek Arch Bridge

Conceptual Design Report

SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation

Community of Interest Railroad-DOT Mitigation Strategies (R16) Webinar. September 27, 2016

The National Gateway Preparing for Tomorrow Lisa Mancini, VP Strategic Infrastructure Initiatives

TIMBER BRIDGES AND 286 LOADING

1.0 Introduction. The USACE Fort Worth District s goals for the REIS are to:

Guidelines for Preparing a Compensatory Mitigation Plan

DESIGN AND FLOAT-IN CONSTRUCTION OF A 500 FT. TRUSS SPAN

IRWA Railroad Symposium

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

BRIDGIT: User-Friendly Approach to Bridge Management

Opportunities for Accelerating FTA Project Development Post MAP-21

Texas Pacifico Transportation South Orient Rail-line Infrastructure Assessment

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10

TRI SAGE CONSULTING Monthly Report Carson Truckee Water Conservancy District

Scott Neubauer. Bridge Maintenance and Inspection Engineer Office of Bridges and Structures Iowa DOT

PRECONSTRUCTION BACKGROUND VIBRATION MONITORING SUMMARY REPORT

21 ST CENTURY CRANE ACCESS TRESTLE

Design and Permitting

PROGRAMMATIC AGREEMENT

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Chapter 5 BRIDGING 38 BRIDGING

Feasibility Assessment Study

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE

MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY

UP-West Line Background & Project Development Process

TEXAS FREIGHT MOBILITY PLAN: DRAFT KEY POLICY RECOMMENDATIONS

Contract Administration Section

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota

Austin Avenue Bridges Project Walking Tour Agenda

Guideline for Bridge Safety Management February 2012

Portland District Regulatory Branch Permit Streamlining for Restoration Projects

Oregon International Port of Coos Bay Rail Reactivation Services Parklake Drive NE, Suite Central Avenue, Suite 300 PO Box 1215

Georgia Department of Transportation Railroad Coordination Submission Checklist

2012 MdQI Conference Quality Transportation- A Hybrid Approach. MDTA Facility Inspection Program- An Inside Look. Ryan C. Nolan Lillian Sidrak

Draft. WHEREAS, the MDT participated in the consultation and has been invited to concur in this Programmatic Agreement; and

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Restoration Environmental Assessment. Appendix B

Oregon Rail Study Appendix B Oregon Rail Bridge Assessments, Report of Study Findings

Construction of the Salt River Bridge and Mitigation of Unforeseen Subsurface Conditions

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 7

Generating Railroad Bridge Features. Judah Lyman FRA Derald Dudley RITA April 12, 2010

Final Quiet Zone Work Plan

USACE Regulatory Program: Uncertainty in Permit Decisions - Challenges & Strategies

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

Economic Perspective PACIFIC RIM TRADE

Engineered Wood Products for Transportation Structures-An Overview of the Obstacles and Opportunities

Report on. Texas Bridges. as of September Prepared by the Bridge Division Texas Department of Transportation

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

Public Works Project of the Year Award Nomination Supporting Data Page 1

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

U.S. House Subcommittee on Energy and Power. Discussion Drafts Addressing Hydropower Regulatory Modernization and FERC Process

SUBJECT: PL Waitsburg Levee Emergency Rehabilitation Project: Walla Walla County, WA

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

SOUTHEAST TEXAS CONTINUING EDUCATION BRIDGE INSPECTION, MAINTENANCE AND REPAIR

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE

Sandpoint Junction Connector

Public Meeting. Draft Environmental Impact Statement (EIS) and Section 106 Consultation. Preferred Alternative Selection November 29, 2018

Record of Professional Development Hours

Upper Monongahela River Association, Inc. P.O. Box 519 Granville, WV

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

Alluvial Fans 150 Years of Flood Control, Urbanization, and Politics in Los Angeles

Civil Engineering Courses

State Level Historic Documentation Report. Poca Truss Bridge Roane County

Coordinating with Freight Railroads

Summary of Critical Findings Reviews for the National Bridge Inspection Program

Major Capital Improvements

Transcription:

Using a Programmatic Agreement as a Bridge to the Future: Streamlining Historic Review Clearance for Hundreds of Wooden Trestle Bridges Presenters: Raghu Chatrathi, CSX Transportation Marty Marchaterre, Amec Foster Wheeler 1 1

Maintaining Wooden Trestle Bridges All Class I railroads perform routine repair and replacement of wooden trestle bridges for continued safe operations Many railroad bridges are over 50 years of age U.S. Army Corps of Engineering (USACE) permitting process triggers historic review Section 404 of Clean Water Act Section 10 of the Rivers and Harbors Act Consider project impacts on historic resources 2

Issues with Current Historic Review Process Review of bridges on project-by-project basis Number of planned repair and replacement projects Delays and scheduling uncertainty USACE approval for one nationwide permit took over a year CSX plans to repair or replace numerous bridges in Georgia alone over the next few years, and cannot be successful if this timeline is maintained 3

What is a Historic Bridge? What comes to mind first for a historic railroad bridge? We agree these types of construction/design are unique! 4

Wooden Trestle Bridges? But are these? Hundreds or thousands of these types of bridges can be found on CSX rail system. 5

Wooden Trestle Bridges as Historic Resources Wooden trestle bridges can be historic resources Not unique in design - a reason to argue not historic May have been repaired with non-original materials Historic as contributing elements of historic railroad corridors Most GA railroad corridors considered historic Replacement considered an adverse effect Mitigation required - archival / photographic documentation 6

Alternative for Standard Historic Review Process Challenge: Streamline Historic Review Process At the urging of regulatory agency, CSX initiated discussions with USACE and GA State Historic Preservation Office (SHPO) All parties expressed need to improve process Agencies suggest that a Programmatic Agreement is the way to proceed to streamline the historic review process 7

Programmatic Agreement Programmatic Agreement (PA) streamline review process and still appropriately consider historic resources PA development often lengthy process multiple years Due to collaborative effort and support of all parties, timeframe significantly shortened Final version had to be reviewed and approved by senior management of reviewing agencies and CSX Legal Draft to signature in a few months 8

Programmatic Agreement Covers CSX wooden trestle bridges in Georgia Over 200 bridges More than 50 years old Main structural not previously altered with modern construction materials Includes: Single span or multiple span Open or closed deck Wooden or masonry end bents Pilings of wood, steel, or concrete Wooden stretchers Transverse members (lintels) of wood, steel, or concrete 9

Three Conditions of Programmatic Agreement 1. Update State Railroad Industry History related to CSX system that operates in Georgia Reasonable level of effort Discuss former railways that have merged or been acquired to form current CSX rail system in Georgia: Air Line Railroad Atlantic Coast Line Georgia Railroad Louisville & Nashville Railroad Nashville, Chattanooga & St Louis Seaboard Air Line Seaboard Coast Line 10

Conditions of Programmatic Agreement (continued) Archival documentation Information on railroad bridge technology - standard drawings History of former railways Maps historic railroad maps, Valuation (Val) maps 11

Conditions of Programmatic Agreement (continued) 2. Compile wooden trestle bridge inventory Location Type (deck, superstructure) Length Number of spans Construction date Former railway line Use inventory to identify representative sample Negotiate representative sample Select bridges on former railway lines Identify bridges with open and ballasted deck type 12

Conditions of Programmatic Agreement (continued) 3. Photographic documentation of representative sample (i.e. varying bridge/construction types) Basic site information name, milepost, short description, location maps Digital photographs no large format prints Photo log USACE and SHPO review Once accepted, no further historic reviews necessary for any CSX wooden trestle bridges in Georgia 13

Interim Historic Review Process While PA conditions being implemented: Interim historic review process Used even while waiting for final PA signatures No archival research on individual bridge or full report necessary Photodocumentation only Still required agency review 14

Benefits of Programmatic Agreement Once conditions of PA have been completed and approved by reviewing agencies, no further historic reviews necessary Applies to all CSX wooden trestle bridges in Georgia Streamlined historic review in the short- and long-term Upfront costs to CSX Bridge Department but significant cost savings for the Company over time Most importantly, certainty and time savings for future bridge project permitting (i.e. expedite permit approvals) 15

Future Benefits of Programmatic Agreement After demonstration of success, CSX plans to take the PA approach on the road to other SHPOs in which they operate Open discussions about wooden trestle bridges in other states What other permit requirements for rail construction and infrastructure can be streamlined by entering into PAs with other agencies? 16

17