SHAPING THE NATURAL GAS MARKET OF CYPRUS

Similar documents
SHAPING THE NATURAL GAS MARKET OF CYPRUS. Dr. Symeon Kassianides Chairman Natural Gas Public Company

CYPRUS LNG IMPORT PROJECT AND NG MARKET FORMATION

DRIVING THE ENERGY AGENDA. The Economist

CEF Action n 2016-EU-SA-0009 "CYnergy"

Floating Regasification The Aegean LNG terminal

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

member of the TSAKOS GROUP of companies

26 JUNE 2012 UNIVERSITY OF CYPRUS, NICOSIA

REPUBLIC OF KENYA MINISTRY OF ENERGY AND PETROLEUM KENYA PETROLEUM TECHNICAL ASSISTANCE PROJECT (KEPTAP) PROJECT MANAGEMENT UNIT (PMU)

2016 CEF Synergy Call Actions selected for funding SYNERGY

The Eastern Mediterranean and European Energy Landscape: Trends and Opportunities

PROJECTS OF COMMON INTEREST (PCIs)

Ministry of Energy and Water Government of Lebanon

Eastern Mediterranean Natural Gas Developments the Challenges Ahead

LNG Import Facility Infrastructure Options

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

ENERGY: OIL AND NATURAL GAS

Environmental and Social Impact Assessment [ESIA] for Proposed Liquefied Natural Gas (LNG) Project at Tema in the Greater Accra Region of Ghana

Capabilities in LNG

Discover a proven way! Arturas Drungilas. Marketing and Corporate Affairs Director

Questions on the LNG Rulebook published by LNG Croatia on January 17, 2018.

ACTIVITY 7 DISSEMINATION & PUBLIC AWARENESS

Onshore terminal plants

Background Information Document

Energy East Pipeline. Project Overview. Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014

Lars Odeskaug - TORP CEO

Motorways of the Sea Forum. Brussels, 16 th of June 2017

LNG TERMINAL IN ŚWINOUJŚCIE AS A LNG GATE TO THE BALTIC SEA

Presentation to Global Offshore 2012

LNG R E F E R E N C E P R O J E C T S. Phone: +49(0) GOC Engineering GmbH Bachovenstr. 8; Sinzig, Germany

We deliver gas infrastructure

Click to edit Master title style

The Energy Service of the Ministry of Commerce, Industry and Tourism has the overall responsibility of Energy in Cyprus and specifically for:

Amended Background Information Document

ACCELERATION OF SMALL SCALE LNG SUPPLY CHAIN INFRASTRUCTURE FOR CENTRAL AND EAST REGION OF INDONESIA

FUGRO GROUP LNG FIELD DEVELOPMENT AND FACILITIES. TACKLING your complex challenges. UNDERSTANDING your operational objectives

Background Information Document

OLT Offshore LNG Toscana Alessandro Fino CEO

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

Liquefied Natural Gas Terminals Services and solutions


EUROPEAN ENERGY MARKET:

Introduction to the Expanded South Corridor Concept

PERP Program LNG Receiving Terminals New Report Alert

LNG IMPORT OPTIONS STUDY REPORT

2014/94/EU Directive & Port infrastructure: The Poseidon Med II, elemed & CYnergy experience

Development of HK Electric Gas Receiving Facilities at

WÄRTSILÄ MOBILE LNG: EASILY THE BEST

The changing landscape of gas pipelines in SE Europe & the

Trelleborg Marine Systems A Comprehensive Approach to FLNG Docking & Mooring Systems

Global LNG Dynamics and South East Mediterranean Hydrocarbons Potential

SGC Gas Regional Group meeting. Preparation of the third Union list of PCIs Presentation of and discussion on the PCI candidates

Gas Infrastructure Development:

RULES FOR CARRYING OUT THE BINDING PHASE OF THE OPEN SEASON PROCEDURE

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

Liquefied Natural Gas to Power IPP Procurement Programme

Jordan LNG Project. Presented By: Eng. Ahmad Zubi / NEPCO

Opportunities for Pan GCC Natural Gas Grid

Appendix A: Project Characteristics

LNG as fuel. OTMW-Module 5 Monday 23 rd of November 2015 University of Piraeus. Working together for a safer world

A 260MW disruption in the energy industry of Cyprus How to reduce your bill George Chrysochos, CEO, Cyfield Group

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options

COMPLETING THE LNG VALUE CHAIN

LNG market developments. 12 th of February 2015 Jonathan Raes development EXMAR LNG Infrastructure

Liquefied Natural Gas to Power IPP Procurement Programme

SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines

Introduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs

The case of Poseidon Med, LNG Bunkering Challenges at Port

Leviathan Development And Tamar Expansion Rowing Forward In Parallel Tracks. April 2016

Thomas SCHLEKER, PhD. Global Leadership in Renewables

Gas Infrastructure Development in CEE: building basis for a major shift in energy-mix

The role of Greece as a supply route to Europe: An emphasis to SEE market s quest for security and competitiveness

Conditions for accelerating the deployment of offshore wind power in the BSR - Seminar 27 April 2012, Wind Power in the Nordic and Baltic Region

LNG Terminal in Świnoujście. Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus

Future sustainable EU energy systems and the case of Cyprus

Innovations for the Global LNG Industry Bringing Continents of Energy Together Marine Technology Society March 22, 2007

KOGAS s Technical Capability and Plan on Off-shore Plant Business

Citation for the original published paper (version of record):

DR. CHARLES ELLINAS Executive President. Frederick University, 19 September 2013

CHAPTER 3: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT

Nearshore Regasification Terminals and FSRUs

THE FUTURE OF NATURAL GAS SECTOR OF THE REPUBLIC OF CROATIA. Vladimir Đurović

Floating storage and regasification barges

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL

4 th Annual LNG Transport, Handling and Storage Conference May By Akkapon Pinkaew NGV Business and Product Development Manager

Outcome of the October 2014 European Council

PETRONET LNG LIMITED, INDIA Current Activities : Agenda No. 5

LNG Houston, February 6-7 th, The case for developing a Floating LNG Receiving Terminal on the US East Coast

West Coast -- Cabrillo Port: Cracking the California Code

BUSINESS PLAN CEN/TC 282 INSTALLATION AND EQUIPMENT FOR LNG EXECUTIVE SUMMARY

State of Play of Gas Interconnection Poland Lithuania (GIPL)

Workshop on photovoltaics, grid Integration and funding of the next wave of PV expansion in Cyprus, 13 December 2016.

DEVELOPMENT OF A REGIONAL GAS MARKET IN THE BALTIC AND CEE REGIONS

Development in the East Med from VTTI

Development of Efficient, Environmentally Friendly and Flexible Shipboard Regasification Vessel

Adriatic LNG Terminal (ALT) Roger D. Leick ALT Topsides Manager

Stewardship. Expectations. SE-01 Joint Venture Hub Strategy Implementation Guide

PCI candidates presentations; project by project. SGC Regional Group 24 th of February 2015

Capability Statement Gas and liquid bulk terminals Delta Marine Consultants

Transcription:

NATURAL GAS PUBLIC COMPANY (DEFA) SHAPING THE NATURAL GAS MARKET OF CYPRUS Dr. Symeon Kassianides Chairman Natural Gas Public Company New York 11/29/2017

SHAPING THE NATURAL GAS MARKET OF CYPRUS 1. Current Status 2. Gas Imports Previous Attempts/Processes 3. Latest Developments 1. LNG Supply Options Study 2. CEF Synergy CYnergy Project 3. New LNG Project (LNG Procurement and Infrastructure Development) 4. NG Pipeline Network 4. Way Forward 2

1. CURRENT STATUS Cyprus has an energy isolated market (no interconnected capacity) High Dependency on Liquid Fuels (Power Gen) 3 Main Conventional Power Stations Owned by EAC, Total 1478MW Dual fuel (LF & NG) generation capacity 830MW at VPS Increasing Renewable Penetration (Solar, Wind) NG Market Regulation under CERA Cyprus Law - Harmonised with EU Directive 2009/73/EC Derogations may apply due to Isolation & Emergent Market Possible monopolistic operation for early years 3

2. GAS IMPORTS PREVIOUS ATTEMPTS / PROCESSES 3 Previous Attempts The first was for a Long Term LNG Supply & On-Shore Regas Terminal Following Leviathan And Aphrodite Discoveries, 2 additional Interim Gas Supply Processes for the period up to indigenous gas arrival The unsuccessful conclusion reasons of the processes were analysed, indicating the main issues that must be dealt with for the future Duration Quantities High Demand in Flexibility Prevailing market conditions at the time 4

3.1. DEFA s LNG Supply Options Study Target: NG supply by 2020, due to environmental constraints relating to emission limits DEFA analysed and compared all options for LNG Supply Optimum way forward (accounting for cost, time, flexibility) is through floating storage and regas facilities 5

3.2. CEF Synergy CYnergy Project Holistic Approach for NG Market development and penetration of use of NG to Energy and Transport sectors Total Proposal Cost 7,5m CEF EU Co-financing 4,5m (60%) Implementation of CYnergy proposal is aligned with NG supply target date by 2020 All CYnergy resources have been mobilised and successfully submitted a CEF Energy Proposal for Infrastructure Development of the PCI CyprusGas2EU and the timely completion of the project 6

3.3. New LNG Project (LNG Procurement and Infrastructure Development) 2 Separate processes LNG Procurement, Public Tender to be announced by Q1 2018 Infrastructure Development, Public Tender to be announced by Q1-Q2 2018 LNG Project infrastructure requirements have been included in the new CEF Energy Call proposal submission by MECIT, MTCW, DEFA, CPA aiming to secure a grant for the PCI CyprusGas2EU 7

3.3. New LNG Project - Infrastructure Requirements Marine Works: Jetty for FSRU berthing and LNG transfer activities and an emergency shelter for the FSRU Floating Storage and Regasification Unit (FSRU) Gas export system and Loading Arm (inclusive of; meters, Gas compressors, filters, heaters, venting system, quick connection, export arm pipelines), permanently berthed in Vassilikos bay Jetty borne Gas Pipeline (inclusive of; gas pipelines, valves) connecting the FSRU to the receiving point onshore Onshore Gas Pipeline (inclusive of; pipeline, inline valves, cathodic protection systems, civil works), connecting the receiving point onshore to the downstream delivery point Pipeline Storage Array (inclusive of; inlet and outlet manifolds, inline valves, protection systems, civil works), able to store Natural Gas in gaseous form in the required operational pressure ranges adjacent to Vassilikos power station Onshore Above Ground Installation (AGI) Metering Station 8

3.3. New LNG Project Project Layout 9

3.3. New LNG Project Preliminary Cost Estimate Consultation with all Cypriot Operating Financial Institutions 10 LoIs have been received Total (in EUR) FSRU & Metering Station 150.664.052 Offshore Pipeline 11.589.542 Local Buffer & Onshore Pipeline 11.589.542 Jetty/Tresle Structure 54.199.346 Breasting & Mooring Dolphins 16.209.150 Loading/Unloading Platforms 16.715.686 GoC Decision for Electricity Authority of Cyprus (EAC) participation in the infrastructure SPV, up to 30% EAC provided a LoI Breakwater Extension 41.839.869 Jetty Structure for the Emergency Shelter 1.013.072 Shelter Breasting & Mooring Dolphins 6.179.739 Dredging 20.000.000 Leeside Breakwater 10.000.000 Total Investment Cost 340.000.000 10

3.4. NG Pipeline Network DEFA appointed GNFe for Engineering Consultancy Services for the NG Pipeline Network Development in 2010 Feasibility Study completed in 2012 Revised in 2016-2017 11

3.4. NG Pipeline Network Various Studies are included in the Feasibility Study Gas Demand Route Selection Network Sizing Preliminary EIA & Risk Assessment Economic & Financial Analysis 12

3.4. NG Pipeline Network Phase A Power Gen Route Selection 13

4. WAY FORWARD LNG Procurement, Public Tender to be announced by Q1 2018 Infrastructure Development, Public Tender to be announced by Q1-Q2 2018 Open Season Process in early 2018, for the determination of demand by all users, committed quantities of NG and spatial allocation users FEED for the Pipeline Network (following completion of Open Season and generation expansion plan study of EAC) 16

Thank You! Dr. Symeon Kassianides Chairman, Natural Gas Public Company Tel: +357 22761761 Email: info@defa.com.cy 17