MUNICIPAL STORMWATER REGULATION PROGRAM TIER A MUNICIPALITIES 2018 PERMIT UPDATE

Tier A Municipal Stormwater Regulation Program Stormwater Pollution Prevention Team Members Number of team members may vary.

NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM

Tier A Municipal Stormwater Regulation Program Stormwater Pollution Prevention Team Members Number of team members may vary.

STORMWATER POLLUTION PREVENTION PLAN

Stormwater Pollution Prevention Plan (SPPP)

Municipal Stormwater Regulation Program

THE TOWNSHIP OF WOODBRIDGE MIDDLESEX COUNTY NEW JERSEY

Part 2.0 Non-Numeric Effluent Limitations

Stormwater Management - Basic Overview for Municipal Employees

Washington State University Pullman Stormwater Management Program Plan 2017

New Jersey Statewide Stormwater, Flood Hazard and Wetlands Programs

CHAPTER 5. NPDES PHASE II EVALUATION

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

City of Evanston STORMWATER MANAGEMENT PLAN February 2018

Municipal Stormwater Infrastructure Operation and Maintenance Plan. Central Massachusetts Regional Stormwater Coalition.

STORMWATER POLLUTION PREVENTION PLAN 2018 UPDATE

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report

STORMWATER POLLUTION PREVENTION PLAN

Municipal Stormwater Regulation Program

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

APPENDIX A EXCERPTS FROM THE PERMIT

STORM WATER MANAGEMENT STANDARDS DRAFT

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

CITY OF MANASSAS NPDES PHASE II STORMWATER PERMIT VSMP SMALL MS4 PROGRAM PLAN MINIMUM MEASURES AND BEST MANAGEMENT PRACTICES

Alliance of Rouge Communities Stormwater Permit Reporting System. Training Materials

Municipal Stormwater Regulation Program

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts.

BMP Description: The GSWMD will work with NIRPC and local groups to mark existing storm sewer structures.

(Total Maximum Daily Load) What Does the Federal Government Require for Storm Water Management Under Phase II?

S5.C.1 Public Education and Outreach

Improving Stormwater Quality and Projecting our Groundwater in NJ. Ed Frankel Acting Chief Bureau of Nonpoint Pollution Control

Pollution Prevention and Good Housekeeping for Municipal Operations. Barry Tonning Tetra Tech

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

Recommended Best Management Practices Bacteria

EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations

MS4 Permit Requirements. What we do on the land impacts water quality! 8/25/2015. Turf Grass: 40 million acres. 1.9% of area surface continental U.S.

Determining How Much You Need: Stormwater Program Cost

Welcome The purpose of this information is to give you an opportunity to:

STORMWATER MANAGEMENT PROGRAM. Table of Contents

ES Inspection and Maintenance of MS4 Structural Controls* Document Identification Number Date: March 14, 2018

NPDES Phase II Municipal Stormwater Permit Guidance

KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM

CITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

Stormwater Management Program

PROGRAM EFFECTIVENESS ASSESSMENT PLAN Storm Water Management Plan

Overview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit

Minnesota Pollution Control Agency requires that the City of Brainerd develop written procedures for

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed

Phase II MS4 General Permit

South Washington Watershed District. Stormwater Pollution Prevention Plan (SWPPP)

Fact Sheet Basic Industrial Stormwater General Permit Date of Public Notice: November 15, 2017 Draft Renewal

Stormwater Awareness Training

STORMWATER POLLUTION PREVENTION PLAN Vehicle Recyling General Stormwater Permit NJ

STORMWATER MANAGEMENT PLAN City of Overland Park, Kansas

BUREAU OF CLEAN WATER

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Stormwater Management Practices and Design Manual. Clemson University

Storm Water Management Program

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

8.1 Regulatory Requirements

MCM#6 Pollution Prevention/Good Housekeeping for Municipal Operations. Licking County MS

Dean Tuomari Wayne County Department of Public Services Water Quality Management Division,

The Village of Wellington NPDES Guidance/Reference Document

2015 MS4 Summary for Girdwood Road Service Area January 12, No cleaning this year, done every other year or as needed annually.

Non-Priority Projects WQMP Preparation Guidance Manual

REQUEST FOR REVOCATION of the following Permit or Permit Authorization (please check):

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS

ADMINISTRATIVE REVISIONS TO THE NOTICE OF INTENT

City of Waukegan, Illinois

Stormwater Pollution Prevention Training Arlington Public Schools August 8, 2014

Municipal Stormwater Management Planning

MS4 PROGRAM AUDITS: MUNICIPALITIES PERSPECTIVE

City of Vancouver March 2017 DRAFT

S.O.P. No. HMD

VILLAGE OF SKOKIE, ILLINOIS

BARTON HILLS VILLAGE STORMWATER MANAGEMENT PROGRAM

TRAVIS COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT 17 STORMWATER MANAGEMENT PROGRAM TPDES PHASE II MS4 GENERAL PERMIT (TXR040000)

15A NCAC 02B.0281 FALLS WATER SUPPLY NUTRIENT STRATEGY: STORMWATER REQUIREMENTS FOR STATE AND FEDERAL ENTITIES The following is the stormwater

Regional Stormwater Program 2013 Stormwater Management Plan

Municipal Separate Storm Sewer System (MS4) Stormwater Permit Program Minimum Control Measure 1 Public Education and Outreach

Paraprofessional Training Session 1

CITY OF PUYALLUP 2018 STORMWATER MANAGEME NT PROGRAM PLAN (SWMPP)

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) STORMWATER MANAGEMENT PROGRAM

Implementation of. Storm Water Phase II

BMP PAGE. Review and Update Written Partnership Agreements

New Jersey Department of Environmental Protection Division of Water Quality Bureau of Nonpoint Pollution Control FACT SHEET

SNOW REMOVAL & DISPOSAL POLICY

2014 Whatcom County Stormwater Management Program

VILLAGE OF LAKE ZURICH Engineering Division NPDES PHASE II YEAR 2 ANNUAL REPORT FOR

Phase II MS4 Evaluations: Requirements and Results

Measure #6. MS4 Program. Minimum Control. 3 Required BMPs: Pollution Prevention & Good Housekeeping

Storm Water Run-off. Applicability. Background Storm water run-off from paved parking areas, Existing Federal and State Laws

MARCH 2015 TO FEBRUARY 2016 (YEAR 13) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS A. CHANGES TO BEST MANAGEMENT PRACTICES

The Stormwater Management Plan

FACT SHEET. Public Comment Period Expiration Date: To be determined Contact: Raymond Bahr

Transcription:

New Jersey Pollution Discharge Elimination System (NJPDES) Stormwater Pollution Prevention Planning (SP3) Workshop Presented by: The Environmental Joint Insurance Fund (E-JIF) and PMK Group 65 Jackson Drive Cranford, NJ 07016 (800) 879-6681 MUNICIPAL STORMWATER REGULATION PROGRAM (MSRP) STORMWATER POLLUTION PREVENTION PLANNING (SP3) N.J.A.C. 7:14A STORMWATER MANAGEMENT N.J.A.C. 7:8 What s the difference and What s the same 1

February 2, 2004 Effective Date of Rule Municipal Stormwater Regulation Program (N.J.A.C. 7:14A) Stormwater Management Plan (N.J.A.C. 7:8) Stormwater t Pollution Municipal i Stormwater t Prevention Plan Management Plan Addresses Non-Point Source Runoff from Municipal Operations Addresses Controls to Minimize Runoff and Non- Point Source Pollution from Existing Develop., New Develop. & Redevelop. Due Date 12 months from EDPA (March/April 2005) Must Retain Onsite for NJDEP Review Must Submit to County Review Agency MUNICIPAL STORMWATER REGULATION PROGRAM (MSRP) SP3 (Pollution Prevention Planning) Behavioral/Education and Source Reduction. Developed by NJDEP as a result of the USEPA s Phase II rules published in December 1999. Addresses non-point sources of pollution that enter our waters from run off into municipal separate stormwater sewer systems, or MS4s. Intended to improve surface water quality in order to achieve its designated use. 2

MUNICIPAL STORMWATER REGULATION PROGRAM (MSRP) Stormwater Management Goals - Civil/Mechanical processes of stormwater. Maintain groundwater recharge. Reduce flood damage. Minimize runoff and erosion from new development & redevelopment. Prevent increase of non-point source pollution. Ensures appropriate design, installation, and operation of stormwater facilities. Maintain integrity and functionality of stormwater facilities. Stormwater Pollution Prevention Plan SP3 Basic Sections Introduction Due April 1, 2005 Seventeen (17) Basic NJDEP Forms Checklists and Logs Source Material Inventory and Best Management Practices (BMPs) Standard Operating Procedures 3

Section 1 Stormwater Pollution Prevention Plan Team Members Program Coordinator Public Notice Coordinator Post-Construction Stormwater Management Coordinator Local Public Education Coordinator Ordinance Coordinator Public Works Coordinator Employee Training Coordinator Others Stormwater Pollution Prevention Plan Section 2 Public Notice How is the Municipality i going to give public notice, and encourage public involvement? Municipal Website Local Newspapers Must Comply with Open Public Meetings Act. N.J.S.A 40:49-1 et seq. for ordinance adoption. Municipal Land Use Law (N.J.S.A. 40:55D-1 et seq.) for Municipal Stormwater Management Plan adoption. 4

Section 3 New Development and Redevelopment STORMWATER MANAGEMENT! Effective February 2, 2004 for all residential projects Effective upon ordinance adoption for all non- residential projects Post-construction standards Residential lsit Site Improvement m tst Standards Stormwater Management Plan Planning/Zoning Section 4 Public Education Begin April 1, 2005 Conduct annual event Must describe when and what will be available. Document how and when the NJDEP provided educational material will be submitted to all residents/businesses. (see NJDEP handout REQUIRED Annually). Local School programs? Volunteer Groups? Website? 5

Section 5 Storm Drain Inlet Labeling Due by April 1, 2009 Within sixty (60) months (50% by 36 mos.) after effective date of permit (4/1/04). Describe 2 sectors and labels to be used: Stencils, Tags, Permanently stamped Who will perform labeling: DPW Volunteer assistance? Recommend annual check during basin clean-out. STORMWATER INLET LABELING (from www.earthwater-stencils.com) 6

STORMWATER INLET LABELING AND DESIGN STANDARDS (campbellfoundry.com) Section 6 MS4 Outfall Pipe Mapping Due April 1, 2009 Within sixty (60) months (50% by 36 mos.) after effective date of permit (4/1/04). / Describe sectors. How will Map be prepared? (type and scale). Who will be preparing? (consultant?, DPW?, etc.). Volunteer assistance? Who will establish alphanumeric identifiers to each outfall? Recommend performing dry weather flow and scouring inspections. 7

Section 7 Illicit Connection Elimination Program Begin October 1, 2005 Initial outfall inspections - (50% w/in 36 mos.; remaining by 60 mos.). Should include: Describe requirements detailed in Attachment A of the permit. Who will be conducting? When will inspections be conducted (i.e. Along with mapping and scouring inspections). Define the sectors. Identify a hotline for reporting of illicit connections. Describe how municipality will continue program (i.e. maintenance and complaints). Describe how municipality will address identified illicit connections. Section 8 Illicit Connection Recordkeeping Utilize NJDEP Illicit Connection Report Form. No dry weather flow - complete items 1 through 4, 7, certify, retain with SPPP. Intermittent dry weather flows - inspect 3X. If dry weather flow, complete form in full and perform field testing. Field testing for surfactants, ammonia, potassium, fluoride, and temp. required. Six (6) months to close out investigation. Close out form must be attached to appropriate Illicit Connection Report Form and submitted to NJDEP with Annual Report. All forms must be kept with SPPP. 8

Section 9 Yard Waste Ordinance/Collection Program Begin by October 1, 2005 Describe Yard Waste Collection Program Containerized vs. Non-Containerized Section 9 Yard Waste Ordinance/Collection Program Containerized Adopt and enforce an ordinance prohibiting the placement of non- containerized yard waste in the roadway. Non-Containerized Collect 1/month, Oct. thru Dec. and 1x in Spring. Adopt and enforce an ordinance prohibiting the placement of yard waste at curb 7 days prior to pickup and 10 feet from an inlet. 9

Section 10 Ordinances Develop and Implement by October 1, 2005 Describe adoption date and enforcement procedures: Pet Waste Litter Control Improper Disposal of Waste Wildlife Feeding Containerized Yard Waste/Collection Program Illicit Connection Section 11 Storm Drain Inlet Retrofitting Begin April 1, 2005 Inlet types (i.e. RSIS bicycle safe, curb opening < 2 ). Inlets in direct contact of repaving, repairing, reconstruction or alterations. Annual list of projects, no. inlets impacted, those with hydraulic exemptions. Exemptions: Projects started or awarded prior to March 3, 2004 Flood prone areas (requires PE Certification) Historic places Alternative device (netting facility, trash rack, etc.) Existing Inlets with curb opening no larger than 9 square inches 10

Section 12 Street Sweeping/Road Erosion Control Maintenance (Tier A) April 1, 2005 Minimum Standard Sweep Once Per Month Municipal curbed roads with inlets; Posted speed limit of 35 mph or less; In predominantly commercial areas; and Weather and street surface conditions permitting. Measurable Goal Certify annually. Maintain records of dates and areas swept. Number of miles of streets swept and the total amount of materials collected. SPPP Plan should describe roads that meet definition. Log should be developed for documenting completion. Plan should also include how roadside erosion will be identified, documented and addressed. (Begin by October 1, 2005). Section 13 Stormwater Facility Maintenance Begin by April 1, 2005 Annual Catch Basin Cleaning Program: Describe inspection and method of cleaning. Describe who will be conducting and include evidence of written agreements with any outside agencies/contractors. Stormwater Facility Maintenance Program: These include catch basins, detention basins, filter strips, riparian buffers, infiltration trenches, sand filters, constructed wetlands, wet basins, bioretention systems, low flow bypasses, and stormwater conveyances (i.e. anything that conveys stormwater). Describe type of facilities owned/operated and maintenance procedures Keep logs of all maintenance and repairs. Refer to NJDEP Stormwater Management Facilities Maintenance Manual, dated June 1989 for guidance. 11

Section 14 Outfall pipe Stream Scouring Remediation Begin by October 1, 2005 Develop and implement a stormwater outfall pipe scouring detection, remediation i and maintenance program. Must identify and control localized stream and stream bank scouring in the vicinity of outfall pipes operated by the municipality. These areas shall then be prioritized and repairs shall be scheduled and completed. Plan must include a list of the locations of outfall scouring identified, the dates control measures are to begin, and the dates any control measures were completed. Section 15 De-Icing Material Storage Permanent Structure by April 1, 2007 Permanent structure with impermeable floor required by April 1, 2007. Seasonal Tarping (October 15 thru April 30) required by April 1, 2005 and acceptable until April 1, 2007. Sand may be stored outside and uncovered if a 50-foot setback is maintained from storm sewer inlets, ditches or other stormwater conveyance channels, and surface water bodies. Plan must document procedures for compliance and inspection schedules to ensure compliance. 12

Section 16 Standard Operating Procedures Fueling Operations SOP Required for vehicle fueling and delivery of bulk fuels. Vehicle Maintenance SOP For vehicle maintenance and repair that occur at municipal maintenance yard. Good Housekeeping SOP For all materials or machinery listed in the Inventory Requirements for Municipal Maintenance Yard Operations in accordance with Attachment D (including primary and secondary maintenance locations). Section 17 Employee Training Begin April 1, 2005 Tier A Municipalities shall develop and conduct an annual employee training program for appropriate employees on appropriate topics: i. Waste Disposal Education ii. Municipal Ordinances iii. Yard Waste Collection Program (if applicable) iv. Illicit Connection Elimination and Outfall Pipe Mapping v. Street Sweeping vi. Stormwater Facility Maintenance vii. Road Erosion Control and Outfall Pipe Stream Scouring Remediation viii. Maintenance Yard Operations (including Ancillary Operations) ix. Construction Activity / Post-Construction Stormwater Management in New Development and Redevelopment Plan must include person, trained, topic(s), and date of training 13

GOOD HOUSEKEEPING PRACTICES Within 12 months from the EDPA, permittees must comply with the minimum standards of the good housekeeping practices detailed in the permit. CONTAINER MANAGEMENT Inspect containers regularly and maintain in good condition. Dispose of containers regularly. Seasonal changes can cause bulging which can result in costly over packing and cleanups. 14

CONTAINER MANAGEMENT Store inside (when practical) on spill platforms and away from floor drains. Outdoor storage must also be covered. OTHER SOURCE MATERIAL TO CONSIDER Used car batteries, tires, equipment and vehicle parts should be covered from precipitation pending proper disposal. Road waste generated from street sweeping should be stored in a covered container on impervious surface. 15

Source Material BMP Street Sweeping Storage Right! Wrong Source Material Goal is to achieve no-exposure 16

OTHER SOURCE MATERIAL TO CONSIDER The General Stormwater Permit applies to all ancillary operations which h include, but are not limited to: Fire, police and other emergency departments. Recycling Centers. Parks and recreation departments. WASTE DISPOSAL The Drain is Just for Rain Interior floor drain systems shall not discharge to groundwater, surface water or stormwater without a valid separate NJPDES permit (minimal exceptions) regardless of pretreatment. Permit does not authorize the discharge of any waste or pollutant into the MS4. Illicit connections must be corrected within 6 months of identification. 17

Annual Report Due on or before May 2, 2005 and every 12 months thereafter. Specifically addresses each permit requirement and requires the municipality to certify compliance or non-compliance. Must be maintained for a minimum of 5 years. NJDEP proposes to perform annual inspections to review SPPP and verify compliance. ADDITIONAL INFORMATION OR QUESTIONS Visit i NJDEP division i i of water quality at: http://www.state.nj.us/dep/dwq/municstw.html and www.njstormwater.org Or contact the NJDEP Bureau of Nonpoint Pollution Control at (609) 633-7021. 18