The five steps to running a successful Solid Recovered Fuel (SRF) plant

Similar documents
1 EXECUTIVE SUMMARY: WR 0608 EMISSIONS FROM WASTE MANAGEMENT PROCESSES

NG BAILEY CREATING EXCEPTIONAL ENVIRONMENTS FACILITIES SERVICES

Reducing the Cost of Waste Shredding. A short guide for waste contractors to improve the revenues of the waste shredding business.

Appraisal for options of solid recovered fuel (SRF) utilisation within. the UK

STANDARDISATION OF SRF. Basic information for producers and users of SRF, public authorities and other stakeholders

BPIF SPECIALIST SERVICES PROCESS IMPROVEMENT

TYRANNOSAURUS. State of the Art in Waste to Energy Processing

Waste Pre-Shredders from Metso Recycling M&J Eta PreShred Stationary

5th CAE Annual Conference

Waste Pre-Shredders from Metso Waste Recycling M&J PreShred Stationary

HOW TO IDENTIFY WHEN YOUR ERP SYSTEM IS MIS-FIRING & W H A T T O D O A B O U T I T

Idhammar MMS The Business Case

The for. uest uality. How do British manufacturers approach quality and what does this mean for customers?

Impact of Agile on Change Management

White Paper. Transforming Contact Centres using Simulation-based Scenario Modelling

SYSTEM SOLUTIONS SOLID RECOVERED FUELS TURN THE HEAT UP.

IDENTIFY HOW THE OUTCOMES CAN BE DELIVERED SUSTAINABLY STAGE 3. Sport England: Guide to Research

The EDEM BulkSim Solution:

Spare Parts Optimisation in Maintenance Improvement

Vantage Cost Reduction

Cintra iq Implementation Methodology (C.I.M) Document for public distribution

ENERGY-WASTE - Energy exploitation of non-recyclable urban waste in a sustainable waste-to-energy market LIFE09 ENV/GR/000307

LANDMARKS OF IMPLEMENTING LEAN MANAGEMENT IN PUBLIC SERVICES

TYRANNOSAURUS Process. SRF Fuel for Cement Kilns

Enterprise MRO Services PRESENTED BY:

Overall Equipment Efficiency (OEE)

CIRRUS LOGISTICS WHITE PAPER How to save millions on your demurrage bill

Institutional Structures & Economics of Waste Management. Prof Adam Read Practice Director 7 th June 2016, Manila, Philippines

Technology Consulting Analytics solutions for manufacturing and industrial products

Introduction. The design challenge. Re-Engineering

P2 Performance Management September 2013 examination

Quantifiable Benefits Achieved by ISO 9001 Clients Certified by QMS International Results from 2016 Client Survey

OPTIMISING MARINE MAINTENANCE

CEWEP Country Report 2016

Entech Pollutec 2014 WASTE TO ENERGY BY TYRANNOSAURUS SOLUTIONS

Terms of Reference for Skills and Employability Associate Advisers

Delivering tomorrow s companies today. How global business services can transform your business. The COO perspective

National Commissioning Board. Leading Integrated and Collaborative Commissioning A Practice Guide

Options Appraisal for Repairs and Maintenance Services for Babergh and Mid Suffolk District Councils (MSDC)

The Case for the SIO. A guide to navigate the new challenges of Service Management. kpmg.ca

Standards for SRF what comes next?

Experience Customer Segments First hand

The process of evaluating an organization s resources and capabilities. Provides information on organization s assets, skills, and work activities.

Contract Management Part Two Identifying Opportunities

TYRANNOSAURUS SRF Production Process

Are You Being Ruined by Best Efforts: Does your Maintenance & Reliability Strategy Really Support Defect Elimination and Incident Avoidance?

Increasing the Quantity and Quality of Metals Recovered at Waste-to Energy Facilities

Strategic CSAT: Driving Strategic Outputs From Satisfaction Research

BUSINESS PLAN CEN/TC 366 MATERIALS OBTAINED FROM END-OF-LIFE TYRES (ELT) EXECUTIVE SUMMARY

Restructuring for Lower Costs and Greater Efficiency

Where We Are The Wiltshire Facility, Westbury, UK

POSITION DESCRIPTION BUSINESS ANALYST / TESTER

An Introduction to An Introduction to. BIRST Infor EAM

Competence Criteria for Licentiate (LCIBSE)

To 3PL or Not to 3PL:

Scheduling in Dynamic Environments

These IDGTE Guidance notes are intended to help applicants complete the EngTech Application Form.

Implementing an Employee Engagement Programme

The Plant Wellness Way: Enterprise Asset Management for World Class Plant Reliability

TYRANNOSAURUS SRF Production Process

Brochure. Aspen PIMS

EFQM FRAMEWORK FOR SUSTAINABILITY

Optimisation of Fuels from MBT Processes. 1 Drivers for the production of Waste Derived Fuels

Significant Service Contracts Framework

Hamm MW Pyrolysis Plant. Integrated Pyrolysis into Power Plant Plant capacity 100,000 t/a Pre-processed Waste Materials

Driving improved supply chain results Adapting to a changing global marketplace. The COO perspective

What is the optimal role of measures in strategy execution?

CIPS POSITIONS ON PRACTICE PURCHASING & SUPPLY MANAGEMENT: SUPPLY CHAIN MANAGEMENT

P2 Performance Management September 2012 examination

Management Science 2 ABI-301 Prelim Period Lecture Note#3. Introduction to Operations Management. 1 Page

Transformation in Royal Mail

Contents leading in loading

Maximize uptime with Metso Metrics. Data and expertise to directly improve your bottom line

THE BIG SHORT. but does your business have the skills to succeed in a new and changing market? Place a vacancy at brookstreet.co.

PUTTING THE i IN CRM. The benefits to the individual and the entire firm

LEADER. Develop remarkable leaders who deliver amazing results

A Presentation by, CPA John Nyamosi

Manufacturing Services

Procurement Business Partner. Service Manager Procurement Business Partnering. Grade: Type of position: Hours per Week: Full Time

Head of Registration Social Work England

White paper. Portland. Do More With Bpo End-To-End Category Management Delivers Sustainable Value. Sue Woodall

Product Inspection. Compliance Expertise Performance Uptime. Product Inspection Services Maximizing Productivity

Customer Service Excellence in the Public Sector Pauline Cochrane Head of Events & Partnerships

Head of Kent & Essex Estate Main purpose of the role: management of the joint Essex Status:

Asset Management Policy

Level 5. Nov Senior Assessor s Report. Advanced Diploma Purchasing and Supply. Operations Management in the Supply Chain L5-12

OPERATIONAL CASE STUDY February 2018 EXAM ANSWERS. Variant 2. The February 2018 exam can be viewed at

MKTG101. Marketing Fundamentals

Servicing All Makes and All Models of Equipment and Software

Head of Programmes and Performance Improvement

Leading Change is a young, dynamic consultancy focused on strategy execution.

Standard Costing and Variance Analysis

Birmingham Community Health and Wellbeing Consortium Members Meeting 24 th November 2011

Optimising asset management:

Optimising asset management:

Stock Optimisation: Making the warehouse an efficient service partner for the business

Candidate Pack - Business Analyst

Case Study: Children s Commissioning Consortium Cymru

Charta Porta Service Offerings for MPS

Head of HR Process Improvement. Pay Band. Duration of job

Transcription:

The five steps to running a successful Solid Recovered Fuel (SRF) plant By Marcus Brew, UNTHA UK Introduction Impending landfill diversion targets, the increasing depletion of fossil fuels and the need to improve the country s waste agenda, have all contributed to rising alternative fuel production rates in the UK. The manufacturing of Solid Recovered Fuels (SRF) for instance which can be burned for energy instead of coal, oil and gas represents an area of great potential. The environmental benefits that the UK can achieve from this type of Waste to Energy (WtE) process are numerous, and acknowledgement of these benefits is becoming ever-more widespread. But owners and operators of SRF plants cannot neglect the fact that, whilst supporting the UK s waste agenda, they are also creating a product to sell to customers such as power stations or cement kilns. These SRF customers need a precise and refined particle size, even more-so than RDF which in comparison tends to be a rougher shred with a less specific fraction requirement. The waste processing systems that recyclers invest in to create SRF should therefore be built and operated in the same way as any true production environment, if both the alternative fuel producer and end user are to reap the greatest possible return on investment. This white paper is designed to offer specialist insight and much-needed guidance for the best practice design and ongoing management of an efficient SRF plant, presented in a five-point plan. Drawing upon the principles of lean manufacturing this paper examines the ways to structure the SRF production system before considering the importance of input material, equipment and operators when creating a high quality fuel for the end user. Challenges do of course face SRF manufacturers but this advice-led resource explains that, when looking at the plant as a production system not just a recycling process, benefits such as maximum availability, uptime, throughput and return on investment can be achieved.

Step 1 Understanding the input material, product and market What is SRF? Solid Recovered Fuels (SRF) and Refuse Derived Fuels (RDF) are much-discussed topics within the WtE industry, but confusion often surrounds the difference between the two. In simplest terms, SRF is manufactured to a specification whereas RDF is not. The European Committee for Standardisation has now set out classes of SRF specification under document CEN/TS 15359. Drawn up with the assistance of waste experts and SRF users such as cement kiln operators, this is designed to provide an efficient method of trading SRF in the market place. Other standards relating to SRF are also available under CEN/TC 343. Not reaching this class 2 specification could have significant implications for SRF producers, especially as more manufacturers enter the market place. It will affect the attainable gate fee for the fuel, and also the number of customers the fuel can be sold to. At the same time, SRF remains a waste and to burn this waste, operators must comply with the stringent rules and regulations that other waste management companies abide by. This highlights even more-so, the importance of quality control mechanisms in the SRF production process. The changing SRF marketplace There are currently no plans for the Government to change the classification of SRF from a waste derived fuel to a product, as the priority is still for waste to be recycled rather than incinerated. Yet this does not mean that the WtE market will not expand. The ever-increasing price of oil for example, encourages energy companies to source alternative fuels. Hopefully as demand for SRF increases, the gate fee will begin to fall and the market will open up further, making Solid Recovered Fuels an affordable, beneficial and readily available energy source in the UK.

Furthermore cement producers are considering using SRF not only in precalciner burners (which account for approximately 60% of all fuels burnt at cement kilns), but also main rotary kilns. These will however require a much higher specification SRF. The input material (type and quality of waste) and end user SRF specification will significantly influence how much SRF an organisation can produce. Wet municipal solid waste (MSW) for instance will require most of the organics to be removed in order to meet moisture content specifications, whereas commercial and industrial (C&I) and demolition material will need a large percentage of inert material to removed to satisfy ash requirements. It is clearly evident that quality is the main driver during this entire process; therefore it should be considered and controlled at all stages. Understanding the manufacturing environment Even though SRF is not officially classified as a product it must still be treated as one there is an end user of this fuel with a stringent specification that needs to be satisfied. When considering the principles of Porter s (1985) value chain for instance: The primary activities of an SRF producer are input waste (inbound logistics), the SRF plant (operations), the fuel broker or end user (outbound logistics), the sale of the SRF product (marketing and sales) and the steps taken to liaise with the end user to ensure the SRF continually meets the necessary specification (service). It is clear that this is a true manufacturing scenario, so to achieve a maximum gross margin and gain the full benefit of the plant investment, an SRF business should follow the same routes to market as other production organisations.

Step 2 Considering SRF plant design and equipment to improve profits Lean manufacturing in SRF Having decided to manufacture SRF, decisions then have to be made as to the best way to deliver the fuel to the end user, at the right time and to the right quality specification. This is where the philosophy of lean manufacturing can really add value. Originally stemming from the automotive industry, lean manufacturing focuses on the reduction of system waste such as labour or machinery downtime, in order to improve efficiencies and diminish overall production costs. A focus on achieving a product of a certain quality at a certain time and at the most attractive possible price maintains satisfied customers, helps attract new business and develops employees. It is common to hear waste companies talk about employees not having the right skill set, but large manufacturers have the same pool of people to recruit from and they boast some of the best productivity figures in Europe, due to the implementation of intelligent systems. Intangible benefits of lean manufacturing: Safer work conditions Increased employee loyalty Increased customer satisfaction Reduced quality issues Tangible benefits of lean manufacturing: Increased productivity Inventory reduction Lead time reduction Reduced overheads Increased profits If an SRF manufacturer is to develop a lean strategy, then systems must be designed to impact both on the tangible and intangible benefits of the organisation. Otherwise improvements do not occur

and the new system will fail. The principles of lean manufacturing must also be constantly monitored by employees to deliver the best results. Considering the design of the SRF plant When considering the plant design most people will look firstly at the material that is available for SRF production. However this would be a mistake. The most successful plants are designed from the furthest point in the value chain backwards; this ensures that all costs that need to be attributed to the SRF production are considered, and guarantees that the right quality requirements have been met. Quality considerations will become even more important as the number of SRF manufacturers increases and the level of competition continues to rise end users will be able to be more selective in their choice of supplier. However manufacturers that have thought about their plant design and the future impacts that this will have on their SRF, will be in a much better position to react quickly. The SRF plant and lean manufacturing system is not something that should be designed quickly, because it stands to achieve long term gain if it is flexible enough to adapt to future market trends and demands.

Step 3 Applying TPM Total Preventative Maintenance systems Even if the lean philosophy is not adopted entirely, the easiest way to achieve tangible production improvements is by purchasing equipment and designing the plant with Total Preventative Maintenance (TPM) systems in mind. TPM should not be confused with Preventative Maintenance procedures, which are the minimum actions that are required to keep the plant operational. Typically these would be carried out by the equipment supplier at regular service intervals, which invariably leads to higher maintenance costs and downtime. Conversely with TPM, staff are trained and empowered to complete the tasks when they need to be actioned, which increases equipment uptime, and negates the need for the manufacturer to undertake all remedial work thus reducing the costs incurred by the SRF producer. Many SRF manufacturers only assess the direct maintenance costs of their equipment and do not factor in the associated costs linked to loss of availability, manpower and product throughput. Yet for every hour that the plant is stopped, the implications for the manufacturer magnify. However TPM encourages manufacturers to look at the design, requirements and performance of equipment as a whole, to better understand where failures are occurring and ensure this does not continually impact upon profits. Selecting SRF plant equipment Varied equipment will be required in order to operate the plant successfully. Extensive research and considered selection of the best-fit equipment will lead to reduced downtime, greater plant availability and less small stoppages due to insufficient resources.

It is important to consider if the infrastructure of the plant can support the SRF operation. The list of things to assess includes, but is not limited to: Buildings Electrical supply Plumbing Gas Amenities It is also important to select best-fit machinery that has been proven to excel in the complex and precise processing of waste for SRF. Operators will need to select the right: Primary and secondary shredders Trommels/screens Magnets Conveyors Near infra-red sorting equipment Air compressors Auxiliary kit will be required to operate alongside the machinery such as: Grabs/Shovels Transport equipment SRF manufacturers should also seek robust and hard-wearing tooling for use within the machinery including: Screens Cutters Belts Plus other tools such as: Small hand tools for maintenance and operation Spanners Air tools Ensuring the plant remains operational Once the equipment has been selected, it needs to be prioritised in terms of relevance to the overall SRF manufacturing process. The following questions should be asked: How much does the process rely on this equipment? Can the plant operate without it? Is this a primary or subsidiary piece of equipment? Once these questions have been answered, appropriate resources can then be allocated to ensure the equipment remains operational.

It is important that contingencies are put into place though, to provide the greatest level of plant flexibility possible. Manufacturers should ask: What will happen if the equipment breaks down? Can the process be easily outsources or modified? Can the process or equipment be substituted? Are replacement parts easily available and accessible locally? Are the skills to repair available locally? The equipment manufacturer should be able to supply answers to most of these questions, and is likely to be able to assist in the training of staff so that contingencies can be developed. If this insight and expertise cannot be provided, it should be questioned whether the correct supplier has in fact been selected.

Step 4 Measuring and driving improvements Considering the system and measuring investment success TPM can work for any company. If the principles of TPM have been considered and applied by an SRF manufacturer before, but they have been deemed to be unsuccessful, it is important to consider what could have been done differently. Sometimes for instance the plant may have been optimally designed, but the problems arise due to a lack of thought regarding the system and poor measurement of investment success. It is important to fully understand the equipment within the SRF plant. It is such a straightforward piece of advice but it is imperative that manuals are comprehensively read when the machines are first supplied. Over 90% of issues can be solved by understanding why the equipment has failed, and simple maintenance routines can avoid the incurrence of additional manufacturer costs. Greater knowledge of machine parts, wear rates and weak points will reduce the overall time that needs to be scheduled for maintenance, meaning decreased planned downtime. More efficient identification of failure causes and repair works will lower unplanned downtime also. This equates to increased plant productivity and reduced operating costs, plus heightened plant safety as operators system knowledge is stronger. It is important to collate and monitor system information on an ongoing basis once the SRF plant has been designed and built. This will ensure the optimum ongoing operation of the manufacturing process. The following data should be captured and analysed (as a minimum): Current availability Current uptime/ downtime Service history Product quality This information will become more detailed and valuable as trends and patterns start to appear from a longer-term data-rich period of time. However estimates can be made even in the earliest stages of SRF plant operations, so that the data can then be fed back into either a simple excel spreadsheet or more complex software package for analysis.

Management of the SRF plant To be a worthwhile exercise, system data should be utilised in a meaningful way once captured, and this responsibility tends to fall to middle and upper management. Recommendations described in earlier parts of this white paper will undoubtedly be better implemented by plant operators and engineers, but if the plant is not effectively managed and people are not held accountable if targets are missed, the system will ultimately fail. This means that KPI s (Key Performance Indicators) should be set by management to encourage the attainment of achievable results that lie in alignment with organisational budgets or other departmental targets. A helpful matrix within this field is that of Overall Equipment Effectiveness, known as OEE. This model alone could be extensively investigated and discussed, but in simple terms it provides a snapshot indication of plant performance and is used by many companies as the benchmark for equipment success. KPIs could include, for example: Throughput Quality Delivery schedules Operating costs Maintenance schedule Maintenance budget Example OEE calculation: 97.9% 90% 95% 83.7% Availability Performance Quality Overall Equipment Effectiveness

Step 5 Ask the question what next? TPM is very much a visual system that enables plant operators, engineers and management to clearly see, every day, what they and the plant are required to achieve. Large informative notice boards, check sheets and other media provide direction and an indication of whether targets are being achieved. TPM must be aligned with other business functions within the organisation, but for it to be truly successful it should be considered at the procurement stage with the involvement of all key stakeholders. These key pieces of advice will help to ensure the effective design, implementation and management of an SRF production plant s TPM system: Upper level management need to be in agreement from the start Upper level management need to appreciate the success that TPM brings to the company It must be acknowledged that TPM does not make more work, it reduces it Success depends upon planning and making the investment bring greater returns. Because of this, the system will need to be managed Visual management is a core component of TPM Early involvement of the wider team will encourage buy in The system must be resourced and budgeted effectively. To speak to a member of the UNTHA UK team for further information about the content of this white paper, or to request a case study or reference from an UNTHA UK client that has implemented these principles in their own SRF production plant, call 0845 450 5388 or email: sales@untha.co.uk

Author biography This white paper has been prepared by UNTHA UK s business development manager for waste & RDF/SRF applications, Marcus Brew. With a 20 year career working with technically complex capital equipment, Marcus has been involved in multi-million pound blue-chip engineering projects around the world. As a result his indepth knowledge of the production environment spans everything from waste management to the automotive industry and the fascinating world of aerospace. Now a recognised expert in shredding technologies for the Waste to Energy industry, Marcus has worked with some of the country s leading SRF and RDF operators. His insight into the value of production philosophies such as lean manufacturing means his unrivalled expertise is highly sought after in the current competitive WtE environment. His knowledge of the associated supply chain and the commercial environment means Marcus is also ideally placed to provide advice on financing, operations and cost reductions for both customers and system builders.