The Technical & Practical challenges of FLNG

Similar documents
RISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS. Braemar Engineering

Introduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs

Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)

Scalable FLNG for Moderate Metocean Environments. R M Shivers LoneStar FLNG

ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Mid to Large Scale Floating LNG Plant -Technology Development and JGC Contribution

FLNG from front-end studies up to smooth execution. Dominique GADELLE Vice President Upstream / LNG Technip France Paris, March 11 th, 2015

MEETING THE EXECUTION CHALLENGES OF SHELL PRELUDE FLNG

Floating LNG Business A breakthrough in offshore gas monetization

Processing LNG Offshore: Maximizing Reliability, Performance & Safety. By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016

SHELL FLNG TECHNOLOGICAL BREAKTHROUGH AND INNOVATIVE APPLICATION OF EXISTING TECHNOLOGIES

THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND

The Low Motion Floater (LMF)

PROCEDURE. GTT (GAZ TRANSPORT & TECHNIGAZ) Mk III, Mk V & NO96 MEMBRANE CONTAINMENT SYSTEMS GENERAL APPROVAL AND SUPPLY OF MATERIALS AND COMPONENTS

When bigger is better Prelude FLNG, the world s biggest floating structure

Floating offshore gas units

ECONOMIC COMPARISON BETWEEN OIL AND LNG FOR DECISION MAKING TO EVALUATE WHICH PRODUCT TO DEVELOP FROM A DEEPWATER WEST AFRICA FIELD

Floating LNG: Origins and Future Impact on the LNG Industry

ShipRight Notice for. Linked Supporting Services Anti-Corrosion System Notation, July Issue date: September 2014

Benefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

Technical Innovation for Floating LNG. Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA

Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions

Marine Facilities for LNG Carrier Transfer Alternatives

Why LNG? LNG is mainly produced for transportation purposes. More economical to transport gas as LNG compared to pipelines over long distances

OTC FLNG Projects Economics Improvement Based on Reliability Assessment

Swivel and Marine Systems. Swivel stack and fluid transfer systems for multiple applications

COMMERCIAL AND TECHNICAL CONSIDERATIONS IN THE DEVELOPMENTS OF OFFSHORE LIQUEFACTION PLANT

FLNG Safe Tandem Offloading of LNG in Severe Offshore Environments

TRAINING CATALOGUE. Academy Korea SAFER, SMARTER, GREENER

Operating within offshore and onshore OIL AND GAS MARKETS AROUND THE WORLD, ASCO provides a broad range of services tailored to the needs of our

A Leader In Maritime Technology

FLNG A Nice Niche? Martin Wilkes

Lecture 10 LNG Shipping

The Role of Gas in Energy Transition

ShipRight Design and Construction

Handling and Transportation of LNG

Membrane CCS for LPG Carrier

TRAINING CATALOGUE. Academy Korea SAFER, SMARTER, GREENER

CERTIFICATE OF FIRE APPROVAL

Upstream & Downstream

Aryatech Marine & Offshore Services Pvt. Ltd. Aryatech Engineering Consultants FZE

Design Theories of Ship and Offshore Plant

FLOATING LNG OVERVIEW

General presentation May 2016

SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines

This document is a preview generated by EVS

Floating LNG. Solutions. Floating LNG solutions Catalogue TRELLEBORG FLUID HANDLING SOLUTIONS

EC TYPE EXAMINATION (MODULE B) CERTIFICATE

Sevan Marine ASA Floating LNG FPSO -how to put the gas into exportable parcels. Carnegie ASA Shippingklubben, Oslo January 28, 2008

American Institute of Marine Underwriters

LNG as a marine bunker fuel

The Tassie Shoal Methanol and LNG Projects - Monetising stranded Timor Sea gas

LNG Systems for Marine Application. LNG Reliquefaction & LNG Regasification. Oil & Gas Systems

The World First Ever Very Large Ethane Carrier (VLEC)

Multiple screw pumps on FPSO vessels

Six Keys to Floating Projects Success

WE RE HERE FOR THE LONG HAUL.

ANNUAL MEETING MASTER OF PETROLEUM ENGINEERING. 3/May/2016 Instituto Superior Técnico 1

Corrigenda 1. Rule Editorials

Integrated Utilization of Offshore Oilfield Associated Gas

LNG FPSO : TURBOEXPANDER PROCESS ECONOMICS MONETIZING THE GAS PROBLEM ABSTRACT

Floating LNG: The Challenges of production systems and well fluids management By: Frederic MOLLARD, TECHNIP France 04/19/2013

LR SOFTWARE CONFORMITY ASSESSMENT SYSTEM. Assessment Module GENPMS Software Products for Planned Maintenance Schemes

FLNG Economics and Market Potential

FLNG Still a Nice Niche? Martin Wilkes

Liquefied Natural Gas Terminals Services and solutions

Offering solutions 2 value

Materials and Qualification Procedures for Ships

Research of design challenges and new technologies for floating LNG

Research of design challenges and new technologies for floating LNG

North American LNG 2006

INPEX Ichthys LNG Project

Contents. 1 Overview of Ship-Shaped Offshore Installations Front-End Engineering Preface Acknowledgments How to Use This Book.

Excelerate Energy: Efficient And Cost-Effective Solutions for the Global Gas Market

Classification of the Largest Ever Floating Storage Regasification Unit

PLUTO OFFSHORE FACILITY OPERATIONS

Lean Semi A Low Cost Solution for Marginal Fields

LIGHTWEIGHT SERVICE CRANE WORLDWIDE HEAVY TRANSPORTATION AND LIFTING

Early Production in Deep Waters. Mats Rosengren, Frontier Drilling do Brasil Vitoria, Brazil

YOUR PARTNER IN CUSTOMISED OFFSHORE VESSELS

EC TYPE EXAMINATION (MODULE B) CERTIFICATE

Stepping Stones to FLNG The Tassie Shoal Project Australasian FLNG/FPSO Forum Perth, September 2009

Floating LNG What are the key business development risks and mitigation strategies in a FLNG project?

Application for a recommendation on the use of membrane tanks for transport of liquefied natural gas on the tank vessel Argos-GL

ZR-LNG TM Dual Expander Methane Cycle Liquefaction Technology Applied to FLNG

INVENTIVE SOLUTIONS for an Evolving Industry

TECHNICAL AND OPERATIONAL INNOVATION FOR ONSHORE AND FLOATING LNG

DOCKWISE VANGUARD New generation of Heavy Marine Transport NOIA Fall Meeting October 20, 2012

Right Additional Design Procedures

SAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22

About Cortland in Australia

Marine Transportation of LNG. Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development

Mapping of ISO standards on LNG

IACS Rec s and Panel Responsible

Enhance Oil, Chemicals, LPG and LNG transfer and production. using innovative and field proven Trelleborg bonded hose solutions

EC TYPE EXAMINATION (MODULE B) CERTIFICATE

Adriatic LNG Terminal (ALT) Roger D. Leick ALT Topsides Manager

IMO future plans for regulation

A smart LNG Offloading to Conventional LNG Carriers in Severe Open Sea Environments

Transcription:

SUT Evening Technical Meeting: On the Fringes of FLNG, Perth 19/08/2015 Jeff Baker Energy Compliance Technical Manager, Australasia Working together for a safer world

Agenda Introduction Acknowledgement to Shell Australia Lloyd s Register and FLNG FLNG Challenges Lloyd s Register and variants of it are trading names of Lloyd s Register Group Limited, its subsidiaries and affiliates. Lloyd's Register International (Reg. No. 6676406) is a Company Limited by Guarantee registered in England and Wales. A Charity (Reg. No. 1151987) registered in England and Wales by the Charity Commission. Registered Office: 71 Fenchurch Street, London, ECM3M 4BS, UK. A member of the Lloyd s Register group. Lloyd's Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd's Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract

Lloyds Register s role in FLNG Prelude - world s first Floating LNG Project. FEED design review at generic & project specific concept stage, Verification, Certification, Classification and Validation services. FLNG Rules annually reviewed - latest revision July 2015. Supporting publications including: Surveys by ROV, Risk based inspection for hull structures, Risk based analysis for cryogenics spills, Fire loading and protection, Calculation of probabilistic explosion loads, Technology Qualification. Image courtesy of Shell Australia

FLNG Overview Access stranded gas, using: Floating offshore or near shore structure permanently moored Subsea wells, via flowlines and risers (or other incoming supply) Fractionation and cleaning modules Liquefaction (refrigeration) Storage LNG, LPGs and condensate (oil) Offloading - tandem or side by side Image courtesy of Shell Australia

The Challenge Combine new technologies, codes, standards and practice from three industries. Marine LNGCs Floating Offshore Installations Land based liquefaction Complex supply chain Significant new IP Harsh environment

FLNG Design Issues New concept => risks associated with: Process (restricted footprint versus land plant) Vessel motions - effect on process plant Process plant reliability (limited line pack available) Storage of large quantities of process chemicals Potential production and storage of multiple liquid and gas types Managing Cryogenic fluids in proximity to large, critical hull structures

FLNG Design Issues Sloshing (dynamic loading of LNG CCS through filling range) Vessel strength and fatigue at fixed offshore location for (long) on station design life in harsh environments (e.g. Cyclone areas) Cooling water demands uptake and discharge Very high Topsides hull turret loads Ballast tank hydrostatic head design issues Stationkeeping for offloading (tandem or side by side?) High mooring interface loads between FLNG and LNGC Very HV Power Generation and control - voltages beyond normal floating offshore and marine practice Fire and Blast challenges Dynamic Offloading Systems Regulatory issues

Challenges of Scale Image courtesy of Shell Australia Largest floating offshore facility in the world Production from 2 MTPA to in excess of 6 MTPA Deck size more than 4 football fields Hull/substructure: Deck area equivalent of four typical FPSOs Volume equivalent of eight typical FPSOs Topsides facilities four to five tiered modules over the same deck area + accommodation block and turret Operating weight is six times largest aircraft carrier One quarter size of onshore equivalent plant Equipment stacked vertically for space optimisation Cargo liquids containment capacity of 175 olympic size swimming pools All operating permanently offshore in depths of water from 100 to over 1000 metres

Size and scale versus current practice LNGC 50 m x 30 m LNGC 330 m

Loads due to offshore outfitting Turret bearings Crane pedestals Lifeboat platforms Helideck Topside plant Flare stack

Topsides Layout and Loads Oil FPSO topsides up to 40,000 tonnes? FLNG topsides up to 90,000 tonnes? FPSO Module total typically 4,500t max, static reaction loads up to 1,250t, dynamic 2000t FLNG Liquefaction modules total 25,000 to 30,000t, dynamic reaction loads up to 4,000t

Comparison of marine containment systems Membrane No cool-down rate limit Good visibility from bridge Space efficient Flat deck area is potentially beneficial for FLNG Design company available for inservice advice Complex - Integrity of containment system depends on quality from many sub-contractors Potentially vulnerable to partial fillings - sloshing damage Moss Less chance of damage by mis-operation Primary barrier fully gas-tight Visible secondary barrier No barred fill ranges Easier access for repair Expensive build facilities at shipyard Domed tanks give poor deck area for FLNG and bridge visibility issues SPB Same as Moss, but: Good visibility from bridge Flat deck area is potentially beneficial for FLNG Prefabricated, possibly offsite More space efficient than Moss In-service experience limited

Marine LNG Containment Systems suitable for FLNGs Membrane Systems Independent Tanks Source: IHIMU Prismatic (SPB) Stainless steel Aluminium alloy (Also used for LPGs) GTT Mark III GTT NO96

Offloading Systems LNG LPG Side by side Tandem Overthe-stern Remote As LNG Condensate Hose reels Floating hoses over- the-stern

Safety aspects - Cryogenics Trading gas carriers - Only manifold section needs to be considered: Used periodically with loading arms connected and disconnected in benign conditions FLNG more complex - LNG rundown into storage tanks and liquefaction processes in constant use and at cryogenic temperatures

ANY QUESTIONS? Jeff Baker, Energy Compliance Technical Manager, Australasia 1st Floor, 503 Murray Street, Perth WA 6000 T +61 8 9318 7300 E Jeff.baker@lr.org Working together for a safer world Lloyd s Register and variants of it are trading names of Lloyd s Register Group Limited, its subsidiaries and affiliates. Copyright Lloyd s Register [Entity]. 2013. A member of the Lloyd s Register group.