Mining and Our Natural Resources

Similar documents
Regulatory and Permitting. for Metallic Mining in Minnesota

Poly Met Mining, Inc. Antidegradation Review - Preliminary Determination for 401 Certification

Essar Steel Minnesota L.L.C. Supplement to Environmental Impact Statement (SEIS) Preparation Notice

2.1 INTRODUCTION 2.0 EIS DEVELOPMENT

Public Notice (33 USCS 1344, 33 CFR 325.3) for the PolyMet Mining Corp. NorthMet Project

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

Regulation of Mines In South Florida

Permitting and Environmental Review

Public Notice of Application for Permit

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Minnesota Wetland Conservation Act Notice of Decision Permit to Mine

DRAFT SPECIAL CONDITIONS

PROTECTING GROUNDWATER IN MINING AREAS. MME Workshop Duluth 2015 Bruce Olsen

Public Notice ISSUED: 13 NOV 2015 EXPIRES: 14 DEC 2015

Stibnite Gold Project. Environmental Impact Statement (EIS)

Department of the Army; Corps of Engineers

Iron Mining In the Lake Superior Basin

WETLAND MITIGATION IN MINNESOTA: One Nonprofit's Perspective

GREENS CREEK MINE FINANCIAL ASSURANCE REVIEW

Public Notice.

Mesabi Nugget Phase II Project. Draft Scoping Decision Document

University of MN-Duluth Center for Ethics and Public Policy Copper & Nickel Mining in Minnesota April 9, 2013

1.2 SELECTION OF APPROPRIATE ENVIRONMENTAL REVIEW DOCUMENT

7.0 COMPARISON OF ALTERNATIVES AND OTHER NEPA CONSIDERATIONS

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

Base Metal and Iron Ore Mining

U. S. Steel Keetac Expansion Project. Draft Scoping Decision Document

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. St. Francis Wastewater Treatment Facility Project Description

SOUTH ST. LOUIS SOIL AND WATER CONSERVATION DISTRICT FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act Application

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

Mn/DOT Outstate District SWPPP

Before we get to the E&SC

1) Permitting process doesn t guarantee a Yes. 3) Many permits from many agencies are required. 4) Financial assurance ($) is required

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

Public Notice of Application for Permit

Environmental Assessment for Stillwater Mining Company s Benbow Exploration Portal and Support Facilities Plan of Operations for Mineral Exploration

Public Notice ISSUED: 13 May 2014 EXPIRES: 12 June 2014

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

Mining Impacts. Metal Recycling. Reading Today: Ch. 12 pp , also Ch. 16 pp Wed: Ch. 13

Metal Recycling. Mining Impacts. Recycling of other mineral resources. Hazardous Work

THE CORPS REGULATORY AUTHORITY

IC Chapter 19. Abandoned Mines

Public Notice.

Ohio Environmental Protection Agency (Ohio EPA) Fact Sheet For. National Pollutant Discharge Elimination System (NPDES)

Public Notice ISSUED: 22-JAN-2014 EXPIRES: 6-FEB-2014

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

JOINT PUBLIC NOTICE. December 18, 2017

Reclamation, Closure and Postclosure Plan

FILLMORE COUNTY FEEDLOT ORDINANCE

SITING OF ENERGY FACILITIES IN OREGON EFSC Standards in Oregon Administrative Rule

GRADING, EROSION AND SEDIMENTATION CONTROL

Responsible Mining in the Lake Superior Basin Dec. 2013

Environmental Impact Assessment (EIA)

Public Notice of Application for Permit

Public Notice of Application for Permit

Public Notice.

Public Comment Period for Draft Environmental Impact Statement

FINDINGS OF FACT FACILITY HISTORY

Analysis of the City and Borough of Juneau Mining Ordinance. CBJ ; CBJ ; and October 12, 2017

NorthMet Project. Adaptive Water Management Plan

DIRECTIONS FOR USE OF SUITABLE PORTIONS OF THE SOLID WASTE STREAM FOR LAND RESTORATION/RECLAMATION PROJECTS

General Permit No.: OHR Page 53 of 146

Senator Carrie Ruud, Chair Senator Chis Eaton, Ranking Minority Member Environment and Natural Resources Policy and Legacy Finance Committee

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

Chapter 113A. Pollution Control and Environment. 113A-1. Title. 113A-2. Purposes. 113A-3. Declaration of State environmental policy.

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

Public Notice ISSUED: December 11, 2018 EXPIRES: January 10, 2019

RCRA, Superfund & EPCRA Call Center Training Module

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Model Riparian Buffer Ordinance.

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below.

Public Notice of Application for Permit

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

JOINT PUBLIC NOTICE October 24, 2016

Operating and Reclamation Plan

GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

JOINT PUBLIC NOTICE December 16, 2013

Section 3. Plan Submittal/Review Requirements

JOINT PUBLIC NOTICE May 11, 2015

Public Notice: Application for Permit

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVE NEW ORLEANS LA PUBLIC NOTICE

Hurdles to Mining Abandoned Mine Lands

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018

Transcription:

Mining and Our Natural Resources February 28, 2008 Jennifer Engstrom Division of Lands and Minerals MN Department of Natural Resources

Overview Brief overview of environmental review Permit to Mine for ferrous operations Permit to Mine for non-ferrous operations Laboratory research by Division of Lands and Minerals Current example of non-ferrous proposal

Environmental Review The Minnesota Environmental Policy Act (MEPA) requires that an environmental impact statement (EIS) be conducted for all new mining operations. DNR is usually the Responsible Government Unit (RGU) Can also involve federal government depending on specific conditions at the site (land ownership, wetlands, etc)

What Environmental Review Does Helps decision makers understand the environmental and socioeconomic impacts of a proposed project Takes a hard look at the project for potentially significant impacts using the best available data Explores ways to avoid, minimize, or mitigate potential environmental impacts through alternate designs, technologies, and practices

What Environmental Review Does Gives the public early access to decisions makers with multiple opportunities for public input Public notice during scoping Public notice of draft environmental impact statement (EIS) Public notice of final EIS Two public meetings (during scoping and for draft EIS) Prohibits issuance of final permits until environmental review process is complete

What Environmental Review Does Not Do Approve or disapprove a proposed project Guarantee that permits can be issued Analyze every conceivable impact Answer every question

Permitting MN Pollution Control Agency National Pollution Discharge Elimination System / State Discharge System Permit ( Water Quality Permit ) Permit authorizing the treatment and disposal of wastewaters, including mine dewatering, process wastewater, stockpile drainage, sewage, and storm water Air Emission Permit ( Air Quality Permit ) Permit authorizing construction, modification, and/or operation of an air emission facility Other Permits (selected) Liquid Storage Tank Permit Solid Waste Facility (Landfill) Permit Hazardous Waste Generator License

Permitting MN DNR Division of Waters Water Appropriation Permit conserve and utilize the water resources of the state in the public interest Public Waters Permit minimize adverse environmental effects, preserve water resources, and provide for future water use Dam Safety Permit ensure safe construction of tailing basin dams

Permitting MN DNR Division of Lands and Minerals Permit to Mine taconite (iron ore), non-ferrous, peat control adverse environmental effects of mining and provide for reclamation and good mining practices Wetland Replacement Plan no net loss

Minnesota Statute RECLAMATION OF LANDS 93.44 DECLARATION OF POLICY In recognition of the effects of mining upon the environment, it is hereby declared to be the policy of this state to provide for the reclamation of certain lands hereafter subjected to the mining of metallic minerals or peat where such reclamation is necessary, both in the interest of the general welfare and as an exercise of the police power of the state, to control possible adverse environmental effects of mining, to preserve the natural resources, and to encourage the planning of future land utilization, while at the same time promoting the orderly development of mining, the encouragement of good mining practices, and the recognition and identification of the beneficial aspects of mining.

Permit to Mine Taconite and Iron Ore Permit to Mine application Corporation organizational data and certificates Environmental setting maps Environmental setting analysis Mining and reclamation maps Mining and reclamation plans Performance bonds (financial assurance)

Permit to Mine Taconite and Iron Ore Examples of components in application Geology and location of ore body Forest and soil inventories Management of runoff Stockpile design and siting In pit disposal Tailings basin design and operation plans (not an all inclusive list)

Permit to Mine Taconite and Iron Ore When application deemed complete, advertised in legal newspaper Noticed for 4 weeks, once per week Comment period is 30 days after last publication Written objection is cause for evaluating need for hearing If no objections, decision to grant, deny, or request more information made by commissioner

Permit to Mine Non-Ferrous Rules promulgated in early 1990 s Have not been implemented yet Similar components as with taconite operations Important differences in financial assurance and waste characterization

Financial Assurance Subpart 1. Purpose. The purpose of financial assurance is to ensure that there is a source of funds to be used by the commissioner if the permittee fails to perform: A. reclamation activities including closure and postclosure maintenance needed if operations cease; and B. corrective action as required by the commissioner if noncompliance with design and operating criteria in the permit to mine occurs. Ch. 6132.1200

Required Components of Financial Assurance Contingency reclamation plan Plan to reclaim the site if operations cease within the first year Based on third party costs Updated annually based on size of project each year Becomes therefore the plan to close and financially assure the site at any point in time Corrective action plan, if needed If non-compliance with approved design and operating criteria

What is being reclaimed? Open pits Waste rock and surface material stockpiles Tailings basins Buildings and equipment Infrastructure no longer needed for any other use Revegetation of disturbed ground Wetlands by restoration, reclamation, or replacement (not an all-inclusive list)

What is the period of time covered by the assurance? Will vary based on the operation Will be long enough to cover time until All reclamation activities have been completed Conditions necessitating postclosure maintenance no longer exist Corrective actions (if any) have been completed

Copper/Nickel Mining in Sulfide-Bearing Rocks Poses some environmental challenges that must be dealt with carefully Diligent evaluation during ER and permitting Permit projects that comply with rules Reduce impacts, mitigate unavoidable impacts, ensure that area is left in a condition to protect natural resources & minimize need for maintenance

Waste Characterization Combination of laboratory testing, modeling, and prediction to evaluate potential impact of operation Lands and Minerals has been conducting research on sulfur containing rocks for 30 years Anticipation of mining in the Duluth Complex (DC) rock in Minnesota

DNR DC Prediction Research AMAX 6 field test piles SKI 23 rocks Project Part Size Tailings PRI 6 size fractions 1 sample 10 rocks 1977 1983 1989 1995 2001 2007 Other rock types have also been tested.

Waste Characterization In the lab and in the field

Waste Characterization 9 7 Drainage ph 0.18 %S 6 0.58 %S 1.44 %S 3 0 4 8 12 16 Years Minimum drainage ph 6 5 4 laboratory field Compare results in lab and field Also use lab rates to predict and model water quality of proposed operation 3 0.0 0.5 1.0 1.5 2.0 Sulfur content (%S)

Proposed Copper/Nickel Mine -- PolyMet A joint state and federal EIS is being drafted MN DNR and US Army Corps of Engineers (USACE) are lead agencies MN DNR is RGU (regulatory governmental unit) US Forest Service is a cooperating agency Two tribes have formally requested cooperating agency status through the USACE MN DNR has hired consultant to provide specific expertise and EIS drafting services

Summary System in place to conduct environmental review Series of permits in rule to regulate both ferrous and non-ferrous mines More recent developments in copper/nickel deposits calling into action State s knowledge of unique components of this type of mining