BOND CONSTRUCTION UPDATE March 31, 2015 PROJECTS: 1. CIBOLO VALLEY ELEMENTARY SCHOOL BOND 2013 2. STEELE HIGH SCHOOL ADDITIONS & RENOVATIONS BOND 2013 3. DOBIE MIDDLE SCHOOL ADDITIONS & RENOVATIONS BOND 2013
CIBOLO VALLEY ELEMENTARY UPDATE SCUCISD BOND 2013 $ 34,000,000 Bond Allocation 900-1,200 Student Capacity 153,000 Square Feet Architects - O Neil Conrad Oppelt Architects Inc. & Pfluger & Associates General Contractor Bartlett Cocke Construction Management AG CM, Inc. March 31, 2015
CIBOLO VALLEY ELEMENTARY (GREEN VALLEY ROAD NEAR FM 1103 SITE) ES #8 CURRENT STATUS Brick installation ongoing on Pre-K/K grade wings and misc. interior areas Exterior CMU 99% complete; Interior CMU ongoing in restrooms, Pre-K/K MEP rough-ins continue in Pre-K/K HVAC Ductwork installation continues in Pre-K/K Window installation continues, 90% complete exterior Interior drywall continues throughout the building Interior painting continues in Areas A through D Floor tile installed in kitchen, and grouted Kitchen equipment installation ongoing Gymnasium equipment, pads, fans and lighting installed Boilers started up Ceiling Grid installation ongoing Irrigation installation started Millwork being delivered Elevator installation ongoing March/April Brick Veneer to continue on G Window and Storefront installation to complete Ceiling Grid installation continue Start up Chillers Irrigation and Landscape to continue Discovery Zone utilities, and flatwork Building E Discovery Zone structure to begin Restroom tile continue Plumbing Fixture installation to begin
CIBOLO VALLEY ELEMENTARY Perspective Views
CIBOLO VALLEY ELEMENTARY 03-17-15 Front of School
CIBOLO VALLEY ELEMENTARY 03-17-2015 East Elevation (1103)
CIBOLO VALLEY ELEMENTARY 03-17-2015 2 nd Grade Wing
CIBOLO VALLEY ELEMENTARY 03-17-2015 Gymnasium
CIBOLO VALLEY ELEMENTARY 03-17-2015 Alley Between 1st/3rd Grade Wing & Pre-K/Kinder Wing 03-17-2015 Discovery Zone Alley
CIBOLO VALLEY ELEMENTARY CIBOLO VALLEY ES #8 SCHEDULE May 2015 ----------- Substantial Completion June 2015 --------- SCUC Begins Moving In To Building August 2015 ---------- Project Complete
STEELE HIGH SCHOOL UPDATE SCUCISD BOND 2013 $ 25,000,000 Bond Allocation Three Story Academic Wing Addition 84,922 ft 2 Field House Addition 17,299 ft 2 Cafeteria Addition & Athletic Locker Room Renovation Architects - O Neil Conrad Oppelt Architects Inc. & Pfluger & Associates General Contractor Bartlett Cocke Construction Management AG CM, Inc. March 31, 2015
Steele High School Steele CURRENT STATUS Field House Exterior Brick Veneer nearly complete Field House interior walls being closed up Framing up walls and roughing-in MEP s at the Lower Level of the Academic Wing Academic Middle level Walls Framed Up and starting MEP Rough-Ins Academic Upper level Decking near complete Completed MEP Tie-Ins over the Spring Break Adding New Condenser Water Piping Between Cooling Towers and Chillers Cafeteria Brick veneer starting up April Continue MEP installation at Field House Academic Building will continue MEP Installation Start installing roof at the Academic building Waterproofing and brick veneer starting at Academic Wing Glass being installed at Field House, Cafeteria, and Academic Wing
Steele High School Academic Wing Academic Wing Rendering
Steele High School Academic Wing 03-16-2015 Academic Wing Decking Being Placed
Steele High School Academic Wing 03-30-2015 Academic Wing Mall Space
Steele High School Academic Wing 03-16-2015 Academic Wing Typical Science Classroom Framed Up
Steele High School Academic Wing 03-30-2015 Academic Wing Top Floor framing and rough ins starting up
Steele High School Field House Field House Rendering
Steele High School Field House 03-30-2015 Field House Exterior Brick Veneer Near Completion
Steele High School Field House 023-30-2015 Field House Locker Room Showers and Restrooms tiled and duct installed
Steele High School Cafeteria Expansion 03-16-2015 Cafeteria Expansion Duct and ceiling forms in place
Steele High School Schedule for Project: August 2014 ------ General Contractor Selected September 2014 ------ General Contractor begins Construction Substantial Completion Dates Academic Building Addition (Nov 2015) New Field House Building (July 2015) Renovation of Existing ROTC into Welding Shop (Feb 2016) Cafeteria Addition (June 2015) Changed from Nov 2015 Main Entry Renovations (Aug 2015) Renovation of PE Locker Rooms (Aug 2015) Feb. 2016 ----- Project Completion
DOBIE JUNIOR HIGH SCHOOL UPDATE SCUCISD BOND 2013 $ 10,000,000 Bond Allocation Proposed Site Improvements to Include New Drop-off Zone Proposed 8 New Classrooms / 1 New Science Lab Proposed New Kitchen Serving Lines Architect Marmon Mok General Contractor Krueger Construction Construction Management AG CM, Inc. March 31, 2015
Dobie JH School Renovations & Additions Dobie New Front Entry Rendering (View from Dietz Rd.)
Dobie JH School Renovations & Additions Dobie New Front Entry Rendering (View From Borgfeld Rd.)
Dobie JH School Renovations & Additions Schedule for Renovations & Additions February 2015 -------- General Contractor Selected March 2015 ----------- Construction Begins Substantial Completion Dates April 2015 ----------- Phase 1 May 2016 ------------ Phase 2 August 2016 --------- Phase 3 August 2016 ----------- Project Completion