Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School

Similar documents
The following shall be incorporated into the Contract Documents dated 26 MAR 2018.

Addendum #3 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

See attached answers to questions and requests for clarification received.

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture

DATE: January 22, 2016 PBS Project No.: Eugene School District 4J ITB No.:

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

ADDENDUM No. 1. H.S. Thompson Elementary School Abatement Org #307

A. Remove Table of Contents and insert new attached Table of Contents.

ADDENDUM NO. 2 - OUTLINE AND SUMMARY INFORMATION

ADDENDUM 3 TO INVITATION FOR BID 5300-FG. Interior Renovations for UNLV Quality Assurance Lab (QAL) and UNLV Monitoring Systems Lab (MSL)

CLARION UNIVERSITY OF PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION ISSUE DATE: September 4, 2014

RFP /ME - ADDENDUM 2

ADDENDUM #1 TO ALL PROSPECTIVE BIDDERS: SUBJECT: IFB # \ Science Labs Conversions Luther Jackson Middle School, Falls Church, VA

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

Division 09 FINISHES TABLE OF CONTENTS

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

SECTION ALTERATION PROJECT PROCEDURES

MECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING

DALLAS INDEPENDENT SCHOOL DISTRICT

TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS

DISTRICT SERVICES BUILDING

Resolution : 102 Change Orders #3 and #11 through #25 to Manning Squires Hennig Contract (John Walton Spencer School 16)

Proposal. Lexington, MA. Price Work Description

This Addendum consists of~ Pages and. Attachments. NOTE THAT ITEMS APPLY TO ALL CAMPUSES UNLESS SPECIFICALLY NOTED OTHERWISE.

INVITATION TO TENDER ITT NO. PS CONSTRUCTION SERVICES FOR INTERIOR OFFICE RENOVATIONS AT 236 E CORDOVA STREET QUESTIONS AND ANSWERS NO.

METROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) # M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO.

a. "Packaged Rooftop Electric Cooling / Heating Unit Schedule", remark #5 (M001), has the condensate drain requirement for RTU-1.

NEW MIDDLE SCHOOL PROJECT

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.

NARRATIVE REPORT. Hard Fittings on Millboard Insulation (residual)


RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:

Update on FCPS Construction/Renovation Projects. December 2015

Addendum No. 3: EAST HIGH SCHOOL AUDITORIUM RENOVATIONS

Arlington Public Schools Purchasing Office

KIPLING SCHOOL RENOVATION AND EXPANSION PHASE 2 KIPLING, SASKATCHEWAN

ADDENDUM # 1 TO: FROM:

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.

REYNOLDS MIDDLE SCHOOL BATHROOM ADA RENOVATIONS RFP Addendum #1 Prebid Meeting Notes 1:30pm, November 14, 2016

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

COUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA ADDENDA No.

BOND CONSTRUCTION UPDATE

City High Middle School pre-design recommendations. March 29, 2017

REBECCA LG BOSTICK, ARCHITECTS, INC

SOLICITATION ADDENDUM

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT

ADDENDUM NO 1 Issued November 21, 2017

September 23, 2016 ADDENDUM #2

If this link does not work, please go to and enter the access key: 61bd832e4bbf162

Board Work Session Feasibility Study. January 9, 2017

University of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015

Addendum No. 5 Tender Call No Closing: 12:00 NOON (LOCAL TIME), February 17, 2017

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

ADDENDUM #9 DATE: 1/12/17 TO:

BUILDING CONDITION: INTERIOR

Update on FCPS Construction/Renovation Projects. June 2016

ADDENDUM TWO. Peoria Park District ADDENDUM NO. 2 Planning, Design and Construction Department 1314 N. Park Road PROJECT TITLE: Asbestos Abatement

ADDENDUM NO. 1. Kapuskasing District High School Interior Upgrades. ADDENDUM NO. 1 November 9, 2018

ADDENDUM 3. Conversion of Machine Shop to Tissue Culture Laboratory

ALUMNI CENTER RENOVATIONS - UNIVERSITY COMMUNICATIONS

SECTION ADDENDUM NUMBER 1

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

TENDER ADDENDUM NO. TWO (2)

Building Excellence IV Capital Levy Projects Under Construction

Health Life Safety Survey and Master Facilities Plan

2019 Construction

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications)

Bucknell University. Lewisburg, Pennsylvania HUNT HALL IMPROVEMENTS 2017 PROJECT LOCATION MAP CS-1 DRAWING TITLE: PROJECT:

EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES/RFQ #14-Q-009-KR BY AND BETWEEN

NARRATIVE REPORT. Robinson Hall was originally constructed in 1976; there was a 2001 renovation throughout the building.

MARSHALL HOUSING AUTHORITY

NARRATIVE REPORT. Underlayment Paper for Linoleum. Window Glazing (4 types)

NORMAL HILLS BUILDING 8 COSMESTIC UPGRADES PROJECT

NORMAL HILLS BUILDING 6 COSMESTIC UPGRADES PROJECT

Hazardous Materials G

EXIT CONTROL 108 SIM LAB 105 SIM LAB 106 BUSINESS 2465 SF 100 GROSS 25 OCCUPANTS CLASSROOM 104 DATA / COMM 103 SCOPE OF WORK

The addendum consists of six (6) pages of 8½ x 11 text and three (3) 30 x 42 drawings*. End of Addendum 1

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

PROJECT: GROVECENTER ELEMENTARY SCHOOL RELOCATION OF 1-24x40 AND 1-36x40 RELOCATABLE BLDG. AND PLAY EQUIPMENT.

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

Supplemental Information Requested of Staff from Review Panel Bishop Place Economic Hardship Applications

Angio to Cath. Lab Renovation ADDENDUM #2 12/29/2017

RULON ACOUSTICAL CEILING SYSTEM ALURATONE 100 ARCHITECTURAL SPECIFICATIONS

BOYERTOWN AREA SCHOOL DISTRICT February 28, Boyertown West Middle School Renovation Project

REQUEST FOR QUOTATION Carroll Hall Alterations Addendum #2 Dated Jan 11, 2016

Addendum #1. January 22, 2018

Procedure for Department Managed Repair and Renewal Projects Under $15,000

Addendum Number One. USC Preston College Bathroom and Flooring Renovations Part II Project Number: H SG

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

DALLAS INDEPENDENT SCHOOL DISTRICT. BID PACKAGE # 209 ORG 056 E. D. Walker Middle School Addition & Renovations

Update on FCPS Construction/Renovation Projects. November 2015

DIVISION 9 FINISHES. This Article on Codes, Regulation and Standards shall apply to all Divisions of the Building Standards

A R C V I S I O N S T U D I O S P C

DENNIS TOWNSHIP FEASIBILITY STUDY

Transcription:

ADDENDUM No. 002 For Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School DALLAS INDEPENDENT SCHOOL DISTRICT September 24, 2014 The following items modify the Project specifications and drawings as follows: The following items pertain to all projects within this Bid Package: PREPROPOSAL MEETING QUESTIONS AND ANSWERS 9 24 2014 ITEM NO. 01: Both Schools Is the Asbestos report available or will a drawing be provided to identify the ACM? ANSWER: Anson Jones and Fred Florence are currently under review for asbestos. The final asbestos report and drawings will be provided by the District to the successful General Contractor following the issuing of the Notice to Proceed. ITEM NO. 02: Both Schools What is the proposed abatement schedule if required? ANSWER: Anson Jones and Fred Florence are currently under review for asbestos. The final asbestos schedule will be provided by the District to the successful General Contractor following the issuing of the Notice to Proceed ITEM NO. 03: Both Schools What is the existing roof and if under warranty, who has the warranty? ANSWER: Per the District, the existing roof for both schools are under warranty. The warranty for the existing roof will be attached to Addendum 02. Page 1 of 7

ITEM NO. 04: Both Schools Note on the Index Sheet indicates to install new mini-blinds at all exterior glass opening, is this applicable? ANSWER: Removal, storing and reinstalling window blinds is applicable only to the (9) nine Science Lab renovations at Florence MS only. ITEM NO. 05: Both Schools Clarification: Please revise the substantial completion date for both schools in the front end documents, sections 00 31 00 & 00 41 00 to be on 02/06/2016. ITEM NO. 06: Both Schools Clarification: Please revise the printing company information in section 00 11 13 to be as following: SOUTHWESTERN BLUPRINT Attention: Sergio Gietema Address: 2108 Main St. Dallas, TX 75201 Phone: 214-939-0546 Fax: 214-761-1952 Email: sgietema@swbp.com. ITEM NO. 07: Both Schools Specification Sections 00 11 13 Clarification: Please replace the plan rooms list on section 00 11 13 with the attached revised plan room list on specification section 00 11 13. ITEM NO. 08: Both Schools Specification Section 00 45 39 Clarification: Please replace the MWBE form for the section 00 45 39 with the attached revised MWBE form for section 00 45 39 MWBE Compliance Guidelines and Forms 8-1-14. ITEM NO. 09: Both Schools What is the next NTP Date? Answer: The revised estimated construction NTP date is projected to be 02/06/2015. ITEM NO. 10 Both Schools: Clarification: replace Specification Section 09 9100 with the revised Specification 09 9100. Page 2 of 7

ITEM NO. 11: Anson Jones ES A2.03 Note 1 indicates to infill wall opening. What is the extent of this work and is there a detail available? Any exterior finishes required? Answer: The extent of the infill at wall openings will be at areas where the existing radiators will be removed only. Please refer to revised sheet A2.03 dated 09/10/14, for more information. No exteriors finishes is required. ITEM NO. 12: Anson Jones ES Clarification: Classrooms scheduled to have existing wood base to be removed throughout the room will be revised remove only the wood base at the window sill only as indicated on revised sheet A0.01, A0.02, A2.03 and A2.04 dated 09/10/14. ITEM NO. 13: Anson Jones ES Clarification: Classrooms with existing wood base to be removed will be revised to remain. Contractor to prep existing wood base to receive new paint throughout as indicated on revised sheets A2.03 and A2.04 dated 09/10/14.. Color to be black. ITEM NO. 14: Anson Jones ES Is any additional structural support required for the new RTU s? Answer: Additional structural modifications may be required for AHU2 and AHU3. ITEM NO. 15: Anson Jones ES Clarification: Please refer to attached revised Mechanical and Electrical sheets E1.2B, M1.1A, M1.1B, M1.2, M2.1A, M2.1B, M3.1, MD1.1A AND MD1.1B for the following revisions: All MEP floor plans edited to correct plan designations/key plans/titles. M1.2 #1 piping roof support will work for current roof surface. M1.2- #2 revised AHU and CU designations. M3.1- #1 deleted air devices not used. M3.1- #2 CU-4 was a typo-revised wherever shown. E1.1 existing equipment pads noted on demo drawing to be removed and new pads are shown/noted on new mech. drawings. E1.2B CU-4 revised to CU-1. ITEM NO. 16: Anson Jones ES Provide specifications for the gas piping and condensate piping. Answer: Refer to Specification Section 231123 for gas piping and 232113 for condensate piping. Page 3 of 7

ITEM NO. 17: Anson Jones ES Provide roof type, specifications, and warranty information. Answer: Per the District, the existing roof for both schools are under warranty. The existing roof type and specifications will need to be verified with the District. ITEM NO. 18: Anson Jones ES Verify that AHU s 2 & 3 are replacing existing units. The demo sheets do not indicate to remove any units at these locations. Answer: There is currently not an existing AHU 2 & 3. AHU-2 & AHU-3 are new. The new air handling units are scheduled to be placed at existing openings that are capped. ITEM NO. 19: Anson Jones ES Provide details for the attachment of the security cage. The model number is provided in the mechanical drawings. Answer: Please refer to sheet A2.05 (dated 09/10/14) plan note 2 for further information on the security cage. ITEM NO. 20: Anson Jones ES A4.03 has a note in the upper right corner stating to reuse the new fixtures, can this be clarified? Answer: The legend is revised to only be new light fixtures not reused. ITEM NO. 21: Anson Jones ES Mechanical drawings indicate the condensate piping on the roof to be CPVC, is this correct? Answer: Yes ITEM NO. 22: Anson Jones ES A0.02 - What is note number 8 indicating in rooms A109 & A110? Ceilings? Answer: Note 7 and 8 have been removed from room A109 and plan note 8 has been revised as indicated on revised sheet A0.02 dated 09/10/14. ITEM NO. 23: Anson Jones ES A0.02 indicates to remove the carpet in room A109, A2.04 does not indicate a new finish for this room. Answer: Removing carpet in room A109 is incorrect. Current floor is existing VCT and is scheduled to remain during construction. Plan Note 8 is added to only replace individual tile with new if damaged due to removal of existing radiator as indicated on revised sheet A2.04 dated 09/10/14. ITEM NO. 24: Anson Jones ES A4.02 indicates a new ceiling in rooms A109 & A110, A0.02 does not remove these ceiling. Answer: Rooms A109 and A110 are scheduled to have existing ceiling to be removed as indicated in revised sheet A0.02 dated 09/10/14. Page 4 of 7

ITEM NO. 25: Anson Jones ES A2.05 show an RTU that the mechanical drawings do not. Is it required?. Answer: The RTU locations have been revised to reflect the mechanical drawings as indicated on revised sheet A2.05 dated 09/10/14. ITEM NO. 26: Anson Jones ES Clarification: Environmental Contractor to remove and discard existing carpet and black mastic form Room A110. General contractor to provide and install scheduled VCT flooring as indicated on revised sheet A0.02 dated 09/10/14. ITEM NO. 27: Fred F. Florence HS It was mentioned at the pre)bid that data/communications cabling may be laying on the grid or above ceiling equipment. Is this cabling to be clean)up? If so, what is the extent of the work and what will be seen as acceptable? Answer: The existing data/communication cabling should be tied up and secured in a safe way. ITEM NO. 28: Fred F. Florence HS A2.01 indicates to infill wall openings at the following rooms A101,102,105,112,114,117)119, & 121)123. MD1.1C indicates that these rooms have window mounted A/C units to be removed. What is the extent of the repair, is there a detail available, and what is the exterior finish? Answer: The extent of the infill at wall openings will be at areas where the existing radiators will be removed only. A total of (8) A/C window units will be removed from the existing exterior window. Therefore, the windows must be repaired and a glass window will need to be inserted to close the opening. The glass will need to match the existing exterior glass thickness and type. ITEM NO. 29: Fred F. Florence HS Clarification: The DISD Abatement contractor will remove the backer rod and sealant. Contractor to provide and install new backer rod and sealant at all exterior windows scheduled to have the existing A/C window units removed. As indicated on revised sheet A2.01 dated 09/10/14. ITEM NO. 30: Fred F. Florence HS Clarification: At those rooms where existing UVs or steam radiators are to be removed, a 2 strip of existing VCT will need to be removed as part of this work. The GC will be required to install new VCT (color/selection to be selected by the Owner/AE) the width of the room x 2. The existing base will be removed and new base (to match existing) will be installed the length of the room.. The spaces that are being renovated for new Science Labs (Rooms 101, 102, 103, 104, 109, 109A, 110, 110A, 111, 114, 114A, 117, 212, 213, 320 and 320A are to receive new flooring and base as scheduled. Page 5 of 7

ITEM NO. 31: Fred F. Florence HS Clarification: Please refer to attached revised Mechanical and Electrical sheets E1.1B, E1.1C, E1.2A,E1.2B, E1.3A, E2.1B, E2.1C, E2.2A, E2.3A, M1.1C and M1.2A. ITEM NO. 32: Fred F. Florence HS Verify that the science casework is to be manufactured P)Lam. The past science labs that we have bid or completed for DISD have been wood science casework. ANSWER: The science lab lower and upper casework will be wood science casework with a wood veneer at faces and edges with a medium oak stain and transparent finish. Stain sample to submitted and approved by architect. Please refer to revised sheets a2.01, A2.02, A2.03, A2.04, A2.05, A2.06, and A2.07 dated 09/10/14. ITEM NO. 33: Fred F. Florence HS Clarification: Please add Plan Note 2 to Science Labs 102, 109, 111, 114, 117 and 110 as indicated on revised sheet A4.04 dated 09/10/14. ITEM NO. 34: Fred F. Florence HS Provide wall finish types at wall in)fills and repairs at radiator removal. Drawings indicate to repair, but no notes as to the wall type or finish are provided. Answer: The existing radiators are surfaced mounted and once removed the wall will need to be patched/ repaired and repainted from column to column and from floor to bottom of window sill. The existing corridor radiators are surface mounted and once removed the wall will need to be patched/ repaired and repainted 25LF on each side of the radiator locations. This includes the areas that were damaged from the radiator removal. Assume the patch will be the size of the removed radiator. The existing wall are plaster and finishes must match surrounding finishes. ITEM NO. 35: Fred F. Florence HS Clarification: Add Specification Section 06 4100 regarding wood case work for the Science Labs and Prep Rooms. ITEM NO. 36: Fred F. Florence HS Clarification: Add Specification Section 08 7100 regarding door hardware for the Science Labs and Prep Rooms. Sheet A2.01 (dated 09/10/14) has been revised to refer to the specification for hardware information. ITEM NO. 37: Fred F. Florence HS Clarification: DISD Abatement Contractor will be removing the existing millwork and disposing of the existing millwork. As indicated on revised sheets A0.01, A0.02 and A0.03 dated 09/10/14. ITEM NO. 38: Fred F. Florence HS Provide the IDF room locations for the science lab data that is to be added. Answer: Please refer to revised electrical sheets for IDF room. Page 6 of 7

ITEM NO. 39: Fred F. Florence HS Clarification: Detail 03 - Side wall discharge section detail has been revised as indicated on revised sheet A4.04. Attachments: Both Schools: Specifications: Section 09 9100, Sections 00 11 13, Room List, Sections 00 45 39 MWBE Compliance Guidelines and Forms. Roof Warranty Anson Jones: A0.01, A0.02, A2.03, A2.04, A2.05, dated 09/10/14 E1.1A, E1.1B, E1.1C, E1.2A, E1.2B, E1.2C, M1.1A, M1.1B, M1.2, M2.1A, M2.1B, M3.1, MD1.1A AND MD1.1B Fred F. Florence: Specification Sections 08 7100 and 06 4100 A0.01, A0.02, A0.03, A2.01, A2.02, A2.03, A2.04, A2.05, A2.06, A2.07, A4.04, dated 09/10/14 E1.1B, E1.1C, E1.2A,E1.2B, E1.3A, E2.1B, E2.1C, E2.2A, E2.3A, M1.1C and M1.2A. END OF ADDENDUM "This document may have attachments. Proposer is responsible to obtain the complete document. Electronic and hard copies are available at Southwestern Blueprint at proposer's cost." Page 7 of 7