PINFISH COURT DRAINAGE IMPROVEMENTS

Similar documents
PHASE II PLANS 7/16/2018

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION CONTRACT PLANS FINANCIAL PROJECT ID (FEDERAL FUNDS) COLLIER COUNTY (03000) HARBOUR DRIVE

Black Creek Bridge Replacement FPN # USGS Topographic Quadrangle Map Clay County, Florida

A T L A N T I C O C E A N

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

TRANSPORTATION OFF SYSTEM POST PROJECT MAINTENANCE AGREEMENT BETWEEN FLORIDA DEPARTMENT OF TRANSPORTATION AND CITY OF NAPLES

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST


APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

SANBORN COUNTY

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES

UTILITY PLANS HANSON STREET EXTENSION PHASE I

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT

Dial or (800)

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

DOCUMENT ADDENDA AND MODIFICATIONS

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

SECTION PAYMENT PROCEDURES

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

LEE COUNTY BOARD OF COUNTY COMMISSIONERS PUBLIC WORKS ADMINISTRATION DEPARTMENT OF TRANSPORTATION CONTRACT PLANS PLANS OF PROPOSED

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION

SECTION 1 GENERAL NOTES

IMMOKALEE ROAD (CR-846) CHLORAMINE BOOSTER STATION RELIABILITY CONNECTION

Water Pollution Control for Work in Sensitive Areas

West Energy Sanitary Sewer in Columbia, SC State Project # H27-Z185-CP Prepared For. Chao & Associates, Inc.

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

MOBILIZATION CURB AND GUTTER, REM EXCAVATION, EARTH DR STRUCTURE, RECONST, CASE 1 AGGREGATE BASE, CONDITIONING COLD MILLING HMA SURFACE

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

SOIL TRACKING PREVENTION DEVICE TYPE A

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

SECTION TRENCHING

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

SECTION 1500 REMOVALS

SECTION MAINTENANCE OF EXISTING CONDITIONS

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

SECTION GENERAL EXCAVATION

November 29, CITY OF PLANT CITY Purchasing Division (813)

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

Please print or type.

COUNTY OF CHIPPEWA APPLICATION FOR UTILITY PERMIT on COUNTY HIGHWAY RIGHT OF WAY

FDOT REF. ITEM DESCRIPTION

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

GRADING, EROSION AND SEDIMENTATION CONTROL

SECTION MEASUREMENT AND PAYMENT

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION TRENCHING & BACKFILLING

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

ADVERTISEMENT SET DECEMBER 2013

BASE BID FORM FY 2015

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

NOTICE TO BIDDERS ADDENDUM NO. 2

3Bureau of Construction and Maintenance

STATE OF FLORIDA 10 DEPARTMENT OF TRANSPORTATION CONTRACT PLANS FINANCIAL PROJECT ID DUVAL COUNTY (72260) SR 105 / SR A1A


Project # Brown County PCN i40h Replace Section Line Road Culvert

The purpose of this addendum is to respond to RFI s submitted to the County and issue a revised SECTION BID FORM.

SECTION TRENCHING, BACKFILL AND COMPACTION

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

BID TAB CONTRACTOR GRAND TOTAL ENGINEER ESTIMATE $ 2,119, CIVIL CONSTRUCTION, LOW BIDDER $ 2,059,244.21

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

SECTION MEASUREMENT AND PAYMENT

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

ROAD CUT PERMIT APPLICATION & INSTRUCTIONS

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

C. Foundation stabilization for pipe and utility structures.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

Florida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

PUBLIC WORKS DEPARTMENT GENERAL NOTES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

USD 383 H.S. West Campus Pedestrian Improvemen SW1702

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

CONSTRUCTION STAKING GUIDELINES

SARASOTA COUNTY GOVERNMENT PROCUREMENT 1660 Ringling Boulevard Sarasota, Florida Telephone (941)

District No.: Applicant: Type of Work:

Construction Specification for General Excavation

Transcription:

P RAILWAY 6 COMPONENTS OF CONTRACT PLANS SET 10 CHIPLEY 95 PENSACOLA FORT WALTON BEACH TALLAHASSEE 10 LAKE 295 JACKSONVILLE PANAMA CITY CITY ST AUGUSTINE GAINESVILLE DRAINAGE IMPROVEMENTS OCALA DELAND DAYTONA BEACH A DETAILED INDEX APPEARS ON THE KEY OF EACH COMPONENT JEI PROJECT ID NEW PORT RICHEY TAMPA ST PETERSBURG ORLANDO LAKELAND BARTOW BEE LINE EXPRESSWAY FLORIDA'S TURNPIKE MELBOURNE - COCOA COUNTY 2 SARASOTA - BRADENTON 95 FT PIERCE INDEX OF ROADWAY PLANS FT MYERS WEST PALM BEACH NAPLES 1 KEY FT LAUDERDALE 2 SUMMARY OF PAY ITEMS MIAMI 3 GENERAL NOTES PROJECT LAYOUT PROJECT LOCATION 5 6 PLAN EROSION CONTROL R-2-E R-25-E R-25-E R-26-E KEY WEST TO ESTERO TO ESTERO KEYS KORESHAN END PROJECT STA. 23+80.00 MOUND STATE HISTORIC KEY 31 SITE 33 Estero 3 STATE High 36 32 ARCHAEOLOGICAL SITE MOUND Wiliams Road School CHARLIE KEY KEY 6 5 3 Goombs Pt. DAVIS KEY KEY BLACK Bay 35 36 2 1 31 T-6-S T-7-S N 0 1 2 Miles ROADWAY SHOP DRAWINGS TO BE SUBMITTED TO: JOSHUA J. HILDEBRAND JOHNSON ENGINEERING INC. ESTERO B 7 8 Coconut 9 Rd. 10 11 12 7 LONG KEY 865 BAY AQUATIC PRESERVE PLANS PREPARED BY: New Pas BIG Pass 2 HICKORY IS. Broadway Channel Spring Cr. 887 RYAN K. BELL, P.E. 60010 COUNCIL DISTRICT 1: AMY QUAREMBA BEGIN PROJECT STA. 20+00.00 25 30 Hogue Channel 1 5 BONITA FINAL SUBMITTAL MAY 2017 DISTRICT 2: GREG DEWITT DISTRICT 3: STEVEN SLACHTA DISTRICT : PETER R. O'FLINN DISTRICT 5: MIKE GIBSON DISTRICT 6: FRED FORBES Bonita Beach Fish Trap 31 Bay WIGGINS Imperial Bonita Beach River 865 Rd. BONITA SPRINGS Pop. 32,797 Oak Creek A 11 T-7-S T-8-S NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION. MAYOR: PETER SIMMONS 901 887 93 CITY PROJECT MANAGER: DAVID LICCARDI TO NAPLES TO NAPLES 1-800-32-770 WWW.SUNSHINE811.COM GOVERNING DESIGN STANDARDS: CALL 8 HOURS BEFORE DIGGING Florida Department of Transportation, FY2017 Design Standards ebook (DSeB) and applicable Design Standards Revisions (DSRs) at the following website: http://www.fdot.gov/rddesign/designstandards/standards.shtm KEY ROADWAY PLANS ENGINEER OF RECORD: JOSHUA J. HILDEBRAND, P.E. P.E. : 73952 GOVERNING STANDARD SPECIFICATIONS: Florida Department of Transportation, 2017 Standard Specifications for Road and Bridge Construction at the following website: FISCAL YEAR http://www.fdot.gov/programmanagement/implemented/specbooks 17 1 9:22:28 AM U:\Projects\\roadway\keysrd01.dgn

SUMMARY OF PAY ITEMS PAY ITEM PAY ITEM UNIT QUANTITY 101 1 MOBILIZATION LS 1 102 1 MAINTENANCE OF TRAFFIC LS 1 MINIMUM OVERLAY 1" w/25'-0 TAPER EXISTING BASE (DEPTH VARIES) MINIMUM OVERLAY 1" w/25'-0 TAPER INSTALL ASPHALT PATCH WITHIN 2 HOURS OR WHEN FLOWABLE FILL HAS SUFFICIENTLY CURED SAWCUT EX. PAVEMENT 2" TYPE S ASPHALT FLOWABLE FILL 3" 10 11 FLOATING TURBIDITY BARRIER LF 50 10 18 INLET PROTECTION SYSTEM EA 2 FLOWABLE FILL TO BE INSTALLED WITHIN 2 INCHES OF UNDERSIDE OF EXISTING ASPHALT SURFACE PIPE 110 1 1 CLEARING AND GRUBBING LS 1 TRENCH BACKFILL TO 3" ABOVE TOP OF PIPE 110 7 1 MAILBOX, FURNISH AND INSTALL SINGLE EA 5 121 70 FLOWABLE FILL CY 5 33 1 12 SUPERPAVE ASPHALTIC RETE, TRAFFIC B, 3" SY 277 33 1 12A SUPERPAVE ASPHALTIC RETE, TRAFFIC B, SP 9.5, 1" SY 5 25 1 521 INLETS, DITCH BOTTOM TYPE C, <10' EA 7 25 1 529 INLETS, DITCH BOTTOM TYPE C, MODIFY EA 1 30 1 115 RCP PIPE, STORM DRAIN, ROUND, 15" LF 60 NOTES: 1. BACKFILL SHALL BE OF SUITABLE MATERIAL REMOVED FROM EXCAVATION EXCEPT WHERE OTHER MATERIAL IS SPECIFIED. BACKFILL MATERIAL SHALL CONSIST OF EARTH, LOAM, DY CLAY, GRAVEL, CRUSHED LIMESTONE, OR OTHER APPROVED MATERIAL. REFER TO TECHNICAL SPECIFICATIONS FOR DETAIL REQUIREMENTS. 2. IF TRENCH BOTTOM CONTAINS ROCK, THEN A MINIMUM OF A 6" PIPE BEDDING SHALL BE USED. TRENCH WIDTH PIPE OUTSIDE DIAMETER + 3' 30 1 118 RCP PIPE, STORM DRAIN, ROUND, 18" LF 128 30 1 215 RCP PIPE, STORM DRAIN, ELLIP., 12"X18" LF 1 PAVED AREA TRENCH RESTORATION DETAIL N.T.S. 522 2 PLAIN CEMENT RETE PAVEMENT, 6" (WAY) SY 19 570 1 2 PERFORMANCE TURF, SOD SY 53 700 1 50 SINGLE SIGN POST, RELOCATE EA 1 ASB-1 AS-BUILTS LS 1 SUMMARY OF PAY ITEMS - BID ALTERNATE 1 PAY ITEM PAY ITEM UNIT QUANTITY 33 1 12B SUPERPAVE ASPHALTIC RETE, TRAFFIC B, SP 9.5, 1" SY 82 570 1 2A PERFORMANCE TURF, SOD SY 128 PAY ITEM NOTES: 110 11 CLEARING AND GRUBBING SHALL INCLUDE, BUT NOT BE LIMITED TO THE REMOVAL OF ASPHALT, RETE, ROADWAY BASE, STORM STRUCTURES, PIPES, YARD DRAINS, VEGETATION/TREE ROOTS, TREE TRIMMING, AND FENCE. ALL CLEARING AND GRUBBING SHALL BE REMOVED FROM THE JOB SITE BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE CITY. ROAD COUNTY JEI PROJECT ID SUMMARY OF PAY ITEMS 2 JOSHUA J. HILDEBRAND, P.E. 73952 9:22:33 AM U:\Projects\\roadway\CESSRD01.DGN

GENERAL NOTES 1. ELEVATIONS SHOWN ON THE PLANS ARE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) 2. HORIZONTAL DATUM = NAV 83 FLORIDA STATE PLANE, WEST ZONE, US FOOT. 3. EXISTING FACILITIES SHALL BE RESTORED TO THAT WHICH EXISTED PRIOR TO COMMENCING CONSTRUCTION AT NO ADDITIONAL COST TO OWNER.. EXISTING DRAINAGE STRUCTURES WITHIN CONSTRUCTION LIMITS SHALL REMAIN, UNLESS OTHERWISE NOTED. 5. THE LOCATION(S) OF THE UTILITIES SHOWN IN THE PLANS (INCLUDING THOSE DESIGNATED Vv, Vh, AND Vvh) ARE BASED ON LIMITED INVESTIGATION TECHNIQUES AND SHOULD BE CONSIDERED APPROXIMATE ONLY. THE VERIFIED LOCATIONS/ELEVATIONS APPLY ONLY AT THE POINTS SHOWN. INTERPOLATIONS BETWEEN THESE POINTS HAVE NOT BEEN VERIFIED. 6. CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES IN THE AREA PRIOR TO CONSTRUCTION AND CONTACT THE SUNSHINE STATE ONE CALL AT (800) 32-770. 7. EXISTING UTILITIES ARE TO REMAIN IN PLACE UNLESS OTHERWISE NOTED. 8. UTILITY/AGENCY OWNERS COMPANY CONTACT TELEPHONE NUMBERS COMCAST WILLIAM STANTON 239-32-1861 FLORIDA POWER & LIGHT TRACY STERN 800-868-955 BONITA SPRINGS UTILITIES, INC. ANDREW KORBEL 239-390-820 CENTURYLINK JIGS SLIAG 239-263-623 9. ANY PUBLIC LAND CORNER WITHIN THE LIMITS OF CONSTRUCTION IS TO BE PROTECTED. IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN PROPERLY REFERENCED, THE CONTRACTOR SHALL NOTIFY THE WITHOUT DELAY BY TELEPHONE AT (239) 99-626 10. CONTRACTOR SHALL PROMPTLY REPORT ALL FIELD CHANGES TO ENGINEER. 11. ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE STATE OF FLORIDA EROSION AND SEDIMENT CONTROL MANUAL. 12. CONTRACTOR TO MAINTAIN EXISTING TRAFFIC / ACCESS, EXISTING DRAINAGE, AND EXISTING UTILITIES DURING CONSTRUCTION, UNLESS OTHERWISE APPROVED BY THE. 13. CONSTRUCTION STAKING IS THE CONTRACTOR S RESPONSIBILITY. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THESE SERVICES DURING CONSTRUCTION. 1. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL CONSTRUCTION-RELATED PERMITTING. PAYMENT FOR ACQUISITION OF CONSTRUCTION-RELATED PERMITS SHALL BE INCIDENTAL TO THE COST OF CONSTRUCTION-RELATED ACTIVITIES. NO ADDITIONAL PAYMENT SHALL BE MADE. 21. MAINTENANCE OF TRAFFIC SHALL BE IN ACCORDANCE WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) INDEX 600 SERIES. 22. THE DOES NOT CERTIFY THE LOCATION OR EXISTENCE OF ANY UNDERGROUND UTILITIES, NOR AS TO THE SOIL OR GROUND CONDITIONS, AND ASSUMES NO LIABILITY FOR SUCH. THE LOCATION OF UNDERGROUND UTILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. BEFORE WORKING IN AN AREA, CONTRACTOR SHALL GUARANTEE THAT ALL UNDERGROUND UTILITIES HAVE BEEN LOCATED 23. IT IS RECOMMENDED THAT THE CONTRACTOR CONDUCT SITE INVESTIGATIONS TO SATISFY HIM/HERSELF WITH THE EXISTING TOPOGRAPHY AND GENERAL CONDITION OF THE AREA OF WORK. ANY FAILURE BY THE CONTRACTOR TO ACQUAINT HIM/HERSELF WITH THE AVAILABLE INFORMATION AND FIELD CONDITIONS WILL NOT RELIEVE HIM/HER FROM RESPONSIBILITY FOR ESTIMATING PROPERLY THE DIFFICULTY OR COST OF SUCCESSFULLY PERFORMING THE WORK. 2. THE ENGINEER SHALL BE CONSULTED TO MAKE ANY REQUIRED INTERPRETATIONS OF THE PLANS,HOWEVER, THIS IN NO WAY RELIEVES THE CONTRACTOR OF HIS/HER RESPONSIBILITY FOR CONSTRUCTING THE PROJECT IN ACCORDANCE WITH THE INTENT OF THE PLANS. THE CONTRACTOR SHALL REFER TO THE CONTRACT DOCUMENTS FOR ADDITIONAL CONTROL AND SCOPE OF WORK. 25. EACH ITEM LISTED IN SUMMARY OF ESTIMATED QUANTITIES IS TO INCLUDE ALL WORK AND MATERIALS NECESSARY TO COMPLETE THE ITEM. PAYMENT FOR CONTRACT ITEMS WILL BE BASED ON ACTUAL FIELD (IN-PLACE) MEASUREMENTS OF THE COMPLETED ITEMS, READY FOR SERVICE AND ACCEPTED BY THE. ANY DISCREPANCIES BETWEEN THE PLANS AND FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. THE QUANTITIES AS PROVIDED ARE APPROXIMATE ONLY AND NO CLAIM SHALL BE MADE AGAINST THE CITY OF BONITA SPRINGS FOR ANY EXCESS OR DEFICIENCY. THE CONSTRUCTION LENGTHS INDICATED IN THESE PLANS ARE APPROXIMATE. ACTUAL LIMITS MAY BE SET IN THE FIELD AS DIRECTED BY THE ENGINEER. REQUIRED WORK NOT ITEMIZED UNDER SUMMARY OF ESTIMATED QUANTITIES OR SPECIAL PROVISIONS SHALL BE INCIDENTAL TO THE CONTRACT. 26. THE CONTRACTOR SHALL FURNISH, ERECT AND MAINTAIN ALL NECESSARY TRAFFIC CONTROL AND SAFETY DEVICES, INCLUDING TEMPORARY PAVEMENT MARKING, IN ACCORDANCE WITH THE U.S. DEPARTMENT OF TRANSPORTATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" DECEMBER 2009, AND THE CURRENT FLORIDA DEPARTMENT OF TRANSPORTATION "ROADWAY AND TRAFFIC DESIGN STANDARDS" 2016, AS AMENDED BY THE SPECIFICATIONS FOR THIS PROJECT. 27. ANY MAILBOX WITHIN THE LIMITS OF CONSTRUCTION IS TO BE TAKEN DOWN AND RESET BY THE CONTRACTOR IN ACCORDANCE WITH POSTAL REQUIREMENTS; COST TO BE INCLUDED UNDER 110-7-1. REMOVAL AND RELOCATION OF MAILBOXES IS INCIDENTAL TO THIS PAY ITEM. REPLACEMENT OF MAILBOXES DAMAGED DURING REMOVAL AND RELOCATION IS THE RESPONSIBILITY OF THE CONTRACTOR. 28. ANY EXISTING PAVEMENT THAT IS TO BE REMOVED MUST BE SAW-CUT PRIOR TO REMOVAL. WHERE CONNECTIONS TO EXISTING WALKS AND S ARE NOT INDICATED ON THE PLANS, PROPER CONNECTIONS SHALL BE MADE AT THE DIRECTION OF THE ENGINEER. 29. ALL STATIONS AND OFFSETS REFER TO THE CENTER LINE OF CONSTRUCTION UNLESS OTHERWISE NOTED. DIMENSIONS REFER TO THE EDGE OF PAVEMENT (E/P) UNLESS OTHERWISE NOTED. 30. ALL PROPOSED STRUCTURES AND STORM FACILITIES LOCATED WITHIN THE RIGHT-OF-WAY SHALL BE CLEANED PRIOR TO ACCEPTANCE OF CONTRACT. COST SHALL BE INCLUDED IN MOBILIZATION PAY ITEM 101-1. 31. ALL PROPOSED PIPE SHALL BE REINFORCED RETE PIPE (RCP). 15. CONTRACTOR SHALL NOT BRING ANY HAZARDOUS MATERIALS ONTO THE PROJECT. SHOULD THE CONTRACTOR REQUIRE SUCH FOR PERFORMING THE CONTRACTED WORK, THE CONTRACTOR SHALL REQUEST, IN WRITING, WRITTEN PERMISSION FROM THE CITY PROJECT MANAGER. THE CONTRACTOR SHALL PROVIDE THE CITY PROJECT MANAGER WITH A COPY OF THE MATERIAL SAFETY DATA (MSDS) FOR EACH HAZARDOUS MATERIAL PROPOSED FOR USE. BECAUSE STATE LAW DOES NOT TREAT PETROLEUM PRODUCTS THAT ARE PROPERLY CONTAINERIZED AND INTENDED FOR EQUIPMENT USE AS A HAZARDOUS MATERIAL, SUCH PRODUCTS DO NOT NEED AN MSDS SUBMITTAL. ANY KNOWN OR SUSPECTED HAVARDOUS MATERIAL FOUND ON THE PROJECT BY THE CONTRACTOR SHALL BE IMMEDIATELY REPORTED TO THE CITY PROJECT MANAGER, WHO SHALL DIRECT THE CONTRACTOR TO PROTECT THAT AERA OF KNOWN OR SUSPECTED CONTAMINATION FROM FUTHER ACCESS. THE CITY PROJECT MANAGER WILL ARRANGE FOR INVESTIGATION, IDENTIFICATION, AND REMEDIATION OF THE HAZARDOUS MATERIAL. THE CONTRACTOR SHALL NOT RETURN TO THE AREA OF CONTAMINATION UNTIL APPROVAL IS PROVIDED BY THE CITY PROJECT MANAGER. 16. PRIOR TO INCORPORATION INTO THE PROJECT, A CERTIFICATION FROM THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF PLANT INDUSTRY, STATING THAT THE SOD, HAY, STRAW, AND MULCH MATERIALS, ARE FREE OF NOXIOUS WEEDS, INCLUDING TROPICAL SODA APPLE, SHALL BE FURNISHED TO THE CITY PROJECT MANAGER BY THE CONTRACTOR. ALL SOD MATERIALS SHALL BE SUBJECT TO INSPECTION BY THE CITY OR APPOINTED REPRESENTATIVE PRIOR TO PLACEMENT. ANY SOD WITH NOXIOUS WEEDS AND GRASSES, INCLUDING TROPICAL SODA APPLE, SHALL BE REJECTED FOR USE ON THE PROJECT. 17. AT THE COMPLETION OF THIS PROJECT, ALL DISTURBED SURFACES SHALL BE COVERED BY PERFORMANCE TURF. 18. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING CONVEYANCES AND DRAINAGE CONNECTIONS WITHIN THE PROJECT LIMITS AT ALL TIMES. 19. CONTRACTOR SHALL REPLACE ANY EXISTING SIDE STREET MARKINGS OBLITERATED DURING CONSTRUCTION. 20. SOD QUANTITY INCLUDES ONLY THOSE AREAS INTENDED TO BE DISTURBED BY PROPOSED IMPROVEMENTS. OTHER DISTURBED AREAS NOT INTENDED TO BE DISTURBED, INCLUDING BUT NOT LIMITED TO STAGING AREAS, STOCKPILE AREAS, ETC., SHALL BE SODDED AT NO ADDITIONAL COST. ROAD COUNTY JEI PROJECT ID GENERAL NOTES 3 JOSHUA J. HILDEBRAND, P.E. 73952 9:22:33 AM U:\Projects\\roadway\GNNTRD01.DGN

N 0 20 100 Feet STA. 23+80. 00 CP 1 SPRING CREEK SURVEY / PINFISH CT. CL 2 & 3 SW ORDFISH STREET STA. 20+00.00 10. 00 JACKFISH STREET 20 CL 1 CL 20.00 CP 2 SURVEY / KINGFISH ST. REDFISH STREET VERTICAL CONTROL POINT TABLE POINT COORDINATES NORTH EAST ELEVATION STATION OFFSET CP 1 7659.8 710722.37.38 SIRC CP 2 7352.10 710765.127.10 SIRC BL SURVEY - / ALIGNMENT POINT COORDINATES NORTHING EASTING CONTROL CURVE STATION BL SURVEY - PINFISH CT. CL1 7081.20 710606.3639 20+00.00 BL SURVEY - PINFISH CT. CL2 7080.1783 71076.358 21+0.00 BL SURVEY - KINGFISH ST. CL3 7080.1783 71076.358 21+0.00 BL SURVEY - KINGFISH ST. CL 7320.1689 71078.877 23+80.00 ROAD COUNTY PROJECT LAYOUT JEI PROJECT ID JOSHUA J. HILDEBRAND, P.E. 73952 9:22:35 AM U:\Projects\\roadway\PLAYRD01.dgn

N ASPH FENCE POST ESB 76 2.609 SPKD CP LB62 TELE PED PLANTER TELE PED CONST. 38 LF OF MAILBOX S-10 S-11 PROTECT & ADJUST BURIED TELE. DURING CONST. OF 12"X18" PIPE YARD DRAIN TO BE REMOVED SURVEY / PINFISH CT. TELE POLE/PED SET PK NAIL & DISK LB62 10.00 STA. 20+00.00 20 21 S-1 S-13 CONST. 3 LF OF S-12 MAILBOXES (2) CONST. 0 LF OF TRIM VEGETATION AS NECESSARY FOR INSTALLATION OF PIPE/INLET CONST. 23 LF OF CONST. 33 LF OF 15" PIPE SIGN TO AVOID CONFLICT WITH PROP. PIPE S-10 S-11 S-12 STA. 20+2.00 (32.00' RT) STA. 20+10.50 (6.00'' RT) STA. 20+2.00 (26.30' LT) INDEX 232 INDEX 232 INDEX 232 GRATE: 2.30 GRATE: 2.60 GRATE: 2.5 FL. = 0.60 (W) FL. = 0.60 (N) FL. = 0.60 (E) FL. = 0.60 (S) FL. = 0.60 (W) S-13 S-1 S-15 STA. 20+82.00 (12.00' LT) STA. 21+08.00 (10.50' LT) STA. 21+80.00 (12.00' LT) INDEX 232 INDEX 232 INDEX 232 GRATE: 2.80 GRATE: 2.90 GRATE: 3.20 FL. = 0.60 (E) FL. = 0.60 (N) FL. = 0.50 (S) FL. = 0.60 (W) FL. = 0.50 (W) FL. = 0.50 (E) S-16 S-17 S-18 STA. 21+80.00 (17.00 RT) INLET INLET GRATE: 3.30 GRATE: 3.10 FL. = 0.50 (S) FL. = 0.08 (E) FL. = 0.1 (W) FL. = 0.10 (W) INDEX 232 GRATE: 3.68 FL. = 0.50 (N) FL. = 0.50 (W) LEGEND PAVEMENT RECONSTRUCTION WAY RECONSTRUCTION 1" OVERLAY 1" OVERLAY BID ALTERNATE 1 SEAWALL INV. 0.06 15" RCP 0 5 Feet 20 S-15 CONST. 27 LF OF 15" PIPE 22 23 15" RCP S-18 STA. 23+80.00 20.00 SURVEY / KINGFISH ST. TIE PROP. 15" PIPE INTO INLET CONST. 128 LF OF 18" PIPE S-17 S-16 MAILBOX MAILBOX REMOVE AND REPLACE WAY W/ 6" RETE IN PLACE TELE POLE/PED ROAD COUNTY JEI PROJECT ID PLAN 5 JOSHUA J. HILDEBRAND, P.E. 73952 9:23:06 AM U:\Projects\\roadway\PLANRD01.dgn

N ASPH FENCE POST ESB 76 2.609 SPKD CP LB62 TELE PED PLANTER TELE PED S-10 TELE POLE/PED SET PK NAIL & DISK LB62 10.00 STA. 20+00.00 20 21 S-11 S-13 S-1 S-12 LOT 9 LOT 10 SEAWALL FLOATING TURBIDITY BARRIER 0 5 Feet LOT 12 LOT 11 20 SURVEY / PINFISH CT. 15" RCP S-15 22 23 15" RCP INLET PROTECTION SYSTEM STA. 23+80.00 SURVEY / KINGFISH ST. 20.00 INLET PROTECTION SYSTEM S-16 TELE POLE/PED ROAD COUNTY JEI PROJECT ID EROSION CONTROL 6 JOSHUA J. HILDEBRAND, P.E. 73952 9:23:07 AM U:\Projects\\roadway\SWPPRD01.DGN